ML17272A039

From kanterella
Jump to navigation Jump to search
Purdue University Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request for Management Chain Change
ML17272A039
Person / Time
Site: Purdue University
Issue date: 10/03/2017
From: Cindy Montgomery
NRC/NRR/DPR/PRLB
To: Townsend C
Purdue University Research Reactor
Montgomery C, NRR/DLP, 415-3398
Shared Package
ML17272A039 List:
References
Download: ML17272A039 (4)


Text

October 3, 2017 Clive Townsend, Reactor Supervisor Purdue University School of Nuclear Engineering 400 Central Drive West Lafayette, IN 47907

SUBJECT:

PURDUE UNIVERSITY - SUPPLEMENTAL INFORMATION NEEDED FOR ACCEPTANCE OF REQUESTED LICENSING ACTION RE: LICENSE AMENDMENT REQUEST FOR MANAGEMENT CHAIN CHANGE

Dear Mr. Townsend:

By letter dated August 28, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17241A031) Purdue University submitted a license amendment request (LAR) for the Purdue University Research Reactor. The proposed LAR would appoint the Head of the School of Nuclear Engineering as the Level 1 designee, and make changes in the relevant technical specifications (TSs). The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the facility.

Consistent with Section 50.90, Application for amendment of license, construction permit, or early site permit, of Title 10 of the Code of Federal Regulations (10 CFR), whenever a holder of a license, desires to amend the license, an application for an amendment must be filed with the Commission, as specified in 10 CFR 50.4, Written communications, fully describing the changes desired, and following as far as applicable, the form prescribed for original applications. Section 50.34, Contents of applications; technical information, addresses the content of technical information required. Section 50.34(b)(6)(i) stipulates that the application shall include the applicants organization structure, allocations or responsibilities and authorities, and personnel qualifications requirements. The NRC staff has reviewed your submittal and has concluded that to find your LAR acceptable, the following supplemental information is needed:

1. Provide an explanation on how the position requirements for the Head of the School of Nuclear Engineering ensure that the individual in that position will consistently meet the requirements for the Level 1 designee.
a. Specifically identify if the Head of the School of Nuclear Engineering will have the same responsibilities as the current Level 1 designee, to safeguard the public

C. Townsend and facility personnel from undue radiation exposures and for adhering to all requirements of the operating license and TSs.

b. Specifically identify if the Head of the School of Nuclear Engineering will have the same level of authority as the current Level 1 designee, to commit university resources and take any necessary actions, including personnel actions, in order to maintain the safety and security of the public, personnel, and the facility.
c. Specifically identify how the Level 1 designee is the individual responsible for the reactor facilitys license or charter, e.g., the unit or organizational head, according to the guidance in American Nuclear Standards Institute/American Nuclear Society (ANSI/ANS) 15.1-2007.

The NRC staff requests that Purdue University provide the supplemental information by 30 days from the date of this letter. This will enable the NRC staff to complete its acceptance review and begin its detailed technical review. If the information responsive to the NRC staff request is not received by that date, the application will not be accepted for review pursuant to 10 CFR 2.101, Filing of application, and the NRC will cease its review activities associated with the application. If the application is subsequently accepted for review, you will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

If you have any questions, please contact me at (301) 415-3398, or by electronic mail at Cindy.Montgomery@nrc.gov.

Sincerely, R/A Cindy Montgomery, Project Manager Research and Test Reactors Licensing Branch Division of Licensing Projects Office of Nuclear Reactor Regulation Docket No. 50-182 License No. R-87 cc: See next page

Purdue University Docket No. 50-182 cc:

Leah Jamieson, Dean of Engineering Purdue University School of Nuclear Engineering 400 Central Drive West Lafayette, IN 47907 Mayor City of West Lafayette 609 W. Navajo West Lafayette, IN 47906 John H. Ruyack, Manager Epidemiology Res Center/Indoor

& Radiological Health Indiana Department of Health 2525 N. Shadeland Avenue, SuiteE3 Indianapolis, IN 46219 Howard W. Cundiff, P.E., Director Consumer Protection Indiana State Department of Health 2 North Meridian Street, 5D Indianapolis, IN 46204 Dr. Robert Bean, Director Purdue University Radiation Laboratory School of Nuclear Engineering 400 Central Drive West Lafayette, IN 47907-2017 Test, Research and Training Reactor Newsletter P.O. Box 118300 University of Florida Gainesville, FL 32611

C. Townsend

SUBJECT:

PURDUE UNIVERSITY - SUPPLEMENTAL INFORMATION NEEDED FOR ACCEPTANCE OF REQUESTED LICENSING ACTION RE: LICENSE AMENDMENT REQUEST FOR MANAGEMENT CHAIN CHANGE DATED: OCTOBER 3, 2017 DISTRIBUTION:

PUBLIC CMontgomery, NRR AAdams, NRR RidsNrrDlpPrta DHardesty, NRR NParker, NRR RidsNrrDlpPrtb AMendiola, NRR PRLB R/F RidsNrrDlp GMorlang, NRR ADAMS Accession Number: ML17272A039; *concurred via email OFFICE NRR/DLP/PRLB/PM* NRR/DLP/PRLB/LA* NRR/DLP/PRLB/BC NRR/DLP/PRLB/PM NAME CMontgomery NParker AAdams CMontgomery DATE 09/28/17 9/29/17 10/3/17 10/3/17 OFFICIAL RECORD COPY