ML120090061: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 9, 2012 Mr. Tom E. Tynan Vice President - Vogtle Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 9, 2012 Mr. Tom E. Tynan Vice President - Vogtle Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830


==SUBJECT:==
==SUBJECT:==
MEETING ANNOUNCEMENT - PUBLIC MEETING   VOGTLE ELECTRIC GENERATING PLANT, DOCKET NOS. 50-424 & 50-425  
MEETING ANNOUNCEMENT - PUBLIC MEETING VOGTLE ELECTRIC GENERATING PLANT, DOCKET NOS. 50-424 & 50-425


==Dear Mr. Tynan:==
==Dear Mr. Tynan:==
Line 24: Line 25:
This letter confirms a Category 1 public meeting which has been scheduled for January 31, 2012, at 1:30 p.m. - 3:30 p.m. (EDT). The enclosed meeting notice provides additional details.
This letter confirms a Category 1 public meeting which has been scheduled for January 31, 2012, at 1:30 p.m. - 3:30 p.m. (EDT). The enclosed meeting notice provides additional details.
The purpose of the meeting is to provide an opportunity to discuss the high failure rate on the April 2011 initial operator license examination including planned corrective actions.
The purpose of the meeting is to provide an opportunity to discuss the high failure rate on the April 2011 initial operator license examination including planned corrective actions.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
Should you have any questions concerning this meeting, please contact me at (404) 997-4608.  
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Should you have any questions concerning this meeting, please contact me at (404) 997-4608.
Sincerely, /RA/
Sincerely,
Bruno Caballero, Chief (Acting) Operator Licensing Branch 1 Division of Reactor Safety Docket Nos.: 50-424 and 50-425 License Nos.: NPF-68 and NPF-81  
                                              /RA/
Bruno Caballero, Chief (Acting)
Operator Licensing Branch 1 Division of Reactor Safety Docket Nos.: 50-424 and 50-425 License Nos.: NPF-68 and NPF-81


==Enclosure:==
==Enclosure:==
As stated
cc w/encl:  (See page 2) 
_ML# 120090061_________________
X  SUNSI REVIEW COMPLETE  OFFICE RII:DRS RII:DRP RII:DRS RII:DRS RII:DRP  SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/  NAME BCaballero JHickey MWidmann JMunday RCroteau  DATE 1/5/2012 1/5/2012 1/5/2012 1/6/2012 1/6/2012  E-MAIL COPY?
Y ES NO  Y ES NO    Y ES      NO Y ES NO  Y ES NO  YES NO SNC  2  cc w/encl:
S. Kuczynski Chairman, President and CEO Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution D. G. Bost Chief Nuclear Officer Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution N. J. Stringfellow Licensing Manager Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Paula Marino Vice President Engineering Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
T. A. Lynch Vice President Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Dennis R. Madison Vice President Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc. Electronic Mail Distribution J. L. Pemberton SVP & General Counsel-Ops & SNC Southern Nuclear Operating Company, Inc. Electronic Mail Distribution T. E. Tynan Site Vice President Vogtle Electric Generating Plant Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution B. D. McKinney, Jr. Regulatory Response Manager Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution D. W. Daughhetee Licensing Engineer Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution L. Mike Stinson Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
T. D. Honeycutt Regulatory Response Supervisor Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
L. P. Hill Licensing Supervisor Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
L. L. Crumpton Administrative Assistant, Sr. Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Hickox, T. Mark Vogtle Electric Generating Plant Electronic Mail Distribution
S. C. Swanson Site Support Manager Vogtle Electric Generating Plant Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission Vogtle Electric Generating Plant U.S. NRC 7821 River Road Waynesboro, GA  30830
(cc w/encl continued on page 3)
SNC  3  cc w/encl:
Bob Masse Resident Manager Vogtle Electric Generating Plant Oglethorpe Power Corporation Electronic Mail Distribution Arthur H. Domby, Esq.
Troutman Sanders Electronic Mail Distribution Sandra Threatt, Manager Nuclear Response and Emergency Environmental Surveillance Bureau of Land and Waste Management Department of Health and Environmental  Control Electronic Mail Distribution Division of Radiological Health TN Dept. of Environment & Conservation 401 Church Street Nashville, TN  37243-1532 Richard Haynes Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control 2600 Bull Street Columbia, SC  29201 Lee Foley Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution Mark Williams Commissioner Georgia Department of Natural Resources Electronic Mail Distribution
F. Allen Barnes Director Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution
Cynthia A. Sanders Radioactive Materials Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution James A. Capp Program Coordination Branch Chief Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Al Frazier Emergency Response and Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution


Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution
As stated cc w/encl: (See page 2)


Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution
_ML# 120090061_________________    X SUNSI REVIEW COMPLETE OFFICE              RII:DRS      RII:DRP      RII:DRS      RII:DRS      RII:DRP SIGNATURE              /RA/          /RA/          /RA/          /RA/        /RA/
NAME                BCaballero    JHickey      MWidmann      JMunday      RCroteau DATE                1/5/2012      1/5/2012      1/5/2012      1/6/2012    1/6/2012 E-MAIL COPY?        YES      NO  YES      NO  YES    NO  YES      NO  YES      NO  YES    NO


Office of the Attorney General 40 Capitol Square, SW Atlanta, GA   30334 Office of the County Commissioner Burke County Commission Electronic Mail Distribution (cc w/encl continued on page 4)  
SNC                                      2 cc w/encl:
S. Kuczynski                              B. D. McKinney, Jr.
Chairman, President and CEO                Regulatory Response Manager Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution              Electronic Mail Distribution D. G. Bost                                D. W. Daughhetee Chief Nuclear Officer                      Licensing Engineer Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution              Electronic Mail Distribution N. J. Stringfellow                        L. Mike Stinson Licensing Manager                          Vice President Southern Nuclear Operating Company, Inc. Fleet Operations Support Electronic Mail Distribution              Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Paula Marino Vice President                            T. D. Honeycutt Engineering                                Regulatory Response Supervisor Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution              Electronic Mail Distribution T. A. Lynch                                L. P. Hill Vice President                            Licensing Supervisor Joseph M. Farley Nuclear Plant            Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution L. L. Crumpton Dennis R. Madison                          Administrative Assistant, Sr.
Vice President                            Southern Nuclear Operating Company, Inc.
Edwin I. Hatch Nuclear Plant              Electronic Mail Distribution Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution              Hickox, T. Mark Vogtle Electric Generating Plant J. L. Pemberton                            Electronic Mail Distribution SVP & General Counsel-Ops & SNC Southern Nuclear Operating Company, Inc. S. C. Swanson Electronic Mail Distribution              Site Support Manager Vogtle Electric Generating Plant T. E. Tynan                                Electronic Mail Distribution Site Vice President Vogtle Electric Generating Plant          Senior Resident Inspector Southern Nuclear Operating Company, Inc. U.S. Nuclear Regulatory Commission Electronic Mail Distribution              Vogtle Electric Generating Plant U.S. NRC M. J. Ajluni                              7821 River Road Nuclear Licensing Director                Waynesboro, GA 30830 Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution               (cc w/encl continued on page 3)


SNC 4   cc w/encl.:
SNC                                     3 cc w/encl:
Bob Masse                                Cynthia A. Sanders Resident Manager                          Radioactive Materials Program Manager Vogtle Electric Generating Plant          Environmental Protection Division Oglethorpe Power Corporation              Georgia Department of Natural Resources Electronic Mail Distribution              Electronic Mail Distribution Arthur H. Domby, Esq.                    James A. Capp Troutman Sanders                          Program Coordination Branch Chief Electronic Mail Distribution              Environmental Protection Division Georgia Department of Natural Resources Sandra Threatt, Manager                  Electronic Mail Distribution Nuclear Response and Emergency Environmental Surveillance                James C. Hardeman Bureau of Land and Waste Management      Environmental Radiation Program Manager Department of Health and Environmental    Environmental Protection Division Control                                  Georgia Department of Natural Resources Electronic Mail Distribution              Electronic Mail Distribution Division of Radiological Health          Al Frazier TN Dept. of Environment & Conservation    Emergency Response and Radiation 401 Church Street                        Program Manager Nashville, TN 37243-1532                  Environmental Protection Division Georgia Department of Natural Resources Richard Haynes                            Electronic Mail Distribution Director, Division of Waste Management Bureau of Land and Waste Management      Mr. Steven M. Jackson S.C. Department of Health and            Senior Engineer - Power Supply Environmental Control                    Municipal Electric Authority of Georgia 2600 Bull Street                          Electronic Mail Distribution Columbia, SC 29201 Reece McAlister Lee Foley                                Executive Secretary Manager of Contracts Generation          Georgia Public Service Commission Oglethorpe Power Corporation              Electronic Mail Distribution Electronic Mail Distribution Office of the Attorney General Mark Williams                            40 Capitol Square, SW Commissioner                              Atlanta, GA 30334 Georgia Department of Natural Resources Electronic Mail Distribution              Office of the County Commissioner Burke County Commission F. Allen Barnes                          Electronic Mail Distribution Director Environmental Protection Division Georgia Department of Natural Resources   (cc w/encl continued on page 4)
Electronic Mail Distribution


Director Consumers' Utility Counsel Division Governor's Office of Consumer Affairs 2 M. L. King, Jr. Drive Plaza Level East; Suite 356 Atlanta, GA   30334-4600  
SNC                                      4 cc w/encl.:
Director Consumers' Utility Counsel Division Governor's Office of Consumer Affairs 2 M. L. King, Jr. Drive Plaza Level East; Suite 356 Atlanta, GA 30334-4600 Amy Whaley Engineer Nuclear Generation Development and Construction Electronic Mail Distribution Southern Nuclear Operating Company, Inc.
ATTN: Mr. Richard D. Brigdon Plant Training and Emergency Preparedness Manager Vogtle Electric Generating Plant 7821 River Road Bin 63030 Waynesboro, GA 30830-2965


Amy Whaley Engineer Nuclear Generation Development and Construction Electronic Mail Distribution Southern Nuclear Operating Company, Inc.
SNC                                       5 Letter to Tom E. Tynan from Bruno Caballero dated January 9, 2012
ATTN:  Mr. Richard D. Brigdon Plant Training and Emergency Preparedness Manager  Vogtle Electric Generating Plant 7821 River Road
 
Bin 63030 Waynesboro, GA 30830-2965
 
SNC 5   Letter to Tom E. Tynan from Bruno Caballero dated January 9, 2012  


==SUBJECT:==
==SUBJECT:==
MEETING ANNOUNCEMENT - PUBLIC MEETING VOGTLE ELECTRIC GENERATING PLANT, DOCKET NOS. 50-424 & 50-425
MEETING ANNOUNCEMENT - PUBLIC MEETING VOGTLE ELECTRIC GENERATING PLANT, DOCKET NOS. 50-424 & 50-425 Distribution w/encl:
Region II Administrators Secretary Region II DRP Division Secretary Region II Division Directors and Deputies Region II Counsel Region II State Liaison Officer Region II Public Affairs Officer Region II Resource Management Branch Region II Receptionist Region II Regional Coordinator OEDO Headquarters Operation Officer PMNS RIDSNRRPMVogtle Resource L Douglas, RII RIDSNRRDIRS OE Mail PUBLIC


Distribution w/encl
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 9, 2012
: Region II Administrator's Secretary Region II DRP Division Secretary Region II Division Directors and Deputies Region II Counsel Region II State Liaison Officer Region II Public Affairs Officer Region II Resource Management Branch Region II Receptionist Region II Regional Coordinator OEDO Headquarters Operation Officer PMNS RIDSNRRPMVogtle Resource L Douglas, RII RIDSNRRDIRS OE Mail PUBLIC Enclosure


==SUBJECT:==
==SUBJECT:==
January 9, 2012 PUBLIC MEETING VOGTLE ELECTRIC GENERATING PLANT ANNUAL ASSESSMENT FACILITY: Vogtle Electric Generating Plant DOCKET: 50-424 and 50-425 DATE & TIME:
PUBLIC MEETING VOGTLE ELECTRIC GENERATING PLANT ANNUAL ASSESSMENT FACILITY:     Vogtle Electric Generating Plant DOCKET:       50-424 and 50-425 DATE & TIME:   Tuesday, January 31, 2012, at 1:30 p.m. (EDT)
Tuesday, January 31, 2012, at 1:30 p.m. (EDT)
LOCATION:     USNRC - Region II 245 Peachtree Center Ave., NE Suite 1200 14th floor Executive Conference Room Atlanta, GA 30303-1257 PURPOSE:      The purpose of the meeting is to provide an opportunity to discuss the high failure rate on the April 2011 initial operator license examination, including planned corrective actions.
LOCATION: USNRC - Region II 245 Peachtree Center Ave., NE Suite 1200  
The Exam Report is accessible from the Publicly Available Records (PARS) component of NRC's document system (ADAMS) (ML111320617) at http://www.nrc.gov/reading-rm/adams.html.
The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding conduct of NRC meetings.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact, listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
Enclosure


14 th floor Executive Conference Room Atlanta, GA 30303-1257 PURPOSE: The purpose of the meeting is to provide an opportunity to discuss the high failure rate on the April 2011 initial operator license examination, including planned corrective actions. The Exam Report is accessible from the Publicly Available Records (PARS) component of NRC's document system (ADAMS) (ML111320617) at http://www.nrc.gov/reading-rm/adams.html. The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding conduct of NRC meetings.
2 CATEGORY:       This is a Category 1 meeting: The public is invited to observe the meeting and will have the opportunity to communicate with the NRC after the business portion of the meeting but before the meeting is adjourned.
 
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact, listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257
 
2 Enclosure CATEGORY: This is a Category 1meeting: The public is invited to observe the meeting and will have the opportunity to communicate with the NRC after the business portion of the meeting but before the meeting is adjourned.
NRC OFFICE(S)
NRC OFFICE(S)
PARTICIPATING:              
PARTICIPATING: Region II OTHER ORGANIZATIONS PARTICIPATING: None PARTICIPANTS:   NRC (partial list)
 
B. Caballero, Chief (Acting), Operator Licensing Branch 1, Division of Reactor Safety, Region II M. Widmann, Chief, Operator Licensing Branch 1, Division of Reactor Safety, Region II C. Christensen, Deputy Director, Division of Reactor Safety, Region II J. Munday, Director, Division of Reactor Safety, Region II L. Wert, Deputy Regional Administrator, Region II MEETING         Bruno Caballero, NRC, RII CONTACT:        (404) 997-4608 AUDIO TELE-   Interested members of the public can participate in this meeting CONFERENCE:    via a toll-free audio teleconference. For details, please call the NRC meeting contact listed above.
Region II OTHER ORGANIZATIONS PARTICIPATING:
VIDEO-         Not Available CONFERENCE:
None PARTICIPANTS:
Enclosure}}
NRC (partial list) B. Caballero, Chief (Acting), Operator Licensing Branch 1, Division of Reactor Safety, Region II M. Widmann, Chief, Operator Licensing Branch 1, Division of Reactor Safety, Region II  
 
C. Christensen, Deputy Director, Division of Reactor Safety, Region II J. Munday, Director, Division of Reactor Safety, Region II L. Wert, Deputy Regional Administrator, Region II MEETING CONTACT: Bruno Caballero, NRC, RII (404) 997-4608 AUDIO TELE- CONFERENCE: Interested members of the public can participate in this meeting via a toll-free audio teleconference. For details, please call the NRC meeting contact listed above.
VIDEO- CONFERENCE: Not Available}}

Revision as of 09:56, 12 November 2019

01/31/2012 Notice of Meeting with RGN-II Staff Discuss the High Failure Rate on the April 2011 Initial Operator License Examination, Including Planned Corrective Actions
ML120090061
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/09/2012
From: Bruno Caballero
NRC/RGN-II/DRS/OLB
To: Tynan T
Southern Nuclear Operating Co
References
Download: ML120090061 (8)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 9, 2012 Mr. Tom E. Tynan Vice President - Vogtle Southern Nuclear Operating Company, Inc.

Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830

SUBJECT:

MEETING ANNOUNCEMENT - PUBLIC MEETING VOGTLE ELECTRIC GENERATING PLANT, DOCKET NOS. 50-424 & 50-425

Dear Mr. Tynan:

This letter confirms a Category 1 public meeting which has been scheduled for January 31, 2012, at 1:30 p.m. - 3:30 p.m. (EDT). The enclosed meeting notice provides additional details.

The purpose of the meeting is to provide an opportunity to discuss the high failure rate on the April 2011 initial operator license examination including planned corrective actions.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 997-4608.

Sincerely,

/RA/

Bruno Caballero, Chief (Acting)

Operator Licensing Branch 1 Division of Reactor Safety Docket Nos.: 50-424 and 50-425 License Nos.: NPF-68 and NPF-81

Enclosure:

As stated cc w/encl: (See page 2)

_ML# 120090061_________________ X SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRP RII:DRS RII:DRS RII:DRP SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/

NAME BCaballero JHickey MWidmann JMunday RCroteau DATE 1/5/2012 1/5/2012 1/5/2012 1/6/2012 1/6/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO

SNC 2 cc w/encl:

S. Kuczynski B. D. McKinney, Jr.

Chairman, President and CEO Regulatory Response Manager Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Electronic Mail Distribution D. G. Bost D. W. Daughhetee Chief Nuclear Officer Licensing Engineer Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Electronic Mail Distribution N. J. Stringfellow L. Mike Stinson Licensing Manager Vice President Southern Nuclear Operating Company, Inc. Fleet Operations Support Electronic Mail Distribution Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Paula Marino Vice President T. D. Honeycutt Engineering Regulatory Response Supervisor Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Electronic Mail Distribution T. A. Lynch L. P. Hill Vice President Licensing Supervisor Joseph M. Farley Nuclear Plant Southern Nuclear Operating Company, Inc.

Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Electronic Mail Distribution L. L. Crumpton Dennis R. Madison Administrative Assistant, Sr.

Vice President Southern Nuclear Operating Company, Inc.

Edwin I. Hatch Nuclear Plant Electronic Mail Distribution Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution Hickox, T. Mark Vogtle Electric Generating Plant J. L. Pemberton Electronic Mail Distribution SVP & General Counsel-Ops & SNC Southern Nuclear Operating Company, Inc. S. C. Swanson Electronic Mail Distribution Site Support Manager Vogtle Electric Generating Plant T. E. Tynan Electronic Mail Distribution Site Vice President Vogtle Electric Generating Plant Senior Resident Inspector Southern Nuclear Operating Company, Inc. U.S. Nuclear Regulatory Commission Electronic Mail Distribution Vogtle Electric Generating Plant U.S. NRC M. J. Ajluni 7821 River Road Nuclear Licensing Director Waynesboro, GA 30830 Southern Nuclear Operating Company, Inc.

Electronic Mail Distribution (cc w/encl continued on page 3)

SNC 3 cc w/encl:

Bob Masse Cynthia A. Sanders Resident Manager Radioactive Materials Program Manager Vogtle Electric Generating Plant Environmental Protection Division Oglethorpe Power Corporation Georgia Department of Natural Resources Electronic Mail Distribution Electronic Mail Distribution Arthur H. Domby, Esq. James A. Capp Troutman Sanders Program Coordination Branch Chief Electronic Mail Distribution Environmental Protection Division Georgia Department of Natural Resources Sandra Threatt, Manager Electronic Mail Distribution Nuclear Response and Emergency Environmental Surveillance James C. Hardeman Bureau of Land and Waste Management Environmental Radiation Program Manager Department of Health and Environmental Environmental Protection Division Control Georgia Department of Natural Resources Electronic Mail Distribution Electronic Mail Distribution Division of Radiological Health Al Frazier TN Dept. of Environment & Conservation Emergency Response and Radiation 401 Church Street Program Manager Nashville, TN 37243-1532 Environmental Protection Division Georgia Department of Natural Resources Richard Haynes Electronic Mail Distribution Director, Division of Waste Management Bureau of Land and Waste Management Mr. Steven M. Jackson S.C. Department of Health and Senior Engineer - Power Supply Environmental Control Municipal Electric Authority of Georgia 2600 Bull Street Electronic Mail Distribution Columbia, SC 29201 Reece McAlister Lee Foley Executive Secretary Manager of Contracts Generation Georgia Public Service Commission Oglethorpe Power Corporation Electronic Mail Distribution Electronic Mail Distribution Office of the Attorney General Mark Williams 40 Capitol Square, SW Commissioner Atlanta, GA 30334 Georgia Department of Natural Resources Electronic Mail Distribution Office of the County Commissioner Burke County Commission F. Allen Barnes Electronic Mail Distribution Director Environmental Protection Division Georgia Department of Natural Resources (cc w/encl continued on page 4)

Electronic Mail Distribution

SNC 4 cc w/encl.:

Director Consumers' Utility Counsel Division Governor's Office of Consumer Affairs 2 M. L. King, Jr. Drive Plaza Level East; Suite 356 Atlanta, GA 30334-4600 Amy Whaley Engineer Nuclear Generation Development and Construction Electronic Mail Distribution Southern Nuclear Operating Company, Inc.

ATTN: Mr. Richard D. Brigdon Plant Training and Emergency Preparedness Manager Vogtle Electric Generating Plant 7821 River Road Bin 63030 Waynesboro, GA 30830-2965

SNC 5 Letter to Tom E. Tynan from Bruno Caballero dated January 9, 2012

SUBJECT:

MEETING ANNOUNCEMENT - PUBLIC MEETING VOGTLE ELECTRIC GENERATING PLANT, DOCKET NOS. 50-424 & 50-425 Distribution w/encl:

Region II Administrators Secretary Region II DRP Division Secretary Region II Division Directors and Deputies Region II Counsel Region II State Liaison Officer Region II Public Affairs Officer Region II Resource Management Branch Region II Receptionist Region II Regional Coordinator OEDO Headquarters Operation Officer PMNS RIDSNRRPMVogtle Resource L Douglas, RII RIDSNRRDIRS OE Mail PUBLIC

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 9, 2012

SUBJECT:

PUBLIC MEETING VOGTLE ELECTRIC GENERATING PLANT ANNUAL ASSESSMENT FACILITY: Vogtle Electric Generating Plant DOCKET: 50-424 and 50-425 DATE & TIME: Tuesday, January 31, 2012, at 1:30 p.m. (EDT)

LOCATION: USNRC - Region II 245 Peachtree Center Ave., NE Suite 1200 14th floor Executive Conference Room Atlanta, GA 30303-1257 PURPOSE: The purpose of the meeting is to provide an opportunity to discuss the high failure rate on the April 2011 initial operator license examination, including planned corrective actions.

The Exam Report is accessible from the Publicly Available Records (PARS) component of NRC's document system (ADAMS) (ML111320617) at http://www.nrc.gov/reading-rm/adams.html.

The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding conduct of NRC meetings.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact, listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

Enclosure

2 CATEGORY: This is a Category 1 meeting: The public is invited to observe the meeting and will have the opportunity to communicate with the NRC after the business portion of the meeting but before the meeting is adjourned.

NRC OFFICE(S)

PARTICIPATING: Region II OTHER ORGANIZATIONS PARTICIPATING: None PARTICIPANTS: NRC (partial list)

B. Caballero, Chief (Acting), Operator Licensing Branch 1, Division of Reactor Safety, Region II M. Widmann, Chief, Operator Licensing Branch 1, Division of Reactor Safety, Region II C. Christensen, Deputy Director, Division of Reactor Safety, Region II J. Munday, Director, Division of Reactor Safety, Region II L. Wert, Deputy Regional Administrator, Region II MEETING Bruno Caballero, NRC, RII CONTACT: (404) 997-4608 AUDIO TELE- Interested members of the public can participate in this meeting CONFERENCE: via a toll-free audio teleconference. For details, please call the NRC meeting contact listed above.

VIDEO- Not Available CONFERENCE:

Enclosure