ML17207A306: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:
| page count = 5
| page count = 5
}}
}}
See also: [[followed by::IR 05000335/1979015]]


=Text=
=Text=
{{#Wiki_filter:P.O,Bog 0)3100,.":IA'FL~y/0l 0.FLORIO<POVi'EF'LIGHT~CQ':F-''.i
{{#Wiki_filter:P.O,Bog 0)3100,.":IA'FL~y/0l 0.FLORIO<POVi'EF'LIGHT~CQ':F-''.i July 19, 1979 L-79-197 Nr.James P.O'Reilly, Director, Region II Office of Inspection and Enforcement U.S.Nuclear Regulatory Commission
July 19, 1979 L-79-197 Nr.James P.O'Reilly, Director, Region II Office of Inspection
'01 Via ri etta Street, Sui te 3100 Atl anta, Georgi a 30303  
and Enforcement
 
U.S.Nuclear Regulatory
==Dear Nr.O'Reilly:==
Commission
Re: RI I:WAR 50-335/79-15 Florida Power 8 Light Company has reviewed the subject inspection report and a response is attached.There is no proprietary information in the report.Very truly yours, Robert E.Uhrig Vice President Advanced Systems&Technology REU/MAS/cph Attachment cc: 8arold F.Reis, Esquire 79082g0~~PEOPLE..SERVING PEOPLE ATTACHflEtlT Re: RI1:tjAK 50-335/79-15 Findinq As reouired by Technical Specification 6.8.1, procedur s shall be established and implemented.
'01 Via ri etta Street, Sui te 3100 Atl anta, Georgi a 30303 Dear Nr.O'Reilly: Re: RI I:WAR 50-335/79-15
Contlaiy to the above, procedures AP 000720 and 01-2-PR/PSL2 were nol.imple;;:anted in that: AP 0005720, Revision 6, dated f!arch 25, 1977, requires (Section 8.2.7)that personnel who make less than GO percent on any portion o tt.e annual exa.iination-shall attend lectures in those ar=as and 5 of 17 persons scoring less than 80 percent in one or more areas of the 1977 annual examination did not attend the lectures on those are"s in 1978.(';1-2-PR/PSL2, Pevision 5, dated triarch 1977, requires (Section 4.3)that Departm nt Heads establish departmental person.iel training standards and, as of t!ay 30, 1979, such standards had not been prepared for the t'.echani'cal t:;aintenance, Electrical t'aintenance, arid tnstrument and Control Dkpartmerts.
Florida Power 8 Light Company has reviewed the subject inspection
Response Th personnel who did not have a graCe of GO;: or better in the annu:.'l examination and who did not attend the required lectuies were retesteC and re;eivi d exa"..gi ades of GO or greiter.Jn tl;: fulure, fuiluri'o ante>>C lc'i Jr: s c.s ri lill1 ed will li" r.oie, c.i.a deficie>>cg against an individual is record, and make-up trai>>i>>g will be requi red.B.t" chanical, Electrical, and 1 lI C haintenance Department personnel trainirio standards comply with AHS1 STD N18.1.Each of.these depaltments have now documented this standard in thei r proora is.  
report and a response is attached.There is no proprietary
 
information
~Findin In the second paraqraph on page 2 of a letter from tsr.P.Collins of tie Operator Licensing Branch of the l/BC to t)r.t:.Harris of the St.Lucie Plant dated December 9, 1977, the licensee was instructed to assu.e th;t applications for the renewal of operator licenses contain statements indicating any area(s)where the applicant failed to participate in the accepted requalification program and indicate the actions taken or plar">ed to compensate for such nonparticipation.
in the report.Very truly yours, Robert E.Uhrig Vice President Advanced Systems&Technology
Contrary to the above, applications for the renewal of two licenses were sub&#x17d;itted on February 23, 1979, for operators who had missed one or mo;e required lectures, and no statement of the inadequacy nor of the corrective actions wie re included.~Res onse Amended renewal applications for operator licenses were submitted detailing the deficiencies in the individual requalification program attendance for the personnel involved.The Training Supervisor is aware of this deviation and will assure tha'u ure applications for operator license renewal will include inadequacies and deficiercies of the operator as defined in fir.Collins letter of 9/12/77.  
REU/MAS/cph
~,}}
Attachment
cc: 8arold F.Reis, Esquire 79082g0~~PEOPLE..SERVING PEOPLE  
ATTACHflEtlT
Re: RI1:tjAK 50-335/79-15
Findinq As reouired by Technical Specification
6.8.1, procedur s shall be established
and implemented.
Contlaiy to the above, procedures
AP 000720 and 01-2-PR/PSL2
were nol.imple;;:anted
in that: AP 0005720, Revision 6, dated f!arch 25, 1977, requires (Section 8.2.7)that personnel who make less than GO percent on any portion o tt.e annual exa.iination-
shall attend lectures in those ar=as and 5 of 17 persons scoring less than 80 percent in one or more areas of the 1977 annual examination
did not attend the lectures on those are"s in 1978.(';1-2-PR/PSL2, Pevision 5, dated triarch 1977, requires (Section 4.3)that Departm nt Heads establish departmental
person.iel
training standards and, as of t!ay 30, 1979, such standards had not been prepared for the t'.echani'cal
t:;aintenance, Electrical
t'aintenance, arid tnstrument
and Control Dkpartmerts.
Response Th personnel who did not have a graCe of GO;: or better in the annu:.'l examination
and who did not attend the required lectuies were retesteC and re;eivi d exa"..gi ades of GO or greiter.Jn tl;: fulure, fuiluri'o ante>>C lc'i Jr: s c.s ri lill1 ed will li" r.oie, c.i.a deficie>>cg
against an individual
is record, and make-up trai>>i>>g will be requi red.B.t" chanical, Electrical, and 1 lI C haintenance
Department
personnel trainirio standards comply with AHS1 STD N18.1.Each of.these depaltments
have now documented
this standard in thei r proora is.  
~Findin In the second paraqraph on page 2 of a letter from tsr.P.Collins of tie Operator Licensing Branch of the l/BC to t)r.t:.Harris of the St.Lucie Plant dated December 9, 1977, the licensee was instructed
to assu.e th;t applications
for the renewal of operator licenses contain statements
indicating
any area(s)where the applicant failed to participate
in the accepted requalification
program and indicate the actions taken or plar">ed to compensate
for such nonparticipation.
Contrary to the above, applications
for the renewal of two licenses were sub&#x17d;itted on February 23, 1979, for operators who had missed one or mo;e required lectures, and no statement of the inadequacy
nor of the corrective
actions wie re included.~Res onse Amended renewal applications
for operator licenses were submitted detailing the deficiencies
in the individual
requalification
program attendance
for the personnel involved.The Training Supervisor
is aware of this deviation and will assure tha'u ure applications
for operator license renewal will include inadequacies
and deficiercies
of the operator as defined in fir.Collins letter of 9/12/77.  
~,
}}

Revision as of 16:38, 17 August 2019

Responds to NRC 790625 Ltr Re Violations Noted in IE Insp Rept 50-335/79-15.Corrective Actions:Amended Renewal Applications for OLs Were Submitted Detailing Deficiencies in Individual Requalification Program Attendance
ML17207A306
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 07/19/1979
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17207A305 List:
References
L-79197, NUDOCS 7908240104
Download: ML17207A306 (5)


Text

P.O,Bog 0)3100,.":IA'FL~y/0l 0.FLORIO<POVi'EF'LIGHT~CQ':F-.i July 19, 1979 L-79-197 Nr.James P.O'Reilly, Director, Region II Office of Inspection and Enforcement U.S.Nuclear Regulatory Commission

'01 Via ri etta Street, Sui te 3100 Atl anta, Georgi a 30303

Dear Nr.O'Reilly:

Re: RI I:WAR 50-335/79-15 Florida Power 8 Light Company has reviewed the subject inspection report and a response is attached.There is no proprietary information in the report.Very truly yours, Robert E.Uhrig Vice President Advanced Systems&Technology REU/MAS/cph Attachment cc: 8arold F.Reis, Esquire 79082g0~~PEOPLE..SERVING PEOPLE ATTACHflEtlT Re: RI1:tjAK 50-335/79-15 Findinq As reouired by Technical Specification 6.8.1, procedur s shall be established and implemented.

Contlaiy to the above, procedures AP 000720 and 01-2-PR/PSL2 were nol.imple;;:anted in that: AP 0005720, Revision 6, dated f!arch 25, 1977, requires (Section 8.2.7)that personnel who make less than GO percent on any portion o tt.e annual exa.iination-shall attend lectures in those ar=as and 5 of 17 persons scoring less than 80 percent in one or more areas of the 1977 annual examination did not attend the lectures on those are"s in 1978.(';1-2-PR/PSL2, Pevision 5, dated triarch 1977, requires (Section 4.3)that Departm nt Heads establish departmental person.iel training standards and, as of t!ay 30, 1979, such standards had not been prepared for the t'.echani'cal t:;aintenance, Electrical t'aintenance, arid tnstrument and Control Dkpartmerts.

Response Th personnel who did not have a graCe of GO;: or better in the annu:.'l examination and who did not attend the required lectuies were retesteC and re;eivi d exa"..gi ades of GO or greiter.Jn tl;: fulure, fuiluri'o ante>>C lc'i Jr: s c.s ri lill1 ed will li" r.oie, c.i.a deficie>>cg against an individual is record, and make-up trai>>i>>g will be requi red.B.t" chanical, Electrical, and 1 lI C haintenance Department personnel trainirio standards comply with AHS1 STD N18.1.Each of.these depaltments have now documented this standard in thei r proora is.

~Findin In the second paraqraph on page 2 of a letter from tsr.P.Collins of tie Operator Licensing Branch of the l/BC to t)r.t:.Harris of the St.Lucie Plant dated December 9, 1977, the licensee was instructed to assu.e th;t applications for the renewal of operator licenses contain statements indicating any area(s)where the applicant failed to participate in the accepted requalification program and indicate the actions taken or plar">ed to compensate for such nonparticipation.

Contrary to the above, applications for the renewal of two licenses were subŽitted on February 23, 1979, for operators who had missed one or mo;e required lectures, and no statement of the inadequacy nor of the corrective actions wie re included.~Res onse Amended renewal applications for operator licenses were submitted detailing the deficiencies in the individual requalification program attendance for the personnel involved.The Training Supervisor is aware of this deviation and will assure tha'u ure applications for operator license renewal will include inadequacies and deficiercies of the operator as defined in fir.Collins letter of 9/12/77.

~,