{{#Wiki_filter:REGULATORY I)RMATION DISTRIBUTION SYST (RIDS)ACCESSION NBH;8001110630 DOC~OATh: 79/12/19 NOTARIZED; NO PACYL:50 000 Shearon Harris Nuclear Powei Plant~"Onit i~Carolina AOl'H e NAME AUTHOR AFFILIATION
{{#Wiki_filter:REGULATORY     I     )RMATION DISTRIBUTION SYST       (RIDS)
.CFI1ANGlrN,J.
ACCESSION NBH;8001110630                   DOC ~ OATh: 79/12/19     NOTARIZED; NO         DOCKET PACYL:50 000 Shearon             Harris Nuclear Powei Plant~ "Onit i~ Carolina             05000~oil AOl'H e NAME                 AUTHOR AFFILIATION
Carot ina Power C Light Co, RECII, NAME AECIPIENf AFFILIATION DOCKET 05000~oil
. CFI1ANGlrN,J.               Carot ina Power C Light Co, RECII, NAME                 AECIPIENf AFFILIATION


==SUBJECT:==
==SUBJECT:==
Interim rept re defective welds on nine Seismic Class 1 hangers'll correcti've'ction estimated foi comp/etion by 800131~when final rept will be submitted, DISTRIBUTION CODE: B019S COPIES RECEIVED:LTR
Interim rept re defective welds                 on nine Seismic Class   1 hangers'll correcti've'ction estimated foi comp/etion                     by 800131~when final rept will be submitted, DISTRIBUTION CODE: B019S COPIES RECEIVED:LTR                           -
-ENCL SIZE+TIl'I E: Construction Deficiency" Aeport (lUCFA50 55E)NO T hS+mwmoeeeeweseemeem~remmmre RECIPIENT ID'CODE/NAME ACT ION;14 PM~~~W~Ct 20 LA l~ra.W~INTERNAL o 01 0 08 MPA 10 QAS i2 JORDANgE/IE 16 AD F'OA ENGR 17 AO REAC SF1'Y 23 OELD DIRECfOR DSE IBC SYS BR MECH ENG BH S HANAUER EXTERNAL: 03 LPDR*24 ACRS COPIES LTTH ENCL 1 2 1 1 i, 1 i 1 i 1 i 1 1 16 1 RECIPIENT ID"LODE/NAME BCl w'A 4=V 3 AD L~ra 02 NRC PDR 07 EDO E STAFF 09 DEPY DIA DPM 11 STANDRDS DEV 13FIELD COOR/iE 17 AD PLANT SYS 22 DIR DPI" AD/SITE TECH GEObCIENCES BR MATC ENG BA PONhR SYS BR Sl'RUCT hNG 8R 00 NSIC COPIES LlTA ENCL.TOTAL NUMBER OF COPIES l<EQUIRED:
ENCL   SIZE+
LT1'R 07 ENCL If@
TIl'I E: Construction Deficiency" Aeport (lUCFA50 55E)
II p 4 h g V,~iII<,.I,''I'li l J J I II i il iI ji II f~~5 h IR'L h p'r(-pig,OKER Carolina Power 8 Llglit'Cc@pany-December 19, 1979 pl P)fan@$;p 2 Mr.James P.O'Reilly United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest Atlanta,Georgia
NO T hS + mwmoeeeeweseemeem~remmmre RECIPIENT               COPIES              RECIPIENT          COPIES ID'CODE/NAME               LTTH ENCL          ID"LODE/NAME        LlTA ENCL.
'30303 DEFECTIVE SEISMIC CLASS I HANGER WELDS-INTERIM REPORT
ACT ION;         14 PM   ~~~W~Ct                                 BCl w'A 4=V    3 20 LA l     ~ra.W ~                               AD L ~ra INTERNALo 01                                    1            02 NRC PDR 0                              2            07 EDO E STAFF 08 MPA                          1            09 DEPY DIA DPM 10 QAS                        1            11   STANDRDS DEV i2  JORDANgE/IE              i,            13FIELD COOR/iE 16 AD F'OA ENGR                1            17 AD PLANT SYS 17 AO REAC SF1'Y              i            22 DIR DPI" 23 OELD                        1            AD/SITE     TECH DIRECfOR DSE                    i            GEObCIENCES BR IBC SYS BR                      1            MATC ENG BA MECH ENG BH                    i            PONhR SYS BR S  HANAUER                    1            Sl'RUCT hNG 8R EXTERNAL:
* 03 LPDR                        1            00 NSIC 24 ACRS                        16      1 TOTAL NUMBER OF COPIES               l<EQUIRED: LT1'R     07     ENCL If@


==Dear Mr.O'Reilly:==
II p 4 h
In accordance with 10CFR50.55(e), the Region II office (Mr.R.Bradley)was officially notified of the subject deficiency as being a"potentially reportable" item on November 2, 1979.At this time, Mr.R.Bradley was informed that field welds on 9 Seismic Class I hangers were noted by a QA Inspector to be rejectable per the visual acceptance criteria of AWS D 1.1 and that these welds had previously been accepted by a QA Inspector who is no longer working for the Carolina Power&Light Company.On November 26, 1979, the Region II office (Mr.R.Bradley)was officially notified that the subject deficiency was considered report-, able under the provisions of 10CFR50.55(e).
g V,
The intent of this letter is to inform you that all corrective action has not been completed on this item due to the extensive nature of the rework.The current status of corrective action on the subject deficiency is as follows: l.A 100%inspection revealed that there are 331 such hangers in question which had previously been inspected by this QA Inspector.
~ iII  <,. I,    ''I    'li l              I                II J J i
2.192 out of these 331 hangers on subsequent reinspection have now been rejected for defective welds.3.Approximately 135 of these 192 hangers have, to date, been reworked.4., Out of approximately 135 hangers reworked, approximately 67 have been reinspected and found acceptable.
il iI
Inspection on the remaining approximately 68 reworked hangers has not been completed.
                                                        ~ ~
pk O 8001110~p~Q~~ipsepic , 411 Fayettevitte Street~P.O.Box 1551~Raleigh, N.C.27602  
ji                      II f 5
,l V Mr.J.P.O'Reilly December 19, 1979 It is estimated that all corrective action on this item will be completed by January 31, 1980.Upon completion of corrective action, the final 10CFR50.55(e) report will be submitted.
h    IR
In the meantime, we will routinely keep you appraised of our progress on this item during your site inspection visits.If you have any questions regarding this matter, please do not hesitate to contact me.Yours very truly, N.J.Ch gi-Manager Engineering
                              'L h
&Construction Quality Assurance KVH/bd (042/860)cc: Mr.V.Stello (2) 0 (~I lg g}}
 
p' r(- pig,OKER Carolina Power 8 Llglit'Cc@pany-December 19, 1979                                        pl  P )fan@ $ ; p 2 Mr. James P. O'Reilly United States Nuclear Regulatory Commission Region    II 101 Marietta Street, Northwest Atlanta,Georgia '30303 DEFECTIVE SEISMIC CLASS          I HANGER WELDS -          INTERIM REPORT
 
==Dear Mr. O'Reilly:==
 
In accordance with 10CFR50.55(e), the Region II office (Mr. R. Bradley) was officially notified of the subject deficiency as being a "potentially reportable" item on November 2, 1979. At this time, Mr. R. Bradley was informed that field welds on 9 Seismic Class I hangers were noted by a QA Inspector to be rejectable per the visual acceptance criteria of AWS D 1.1 and that these welds had previously been accepted by a QA Inspector who is no longer working for the Carolina Power & Light Company. On November     26, 1979, the Region           II office (Mr. R. Bradley) was officially notified that             the subject deficiency was considered report-,
able under the provisions of 10CFR50.55(e).
The intent of this letter is to inform you that all corrective action has not been completed on this item due to the extensive nature of the rework. The current status of corrective action on the subject deficiency is as follows:
: l. A 100%   inspection revealed that there are 331 such hangers in question     which had previously been inspected by this QA Inspector.
: 2. 192 out of these 331 hangers on subsequent                     reinspection have now been rejected for defective welds.
: 3. Approximately 135 of these 192 hangers have, to date, been reworked.
4.,   Out of approximately 135 hangers reworked, approximately 67 have been reinspected and found acceptable.                       Inspection on the remaining approximately 68 reworked hangers has not been completed.                                                                         pk O
p ~Q
                                                                                                                  ~
                                                                                                      ~
 
pic~ipse 8001110
                      ,
411 Fayettevitte Street ~ P. O. Box 1551 ~ Raleigh, N. C. 27602
 
  ,l V
 
Mr. J. P. O'Reilly                                       December 19, 1979 It is estimated that all corrective action on this item will be completed by January 31, 1980. Upon completion of corrective action, the final 10CFR50.55(e) report will be submitted. In the meantime, we will routinely keep you appraised of our progress on this item during your site inspection visits.
If you have any questions regarding this matter, please do not hesitate to contact me.
Yours very truly, N. J. Ch gi Manager Engineering & Construction Quality Assurance KVH/bd   (042/860) cc:   Mr. V. Stello (2)
 
(~
0 lg I
g}}

Revision as of 06:24, 22 October 2019

Deficiency Rept:On 791126,identified Defective Welds on Nine Seismic Class 1 Hangers.All Corrective Action Estimated for Completion by 800131,when Final Rept Will Be Submitted
ML18003A794
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/19/1979
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To:
References
NUDOCS 8001110634
Download: ML18003A794 (6)


Text

REGULATORY I )RMATION DISTRIBUTION SYST (RIDS)

ACCESSION NBH;8001110630 DOC ~ OATh: 79/12/19 NOTARIZED; NO DOCKET PACYL:50 000 Shearon Harris Nuclear Powei Plant~ "Onit i~ Carolina 05000~oil AOl'H e NAME AUTHOR AFFILIATION

. CFI1ANGlrN,J. Carot ina Power C Light Co, RECII, NAME AECIPIENf AFFILIATION

SUBJECT:

Interim rept re defective welds on nine Seismic Class 1 hangers'll correcti've'ction estimated foi comp/etion by 800131~when final rept will be submitted, DISTRIBUTION CODE: B019S COPIES RECEIVED:LTR -

ENCL SIZE+

TIl'I E: Construction Deficiency" Aeport (lUCFA50 55E)

NO T hS + mwmoeeeeweseemeem~remmmre RECIPIENT COPIES RECIPIENT COPIES ID'CODE/NAME LTTH ENCL ID"LODE/NAME LlTA ENCL.

ACT ION; 14 PM ~~~W~Ct BCl w'A 4=V 3 20 LA l ~ra.W ~ AD L ~ra INTERNALo 01 1 02 NRC PDR 0 2 07 EDO E STAFF 08 MPA 1 09 DEPY DIA DPM 10 QAS 1 11 STANDRDS DEV i2 JORDANgE/IE i, 13FIELD COOR/iE 16 AD F'OA ENGR 1 17 AD PLANT SYS 17 AO REAC SF1'Y i 22 DIR DPI" 23 OELD 1 AD/SITE TECH DIRECfOR DSE i GEObCIENCES BR IBC SYS BR 1 MATC ENG BA MECH ENG BH i PONhR SYS BR S HANAUER 1 Sl'RUCT hNG 8R EXTERNAL:

  • 03 LPDR 1 00 NSIC 24 ACRS 16 1 TOTAL NUMBER OF COPIES l<EQUIRED: LT1'R 07 ENCL If@

II p 4 h

g V,

~ iII <,. I, I 'li l I II J J i

il iI

~ ~

ji II f 5

h IR

'L h

p' r(- pig,OKER Carolina Power 8 Llglit'Cc@pany-December 19, 1979 pl P )fan@ $ ; p 2 Mr. James P. O'Reilly United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest Atlanta,Georgia '30303 DEFECTIVE SEISMIC CLASS I HANGER WELDS - INTERIM REPORT

Dear Mr. O'Reilly:

In accordance with 10CFR50.55(e), the Region II office (Mr. R. Bradley) was officially notified of the subject deficiency as being a "potentially reportable" item on November 2, 1979. At this time, Mr. R. Bradley was informed that field welds on 9 Seismic Class I hangers were noted by a QA Inspector to be rejectable per the visual acceptance criteria of AWS D 1.1 and that these welds had previously been accepted by a QA Inspector who is no longer working for the Carolina Power & Light Company. On November 26, 1979, the Region II office (Mr. R. Bradley) was officially notified that the subject deficiency was considered report-,

able under the provisions of 10CFR50.55(e).

The intent of this letter is to inform you that all corrective action has not been completed on this item due to the extensive nature of the rework. The current status of corrective action on the subject deficiency is as follows:

l. A 100% inspection revealed that there are 331 such hangers in question which had previously been inspected by this QA Inspector.
2. 192 out of these 331 hangers on subsequent reinspection have now been rejected for defective welds.
3. Approximately 135 of these 192 hangers have, to date, been reworked.

4., Out of approximately 135 hangers reworked, approximately 67 have been reinspected and found acceptable. Inspection on the remaining approximately 68 reworked hangers has not been completed. pk O

p ~Q

~

~

pic~ipse 8001110

,

411 Fayettevitte Street ~ P. O. Box 1551 ~ Raleigh, N. C. 27602

,l V

Mr. J. P. O'Reilly December 19, 1979 It is estimated that all corrective action on this item will be completed by January 31, 1980. Upon completion of corrective action, the final 10CFR50.55(e) report will be submitted. In the meantime, we will routinely keep you appraised of our progress on this item during your site inspection visits.

If you have any questions regarding this matter, please do not hesitate to contact me.

Yours very truly, N. J. Ch gi Manager Engineering & Construction Quality Assurance KVH/bd (042/860) cc: Mr. V. Stello (2)

(~