ML18018A635: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Cg REGULATOR INF0RMAT ION DISTRIBUTION 8'r STEM (RIDS)'ACOESSION, NBR'8308010373 | {{#Wiki_filter:Cg REGULATOR INF0RMAT ION DISTRIBUTION 8'r STEM (RIDS) | ||
.DOC.DATE~'83/07/22 NOTARIZED: | 'ACOESSION, NBR'8308010373 . DOC.DATE ~ '83/07/22 NOTARIZED: YES DOCKET ¹ FACIL j50.400 Shear on Herr j s Nuc I'ear ':Power Pl anti Uni t li 'Car ol jna 05000400 50 401 Shearon Har r'is Nuclear Power Pl anti Unit 2i =Carolina 05000401 | ||
YES FACIL j50.400 Shear on Herr j s Nuc I'ear':Power Pl anti Uni t li'Car ol jna 50 401 Shearon Har r'is Nuclear Power Pl anti Unit 2i=Carolina'AUTH NAME AUTHOR AFFILIATION MCDUFFlIEiM.A. | 'AUTH NAME AUTHOR AFFILIATION MCDUFFlIEiM.A. Car ol ina Power L Light <<Co, RECIP. NAME RECIPIENT AFFILIATION DENTONiH R. Office of Nuclear Reactor Reoulationi Di&ector. | ||
Car ol ina Power L Light<<Co, RECIP.NAME RECIPIENT AFFILIATION DENTONiH R.Office of Nuclear Reactor Reoulationi Di&ector. | SUBJECT- Forwards "Shearon Harris Nucl'ear Power Plant Unit 1'Safe | ||
'Shutdown Analvsis in Case of Fi,rei" oroorietary Vols 5-6q in Aresoonse to:draf t SER Oden Item "312.Vol s withheld (reef 10CFR2;790) Vol s 1 4 t'ransmi t ted bv -ser)ar ate l trB | |||
'g<<'ENCL<<$SIZE.TITLE: Licensino Submittal: | ~ | ||
Fire Protection NDTEB!&<<%'r F F I<< | DISTRIBUj'ION CODE: BOOBS COPIES RECEIVED:LTR 'g<< 'ENCL <<$ SIZE | ||
.TITLE: Licensino Submittal: Fire Protection NDTEB! &<< %'r F F g I<< | |||
<<ELD/HDS1 1 I IE FILE | di~ COPIES NRR REt: IPIENT ID CODE/NAME LB3 INT<<ERNAL: <<ELD/HDS1 REG FILE C | ||
BC I | |||
~4I I | |||
.: | |||
L'TTR ENCL 1 | |||
1 2 | |||
-1 1 | |||
I I | |||
.1 REOIP IENT IDCODE/NAME KADAI<<BIBP IE FILE NRR/DS RGN2 I/ASB | |||
~ | |||
43 "COPIES | |||
'lTTR | |||
.1 1 | |||
-1 1 | |||
ENCL, 1 | |||
EXTERNAL: ACRS NRC PDR A | |||
4J 6 O L'P DR NSIC g8 1 | |||
31 NTIS TOTA'L NUMBER OF COPIES REQUIRED: LTTR 19 ENCL | |||
==Dear Mr.Denton:== | I k II 44>I I R f ( '1 | ||
Carolina Power&Light Company (CP&L)hereby submits Volumes 5 and 6 of the Shearon Harris Nuclear Power Plant (SHNPP)"Safe Shutdown Analysis in Case of Fire" report.One (1)original and forty (40)copies of this submittal letter are transmitted. | 'I | ||
The total report consists of six volumes.Volumes 1 through 4 were transmitted by a separate letter.Pursuant to 10 CFR 2.790, CP&L hereby requests that Volumes 3.and 6 of CP&L's"Safe Shutdown Analysis in Case of Fire" report for the Shearon Harris Nuclear Power Plant be withheld from public disclosure on the ground that such volumes contain information described in tt2.790(d) | (( >I I | ||
(1)and t't9.5(a)(4), i.e., commercial information which concerns the physical protection of the Shearon Harris Plant but is not designated as Safeguards Information. | 'f f (4 f f g 'I" f f " 44 11 HI( | ||
Attached hereto is an affidavit executed by M.A.McDuffie which more fully sets forth the reasons why the information should be withheld from public disclosure. | (4 I 4 >f e'f>>rrll'' | ||
CP&L requests tha~t this affidavit also be withheld from public disclosure along with Volumes 5 and'6 of the report.Five (5)copies of Volumes 5 and 6 are attached for distribution as shown below.This report is submitted in response to CP&L Open Item Number 312 from the SHNPP Draft Safety Evaluation Report.Please contact my staff if you have any questions. | Ir "f .'"Irfr'( ' ~ c" 'I ~ 4( | ||
Yours very truly, M.A.McDu fie~Senior Vice President Engineering | 4> (( f lj 'p r >I 4> C t >>f>C 4 ~ I> C | ||
&Construction MAM/FXT/tda (7452FXT)Attachments Cct Mr.E.Licitra (NRC)Mr.R.Eberly (NRC-CHEB) | 'I 4 | ||
(2 copies)Mr.G.F.Maxwell (NRC-SHNPP)* | ~v Ir | ||
Mr.J.P.O'Reilly (NRC-RII)* | " 'l'> | ||
Mr.R.L.Ferguson (NRC-CHEB) | 4 | ||
Mr.G.0.Bright (ASLB)*Dr.J.H.Carpenter (ASLB)*Mr.J.L.Kelley (ASLB)* | , | ||
k | |||
&Construction J Sworn to and subscribed before me this 22nd day of July, 1983.Notary blic My commission expires: | SERIAL: LAP-83-330 Carolina Power & Light Company JUL 22 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS. 1 AND 2 DOCKET NOS ~ 50-400 AND 50-401 DRAFT SAFETY EVALUATION REPORT RESPONSES FIRE PROTECTION SAFE SHUTDOWN ANALYSIS | ||
(1)I am Senior Vice President, Engineering and Construction and am authorized by Carolina Power&Light Company (CP&L)to review the information sought to be withheld and to apply for its withholding. | ==Dear Mr. Denton:== | ||
(2)I am making this Affidavit in accordance with the requirements of 10CFR52.790, (3)The information sought to be w1thheld is contained in Volumes 5 and 6 of the"Safe Shutdown Analysis in Case of Fire" report which is being transmitted herewith.The Safe Shutdown Analysis contains detailed descriptions of the essential equipment, supporting equipment and power supplies required to take the plant to a safe shutdown condition. | |||
Pursuant to Sections 2.790(b)(l)(ii), (b)(4)and (d)(1), I aver that: (a)This information is held in confidence by CP&L.(b)This information consists of detailed drawings that illustrate essential cable routes and raceways and identifies the location of essenti,al equipment and power supplies.It is CP&L's belief that the facts set forth in subparagraph (e)below provide a rational basis for holding this information 1n conf1dence.(c)Carolina Power&Light Company is transmitting this information to the NRC in confidence.(d)This information is not available in public sources 1n the form in which it is being transmi.tted.(e)Withholding of this information from public disclosure is warranted due to the sensitive nature of the material.Volumes 1 through 4 of the"Safe Shutdown Analysis in Case of Fire" report contain detailed listings and locations of essential equipment, support equipment, power supplies, cables, cable routing, and conduit and cable trays.The locations given for all of the items discussed above refer to the detailed plant drawings contained in Volumes 5 and 6 of the report.Used in con)unction w1th Volumes 1 through 4, Volumes 5 and 6 of the Safe Shutdown Analys1s report clearly identify where the key areas of the plant are located.Without Volumes 5 and 6 of this report, the essential equipment and cables cannot be easily located.Further, the Aff1davit sayeth not.M.A.McDuffie Senior Vice President Engineering and Construction 1 | Carolina Power & Light Company (CP&L) hereby submits Volumes 5 and 6 of the Shearon Harris Nuclear Power Plant (SHNPP) "Safe Shutdown Analysis in Case of Fire" report. One (1) original and forty (40) copies of this submittal letter are transmitted. | ||
The total report consists of six volumes. Volumes 1 through 4 were transmitted by a separate letter. Pursuant to 10 CFR 2.790, CP&L hereby requests that Volumes 3 .and 6 of CP&L's "Safe Shutdown Analysis in Case of Fire" report for the Shearon Harris Nuclear Power Plant be withheld from public disclosure on the ground that such volumes contain information described in tt2.790(d) (1) and t't9.5(a)(4), i.e., commercial information which concerns the physical protection of the Shearon Harris Plant but is not designated as Safeguards Information. Attached hereto is an affidavit executed by M. A. McDuffie which more fully sets forth the reasons why the information should be withheld from public disclosure. CP&L requests tha~t this affidavit also be withheld from public disclosure along with Volumes 5 and'6 of the report. Five (5) copies of Volumes 5 and 6 are attached for distribution as shown below. This report is submitted in response to CP&L Open Item Number 312 from the SHNPP Draft Safety Evaluation Report. | |||
Please contact my staff if you have any questions. | |||
Yours very truly, M. A. McDu fie~ | |||
Senior Vice President Engineering & Construction MAM/FXT/tda (7452FXT) | |||
Attachments Cct Mr. E. Licitra (NRC) Mr. Travis Payne (KUDZU)* | |||
Mr. R. Eberly (NRC-CHEB) (2 copies) Mr. Daniel F. Read (CHANGE/ELP)* | |||
Mr. G. F. Maxwell (NRC-SHNPP)* Mr. Wells Eddleman+ | |||
Mr. J. P. O'Reilly (NRC-RII)* Dr. Phyllis Lotchin" Mr. R. L. Ferguson (NRC-CHEB) Mr. John D. Runkle+ | |||
Mr. G. 0. Bright (ASLB)* Dr. Richard D. Wilson" Dr. J. H. Carpenter (ASLB)* Chapel Hill Public Library* | |||
Mr. J. L. Kelley (ASLB)* Wake County Public Library" | |||
* w/o attachments 8308010373 830722 PDR ADOCK 05000400 p6 F PDR | |||
~17 l ayetteville Street o P. O. Box 1551 o Rale h, N. C. 27602 Tgs Hat< | |||
: l. P'SHE | |||
~, h | |||
( | |||
W | |||
) u'~ | |||
'I 4 h | |||
AFFIDAVIT County of Wake State of North Carolina AFFIDAVIT OF M. A. McDUFFIE Before me, the undersigned authority, personally appeared M. A. McDuffie, Senior Vice President, Engineering and Construction, who, being duly sworn according to law, deposes and says that he is authorized to execute this Affidavit on behalf of Carolina Power & Light Company and that the averments of facts set forth in this Affidavit are true and correct to the best of his knowledge, information and belief. | |||
M. A. McDuffie Senior Vice President Engineering & Construction J | |||
Sworn to and subscribed before me this 22nd day of July, 1983. | |||
ggulltttfg Notary blic ~ | |||
(PQ Py My commission expires: | |||
~lriStSCii~ | |||
(1) I am Senior Vice President, Engineering and Construction and am authorized by Carolina Power & Light Company (CP&L) to review the information sought to be withheld and to apply for its withholding. | |||
(2) I am making this Affidavit in accordance with the requirements of 10CFR52.790, (3) The information sought to be w1thheld is contained in Volumes 5 and 6 of the "Safe Shutdown Analysis in Case of Fire" report which is being transmitted herewith. The Safe Shutdown Analysis contains detailed descriptions of the essential equipment, supporting equipment and power supplies required to take the plant to a safe shutdown condition. | |||
Pursuant to Sections 2.790(b)(l)(ii), (b)(4) and (d)(1), I aver that: | |||
(a) This information is held in confidence by CP&L. | |||
(b) This information consists of detailed drawings that illustrate essential cable routes and raceways and identifies the location of essenti,al equipment and power supplies. It is CP&L's belief that the facts set forth in subparagraph (e) below provide a rational basis for holding this information 1n conf1dence. | |||
(c) Carolina Power & Light Company is transmitting this information to the NRC in confidence. | |||
(d) This information is not available in public sources 1n the form in which it is being transmi.tted. | |||
(e) Withholding of this information from public disclosure is warranted due to the sensitive nature of the material. Volumes 1 through 4 of the "Safe Shutdown Analysis in Case of Fire" report contain detailed listings and locations of essential equipment, support equipment, power supplies, cables, cable routing, and conduit and cable trays. The locations given for all of the items discussed above refer to the detailed plant drawings contained in Volumes 5 and 6 of the report. Used in con)unction w1th Volumes 1 through 4, Volumes 5 and 6 of the Safe Shutdown Analys1s report clearly identify where the key areas of the plant are located. Without Volumes 5 and 6 of this report, the essential equipment and cables cannot be easily located. | |||
Further, the Aff1davit sayeth not. | |||
M. A. McDuffie Senior Vice President Engineering and Construction | |||
1 | |||
~ P | |||
' | |||
'I ~ | |||
r | |||
'C}} | |||
Revision as of 03:42, 22 October 2019
| ML18018A635 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 07/22/1983 |
| From: | Mcduffie M CAROLINA POWER & LIGHT CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML18018A636 | List: |
| References | |
| LAP-83-330, NUDOCS 8308010373 | |
| Download: ML18018A635 (7) | |
Text
Cg REGULATOR INF0RMAT ION DISTRIBUTION 8'r STEM (RIDS)
'ACOESSION, NBR'8308010373 . DOC.DATE ~ '83/07/22 NOTARIZED: YES DOCKET ¹ FACIL j50.400 Shear on Herr j s Nuc I'ear ':Power Pl anti Uni t li 'Car ol jna 05000400 50 401 Shearon Har r'is Nuclear Power Pl anti Unit 2i =Carolina 05000401
'AUTH NAME AUTHOR AFFILIATION MCDUFFlIEiM.A. Car ol ina Power L Light <<Co, RECIP. NAME RECIPIENT AFFILIATION DENTONiH R. Office of Nuclear Reactor Reoulationi Di&ector.
SUBJECT- Forwards "Shearon Harris Nucl'ear Power Plant Unit 1'Safe
'Shutdown Analvsis in Case of Fi,rei" oroorietary Vols 5-6q in Aresoonse to:draf t SER Oden Item "312.Vol s withheld (reef 10CFR2;790) Vol s 1 4 t'ransmi t ted bv -ser)ar ate l trB
~
DISTRIBUj'ION CODE: BOOBS COPIES RECEIVED:LTR 'g<< 'ENCL <<$ SIZE
.TITLE: Licensino Submittal: Fire Protection NDTEB! &<< %'r F F g I<<
di~ COPIES NRR REt: IPIENT ID CODE/NAME LB3 INT<<ERNAL: <<ELD/HDS1 REG FILE C
BC I
~4I I
.:
L'TTR ENCL 1
1 2
-1 1
I I
.1 REOIP IENT IDCODE/NAME KADAI<<BIBP IE FILE NRR/DS RGN2 I/ASB
~
43 "COPIES
'lTTR
.1 1
-1 1
ENCL, 1
4J 6 O L'P DR NSIC g8 1
31 NTIS TOTA'L NUMBER OF COPIES REQUIRED: LTTR 19 ENCL
I k II 44>I I R f ( '1
'I
(( >I I
'f f (4 f f g 'I" f f " 44 11 HI(
(4 I 4 >f e'f>>rrll
Ir "f .'"Irfr'( ' ~ c" 'I ~ 4(
4> (( f lj 'p r >I 4> C t >>f>C 4 ~ I> C
'I 4
~v Ir
" 'l'>
4
,
k
SERIAL: LAP-83-330 Carolina Power & Light Company JUL 22 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS. 1 AND 2 DOCKET NOS ~ 50-400 AND 50-401 DRAFT SAFETY EVALUATION REPORT RESPONSES FIRE PROTECTION SAFE SHUTDOWN ANALYSIS
Dear Mr. Denton:
Carolina Power & Light Company (CP&L) hereby submits Volumes 5 and 6 of the Shearon Harris Nuclear Power Plant (SHNPP) "Safe Shutdown Analysis in Case of Fire" report. One (1) original and forty (40) copies of this submittal letter are transmitted.
The total report consists of six volumes. Volumes 1 through 4 were transmitted by a separate letter. Pursuant to 10 CFR 2.790, CP&L hereby requests that Volumes 3 .and 6 of CP&L's "Safe Shutdown Analysis in Case of Fire" report for the Shearon Harris Nuclear Power Plant be withheld from public disclosure on the ground that such volumes contain information described in tt2.790(d) (1) and t't9.5(a)(4), i.e., commercial information which concerns the physical protection of the Shearon Harris Plant but is not designated as Safeguards Information. Attached hereto is an affidavit executed by M. A. McDuffie which more fully sets forth the reasons why the information should be withheld from public disclosure. CP&L requests tha~t this affidavit also be withheld from public disclosure along with Volumes 5 and'6 of the report. Five (5) copies of Volumes 5 and 6 are attached for distribution as shown below. This report is submitted in response to CP&L Open Item Number 312 from the SHNPP Draft Safety Evaluation Report.
Please contact my staff if you have any questions.
Yours very truly, M. A. McDu fie~
Senior Vice President Engineering & Construction MAM/FXT/tda (7452FXT)
Attachments Cct Mr. E. Licitra (NRC) Mr. Travis Payne (KUDZU)*
Mr. R. Eberly (NRC-CHEB) (2 copies) Mr. Daniel F. Read (CHANGE/ELP)*
Mr. G. F. Maxwell (NRC-SHNPP)* Mr. Wells Eddleman+
Mr. J. P. O'Reilly (NRC-RII)* Dr. Phyllis Lotchin" Mr. R. L. Ferguson (NRC-CHEB) Mr. John D. Runkle+
Mr. G. 0. Bright (ASLB)* Dr. Richard D. Wilson" Dr. J. H. Carpenter (ASLB)* Chapel Hill Public Library*
Mr. J. L. Kelley (ASLB)* Wake County Public Library"
~17 l ayetteville Street o P. O. Box 1551 o Rale h, N. C. 27602 Tgs Hat<
- l. P'SHE
~, h
(
W
) u'~
'I 4 h
AFFIDAVIT County of Wake State of North Carolina AFFIDAVIT OF M. A. McDUFFIE Before me, the undersigned authority, personally appeared M. A. McDuffie, Senior Vice President, Engineering and Construction, who, being duly sworn according to law, deposes and says that he is authorized to execute this Affidavit on behalf of Carolina Power & Light Company and that the averments of facts set forth in this Affidavit are true and correct to the best of his knowledge, information and belief.
M. A. McDuffie Senior Vice President Engineering & Construction J
Sworn to and subscribed before me this 22nd day of July, 1983.
ggulltttfg Notary blic ~
(PQ Py My commission expires:
~lriStSCii~
(1) I am Senior Vice President, Engineering and Construction and am authorized by Carolina Power & Light Company (CP&L) to review the information sought to be withheld and to apply for its withholding.
(2) I am making this Affidavit in accordance with the requirements of 10CFR52.790, (3) The information sought to be w1thheld is contained in Volumes 5 and 6 of the "Safe Shutdown Analysis in Case of Fire" report which is being transmitted herewith. The Safe Shutdown Analysis contains detailed descriptions of the essential equipment, supporting equipment and power supplies required to take the plant to a safe shutdown condition.
Pursuant to Sections 2.790(b)(l)(ii), (b)(4) and (d)(1), I aver that:
(a) This information is held in confidence by CP&L.
(b) This information consists of detailed drawings that illustrate essential cable routes and raceways and identifies the location of essenti,al equipment and power supplies. It is CP&L's belief that the facts set forth in subparagraph (e) below provide a rational basis for holding this information 1n conf1dence.
(c) Carolina Power & Light Company is transmitting this information to the NRC in confidence.
(d) This information is not available in public sources 1n the form in which it is being transmi.tted.
(e) Withholding of this information from public disclosure is warranted due to the sensitive nature of the material. Volumes 1 through 4 of the "Safe Shutdown Analysis in Case of Fire" report contain detailed listings and locations of essential equipment, support equipment, power supplies, cables, cable routing, and conduit and cable trays. The locations given for all of the items discussed above refer to the detailed plant drawings contained in Volumes 5 and 6 of the report. Used in con)unction w1th Volumes 1 through 4, Volumes 5 and 6 of the Safe Shutdown Analys1s report clearly identify where the key areas of the plant are located. Without Volumes 5 and 6 of this report, the essential equipment and cables cannot be easily located.
Further, the Aff1davit sayeth not.
M. A. McDuffie Senior Vice President Engineering and Construction