{{#Wiki_filter:*--OPERATING DATA REPORT OPERATING STATUS 1. Unit Name: Palisades
{{#Wiki_filter:*--
: 2. Reporting Period: 880301-880331
OPERATING DATA REPORT DOCKET NO DATE COMPLETED BY        GCPackard TELEPHONE (616)764-8913 OPERATING STATUS NOTES
: 3. Licensed Thermal Power (MWt): 2530 4. Nameplate Rating (Gross MWe): 811.7 5. Design Electrical Rating (Net MWe): 805 6. Maximum Dependable Capacity (Gross MWe):
: 1. Unit Name: Palisades
: 7. Maximum Dependable Capacity (Net MWe): *'k730 DOCKET NO DATE COMPLETED BY GCPackard TELEPHONE (616)764-8913 NOTES 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons: 9. Power Level to Which Restricted, if any (Net MWe): 10. Reasons for Restrictions, if any: This Month 11. Hours In Reporting Period 744.0 12. Number of Hours Reactor Was Critical 744.0 13. Reactor Reserve Shutdown Hours 14. Hours Generator On-Line 744.0 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) lz878z312
                  ~....,...-~~~-----~~~--~-~~
: 17. Gross Electrical Energy Generated (MWH) 608z670 18. Net Electrical Energy Generated (MWH) 578z607 19. Unit Service Factor 100.0 20. Unit Availability Factor 100.0 21. Unit Capacity Factor (Using MDC Net) 106.5 22. Unit Capacity Factor (Using DER Net) 96 .6 23. Unit Forced Outage Rate o.o 24. Shutdowns Scheduled Over Next Six Months (Type, Date and Refueling z Se Et ember 9z 1988z 87 days Yr-to-Date 2zl84.0 lz574.2 lz544.8 3z567z792 lzl54z835 lz093z120 70.7 70.7 68.6 62.2 29.3 Duration of 25. If Shut Down at End of Report Period, Estimated Date of Start Up: 26. Units in Test Status (Prior to Commercial Operation):
: 2. Reporting Period:                 880301-880331
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION  
: 3. Licensed Thermal Power (MWt):               2530
**Based on condenser backpressure Forecast *Weighted Average (635 MWe used as MDC Net prior to October 1985) OC0185-0001B-OP03  
: 4. Nameplate Rating (Gross MWe):             811.7
-----.8804150398 880331 . PDR ADOCK 05000255 R DCD Cumulative 142z743.0 75z591.2 71 z811.0 150z755z709 47z068z355 44z310z154 50.3 50.3 *48.1 38.6 35.8 Each): Achieved 
: 5. Design Electrical Rating (Net MWe):       805
-,  
: 6. Maximum Dependable Capacity (Gross MWe): ~'*770
*DAILY UNIT POWER LEVEL e DOCKET NO 50-255 ------UNIT Palisades DATE 04-07-88 COMPLETED BY GCPackard TELEPHONE (616)764-8913 MONTH March 1988 -----------
: 7. Maximum Dependable Capacity (Net MWe):     *'k730
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 779 17 779 2 778 18 779 3 780 19 780 4 779 20 781 5 780 21 781 6 777 22 777 7 778 23 775 8 775 24 772 9 779 25 774 10 780 26 779 11 777 27 781 12 777 28 774 13 778 29 776 14 778 30 779 15 780 31 76 7 16 779 INSTRUCTIONS:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:
: 9. Power Level to Which Restricted, if any (Net MWe):
: 10. Reasons for Restrictions, if any:
This Month   Yr-to-Date      Cumulative
: 11. Hours In Reporting Period                             744.0     2zl84.0          142z743.0
: 12. Number of Hours Reactor Was Critical                   744.0     lz574.2            75z591.2
: 13. Reactor Reserve Shutdown Hours
: 14. Hours Generator On-Line                               744.0     lz544.8          71 z811.0
: 15. Unit Reserve Shutdown Hours
: 16. Gross Thermal Energy Generated (MWH)               lz878z312   3z567z792        150z755z709
: 17. Gross Electrical Energy Generated (MWH)             608z670   lzl54z835        47z068z355
: 18. Net Electrical Energy Generated (MWH)               578z607   lz093z120        44z310z154
: 19. Unit Service Factor                                   100.0         70.7                50.3
: 20. Unit Availability Factor                               100.0         70.7                50.3
: 21. Unit Capacity Factor (Using MDC Net)                   106.5         68.6              *48.1
: 22. Unit Capacity Factor (Using DER Net)                   96 .6       62.2                38.6
: 23. Unit Forced Outage Rate                                 o.o         29.3                35.8
: 24. Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of Each):
Refueling z Se Et ember 9z 1988z 87 days
: 25. If Shut Down at End of Report Period, Estimated Date of Start Up:
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast        Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
    **Based on condenser backpressure
      *Weighted Average (635 MWe used as MDC Net prior to October 1985)
OC0185-0001B-OP03
          -~----------*  -----
  .8804150398 880331
  . PDR ADOCK 05000255 R                   DCD
 
-,
                        ~VERAGC; *DAILY UNIT POWER LEVEL e DOCKET NO - - - 255
                                                                            --
UNIT     Palisades DATE       04-07-88 COMPLETED BY     GCPackard TELEPHONE (616)764-8913 MONTH
        - - - March
              - - -1988
                      -----
DAY   AVERAGE DAILY POWER LEVEL             DAY   AVERAGE DAILY POWER LEVEL (MWe-Net)                                     (MWe-Net) 1             779                           17               779 2             778                           18               779 3             780                           19               780 4             779                           20               781 5             780                           21               781 6             777                           22               777 7             778                           23               775 8             775                           24               772 9             779                           25               774 10             780                           26               779 11             777                           27               781 12             777                           28               774 13             778                           29               776 14             778                           30               779 15             780                           31               76 7 16             779 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
OC0185-0001C-OP03 REPORT MONTH MARCH 1988 No. Date Type 1 18 880331 s 1. 2. F: Forced S: Scheduled OC0185-0001D-OP03 Duration Reason 2 (Hours) 0 A Reason: A-Equipment Failure (Explain)
OC0185-0001C-OP03
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
 
I'-
DOCKET NO.                        50-255 UNIT SHUTDOWNS AND POWER REDUCTIONS                        UNIT NAME - - - - -        Palisades
                                                                                                                                              ---
DATE -------'-0_4---'0---'-7--8'-'-8 COMPLETED BY - - - - -        GCPackard
                                                                                                                                              ---
REPORT MONTH         MARCH 1988
              ---------~
TELEPHONE            (616)-764-8913 No. Date     Type 1     Duration    Reason 2    Method of        Licensee      System    Component      Cause & Corrective (Hours)                  Shutting          Event          Code 4      Code 5          Action to Down Reactor 3    Report #                                  Prevent Recurrence 18     880331     s             0          A              4                                                    Power reduction to repair                  e condenser tube leak.
: 1.                 2.                                   3.                      4.                                5.
F: Forced         Reason:                              Method:                 Exhibit G - Instructions          Exhibit I - Same Source S: Scheduled      A-Equipment Failure (Explain)       1-Manual                for Preparation of Data B-Maintenance or Test               2-Manual Scram          Entry Sheets for Licensee C-Refueling
* 3-Automatic Scram      Event Report (LER) File D-Regulatory Restriction             4-0ther (Explain)      (NUREG-0161)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
H-Other (Explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor 3 Report # 4 3. Method: 1-Manual 2-Manual Scram
OC0185-0001D-OP03
* 3-Automatic Scram 4-0ther (Explain)
 
: 4. System Component Code 4 Code 5 Exhibit G -Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
e*
I'-DOCKET NO. 50-255 UNIT NAME Palisades
--------DATE -------'-0_4---'0---'-7--8'-'-8 COMPLETED BY GCPackard
--------TELEPHONE (616)-764-8913 Cause & Corrective Action to Prevent Recurrence Power reduction to repair e condenser tube leak. 5. Exhibit I -Same Source e*  


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR MARCH 1988 The plant was operating at essentially 100 percent power when at 2200 hours on March 31, 1988 the plant reduced power to 40 percent to repair a tube leak in the condenser and remained at this power level through the end of the reporting period. OC0185-0001E-OP03
OF OPERATING EXPERIENCE FOR MARCH 1988 The plant was operating at essentially 100 percent power when at 2200 hours on March 31, 1988 the plant reduced power to 40 percent to repair a tube leak in the condenser and remained at this power level through the end of the reporting period.
. ,,. consumers Power POW ERi Nii MICHlliAN'S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 April 7, 1988 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of March, 1988. George Goralski Reactor Engineer CC: KMHaas, Palisades ABDavis, USNRC KW8erry, P24-6148 CSKozup, Palisades Resident Inspector, Palisades DLHackett, Pll-4208 MALapinski, P21-332 GWBruckmann, Div of Radiological Health Services, Lansing, Michigan SLHall, Michigan Dept of Labor RCallen, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades LL8umb, P21-324 G8Szczotka, P-21-3118 HRSnider, P-21-326 Administrator, USNRC Document Control, 950*22*35*10/L GCP88-014 OC0185-0001A-OP03 A CMS ENERGY COMPANY}}
OC0185-0001E-OP03
 
. ,,.
consumers Power POWERiNii MICHlliAN'S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 April 7, 1988 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of March, 1988.
      ~              ~
George Goralski Reactor Engineer CC: KMHaas, Palisades ABDavis, USNRC KW8erry, P24-6148 CSKozup, Palisades Resident Inspector, Palisades DLHackett, Pll-4208 MALapinski, P21-332 GWBruckmann, Div of Radiological Health Services, Lansing, Michigan SLHall, Michigan Dept of Labor RCallen, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades LL8umb, P21-324 G8Szczotka, P-21-3118 HRSnider, P-21-326 Administrator, USNRC Document Control, 950*22*35*10/L GCP88-014 OC0185-0001A-OP03 A CMS ENERGY COMPANY}}

Revision as of 19:17, 21 October 2019

Monthly Operating Rept for Mar 1988.W/880407 Ltr
ML18053A301
Person / Time
Site: Palisades 
Issue date: 03/31/1988
From: Goralski G, Packard G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8804150398
Download: ML18053A301 (5)


Text

  • --

OPERATING DATA REPORT DOCKET NO DATE COMPLETED BY GCPackard TELEPHONE (616)764-8913 OPERATING STATUS NOTES

1. Unit Name: Palisades

~....,...-~~~-----~~~--~-~~

2. Reporting Period: 880301-880331
3. Licensed Thermal Power (MWt): 2530
4. Nameplate Rating (Gross MWe): 811.7
5. Design Electrical Rating (Net MWe): 805
6. Maximum Dependable Capacity (Gross MWe): ~'*770
7. Maximum Dependable Capacity (Net MWe): *'k730
8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:
9. Power Level to Which Restricted, if any (Net MWe):
10. Reasons for Restrictions, if any:

This Month Yr-to-Date Cumulative

11. Hours In Reporting Period 744.0 2zl84.0 142z743.0
12. Number of Hours Reactor Was Critical 744.0 lz574.2 75z591.2
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 744.0 lz544.8 71 z811.0
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) lz878z312 3z567z792 150z755z709
17. Gross Electrical Energy Generated (MWH) 608z670 lzl54z835 47z068z355
18. Net Electrical Energy Generated (MWH) 578z607 lz093z120 44z310z154
19. Unit Service Factor 100.0 70.7 50.3
20. Unit Availability Factor 100.0 70.7 50.3
21. Unit Capacity Factor (Using MDC Net) 106.5 68.6 *48.1
22. Unit Capacity Factor (Using DER Net) 96 .6 62.2 38.6
23. Unit Forced Outage Rate o.o 29.3 35.8
24. Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of Each):

Refueling z Se Et ember 9z 1988z 87 days

25. If Shut Down at End of Report Period, Estimated Date of Start Up:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

OC0185-0001B-OP03

-~----------* -----

.8804150398 880331

. PDR ADOCK 05000255 R DCD

-,

~VERAGC; *DAILY UNIT POWER LEVEL e DOCKET NO - - - 255

--

UNIT Palisades DATE 04-07-88 COMPLETED BY GCPackard TELEPHONE (616)764-8913 MONTH

- - - March

- - -1988


DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 779 17 779 2 778 18 779 3 780 19 780 4 779 20 781 5 780 21 781 6 777 22 777 7 778 23 775 8 775 24 772 9 779 25 774 10 780 26 779 11 777 27 781 12 777 28 774 13 778 29 776 14 778 30 779 15 780 31 76 7 16 779 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

OC0185-0001C-OP03

I'-

DOCKET NO. 50-255 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME - - - - - Palisades

---

DATE -------'-0_4---'0---'-7--8'-'-8 COMPLETED BY - - - - - GCPackard

---

REPORT MONTH MARCH 1988


~

TELEPHONE (616)-764-8913 No. Date Type 1 Duration Reason 2 Method of Licensee System Component Cause & Corrective (Hours) Shutting Event Code 4 Code 5 Action to Down Reactor 3 Report # Prevent Recurrence 18 880331 s 0 A 4 Power reduction to repair e condenser tube leak.

1. 2. 3. 4. 5.

F: Forced Reason: Method: Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling

  • 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-0ther (Explain) (NUREG-0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

OC0185-0001D-OP03

e*

SUMMARY

OF OPERATING EXPERIENCE FOR MARCH 1988 The plant was operating at essentially 100 percent power when at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> on March 31, 1988 the plant reduced power to 40 percent to repair a tube leak in the condenser and remained at this power level through the end of the reporting period.

OC0185-0001E-OP03

. ,,.

consumers Power POWERiNii MICHlliAN'S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 April 7, 1988 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of March, 1988.

~ ~

George Goralski Reactor Engineer CC: KMHaas, Palisades ABDavis, USNRC KW8erry, P24-6148 CSKozup, Palisades Resident Inspector, Palisades DLHackett, Pll-4208 MALapinski, P21-332 GWBruckmann, Div of Radiological Health Services, Lansing, Michigan SLHall, Michigan Dept of Labor RCallen, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades LL8umb, P21-324 G8Szczotka, P-21-3118 HRSnider, P-21-326 Administrator, USNRC Document Control, 950*22*35*10/L GCP88-014 OC0185-0001A-OP03 A CMS ENERGY COMPANY