ML18053A301

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1988
ML18053A301
Person / Time
Site: Palisades 
Issue date: 03/31/1988
From: Goralski G, Packard G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8804150398
Download: ML18053A301 (5)


Text

  • --

OPERATING DATA REPORT OPERATING STATUS

1.

Unit Name: Palisades

~....,...-~~~-----~~~--~-~~

2.

Reporting Period:

880301-880331

3.

Licensed Thermal Power (MWt):

2530

4.

Nameplate Rating (Gross MWe):

811.7

5.

Design Electrical Rating (Net MWe):

805

6.

Maximum Dependable Capacity (Gross MWe):

~'*770

7.

Maximum Dependable Capacity (Net MWe):

  • 'k730 DOCKET NO DATE COMPLETED BY GCPackard TELEPHONE (616)764-8913 NOTES
8.

If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:

9.

Power Level to Which Restricted, if any (Net MWe):

10.

Reasons for Restrictions, if any:

This Month

11.

Hours In Reporting Period 744.0

12.

Number of Hours Reactor Was Critical 744.0

13.

Reactor Reserve Shutdown Hours

14.

Hours Generator On-Line 744.0

15.

Unit Reserve Shutdown Hours

16.

Gross Thermal Energy Generated (MWH) lz878z312

17.

Gross Electrical Energy Generated (MWH) 608z670

18.

Net Electrical Energy Generated (MWH) 578z607

19.

Unit Service Factor 100.0

20.

Unit Availability Factor 100.0

21.

Unit Capacity Factor (Using MDC Net) 106.5

22.

Unit Capacity Factor (Using DER Net) 96.6

23.

Unit Forced Outage Rate o.o

24.

Shutdowns Scheduled Over Next Six Months (Type, Date and Refueling z Se Et ember 9z 1988z 87 days Yr-to-Date 2zl84.0 lz574.2 lz544.8 3z567z792 lzl54z835 lz093z120 70.7 70.7 68.6 62.2 29.3 Duration of

25.

If Shut Down at End of Report Period, Estimated Date of Start Up:

26.

Units in Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure Forecast
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

OC0185-0001B-OP03

-~----------* -----

.8804150398 880331

. PDR ADOCK 05000255 R

DCD Cumulative 142z743.0 75z591.2 71 z811.0 150z755z709 47z068z355 44z310z154 50.3 50.3

  • 48.1 38.6 35.8 Each):

Achieved

~VERAGC; *DAILY UNIT POWER LEVEL e DOCKET NO 50-255 UNIT Palisades DATE 04-07-88 COMPLETED BY GCPackard TELEPHONE (616)764-8913 MONTH March 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 779 17 779 2

778 18 779 3

780 19 780 4

779 20 781 5

780 21 781 6

777 22 777 7

778 23 775 8

775 24 772 9

779 25 774 10 780 26 779 11 777 27 781 12 777 28 774 13 778 29 776 14 778 30 779 15 780 31 76 7 16 779 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

OC0185-0001C-OP03

REPORT MONTH MARCH 1988


~

No.

Date Type1 18 880331 s

1.
2.

F:

Forced S: Scheduled OC0185-0001D-OP03 Duration Reason2 (Hours) 0 A

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor3 Report #

4

3.

Method:

1-Manual 2-Manual Scram

  • 3-Automatic Scram 4-0ther (Explain)
4.

System Component Code4 Code5 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

I'-

DOCKET NO.

50-255 UNIT NAME Palisades DATE -------'-0_4---'0---'-7--8'-'-8 COMPLETED BY GCPackard TELEPHONE (616)-764-8913 Cause & Corrective Action to Prevent Recurrence Power reduction to repair e

condenser tube leak.

5.

Exhibit I - Same Source

e*

SUMMARY

OF OPERATING EXPERIENCE FOR MARCH 1988 The plant was operating at essentially 100 percent power when at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> on March 31, 1988 the plant reduced power to 40 percent to repair a tube leak in the condenser and remained at this power level through the end of the reporting period.

OC0185-0001E-OP03

consumers Power POW ERi Nii MICHlliAN'S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 April 7, 1988 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of March, 1988.

~

~

George Goralski Reactor Engineer CC: KMHaas, Palisades ABDavis, USNRC KW8erry, P24-6148 CSKozup, Palisades Resident Inspector, Palisades DLHackett, Pll-4208 MALapinski, P21-332 GWBruckmann, Div of Radiological Health Services, Lansing, Michigan SLHall, Michigan Dept of Labor RCallen, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades AAAlatalo, Palisades LL8umb, P21-324 G8Szczotka, P-21-3118 HRSnider, P-21-326 Administrator, USNRC Document Control, 950*22*35*10/L GCP88-014 OC0185-0001A-OP03 A CMS ENERGY COMPANY