ML12095A381: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Bklý--------------
{{#Wiki_filter:Bklý FNR Decommissioning Project                                            --------------
FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No: ,2607,-27,2-Survey Unit:,SP'o67 Pkg. A/i/1 Sheet / of ..Date: W167/.2007 Survey Location:
Reconnaissance Level Scan Survey Form Survey No: ,2607,-27,2-                   Survey Unit:,SP'o67               Pkg.           A/i/1         Sheet       /   of ..
w" Pb- R +- /b6 eZ Col)_.I. Instrument Information Inst. HV TE{R 27c Calibration Calibration Set Meter Scaler Detector Detector Setting Setting Inst. Due Date Due Date No. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector) 7I.. -1773 q3-37 24392 I.. l7_S q 2 39.7 1192)08 7 0/8___=NA/NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.Comments: Initial Perfor.mance Test Performed  
Date: W167/.2007                         Survey Location:                 w" Pb- R +-               /b6     eZ     Col)_.
& Satisfactory:, H.Rwonn Measurements Counts Inst. Count per Set Time Minute No. Grid or Location (nin.) (cpm)& G,-a&tn / &-I AVq /// 3,75/ Ac+~lfIev]  
I. Instrument Information Inst.                                                                     HV         TE{R           27c     Calibration       Calibration Set       Meter             Scaler     Detector       Detector     Setting     Setting         Inst. Due Date         Due Date No.       Model           Serial No.     Model         Serial No.     (Vdc)     (mVdc)           Eff.     (Scaler)         (Detector) 7I..       -1773                       q3-37                     24392I..q l7_S           2         39.7 1192)08                   7     0/8
]in/L1177 Comments: Initial / Date III. Total Surface Activi Measurements Counts Inst. Count per Set Time Minute No. Grid or Location (min.) (cpm)/ 1 51ton/ / _5 .60/ / 5£oo/ / ( 5/ _____ / /000o/ /0,o09/.,../_,Q Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpm/100-cn 2 , unless otherwise noted on the attached survey map.Post-Survey Performance Test Performed  
___=NA/
& Satisfactory:
NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.
0i1L4 2cD"(Initial / Date Survey Tech (print/sign):
Comments:
kn Date: be!/ O j C)O Reviewed By (print/sign):
Initial Perfor.mance Test Performed & Satisfactory:,
V // 0 L/7eJ Retention:
Initial / Date H.Rwonn                 Measurements                                     III. Total Surface Activi                  Measurements Counts                                                                      Counts Inst.                               Count          per                  Inst.                                    Count         per Set                                 Time       Minute                  Set                                    Time        Minute No.       Grid or Location         (nin.)       (cpm)                   No.        Grid or Location            (min.)        (cpm)
LP+10 Filename:
                                                                              /
FSS Characterization SCAN Survey FormsRev02 FNR Decommissioning Project Reconnaissance Level Scan Survey Form SurveyNo:-2-00"1-A -Survey Unit: 5P-oO7 Pkg. .)4A- Sheet 2- of 2-Date: 11-7-07 Survey Location:
* 1          51ton
A- k x ''MOe- -Survey Comment Sheet: 4EA2A ~A ~ A~L~ ~'~No$~- -eOAJE.ýtck-a mL1~I~I~Retention:
          & G,-a&tn                   /             &-                       /                                        / _5 .60 I AVq                       ///           3,75
LP+10 Filenarne:
    /       Ac+~lfIev] ]in/L1177                                             /                                        /         5£oo
Survey Comment Map_Form_RevOO FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No: 2-07-- 22-13 Date: 11-1-o-I Survey Unit: -P-C007 Pkg. Sheet .of Z_Survey Location:
                                                                              /            *-                        /            ( 5
tdtj* 0-aw 0ý001 j 1. Instrument Information , ---,. -" '/,-Inst. HIV THR 27t Calibration Calibration Set Meter Scaler Detector Detector Setting Setting Inst. Due Date Due Date No. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector) 1 1-22z/ /V743 q4-31 2q,3qzZ..
                                                                              /          _____                        /          /000o
17s- Z. 34.7 I/tz/og ,7// 7/A 2 L-zzl, 23q11 .. qW-iq.. Z ?Tq/ /oo i0 0 37,0 ,'$131og ./oI tJ/A NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.Comments: Initial Performance Test Performed
                                                                              / *_I
& Satisfactory:
                                                                              /.,../_,Q                                          /0,o09 Comments:
m Initial / Date 1. Backgrounfd Measurements Counts Inst. Count per Set Time Minute No. Grid or Location (min.) (cpm)-41L t 3=ý2 -________________
Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpm/100-cn 2 , unless otherwise noted on the attached survey map.
2- _ _ _o.mmerits:
Post-Survey Performance Test Performed & Satisfactory:                                                         0i1L4 2cD"(
kk4e A 64-. *a 'OL4 4.WL A4dt a, dAl, Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 r~m1llr 2 ,lc *n.iantAa , tnhd.mnomn
Initial / Date Survey Tech       (print/sign): kn                                                             Date:         O be!/ j   C)O Reviewed By (print/sign):             V                                                                       L/7eJ
_ _Post-Survey Performance Test Perform ,& Satisfactory:
                                                                                                              //        0 Filename: FSS Characterization SCAN Survey FormsRev02                                                                 Retention: LP+10
-- 07 (Initial / Date Survey Tech (print/signi:
Date: 11`9_"__-61 Reviewed By (print/sign),'
I4ý " Date: Iit-:9-0'" Filename:
FSS Characterization SCAN Survey FormsRevO2 Retention:
LP+10 FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No: 2o0"7- Survey Unit: IP-Co07 Pkg. A/,A Sheet Z of z.Date: It- Survey Location:
4,o.tg e4 f .a.tc-tt 1i0 ci Survey Comment Sheet: 6eam, e., K) AU-Filename:
Survey CommentMapForm_RevOO Retention:
LP+ 10 Survey No: ,,ý-2,d Date: I J5 4ac"7 I. Instrument Information FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey Unit: JOL. Pkg. S P OD'1 Sheet I ofj Survey Location:
=T jde, 82L2h CORKSc 6MATO7i Pq6mWcAr4-P I1 r-i Inst. lV THI[R 2n Calibration Calibration Set Meter Scaler Detector Detector Setting Setting Inst. Due Date Due Date No. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)
;Z2A) 21%59g 14q*J .2Io 71b WA 35 39-L ~16 1 VA W..Mz4 NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted In the comments below.Commens:,&VA .e ol .sije Paails o4ý covers.Initial Performance Test Performed
& Satisfactory:
19% /W7 II. Background Measurements Counts Inst. Count per Set Time Minute No. Grid or Location (ain.) (cpm)/ a,, 'I I -75 NJ& PIA Z90! _,,'an 1 evA +/-L. (o0/W III. Total Surface ActihA! Measurements Counts Inst. Count per Set Time Minute No. Grid or Location (ri) (cpm)___ ye- A414 Comm ts*~ -~~Pciso~y co ,89 m OT slain..,Ra is1- on IV., .Each of the dernarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dprn/100-cm 2 , unless otherwise noted on the attached survey map.Post-Survey Performance Test Performed
& Satisfactory:
11 1L512/0-7"' Wial I Dafte Survey Tech (print/sign):
45y1 (fl rI1 §J 1 l N Date: 154/ 2W7 Reviewed By (pi/sig: Date: " Filename-FSS Characterization SCAN Survey Forms-Rev02 LP+ 10 (Survey No: _2&7-.23"3o Date: I Inforato FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey Unit:_______
Pkg.&SP-4Z7 Sheet _L of /Survey Location:
Bm Po4 end / kA Corn-r-11 Pjk,4m4iM-~
4-tb oa~,e.Inst. iiV THIR 2,x Calibration Calibration Set Meter Scaler Detector Detector Setting Setting Inst. Due Date Due Date No. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)
I &RP qq-/qX 71L 1166 -.1 .41=/A!Y NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.Comments:
P ,kfqrL/-CZ C- flke/ta Ch OVf-r AW&17#aI ' _-Initial Performance Test Performed
& Satisfactory:
H. Background Measurements I V1,0gW Initial / Date Counts Inst. Count per Set Time Minute No. Grid or Location (rin.) (cpm)I &CXr.v::ownJ t' I __/ S / ___I .Il/ 3o-W 9 M. Total Surface Activh Measurements Counts Inst. Count per Set Time Minute No. Grid or Location (ain.) (epm)/do kylw/A ab -10 Comments: Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpmnl00-cin 2.unless otherwise noted on the attached survey map.Post-Survey Performance Test Performed
& Satisfactory:
__ _ _ I_ _ -__7'=*" Ihita / Date Survey Tech (print/sign):
Date: I / ZW-7 Reviewed By (print/sign):
_ __________________
Filename:
FSS Characterization SCAN Survey Forms_Rev/
Retention:
LP+10 FNR Decommissioning Project Reconnaissance Level Scan Survey Form SurveyNo:
ocWl'- 22319 Survey -Z- Pkg. 6P-MI Sheet t of ý-Date: I11,g 1./o-) Survey Location:
Nci-P'r WaOJJ ea Pcf{ 000K-ov &o"-s'  ,-i Q-L.M I. Instrument Information Inst. HV THR 27c Calibration Calibration Set Meter Scaler Detector Detector Setting Setting Inst. Due Date Due Date No. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)-k, I', A..x.o1 ý'ý-3-ý ý 1 161 )"7,_,0D olo q '~* 7/1/I;ooS NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes or 15-ft RG-58 (LMI 3-37 gas-flow hand-held) unless otherwise noted in the comments below.Comments:
nrU,'5 m Floor k WC W, W h 42- 1 9,4810 q-lqu-- d q3S93 Initial Performance Test Performed
& Satisfactory:
1,W nb]'*a Initial / Date II. Background Measurements Counts Inst. Count per Set Time Minute No. Grid or Location (min.) (cpm)I _______ I~ Kc 2I _______/; .3 / /77q___ dhFv- Lev #,-IH. Total Surface Activi Measurements Counts Inst. Count per Set Time Minute No. Grid or Location (min.) (cpm)Nlorfh d-si d MA flD PUYo-,ý&k -+2 q rea-¢_ _ Aecpm 04V cve~o-.SJp2-i-42__________
________________________________
_____________
I _________________
Comments: ThP~e (ýn noyAf+-\UXLU~Q r-Luv-y.rnvl .Iq-4rcyywý 4O'-o k)iS FCc4 10_'e Each of the demarked grids Cor locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpm/100-cm 2 , unless otherwise noted on the attached survey map.Post-Survey Performance Test Performed L[LL -1121007)Initial / Date Survey Tech (print/sign):
ýefl (7'-no" A Date: l4I2'? 20C Reviewed By (print/sign):
JI' /1 .Date: (//Z9 ).,7¥Filename:
FSS Characterization SCAN Survey FormsRev02 Retention:
LP+10 FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No: --Survey Unit: 0 .Pkg. 'P-)o7 Sheet 2, of Date: I 1121I, 00" Survey Location: WGL~Ju~ pbcrvx ~Rw I. Instrument Information Inst. HV THR 27u Calibration Calibration Set Meter Scaler Detector Detector Setting Setting Inst. Due Date Due Date No. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)
_T l __E:-E. -,?c NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.Comments:
w/u nQcrwzdS 4m-  Initial Performance Test Performed
& Satisfactory:
1 i.2 -7!/,2007 Initial / Date II. Background Measurements Counts Inst. Count per Set Time Minute No. Grid or Location (min.) (cpm)C3 B<e & t-I:3 BK- tir3 3 Fhm A -oP e..14is 6A __Comments: III. Total Surface Activi Measurements Counts Inst. Count per Set Time Minute No. Grid or Location (min.) (cpm)1c-las6 0dM oP and JCone_,to Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpm/100-cm 2 , unless otherwise noted on the attached survey map.Post-Survey Performance Test Performed
& Satisfactory:
it
)"Initial / Date Survey Tech (print/sign):
Date: -r/i)__2"_
_/ _Reviewed By (print/sign):
L 7ate: Filenarne:
FSS Characterizafion SCAN Survey Forms-Rev02 Retention:
LP+10 FNR Decommissioning Project Reconnaissance Level Scan Survey Form 1-jo Survey No: o00-l -J 3S5 Survey Unit: .Pkg. S P- O-'Date: /.2eo7 Survey Location:
Z.xan 4-or', C icl5e.--I. Instrument Information e f Sheet 1  Inst. HV THR 27z Calibration Calibration Set Meter Scaler Detector Detector Setting Setting Inst. Due Date Due Date No. Model Serial No. Model Serial No. d (mVdc) Eff. (Scaler) (Detector)
L a=4~ &#xfd;1q '-13-31 Vk 1-75 .20 L4 7 /o/L.a / A19599 L/3-31-/ ?q3ql/l 1750. ,;20 '1/ 'l..z~f 7/6tl2,*.3 ./ 21I ?8g ID 4q-L X A 0330 1100 S5 q3.q q 0/2 712m ? o///a NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-21 0, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.Comments:
OQOnr-vrecS 5C.9C.weJ
;dA, a4 /-f -/L ,3. ;gg5 Initial Performance Test Performed
& Satisfactory: " 11/24/?07 Initial / Date II. Background Measurements Counts Inst. Count per Set Time Minute No. Grid or Location (min.) (cpm)i / ,,_ Io J 8KG 3 / 1 I AcAl-/on -val 3707-.I- ) ee M/I 3q78'5 k& its.3Ac-/'n 1ev' R53~___Ill. Total Surface Activr Measurements Counts Inst. Count per Set Time Minute No. Grid or Location (min.) (cpm)A/o Arnt _ _/hee we__ &alneA Worec p\J eW Af 1 iJ i_ _Cornm Ibc'yo ( XY xcAI Tr Q QCk Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpm/100-cm2' unless otherwise noted on the attached survey map.Post-Survey Performance Test Performed
& Satisfactory:
/ O JI "Initial / Date Survey Tech (print/sign): A Date: I 2"0"I Reviewed By (print/sign):
KJ/4 >- Date:  Filename:
FSS Characterization SCAN Survey Forms_RevO Retention:
LP+10 FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No: ,2-3}8 Survey Unit: .j -Sheet j of I Date: -,Survey Location:
W a- i 9v6( Cb k n Pod 0L'i54oraqe./
Pxrt,_I. Instrument Information Inst. HIV THR 27c Calibration Calibration Set Meter Scaler Detector Detector Setting Setting Inst. Due Date Due Date No. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)
_____ q ?-37 115o3 q0 qL, +/-i/,-.Ax
(,12z,3/ 22&#xfd;1~ 2-3"01~--
91351. Ab I C11 S 5O 75 4I 1- ;,Z 61ti2OD NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.Comments:
01.0\ onh vcdtL 1..0mJwA 0, 1O00 Initial Performance Test Performed
& Satisfactory:
II. lak~ond Measurements Counts-Inst. Count per Set Time Minute No. Grid or Location (min.) (Cpm)I AG -I q/0 q 7/I~ i-If Aon A&P- NA -?&2-9-L 2. 3(, /.2.- A3c(.on /,eUE 11 ;29& .Initial / Date IIl. Total Surface Activity Measurements Counts Inst. Count per Set Time Minute No. Grid or Location (min.) (cpm)ANl Ain'~cs __OTkka.-&2ancAi Comments: Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpm/1 00-cm 2 , unless otherwise noted on the attached survey map. , Post-Survey Performance Test Performed
& Satisfactory:
Survey Tech (pr] t/sign): K v -nit" la] / Date Date: iO1/qz ol.Reviewed By (print/sign): )4 ,,-' ate: I/ 29/0 7 Filenarne:
FSS Characterization SCAN Survey Forms-Rev02 Retention:
LP+I 0 FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No: 7.007-3q Survey Unit:--- Pkg. , , "' Sheet _ of '.Date: //- Z -f07 Survey Location:
<i,--Jc .c_ a o{w "e'-sJ5T OF-t C I. Instrument Information
'-B pou-'O. lr/lch Sae- ((L0.A 2-Inst. HV THR 27c Calibration Calibration Set Meter Scaler Detector Detector Setting Setting Inst. Due Date Due Date No. Model Serial No. , Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)
.2.-z( & 2l49 4337 ,,,[?2Z !76O 2 3,' 7 /q/Lo 7//7/o0'2- L4-2zzi 22.z /D '-Iq-t/- Z 3-36 /200 3-S: I3zA Y/ Z-7 o/6 6/o1 NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-hold) unless otherwise noted in the comments below.Comments: Initial Performance Test Performed
& Satisfactory:
Z/ 2/-2-F/ -7 Initial / Date II. Background Measurements Counts Inst. Count per Set Time Minute No. Grid or Location (min.) (cpm)I _&t I AI ;5__. I 1,1 Z Com 3 (n Comments:*
III. Total Surface Activi Measurements Counts Inst. Count per Set Time Minute No. Grid or Location (min.) (cpm)ok. a 4L _/A ~ Ma4", Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpm/lOO-crm 2 , unless otherwise noted on the attached survey map.Post-Survey Performance Test Performed
& Satisfactory: * -///zg// 7.A Initial / Date Survey Tech (print/sign):
6- )t&#xfd;6' ' Date: 11-2-Y-07 Reviewed By (print/sign):
_ Date: [Z Filename:
FSS Characterization SCAN Survey Forms Rev02 Retention:
LP+I0 FNR Decommissioning Project -Reconnaissance Level Scan Survey Form Survey No: 2 1-l- X-*L&#xb6; Survey Unit: I-I/,-z!/-3 Pkg. Sheet 2_ of 2_Date: l 4-'- 0"7 Survey Location:
._-,_ tQ--S -. oL (Survey Comment Sheet: This radiological survey covers the west-half of the Beam Port Floor overhead.
The west-half is from the FNR south wall to the FNR north wall and from the storage ports wall to the north-south reactor pool centerline extended to the north stairwell wall. The ceiling and all sides of all head beams were scanned. The west wall of the FNR that extends from ground level (outside) up to the under side of the pool floor hatches on the west side and from the FNR south wall to the fan room is included.(The south, west and north walls around the loading bay under the west pool floor hatches. The south and west walls have a one foot wide ledge along their entire lengths).
The scope of the survey does not include any perimeter walls, vertical columns or the floor, just overhead surfaces.Exceptions to the "no measurements
> action levels" statement on page one: 1. The underside of the four foot by five foot ceiling grate to the fan room reads 2000 gcpm, which is below the action level. This grate is currently going to be demolished and disposed of as radwaste.2. This survey was concentrated of structural surfaces not piping systems. The entire water main was not surveyed.
A small section under the grate referred to above has a small amount of contamination.
It will be decontaminated.
&',O 4C_-Y1 R,, tri 'sq _ i44 z_ d .-Filename:
Survey CommentMapForm RevOO Retention:
LP+I0 FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No: dqCC) Survey Unit: I -S Pkg. Sheet I of jk Date: *A160- Survey Location: -S.o4h t Pord-M I. Instrument Information Inst. HV THR 27t Calibration Calibration Set Meter Scaler Detector Detector.
Setting Setting Inst. Due Date Due Date No. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)
I 43-- I4,49 l-3a 11'5 0 O AD f1,;/&#xfd;)4 7/61/=8 2 2 A;L, AJ qq-lqg- q3a'o I Ilot 3'; '13'1 q4l73Joo q/2T/o, NO I T: All cables 6i-tt R(.8-b5 (ILMI 44-142, 44-9, HP-21U, or 44-92 probes) or 1 b-tt RG-58-bt (LMI 43-37 gas-low held) unless otherwise noted in the comments below._ -A Comments: ,-o Ce4,I'c 1 COULA,,e SCo tc.9 U 10,0W) C&4* .WS- W /O hand-Initial Performance Test Performed
& Satisfactory:
i 11 ;aq/obi Initial / Date!~ ~2l.uied 11. Background Measurements Counts Inst. Count per Set Time Minute No. Grid or Location (min.) (cpm)I S3 t ______-.2-_ A dK(, A I___ ____ ___ LI / 1 7 HI. Total Surface Activi Measurements Counts Inst. Count per Set Time Minute No. Grid or Location (min.) (cpm),Wsd ____Corrnmen t F.: Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpm/1 00-cm 2 , unless otherwise noted on the attached survey map.Post-Survey Performance Test Performed
& Satisfactory:
Initia Survey Tech (piintsign):
VftW G.mko(0 /]d w r I / Date)ate: bqz"J)ate: '1 U I Reviewed By (print/sign):
Filename:
FSS Characterization SCAN Survey FormsRev02 Retention:
LP+10 I .1: FNR Decommissioning Reconnaissance Level Scan Survey No:
Date: I1!301AWo7 Survey Unit: I -7 Survey Location:
F4/4 Project Survey Form .,.. :2..Pkg. sp-j -he6_J of i Ba o+4 Ficor s-ec.( i-1 I. Instrument Information Inst. HV THR 21t Calibration Calibration Set Meter Scaler Detector Detector Setting Setting Inst. Due Date Due Date No. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)
I ~ 2x9-1 gIS s,-3'Y7 3935q25 I&9O ao lti,, -. q3.,- , 1 117q7q 1700 2 .'5i3,,#,, 2l 1L9A NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.Comments:
WaiN.[ CeinLtA OinA P< rtvr\..aN4
/P I tox off)Initial Performance Test Performed
& Satisfactory:
I 11L0/2W1 Initial / Date II. Background Measurements Counts Inst. Count per Set Time Minute No. Grid or Location (ain-) (cpm)8K Bk P I -V1 j /3K 7-1i3 I I~lg 2 Acl-'I I-etie Al/A 3oao-i3 86A< Wt I /I qe Ai&#xfd;LT 1-?c& NIA -299-2-151J16I//(o0 Comments: III. Total Surface Activi Measurements Counts Inst. Count per Set Time Minute No. Grid or Location (ain.) (cpm)on SUN,-,/a bale__6ni~A2 Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpm/1 00-cm 2 , unless otherwise noted on the attached survey map.Post-Survey Performan e Test Performed
& Satis tactory: Survey Tech (print/sign):
Date: 1)Reviewed By (printsign):
ate: [-0 7" Filename:
FSS Characterization SCAN Survey Forms-Rev02.
Retention:
LP+10  


Survey No: 26-7 45-6 Date: 1 2/W-/0" I. Instrument Information FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey Unit: -13 Pkg. .AcJA Sheet ( ofj Survey Location:
FNR Decommissioning Project Reconnaissance Level Scan Survey Form SurveyNo:-2-00"1- A          1* - Survey Unit: 5P-oO7      Pkg.   .)4A-      Sheet   2- of 2-Date: 11-7-07                      Survey Location:         A-  k        x ''MOe--
Fft, FiK_ T o &#xfd; 1u LA)11 Inst. HV THR 27c Calibration Calibration Set Meter Scaler Detector Detector ISetting Setting Inst. Due Date Due Date No. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector) 1 .-2ZZ'( ~2,19o60 'q3-37 -175-0 Z 6..7&#xa2; 7/, i ZL."7 v Q 2q133 92-Z NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.Comments: Initial Performance Test Performed
Survey Comment Sheet:
& Satisfactory:
4EA2A      ~A  ~    A~L~      ~
Tr -07 Initial / Date II. Background Measurements Counts Inst. Count per Set Time Minute No. Grid or Location (min.) (cpm)K t 3  __M I M/A 3,2_3 Il. Total Surface Activi Measurements Counts Inst. Count per Set Time Minute No. Grid or Location (min.) (cpm)/J,7 z 1&#xfd;ql 24C/g4g4&#xfd;&L&#xfd; /-92 , omments: 124ywem, I .Each of the demarked grids (or locations) on the attached surey map has been scanned and do not exceed the actionlevel of 1,750 dpm/fOO-cM 2 , unless otherwise noted on the attached survey map.Post-Survey Performance Test Performed factory: j//4 Initial/ Date Survey Tech (print/sign):
                                        '~No$~- -eOAJE.
110 /A&#xfd;._ I/ Date: 19L-F 07 Reviewed By (print/sign): K Date: /'-I 7 Filename:
                                                                                      &#xfd;tck-a mL1~
FSS Characterization SCAN Survey FormsRev02 Retention:
I~I~
LP+10}}
Filenarne: Survey Comment Map_Form_RevOO                                            Retention: LP+10
 
FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No: 2-07-- 22-13                              Survey Unit: -P-C007                  Pkg.                         Sheet    . of Z_
Date:          11-1-o-I                            Survey Location: tdtj* 0-aw 0&#xfd;001 j
: 1. Instrument Information                                                                  ,     -         -             -,.      -       " '/,-
Inst.                                                                                  HIV        THR            27t    Calibration    Calibration Set          Meter            Scaler          Detector            Detector      Setting    Setting        Inst. Due Date        Due Date No.          Model          Serial No.          Model              Serial No.      (Vdc)    (mVdc)          Eff.      (Scaler)      (Detector) 1 1-22z/                  /V743 q4-31 2q,3qzZ.. 17s-                                             Z.       34.7      I/tz/og          ,7//7/A 2        L-zzl,            23q11          .. qW-iq.. Z ?Tq/ /oo                                i00        37,0          ,'$131og ./oI tJ/A NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.
Comments:                                                                                          m Initial Performance Test Performed & Satisfactory:
Initial / Date 1.Backgrounfd Measurements Counts Inst.                                        Count              per Set                                          Time            Minute No.            Grid or Location            (min.)            (cpm)
        -
2 -
41L                              t            3=&#xfd;
________________
2-                                        _  _    _
o.mmerits:
kk4e        A          64-.                  *a      'OL4 4.WL                          A4dt          a,    dAl,
_ _
Each of    the demarked r~m1llr 2
                      ,lc grids  (or locations) on
                            *n.iantAa              ,
the  attached survey map has been scanned and do not exceed the action level of 1,750 tnhd.mnomn Post-Survey Performance Test Perform                                        ,& Satisfactory:                            -*-07 (Initial                                                                    / Date Survey Tech (print/signi:                                                                                    Date: 11`9_"__-61 Reviewed By (print/sign),'                              I4&#xfd;"                                                Date:    Iit-:9-0'"
Filename: FSS Characterization SCAN Survey FormsRevO2                                                                            Retention: LP+10
 
FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No:    2o0"7-  *-Z1_3    Survey Unit: IP-Co07      Pkg. A/,A          Sheet    Z    of z.
Date:    It-                    Survey Location:  4,o.tg  e4    f      .a.tc-tt  1i0    ci Survey Comment Sheet:
6eam,        e., K) AU-Filename: Survey CommentMapForm_RevOO                                                  Retention: LP+ 10
 
FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No: ,,&#xfd;-2,d                        Survey Unit:        JOL.          Pkg. S P OD'1                Sheet      I  ofj Date: I J5 4ac"7                          Survey Location:          =T jde, 82L2h CORKSc                        6MATO7i r-i Pq6mWcAr4-P I. Instrument InformationI1 Inst.                                                                      lV        THI[R      2n        Calibration      Calibration Set      Meter            Scaler      Detector          Detector      Setting    Setting      Inst.      Due Date        Due Date No.      Model          Serial No.      Model          Serial No.    (Vdc)      (mVdc)      Eff.        (Scaler)      (Detector)
        ;Z2A)          21%59g          14q*J        .2Io 71b            WA 35                39-L      ~16  1 VA          W..Mz4 NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted In the comments below.
Commens:,&VA                .e  ol .sije Paails o4&#xfd; 4Ac*h.k covers.
Initial Performance Test Performed & Satisfactory:                            19%        /W7 II. Background Measurements                                                III. Total Surface ActihA! Measurements Counts                                                                    Counts Inst.                                Count            per                  Inst.                                Count          per Set                                  Time        Minute                  Set                                  Time        Minute No.        Grid or Location          (ain.)        (cpm)                  No.      Grid or Location          (ri)        (cpm)
    /                    a,, 'I          I-              75
___          ye-A414 NJ&                    PIA          Z90
            !            1 evA
_,,'an              +/-L.            (o0
        /W Comm ts*~
co ,89m              OT- slain..,Ra
                                      ~~Pciso~y is1-on IV.,                                                .
Each of the dernarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dprn/100-cm 2 , unless otherwise noted on the attached survey map.
Post-Survey Performance Test Performed & Satisfactory:                                  "'Wial I Dafte11 1L512/0-7 Survey Tech (print/sign): 45y1              (fl rI1&sect;J1 l                    N              Date:        154/2W7 Reviewed By (pi/sig:                                                                          Date:      "
Filename- FSS Characterization SCAN Survey Forms-Rev02                                                            Re*tenton LP+ 10
 
FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No:      _2&7-.23"3o              Survey Unit:_______                Pkg.&SP-4Z7                    Sheet _L      of  /
(
Date: I              Inforato            Survey Location:      Bm Po4 overH*i                  end      / kA Corn-r-11                        Pjk,4m4iM-~ 4-tb                oa~,e.
Inst.                                                                    iiV        THIR          2,x      Calibration    Calibration Set      Meter          Scaler        Detector        Detector      Setting    Setting      Inst.      Due Date        Due Date No.      Model        Serial No.      Model          Serial No.      (Vdc)    (mVdc)        Eff.        (Scaler)        (Detector)
I&RP          */,q            qq-/qX -;*V 71L                1166      410&k/*z,
                                                                                      -              .1                      .41=/A!Y NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.
Comments:        P      ,kfqrL/-CZ          C-        flke/ta                ChOVf-r AW&17#aI                            '      _-
Initial Performance Test Performed & Satisfactory:                                    I V1,0gW Initial / Date H. Background Measurements                                                M. Total Surface            Activh Measurements Counts                                                                    Counts Inst.                                Count          per                  Inst.                                Count          per Set                                  Time        Minute                  Set                                  Time        Minute No.      Grid or  Locationt      (rin.)        (cpm)                  No.        Grid or Location          (ain.)      (epm)
I      &CXr.v::ownJ          '        I      __
                                                                                          /do    kylw/A S /
I
          /    *
                    *vG                  .Il/
                                                  -W9 ___
3o ab -10 Comments:
Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpmnl00-cin2 . unless otherwise noted on the attached survey map.
Post-Survey Performance Test Performed & Satisfactory:                                      _  _  I_ -__7
__'=*"Ihita / Date
_
Survey Tech (print/sign):                                                                    Date:      I    /    ZW-7 Reviewed By (print/sign): _              __________________
Filename: FSS Characterization SCAN Survey Forms_Rev/                                                              Retention: LP+10
 
FNR Decommissioning Project Reconnaissance Level Scan Survey Form SurveyNo: ocWl'-                  22319              Survey Unit:-*                -  Z-        Pkg. 6P-MI                    Sheet      t    of &#xfd;-
Date:      I11,g    1./o-)                          Survey Location: Nci-P'r WaOJJ                        ea      Pcf{ 000K-ov &o"-s'    *    ,-i Q-L.M I. Instrument Information Inst.                                                                                    HV          THR            27c      Calibration    Calibration Set          Meter              Scaler        Detector            Detector        Setting      Setting          Inst.      Due Date        Due Date No.          Model            Serial No.          Model          Serial No.        (Vdc)        (mVdc)          Eff.      (Scaler)        (Detector)
-k,                I',        A..x.o1            &#xfd;'&#xfd;-3-&#xfd;          &#xfd;      1 161        )"7,_,0D    olo              q 1710*w                  '~*
7/1/I;ooS NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes or 15-ft RG-58 (LMI                                      3-37 gas-flow hand-held) unless otherwise noted in the comments below.
Comments:                  nrU,'5          m*,C Floor k            WC          W h 42- 1 W,                    9,4810        q-lqu--    d q3S93 Initial Performance Test Performed & Satisfactory:                                                1,W        nb]'*a Initial / Date II. Background Measurements                                                                IH. Total Surface Activi                  Measurements Counts                                                                            Counts Inst.                                        Count              per                        Inst.                                  Count          per Set                                          Time          Minute                        Set                                    Time        Minute No.          Grid or Location              (min.)          (cpm)                        No.        Grid or Location          (min.)        (cpm)
Nlorfh d-si d I                                              I~            I*1&#xa2;-
MA flD PUYo-
_______
                                                                                                          ,&#xfd;&k +2  -          q
      ,*            Kc              2I          _______/
rea-&#xa2;
        ;              .            3            /              /77q                              __        Aecpm
___        dhFv- Lev #,-                                                                        SJp2-i-42 04V cve~o-.
__________
Comments:
________________________________ _____________ I_________________
ThP~e (&#xfd;n                noyAf+-\ UXLU~Q                r-Luv-y.rnvl  .Iq-4rcyyw&#xfd;                          4O'-o k)iS    FCc410
_'e Each of the demarked grids Cor locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 2
dpm/100-cm , unless otherwise noted on the attached survey map.
Post-Survey Performance Test Performed                                          Safisfa*ry:                    L[LL -1121007)
Survey Tech (print/sign):                &#xfd;efl        (7'-no"                    A Initial / Date Date:    l4I2'?  20C Reviewed By (print/sign):                      JI'        /1        .                                            Date:    (//Z9      ).,7
                                                                                  &#xa5; Filename: FSS Characterization SCAN Survey FormsRev02                                                                                Retention: LP+10
 
FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No:                --        9*    Survey Unit:        0    .          Pkg.          'P-)o7                Sheet 2, of Date: I 1121I, 00"                        Survey Location:            *'orVVY\    WGL~Ju~                                  ~Rw pbcrvx I. Instrument Information Inst.                                                                      HV          THR              27u      Calibration          Calibration Set        Meter          Scaler        Detector        Detector      Setting      Setting          Inst.          Due Date          Due Date No.        Model      Serial No.        Model        Serial No.      (Vdc)      (mVdc)            Eff.            (Scaler)        (Detector)
_TE:-E. l                              -,?c                                                __
NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.
Comments:        w/u      nQcrwzdS 4m-        *-)"      a~Y*>3h,        qq-t*j- %q3*30 Initial Performance Test Performed & Satisfactory:                                          1 -7!/,2007 i.2 Initial / Date II. Background Measurements                                                  III. Total Surface Activi                      Measurements Counts                                                                              Counts Inst.                                Count          per                      Inst.                                        Count          per Set                                  Time          Minute                    Set                                          Time        Minute No.      Grid or Location          (min.)        (cpm)                      No.        Grid or Location                (min.)        (cpm)
C3        B<e&
t-I                                                                            1c-las6        0
:3          BK-        tir3                                                            &#xfd;Ic*,y dM oP 3        FhmA -oP    e..14is        6A        __
andJCone
_,to Comments:
Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpm/100-cm 2, unless otherwise noted on the attached survey map.
Post-Survey Performance Test Performed & Satisfactory:                                      it              1e2/-7*/*2        )
                                                                                                "Initial / Date Survey Tech (print/sign):                                                                            Date:            -r/i)__2"_
_/        _
Reviewed By (print/sign):                          L                                                                              7ate:
Filenarne: FSS Characterizafion SCAN Survey Forms-Rev02                                                                      Retention: LP+10
 
FNR Decommissioning Project                                              e f Reconnaissance Level Scan Survey Form 1-jo                                            Sheet    1      f*      d]*/a Survey No:      o00-l -    J 3S5          Survey Unit:            .        Pkg. S P- O-'
Date: I11,* /.2eo7                          Survey Location: Z.xan 4-or',                C  icl5e.--
I. Instrument Information Inst.                                                                      HV          THR          27z    Calibration        Calibration Set        Meter        Scaler        Detector          Detector      Setting      Setting        Inst.      Due Date          Due Date No.        Model      Serial No.          Model          Serial No.        d        (mVdc)          Eff.        (Scaler)        (Detector)
L    a=4~ &#xfd;1q a /      A19599
                                          '-13-31 L/3-31-/
Vk
                                                          ?q3ql/l 1-75 1750.
                                                                                    .20
                                                                                      ,;20 L4
                                                                                                  '1/
7 /o/L.
7/6tl2,*
                                                                                                                                'l..z~f
.3        .    /    21I  ?8g ID        4q-L      X    A0330          1100            S5        q3.q q0/ 2 712m ?              o///a NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-21 0, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.
Comments: OQOnr-vrecS 5C.9C.weJ                                ;dA,      a4            /-f    -/L ,3. ;gg5 Initial Performance Test Performed & Satisfactory:                            "          11/24/?07 Initial / Date II. Background Measurements                                                Ill. Total Surface Activr Measurements Counts                                                                        Counts Inst.                                Count          per                  Inst.                                    Count          per Set                                  Time        Minute                  Set                                      Time        Minute No.      Grid or Location          (min.)        (cpm)                  No.        Grid or Location            (min.)        (cpm) i    BA*        *"-                /          ,,_ Io J        8KG          3              /            1 I        AcAl-/on -val                M*/        3707                                A/o  Arnt                _        _
                                                                                            /hee          we
__    &alneA            Worec
    -.              I- ) ee            M/I          3q78'                              p\J eW Af1 iJi_                    _
5      k& its
        .3Ac-/'n        1ev'                          R53~___
Cornm Ibc'yo (            XYxcAI    Tr QQCk Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpm/100-cm2' unless otherwise noted on the attached survey map.
Post-Survey Performance Test Performed & Satisfactory:                                                        /        O JI        "Initial                                                  / Date Survey Tech (print/sign):      **          A                                                  Date:      I '-*      2"0"I Reviewed By (print/sign): KJ/4            >-      '-M1-*                                          Date:    JLZZ*/,A2 Filename: FSS Characterization SCAN Survey Forms_RevO                                                                    Retention: LP+10
 
FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No: *L6              ,2-3}8        Survey Unit:                  .j      Pkg.%_**          -            Sheet j        of I Date:          -,Survey                                Location: W          i a-    Cb 9v6(          k Pod n 0L'i54oraqe./Pxrt,_
I. Instrument Information Inst.                                                                        HIV        THR            27c      Calibration      Calibration Set        Meter            Scaler        Detector          Detector      Setting      Setting        Inst.      Due Date        Due Date No.        Model        Serial No.        Model          Serial No.    (Vdc)      (mVdc)          Eff.        (Scaler)        (Detector)
_____  *72*/          ;3*q0  qL, q        ?-37          ;l*            115o3                                +/-i/,-.A*x        (,12z,3
      / 22&#xfd;1~ 2-3"01~--                    91351.          Ab IC11              S                    5O 75        4I1-;,Z            61ti2OD NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.
Comments: 01.0\                    onh vcdtL 1..0mJwA 0,            1O00 Initial Performance Test Performed & Satisfactory:
Initial / Date II.              lak~ond Measurements                                            IIl. Total Surface Activity Measurements Counts-                                                                          Counts Inst.                                  Count            per                    Inst.                                  Count          per Set                                    Time        Minute                      Set                                    Time        Minute No.      Grid or Location            (min.)          (Cpm)                    No.        Grid or Location          (min.)        (cpm)
I      AG -I                                      q/0                                    ANl Ain'~cs                            __
OTkka.-
q7/                                                  &2ancAi I~      i-If      AonA&P-NA                    -?&2-9-L
: 2.        t*3(,                        /.
2.-      A3c(.on                      /,eUE        11
                                                        ;29&      .
Comments:
Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpm/1 00-cm2 , unless otherwise noted on the attached survey map.                                ,
Post-Survey Performance Test Performed & Satisfactory:
la] / Date Survey Tech      (pr] t/sign):    K  *4'      v-nit"                                            Date:      iO1/qz ol.
Reviewed By (print/sign): *          )4          ,,-'                                                  ate:    I/  29/0    7 Filenarne: FSS Characterization SCAN Survey Forms-Rev02                                                                  Retention: LP+I 0
 
FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No:      7.007-3q                    Survey Unit:---                  Pkg.          ,      ,          "' Sheet    _      of    '.
Date: //- Z          -    f07              Survey Location:                                  <i,--Jc. ac_ o{w "e'-sJ5T                      OF-t C
I. Instrument Information                              '-B pou-'O. lr/lch        Sae- *'*                ((L0.A 2-Inst.                                                                      HV          THR            27c        Calibration      Calibration Set        Meter            Scaler      Detector          Detector    Setting        Setting        Inst.        Due Date          Due Date No.      Model          Serial No.    , Model            Serial No.  (Vdc)        (mVdc)          Eff.          (Scaler)        (Detector) 2l49
                        .2.-z(
                              &                              4337
                                                          ,,,[?2Z      !76O            2          3,'7            /q/Lo          7//7/o0' 2-      L4-2zzi        22.z    /D    '-Iq-t/-          Z 3-36      /200            3-S:              I3zA      Y/ Z-7  o/6        6/o1 NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-hold) unless otherwise noted in the comments below.
Comments:
Initial Performance Test Performed & Satisfactory:                                            Z/        2/-2-F/  -7 Initial / Date II. Background Measurements                                                  III. Total Surface Activi                    Measurements Counts                                                                        Counts Inst.                                  Count            per                Inst.                                      Count            per Set                                    Time          Minute                  Set                                        Time        Minute No.      Grid or Location            (min.)          (cpm)                  No.          Grid or Location            (min.)        (cpm)
I      _&t                              I            AI ;5                ok.                                        a _ 4L
                                                                                                                        /A ~      Ma4",
__.                                      I          1*,1 Z Com3                                  (n Comments:*
Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpm/lOO-crm2 , unless otherwise noted on the attached survey map.
Post-Survey Performance Test Performed & Satisfactory:                                    *6      * -        ///zg// 7
                                                        . A                                    Initial / Date Survey Tech (print/sign):              6-      )t&#xfd;6'                            '                  Date: 11-2-Y-07 Reviewed By (print/sign):          _                                                                Date:      [Z Filename: FSS Characterization SCAN Survey Forms Rev02                                                                    Retention: LP+I0
 
FNR Decommissioning Project                        -
Reconnaissance Level Scan Survey Form Survey No: 2        1-l-X-*L&#xb6;  Survey Unit: I-I/,-z!/-3    Pkg. tMa]*      Sheet 2_      of 2_
Date:    l    4-'- 0"7        Survey Location:      . _-,_                    *-LtQ--S          -. oL(
Survey Comment Sheet:
This radiological survey covers the west-half of the Beam Port Floor overhead. The west-half is from the FNR south wall to the FNR north wall and from the storage ports wall to the north-south reactor pool centerline extended to the north stairwell wall. The ceiling and all sides of all head beams were scanned. The west wall of the FNR that extends from ground level (outside) up to the under side of the pool floor hatches on the west side and from the FNR south wall to the fan room is included.
(The south, west and north walls around the loading bay under the west pool floor hatches. The south and west walls have a one foot wide ledge along their entire lengths). The scope of the survey does not include any perimeter walls, vertical columns or the floor, just overhead surfaces.
Exceptions to the "no measurements > action levels" statement on page one:
: 1. The underside of the four foot by five foot ceiling grate to the fan room reads 2000 gcpm, which is below the action level. This grate is currently going to be demolished and disposed of as radwaste.
: 2. This survey was concentrated of structural surfaces not piping systems. The entire water main was not surveyed. A small section under the grate referred to above has a small amount of contamination.
It will be decontaminated.        &',O 4C_-Y1 R,,                tri 'sq _ i44z_ d          .-
Filename: Survey CommentMapForm RevOO                                                    Retention: LP+I0
 
FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No: d,*00-          dqCC)            Survey Unit:          I- S          Pkg. 5*p1:"                    Sheet I          of jk Date:                *A160-              Survey Location: -S.o4h *k t                          6&*w        Pord- F0ooric**C              M I. Instrument Information Inst.                                                                        HV        THR              27t    Calibration        Calibration Set      Meter            Scaler        Detector        Detector.      Setting    Setting          Inst. Due Date            Due Date No.        Model        Serial No.        Model          Serial No.        (Vdc)    (mVdc)            Eff.      (Scaler)          (Detector)
I                        I4,49        43--
* I*l-3a    11'5 0      AD O                        f1,;/&#xfd;)4        7/61/=8 2        2              AJ A;L,              qq-lqg-          q3a'o          I Ilot        3';            '13'1      q4l73Joo            q/2T/o, NO T:
I    All cables 6i-tt R(.8-b5 (ILMI 44-142, 44-9, HP-21U, or 44-92 probes) or 1b-tt RG-58-bt (LMI 43-37 gas-low hand-held) unless otherwise noted in the comments below._                                                        -A Comments:          FIDoo*      ,-o Ce4,I'c    1    COULA,,e              U9 SCo tc.      10,0W) C&4*                WS-
                                                                                                                  . W            /O          !~  ~2l.uied Initial Performance Test Performed & Satisfactory:                                          i11 ;aq/obi Initial / Date
: 11. Background Measurements                                                    HI. Total Surface Activi                    Measurements Counts                                                                            Counts Inst.                                Count          per                    Inst.                                      Count          per Set                                  Time      Minute                      Set                                      Time        Minute No.        Grid or Location          (min.)        (cpm)                      No.        Grid or Location              (min.)        (cpm)
I        K*        S3              t        ______
                                                                                              ,Wsd                                      ____
                                                      - .2-
_          A dK(,                    IA
___      ____            LI
___              /          1  7 t
Corrnmen      F.:
Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpm/1 00-cm 2 , unless otherwise noted on the attached survey map.
Post-Survey Performance Test Performed & Satisfactory:
Initia I / Date Survey Tech (piintsign):        VftW G.mko(0 /]d                          w                        r)ate:      bqz"J Reviewed By (print/sign):
                                                  '1        !*-                U                      I)ate:
Filename: FSS Characterization SCAN Survey FormsRev02                                                                      Retention: LP+10
 
I . 1:
FNR Decommissioning Project Reconnaissance Level Scan Survey Form                              .,..:2..
Pkg. sp-j                -he6_J            of i Survey No:        a~bi-L*tt)              Survey Unit: I - 7 Date:      I1!301AWo7                      Survey Location: F4/4              Ba            o+4 Ficor s-ec.( i-1 I. Instrument Information Inst.                                                                      HV          THR          21t    Calibration        Calibration Set      Meter              Scaler      Detector        Detector        Setting    Setting      Inst. Due Date          Due Date No.      Model          Serial No.      Model        Serial No.        (Vdc)      (mVdc)        Eff.      (Scaler)        (Detector)
I  ~    2x9-1          gIS            s,-3'Y7 3935q25                  I&9O ao "*,A,                            lti,,      -.I*.za
                  ,                          -      3-1 117q7q q3.,-                            1700 2                    .
                                                                                                          '5i3,,#,,                    2l1L9A NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.
Comments: WaiN.[ CeinLtA                  OinA      P<      *rtvr\..aN4    /P        Itox off)
Initial Performance Test Performed & Satisfactory:                                            I11L0/2W1 Initial / Date II. Background Measurements                                                  III. Total Surface Activi              Measurements Counts                                                                      Counts Inst.                                Count          per                      Inst.                                Count          per Set                                  Time        Minute                      Set                                  Time        Minute No.      Grid or Location          (ain-)        (cpm)                      No.        Grid or Location        (ain.)        (cpm)
Bk 8K          P              I -V1                                          on SUN,-,/
j        /3K7- 1i3                    I        I~lg a bale__
6ni~A2 2        Acl-'I            I-etie    Al/A 3oao-i3        86A<        Wt              I        /I qe Ai&#xfd;LT              1-?c&    NIA        -299                      151J16I//(o0 Comments:
Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpm/1 00-cm 2 , unless otherwise noted on the attached survey map.
Post-Survey Performan e Test Performed & Satis tactory:
Survey Tech        (print/sign):                                                                Date:              1)
Reviewed By (printsign):                                                                            ate: [-0              7" Filename: FSS Characterization SCAN Survey Forms-Rev02.                                                              Retention: LP+10
 
FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No:      26    2-45-6          Survey Unit:            - 13        Pkg.            . AcJA        Sheet      ( ofj Date: 1 2/W-/0"                            Survey Location:            FiK_
Fft,
                                                                          *t&T----                      T      o &#xfd; 1u                    LA)
I. Instrument Information11 Inst.                                                                        HV          THR            27c    Calibration      Calibration Set        Meter        Scaler        Detector          Detector    ISetting      Setting        Inst. Due Date          Due Date No.        Model      Serial No.        Model            Serial No.      (Vdc)      (mVdc)          Eff.      (Scaler)        (Detector) 1        .-
2ZZ'(          ~2,19o60            'q3-37                        -175-0          Z                        6..7&#xa2;i ZL."7 v7/, Q 2q13392-Z NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.
Comments:
Initial Performance Test Performed & Satisfactory:                                                    Tr -07 Initial / Date II. Background Measurements                                                  Il. Total Surface Activi                Measurements Counts                                                                        Counts Inst.                                Count            per                    Inst.                                Count          per Set                                  Time          Minute                    Set                                  Time        Minute No.      Grid or Location          (min.)          (cpm)                    No.        Grid or Location          (min.)        (cpm)
                                                                                /J,7 K      t3                                      __M I                                  M/A          3,2_3 1&#xfd;ql z
g4g4&#xfd;&L&#xfd;            /-92                            24C/
, omments:                                      124ywem, Each of the demarked I              .
grids (or locations) on the attached surey map has been scanned and do not exceed the actionlevel of 1,750 2
dpm/fOO-cM , unless otherwise noted on the attached survey map.
Post-Survey Performance Test Performed                            Sa* factory:                  j//4 Initial/ Date Survey Tech (print/sign): 110 /A&#xfd;._                  I/                                            Date:  19L-F 07 Reviewed By (print/sign): KJ*i                    A*    K                                          Date: /'&#x17d;-I             7 Filename: FSS Characterization SCAN Survey FormsRev02                                                                   Retention: LP+10}}

Revision as of 06:23, 12 November 2019

Reconnaissance Level Scan Survey Form - Beam Port Nose Cone
ML12095A381
Person / Time
Site: University of Michigan
Issue date: 02/14/2012
From:
Occupational Safety & Environmental Health University of Michigan
To:
NRC/FSME
Shared Package
ML120950629 List:
References
Download: ML12095A381 (16)


Text

Bklý FNR Decommissioning Project --------------

Reconnaissance Level Scan Survey Form Survey No: ,2607,-27,2- Survey Unit:,SP'o67 Pkg. A/i/1 Sheet / of ..

Date: W167/.2007 Survey Location: w" Pb- R +- /b6 eZ Col)_.

I. Instrument Information Inst. HV TE{R 27c Calibration Calibration Set Meter Scaler Detector Detector Setting Setting Inst. Due Date Due Date No. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector) 7I.. -1773 q3-37 24392I..q l7_S 2 39.7 1192)08 7 0/8

___=NA/

NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.

Comments:

Initial Perfor.mance Test Performed & Satisfactory:,

Initial / Date H.Rwonn Measurements III. Total Surface Activi Measurements Counts Counts Inst. Count per Inst. Count per Set Time Minute Set Time Minute No. Grid or Location (nin.) (cpm) No. Grid or Location (min.) (cpm)

/

  • 1 51ton

& G,-a&tn / &- / / _5 .60 I AVq /// 3,75

/ Ac+~lfIev] ]in/L1177 / / 5£oo

/ *- / ( 5

/ _____ / /000o

/ *_I

/.,../_,Q /0,o09 Comments:

Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpm/100-cn 2 , unless otherwise noted on the attached survey map.

Post-Survey Performance Test Performed & Satisfactory: 0i1L4 2cD"(

Initial / Date Survey Tech (print/sign): kn Date: O be!/ j C)O Reviewed By (print/sign): V L/7eJ

// 0 Filename: FSS Characterization SCAN Survey FormsRev02 Retention: LP+10

FNR Decommissioning Project Reconnaissance Level Scan Survey Form SurveyNo:-2-00"1- A 1* - Survey Unit: 5P-oO7 Pkg. .)4A- Sheet 2- of 2-Date: 11-7-07 Survey Location: A- k x MOe--

Survey Comment Sheet:

4EA2A ~A ~ A~L~ ~

'~No$~- -eOAJE.

ýtck-a mL1~

I~I~

Filenarne: Survey Comment Map_Form_RevOO Retention: LP+10

FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No: 2-07-- 22-13 Survey Unit: -P-C007 Pkg. Sheet . of Z_

Date: 11-1-o-I Survey Location: tdtj* 0-aw 0ý001 j

1. Instrument Information , - - -,. - " '/,-

Inst. HIV THR 27t Calibration Calibration Set Meter Scaler Detector Detector Setting Setting Inst. Due Date Due Date No. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector) 1 1-22z/ /V743 q4-31 2q,3qzZ.. 17s- Z. 34.7 I/tz/og ,7//7/A 2 L-zzl, 23q11 .. qW-iq.. Z ?Tq/ /oo i00 37,0 ,'$131og ./oI tJ/A NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.

Comments: m Initial Performance Test Performed & Satisfactory:

Initial / Date 1.Backgrounfd Measurements Counts Inst. Count per Set Time Minute No. Grid or Location (min.) (cpm)

-

2 -

41L t 3=ý

________________

2- _ _ _

o.mmerits:

kk4e A 64-. *a 'OL4 4.WL A4dt a, dAl,

_ _

Each of the demarked r~m1llr 2

,lc grids (or locations) on

  • n.iantAa ,

the attached survey map has been scanned and do not exceed the action level of 1,750 tnhd.mnomn Post-Survey Performance Test Perform ,& Satisfactory: -*-07 (Initial / Date Survey Tech (print/signi: Date: 11`9_"__-61 Reviewed By (print/sign),' I4ý" Date: Iit-:9-0'"

Filename: FSS Characterization SCAN Survey FormsRevO2 Retention: LP+10

FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No: 2o0"7- *-Z1_3 Survey Unit: IP-Co07 Pkg. A/,A Sheet Z of z.

Date: It- Survey Location: 4,o.tg e4 f .a.tc-tt 1i0 ci Survey Comment Sheet:

6eam, e., K) AU-Filename: Survey CommentMapForm_RevOO Retention: LP+ 10

FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No: ,,ý-2,d Survey Unit: JOL. Pkg. S P OD'1 Sheet I ofj Date: I J5 4ac"7 Survey Location: =T jde, 82L2h CORKSc 6MATO7i r-i Pq6mWcAr4-P I. Instrument InformationI1 Inst. lV THI[R 2n Calibration Calibration Set Meter Scaler Detector Detector Setting Setting Inst. Due Date Due Date No. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)

Z2A) 21%59g 14q*J .2Io 71b WA 35 39-L ~16 1 VA W..Mz4 NOTE
All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted In the comments below.

Commens:,&VA .e ol .sije Paails o4ý 4Ac*h.k covers.

Initial Performance Test Performed & Satisfactory: 19% /W7 II. Background Measurements III. Total Surface ActihA! Measurements Counts Counts Inst. Count per Inst. Count per Set Time Minute Set Time Minute No. Grid or Location (ain.) (cpm) No. Grid or Location (ri) (cpm)

/ a,, 'I I- 75

___ ye-A414 NJ& PIA Z90

! 1 evA

_,,'an +/-L. (o0

/W Comm ts*~

co ,89m OT- slain..,Ra

~~Pciso~y is1-on IV., .

Each of the dernarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dprn/100-cm 2 , unless otherwise noted on the attached survey map.

Post-Survey Performance Test Performed & Satisfactory: "'Wial I Dafte11 1L512/0-7 Survey Tech (print/sign): 45y1 (fl rI1§J1 l N Date: 154/2W7 Reviewed By (pi/sig: Date: "

Filename- FSS Characterization SCAN Survey Forms-Rev02 Re*tenton LP+ 10

FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No: _2&7-.23"3o Survey Unit:_______ Pkg.&SP-4Z7 Sheet _L of /

(

Date: I Inforato Survey Location: Bm Po4 overH*i end / kA Corn-r-11 Pjk,4m4iM-~ 4-tb oa~,e.

Inst. iiV THIR 2,x Calibration Calibration Set Meter Scaler Detector Detector Setting Setting Inst. Due Date Due Date No. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)

I&RP */,q qq-/qX -;*V 71L 1166 410&k/*z,

- .1 .41=/A!Y NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.

Comments: P ,kfqrL/-CZ C- flke/ta ChOVf-r AW&17#aI ' _-

Initial Performance Test Performed & Satisfactory: I V1,0gW Initial / Date H. Background Measurements M. Total Surface Activh Measurements Counts Counts Inst. Count per Inst. Count per Set Time Minute Set Time Minute No. Grid or Locationt (rin.) (cpm) No. Grid or Location (ain.) (epm)

I &CXr.v::ownJ ' I __

/do kylw/A S /

I

/ *

  • vG .Il/

-W9 ___

3o ab -10 Comments:

Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpmnl00-cin2 . unless otherwise noted on the attached survey map.

Post-Survey Performance Test Performed & Satisfactory: _ _ I_ -__7

__'=*"Ihita / Date

_

Survey Tech (print/sign): Date: I / ZW-7 Reviewed By (print/sign): _ __________________

Filename: FSS Characterization SCAN Survey Forms_Rev/ Retention: LP+10

FNR Decommissioning Project Reconnaissance Level Scan Survey Form SurveyNo: ocWl'- 22319 Survey Unit:-* - Z- Pkg. 6P-MI Sheet t of ý-

Date: I11,g 1./o-) Survey Location: Nci-P'r WaOJJ ea Pcf{ 000K-ov &o"-s' * ,-i Q-L.M I. Instrument Information Inst. HV THR 27c Calibration Calibration Set Meter Scaler Detector Detector Setting Setting Inst. Due Date Due Date No. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)

-k, I', A..x.o1 ý'ý-3-ý ý 1 161 )"7,_,0D olo q 1710*w '~*

7/1/I;ooS NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes or 15-ft RG-58 (LMI 3-37 gas-flow hand-held) unless otherwise noted in the comments below.

Comments: nrU,'5 m*,C Floor k WC W h 42- 1 W, 9,4810 q-lqu-- d q3S93 Initial Performance Test Performed & Satisfactory: 1,W nb]'*a Initial / Date II. Background Measurements IH. Total Surface Activi Measurements Counts Counts Inst. Count per Inst. Count per Set Time Minute Set Time Minute No. Grid or Location (min.) (cpm) No. Grid or Location (min.) (cpm)

Nlorfh d-si d I I~ I*1¢-

MA flD PUYo-

_______

,ý&k +2 - q

,* Kc 2I _______/

rea-¢

. 3 / /77q __ Aecpm

___ dhFv- Lev #,- SJp2-i-42 04V cve~o-.

__________

Comments:

________________________________ _____________ I_________________

ThP~e (ýn noyAf+-\ UXLU~Q r-Luv-y.rnvl .Iq-4rcyywý 4O'-o k)iS FCc410

_'e Each of the demarked grids Cor locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 2

dpm/100-cm , unless otherwise noted on the attached survey map.

Post-Survey Performance Test Performed Safisfa*ry: L[LL -1121007)

Survey Tech (print/sign): ýefl (7'-no" A Initial / Date Date: l4I2'? 20C Reviewed By (print/sign): JI' /1 . Date: (//Z9 ).,7

¥ Filename: FSS Characterization SCAN Survey FormsRev02 Retention: LP+10

FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No: -- 9* Survey Unit: 0 . Pkg. 'P-)o7 Sheet 2, of Date: I 1121I, 00" Survey Location: *'orVVY\ WGL~Ju~ ~Rw pbcrvx I. Instrument Information Inst. HV THR 27u Calibration Calibration Set Meter Scaler Detector Detector Setting Setting Inst. Due Date Due Date No. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)

_TE:-E. l -,?c __

NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.

Comments: w/u nQcrwzdS 4m- *-)" a~Y*>3h, qq-t*j- %q3*30 Initial Performance Test Performed & Satisfactory: 1 -7!/,2007 i.2 Initial / Date II. Background Measurements III. Total Surface Activi Measurements Counts Counts Inst. Count per Inst. Count per Set Time Minute Set Time Minute No. Grid or Location (min.) (cpm) No. Grid or Location (min.) (cpm)

C3 B<e&

t-I 1c-las6 0

3 BK- tir3 ýIc*,y dM oP 3 FhmA -oP e..14is 6A __

andJCone

_,to Comments:

Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpm/100-cm 2, unless otherwise noted on the attached survey map.

Post-Survey Performance Test Performed & Satisfactory: it 1e2/-7*/*2 )

"Initial / Date Survey Tech (print/sign): Date: -r/i)__2"_

_/ _

Reviewed By (print/sign): L 7ate:

Filenarne: FSS Characterizafion SCAN Survey Forms-Rev02 Retention: LP+10

FNR Decommissioning Project e f Reconnaissance Level Scan Survey Form 1-jo Sheet 1 f* d]*/a Survey No: o00-l - J 3S5 Survey Unit: . Pkg. S P- O-'

Date: I11,* /.2eo7 Survey Location: Z.xan 4-or', C icl5e.--

I. Instrument Information Inst. HV THR 27z Calibration Calibration Set Meter Scaler Detector Detector Setting Setting Inst. Due Date Due Date No. Model Serial No. Model Serial No. d (mVdc) Eff. (Scaler) (Detector)

L a=4~ ý1q a / A19599

'-13-31 L/3-31-/

Vk

?q3ql/l 1-75 1750.

.20

,;20 L4

'1/

7 /o/L.

7/6tl2,*

'l..z~f

.3 . / 21I ?8g ID 4q-L X A0330 1100 S5 q3.q q0/ 2 712m ? o///a NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-21 0, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.

Comments: OQOnr-vrecS 5C.9C.weJ ;dA, a4 /-f -/L ,3. ;gg5 Initial Performance Test Performed & Satisfactory: " 11/24/?07 Initial / Date II. Background Measurements Ill. Total Surface Activr Measurements Counts Counts Inst. Count per Inst. Count per Set Time Minute Set Time Minute No. Grid or Location (min.) (cpm) No. Grid or Location (min.) (cpm) i BA* *"- / ,,_ Io J 8KG 3 / 1 I AcAl-/on -val M*/ 3707 A/o Arnt _ _

/hee we

__ &alneA Worec

-. I- ) ee M/I 3q78' p\J eW Af1 iJi_ _

5 k& its

.3Ac-/'n 1ev' R53~___

Cornm Ibc'yo ( XYxcAI Tr QQCk Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpm/100-cm2' unless otherwise noted on the attached survey map.

Post-Survey Performance Test Performed & Satisfactory: / O JI "Initial / Date Survey Tech (print/sign): ** A Date: I '-* 2"0"I Reviewed By (print/sign): KJ/4 >- '-M1-* Date: JLZZ*/,A2 Filename: FSS Characterization SCAN Survey Forms_RevO Retention: LP+10

FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No: *L6 ,2-3}8 Survey Unit: .j Pkg.%_** - Sheet j of I Date: -,Survey Location: W i a- Cb 9v6( k Pod n 0L'i54oraqe./Pxrt,_

I. Instrument Information Inst. HIV THR 27c Calibration Calibration Set Meter Scaler Detector Detector Setting Setting Inst. Due Date Due Date No. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)

_____ *72*/ ;3*q0 qL, q  ?-37 ;l* 115o3 +/-i/,-.A*x (,12z,3

/ 22ý1~ 2-3"01~-- 91351. Ab IC11 S 5O 75 4I1-;,Z 61ti2OD NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.

Comments: 01.0\ onh vcdtL 1..0mJwA 0, 1O00 Initial Performance Test Performed & Satisfactory:

Initial / Date II. lak~ond Measurements IIl. Total Surface Activity Measurements Counts- Counts Inst. Count per Inst. Count per Set Time Minute Set Time Minute No. Grid or Location (min.) (Cpm) No. Grid or Location (min.) (cpm)

I AG -I q/0 ANl Ain'~cs __

OTkka.-

q7/ &2ancAi I~ i-If AonA&P-NA -?&2-9-L

2. t*3(, /.

2.- A3c(.on /,eUE 11

29& .

Comments:

Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpm/1 00-cm2 , unless otherwise noted on the attached survey map. ,

Post-Survey Performance Test Performed & Satisfactory:

la] / Date Survey Tech (pr] t/sign): K *4' v-nit" Date: iO1/qz ol.

Reviewed By (print/sign): * )4 ,,-' ate: I/ 29/0 7 Filenarne: FSS Characterization SCAN Survey Forms-Rev02 Retention: LP+I 0

FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No: 7.007-3q Survey Unit:--- Pkg. , , "' Sheet _ of '.

Date: //- Z - f07 Survey Location: <i,--Jc. ac_ o{w "e'-sJ5T OF-t C

I. Instrument Information '-B pou-'O. lr/lch Sae- *'* ((L0.A 2-Inst. HV THR 27c Calibration Calibration Set Meter Scaler Detector Detector Setting Setting Inst. Due Date Due Date No. Model Serial No. , Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector) 2l49

.2.-z(

& 4337

,,,[?2Z !76O 2 3,'7 /q/Lo 7//7/o0' 2- L4-2zzi 22.z /D '-Iq-t/- Z 3-36 /200 3-S: I3zA Y/ Z-7 o/6 6/o1 NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-hold) unless otherwise noted in the comments below.

Comments:

Initial Performance Test Performed & Satisfactory: Z/ 2/-2-F/ -7 Initial / Date II. Background Measurements III. Total Surface Activi Measurements Counts Counts Inst. Count per Inst. Count per Set Time Minute Set Time Minute No. Grid or Location (min.) (cpm) No. Grid or Location (min.) (cpm)

I _&t I AI ;5 ok. a _ 4L

/A ~ Ma4",

__. I 1*,1 Z Com3 (n Comments:*

Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpm/lOO-crm2 , unless otherwise noted on the attached survey map.

Post-Survey Performance Test Performed & Satisfactory: *6 * - ///zg// 7

. A Initial / Date Survey Tech (print/sign): 6- )tý6' ' Date: 11-2-Y-07 Reviewed By (print/sign): _ Date: [Z Filename: FSS Characterization SCAN Survey Forms Rev02 Retention: LP+I0

FNR Decommissioning Project -

Reconnaissance Level Scan Survey Form Survey No: 2 1-l-X-*L¶ Survey Unit: I-I/,-z!/-3 Pkg. tMa]* Sheet 2_ of 2_

Date: l 4-'- 0"7 Survey Location: . _-,_ *-LtQ--S -. oL(

Survey Comment Sheet:

This radiological survey covers the west-half of the Beam Port Floor overhead. The west-half is from the FNR south wall to the FNR north wall and from the storage ports wall to the north-south reactor pool centerline extended to the north stairwell wall. The ceiling and all sides of all head beams were scanned. The west wall of the FNR that extends from ground level (outside) up to the under side of the pool floor hatches on the west side and from the FNR south wall to the fan room is included.

(The south, west and north walls around the loading bay under the west pool floor hatches. The south and west walls have a one foot wide ledge along their entire lengths). The scope of the survey does not include any perimeter walls, vertical columns or the floor, just overhead surfaces.

Exceptions to the "no measurements > action levels" statement on page one:

1. The underside of the four foot by five foot ceiling grate to the fan room reads 2000 gcpm, which is below the action level. This grate is currently going to be demolished and disposed of as radwaste.
2. This survey was concentrated of structural surfaces not piping systems. The entire water main was not surveyed. A small section under the grate referred to above has a small amount of contamination.

It will be decontaminated. &',O 4C_-Y1 R,, tri 'sq _ i44z_ d .-

Filename: Survey CommentMapForm RevOO Retention: LP+I0

FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No: d,*00- dqCC) Survey Unit: I- S Pkg. 5*p1:" Sheet I of jk Date: *A160- Survey Location: -S.o4h *k t 6&*w Pord- F0ooric**C M I. Instrument Information Inst. HV THR 27t Calibration Calibration Set Meter Scaler Detector Detector. Setting Setting Inst. Due Date Due Date No. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)

I I4,49 43--

  • I*l-3a 11'5 0 AD O f1,;/ý)4 7/61/=8 2 2 AJ A;L, qq-lqg- q3a'o I Ilot 3'; '13'1 q4l73Joo q/2T/o, NO T:

I All cables 6i-tt R(.8-b5 (ILMI 44-142, 44-9, HP-21U, or 44-92 probes) or 1b-tt RG-58-bt (LMI 43-37 gas-low hand-held) unless otherwise noted in the comments below._ -A Comments: FIDoo* ,-o Ce4,I'c 1 COULA,,e U9 SCo tc. 10,0W) C&4* WS-

. W /O  !~ ~2l.uied Initial Performance Test Performed & Satisfactory: i11 ;aq/obi Initial / Date

11. Background Measurements HI. Total Surface Activi Measurements Counts Counts Inst. Count per Inst. Count per Set Time Minute Set Time Minute No. Grid or Location (min.) (cpm) No. Grid or Location (min.) (cpm)

I K* S3 t ______

,Wsd ____

- .2-

_ A dK(, IA

___ ____ LI

___ / 1 7 t

Corrnmen F.:

Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpm/1 00-cm 2 , unless otherwise noted on the attached survey map.

Post-Survey Performance Test Performed & Satisfactory:

Initia I / Date Survey Tech (piintsign): VftW G.mko(0 /]d w r)ate: bqz"J Reviewed By (print/sign):

'1  !*- U I)ate:

Filename: FSS Characterization SCAN Survey FormsRev02 Retention: LP+10

I . 1:

FNR Decommissioning Project Reconnaissance Level Scan Survey Form .,..:2..

Pkg. sp-j -he6_J of i Survey No: a~bi-L*tt) Survey Unit: I - 7 Date: I1!301AWo7 Survey Location: F4/4 Ba o+4 Ficor s-ec.( i-1 I. Instrument Information Inst. HV THR 21t Calibration Calibration Set Meter Scaler Detector Detector Setting Setting Inst. Due Date Due Date No. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector)

I ~ 2x9-1 gIS s,-3'Y7 3935q25 I&9O ao "*,A, lti,, -.I*.za

, - 3-1 117q7q q3.,- 1700 2 .

'5i3,,#,, 2l1L9A NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or 44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.

Comments: WaiN.[ CeinLtA OinA P< *rtvr\..aN4 /P Itox off)

Initial Performance Test Performed & Satisfactory: I11L0/2W1 Initial / Date II. Background Measurements III. Total Surface Activi Measurements Counts Counts Inst. Count per Inst. Count per Set Time Minute Set Time Minute No. Grid or Location (ain-) (cpm) No. Grid or Location (ain.) (cpm)

Bk 8K P I -V1 on SUN,-,/

j /3K7- 1i3 I I~lg a bale__

6ni~A2 2 Acl-'I I-etie Al/A 3oao-i3 86A< Wt I /I qe AiýLT 1-?c& NIA -299 151J16I//(o0 Comments:

Each of the demarked grids (or locations) on the attached survey map has been scanned and do not exceed the action level of 1,750 dpm/1 00-cm 2 , unless otherwise noted on the attached survey map.

Post-Survey Performan e Test Performed & Satis tactory:

Survey Tech (print/sign): Date: 1)

Reviewed By (printsign): ate: [-0 7" Filename: FSS Characterization SCAN Survey Forms-Rev02. Retention: LP+10

FNR Decommissioning Project Reconnaissance Level Scan Survey Form Survey No: 26 2-45-6 Survey Unit: - 13 Pkg. . AcJA Sheet ( ofj Date: 1 2/W-/0" Survey Location: FiK_

Fft,

  • t&T---- T o ý 1u LA)

I. Instrument Information11 Inst. HV THR 27c Calibration Calibration Set Meter Scaler Detector Detector ISetting Setting Inst. Due Date Due Date No. Model Serial No. Model Serial No. (Vdc) (mVdc) Eff. (Scaler) (Detector) 1 .-

2ZZ'( ~2,19o60 'q3-37 -175-0 Z 6..7¢i ZL."7 v7/, Q 2q13392-Z NOTE: All cables 6-ft RG-58 (LMI 44-142, 44-9, HP-210, or44-92 probes) or 15-ft RG-58 (LMI 43-37 gas-flow hand-held) unless otherwise noted in the comments below.

Comments:

Initial Performance Test Performed & Satisfactory: Tr -07 Initial / Date II. Background Measurements Il. Total Surface Activi Measurements Counts Counts Inst. Count per Inst. Count per Set Time Minute Set Time Minute No. Grid or Location (min.) (cpm) No. Grid or Location (min.) (cpm)

/J,7 K t3 __M I M/A 3,2_3 1ýql z

g4g4ý&Lý /-92 24C/

, omments: 124ywem, Each of the demarked I .

grids (or locations) on the attached surey map has been scanned and do not exceed the actionlevel of 1,750 2

dpm/fOO-cM , unless otherwise noted on the attached survey map.

Post-Survey Performance Test Performed Sa* factory: j//4 Initial/ Date Survey Tech (print/sign): 110 /Aý._ I/ Date: 19L-F 07 Reviewed By (print/sign): KJ*i A* K Date: /'Ž-I 7 Filename: FSS Characterization SCAN Survey FormsRev02 Retention: LP+10