05000285/FIN-2008009-01: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 1: | Line 1: | ||
{{finding | {{finding | ||
| title = Untimely Corrective Actions | | title = Untimely Corrective Actions for Degraded Fire Protection Water Supply System | ||
| docket = 05000285 | | docket = 05000285 | ||
Line 13: | Line 13: | ||
| identified by = NRC | | identified by = NRC | ||
| Inspection procedure = IP 71111.05 | | Inspection procedure = IP 71111.05 | ||
| Inspector = G Pick, N O,' | | Inspector = G Pick, N O, 'Keefek Sullivan, J Mateychick, R Mullikin | ||
| CCA = H.6 | | CCA = H.6 | ||
| INPO aspect = WP.2 | | INPO aspect = WP.2 |
Revision as of 19:36, 20 February 2018
Site: | Fort Calhoun |
---|---|
Report | IR 05000285/2008009 Section 1R05 |
Date counted | Sep 30, 2008 (2008Q3) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.05 |
Inspectors (proximate) | G Pick N O 'Keefek Sullivan J Mateychick R Mullikin |
CCA | H.6, Design Margins |
INPO aspect | WP.2 |
' | |