|
|
Line 3: |
Line 3: |
| | issue date = 04/11/2017 | | | issue date = 04/11/2017 |
| | title = Response Letter Dated 04/11/2017 to Debbie Grinnell Regarding C10 Emails 03-2017 | | | title = Response Letter Dated 04/11/2017 to Debbie Grinnell Regarding C10 Emails 03-2017 |
| | author name = Bower F L | | | author name = Bower F |
| | author affiliation = NRC/RGN-I/DRP/PB3 | | | author affiliation = NRC/RGN-I/DRP/PB3 |
| | addressee name = Grinnell D | | | addressee name = Grinnell D |
Line 28: |
Line 28: |
|
| |
|
| 1-800-397-4209, 301-415-4737, or by e | | 1-800-397-4209, 301-415-4737, or by e |
| -mail to pdr.resource@nrc.gov. As Ms. Buford stated to you in a n email dated March 10, 2017 (ML 17069A077), at this point, the agency has accept ed NextEra's license amendment requests (LAR) only for review by the staff. This means that the NRC considers the LAR to be acceptable for review upon the NRC staff's conclusion that the application for a license amendment reasonably appears to contain sufficient technical information, both in scope and depth, for the NRC staff to complete the detailed technical review and render, in an appropriate time frame, an independent assessment of the proposed action with regard to applicable regulatory requirements and the protection of public health, safety, and security. | | -mail to pdr.resource@nrc.gov. As Ms. Buford stated to you in a n email dated March 10, 2017 (ML17069A077), at this point, the agency has accept ed NextEra's license amendment requests (LAR) only for review by the staff. This means that the NRC considers the LAR to be acceptable for review upon the NRC staff's conclusion that the application for a license amendment reasonably appears to contain sufficient technical information, both in scope and depth, for the NRC staff to complete the detailed technical review and render, in an appropriate time frame, an independent assessment of the proposed action with regard to applicable regulatory requirements and the protection of public health, safety, and security. |
| More information on the NRC's acceptance review process can be found at: | | More information on the NRC's acceptance review process can be found at: |
| https://www.nrc.gov/docs/ML0918/ML16144A521.pdf The NRC staff's technical review and processing of the license amendment is expected to take a considerable period of time as described in the acceptance letter dated October 12, 2016 (ML16265A440 | | https://www.nrc.gov/docs/ML0918/ML16144A521.pdf The NRC staff's technical review and processing of the license amendment is expected to take a considerable period of time as described in the acceptance letter dated October 12, 2016 (ML16265A440 |
|
---|
Category:Letter
MONTHYEARML24009A1152024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-180, Submittal of Changes to the Technical Specification Bases2023-12-13013 December 2023 Submittal of Changes to the Technical Specification Bases L-2023-177, Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Seabrook Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-160, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Final Rule ML23318A0772023-11-14014 November 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000443/2024011 IR 05000443/20234032023-11-0707 November 2023 Security Baseline Inspection Report 05000443/2023403 and Independent Spent Fuel Storage Installation 07200063/2023401 IR 05000443/20230032023-11-0606 November 2023 Integrated Inspection Report 05000443/2023003 IR 05000443/20230102023-10-19019 October 2023 Triennial Fire Protection Inspection Report 05000443/2023010 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A0522023-10-0202 October 2023 Requalification Program Inspection IR 05000443/20234012023-09-0808 September 2023 Cybersecurity Inspection Report 05000443/2023401 (Cover Letter Only) IR 05000443/20234202023-09-0505 September 2023 Security Baseline Inspection Report 05000443/2023420 IR 05000443/20230052023-08-31031 August 2023 Updated Inspection Plan for Seabrook Station (Report 05000443/2023005) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000443/20233022023-08-16016 August 2023 Operator Licensing Retake Examination Report 05000443/2023302 IR 05000443/20230022023-08-0808 August 2023 Integrated Inspection Report 05000443/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment L-2023-104, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-103, Inservice Inspection Examination Report2023-08-0303 August 2023 Inservice Inspection Examination Report ML23192A0782023-07-11011 July 2023 Operator Licensing Retake Examination Approval L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) SBK-L-23053, Radiological Emergency Plan (Ssrep), Revision 802023-06-22022 June 2023 Radiological Emergency Plan (Ssrep), Revision 80 ML23157A0722023-06-0606 June 2023 Notification of Conduct of a Fire Protection Team Inspection L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000443/20233012023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000443/2023301 L-2023-064, License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-05-11011 May 2023 License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves IR 05000443/20230012023-05-11011 May 2023 Integrated Inspection Report 05000443/2023001 ML23129A0312023-05-0909 May 2023 Reactor Operator Retake License Examination ML23117A3652023-05-0404 May 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Remove Period of Applicability from PTL and Low Temperature Over Pressure Protection Curves SBK-L-23044, 2022 Annual Radiological Environmental Operating Report2023-04-28028 April 2023 2022 Annual Radiological Environmental Operating Report SBK-L-23031, 2022 Annual Radioactive Effluent Release Report2023-04-28028 April 2023 2022 Annual Radioactive Effluent Release Report SBK-L-23033, 2022 Annual Environmental Operating Report2023-04-11011 April 2023 2022 Annual Environmental Operating Report L-2023-053, Core Operating Limits Report for Cycle 232023-04-0505 April 2023 Core Operating Limits Report for Cycle 23 ML23088A1522023-03-29029 March 2023 Summary of Meeting Between Nrc/Region I and C-10 - Questions Regarding Seabrook 4Q2022 Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML23073A1562023-03-23023 March 2023 Relief Request 4RA-22-01, Relief from the Requirements of the ASME Code L-2023-012, License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-03-15015 March 2023 License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-023, Revised Steam Generator Tube Inspection Report2023-03-0303 March 2023 Revised Steam Generator Tube Inspection Report ML23020A1002023-03-0303 March 2023 OEDO-22-00419 - 2.206 Petition for Seabrook Station Structure Concrete Concerns (EPID L-2022-CRS-0000)- Closure Letter 2024-01-29
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
KING OF PRUSSIA, PA 19406
-2713 April 1 1, 2017 Ms. Debbie Grinnell Emeritus Research Director C-10 Research and Education Foundation, Inc.
44 Merrimac Street Newburyport, MA 01950
Dear Ms. Grinnell:
Ms. Angela Buford forwarded me your email to her dated March 1, 2017, and I am writing to acknowledge its receipt. You sent Ms. Buford a clarifying email later the same day. Your emails have been entered into the NRC's Agencywide Documents Access and Management System (ADAMS) as public ly available records (ML17069A049 1 and ML17069A064) at http://www.nrc.gov/reading
-rm/adams.html
. To begin a search for these documents, select "ADAMS Public Documents" and then select "Begin Web
-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by e
-mail to pdr.resource@nrc.gov. As Ms. Buford stated to you in a n email dated March 10, 2017 (ML17069A077), at this point, the agency has accept ed NextEra's license amendment requests (LAR) only for review by the staff. This means that the NRC considers the LAR to be acceptable for review upon the NRC staff's conclusion that the application for a license amendment reasonably appears to contain sufficient technical information, both in scope and depth, for the NRC staff to complete the detailed technical review and render, in an appropriate time frame, an independent assessment of the proposed action with regard to applicable regulatory requirements and the protection of public health, safety, and security.
More information on the NRC's acceptance review process can be found at:
https://www.nrc.gov/docs/ML0918/ML16144A521.pdf The NRC staff's technical review and processing of the license amendment is expected to take a considerable period of time as described in the acceptance letter dated October 12, 2016 (ML16265A440
). Specifically, the letter stated that NRC staff has estimated this licensing request will take about 2 ,000 hours0 days <br />0 weeks <br />0 months <br /> to complete and it further stated that the NRC staff expects to complete this review in 22 months, which is August 2018.
More information on the review and processing of LAR s can be found at: https://www.nrc.gov/docs/ML0918/ML16061A451.pdf. We are aware that the NRR Project Manager for Seabrook, Mr. Justin Poole, informed you and your organization (C-1 0) by an email dated February 7, 2017 (ML17069A039), that the comment period for the Seabrook
's alkali silica reaction (ASR) LAR was noticed in the Federal Register. We further understand that C
-10 submitted comments by the deadline and the comments have been entered into ADAMS as a public record (ML17081A015). The document located at ML16061A451 also provides guidance for addressing comments received
, from the public , in the safety evaluation report (SER) for the license amendment. As I previously
1 Designation in parentheses refers to an Agency
-wide Documents Access and Management System (ADAMS) accession number. Unless otherwise noted, documents referenced in this letter are publicly
-available using the accession number in ADAMS.
D. Grinnell 2 indicated to you in an email dated October 12, 2016 (ML16286A058), any questions regarding the LAR should be directed to Mr. Poole.
We would urge you and C
-10 to continue to review the long list of documents and information on our website page for ASR at Seabrook: https://www.nrc.gov/reactors/operating/ops
-experience/concrete
-degradation.html
. This webpage is frequently updated and includes every significant piece of correspondence on this subject issued since 2010.
I plan to file this response to you in ADAMS at ML17096A412 and make it publically available.
I trust that this is responsive to your questions.
Sincerely,
/RA/ Fred L. Bower III, Chief Reactor Projects Branch 3 Division of Reactor Projects
D. Grinnell 3 DISTRIBUTION: (via email):
[2016-SST-0 948] DDorman, RA DLew, DRP MScott, DRP DPelton, DRP RLorson, DRS JYerokun, DRS MGray, DRS WCook, DRS FBower, DRP RBarkley, DRP PCataldo, DRP, SRI PMeier, DRP, RI JBowen, RI, OEDO DScrenci, PAO NSheehan, PAO JGreives, SLO DTifft, SLO ABuford, NRR JPoole, NRR BLehman, NRR JDanna, NRR BWittick, NRR LJames, NRR RidsNrrPMSeabrookResource RidsNRRDorlLp1Resource Natalie@C-10.org Debbie@C-10.org Info@C-10.org DOCUMENT NAME: G:\DRP\BRANCH3\Action Items
\2017\2017-SST-0948-Grinnell Emails Response_2017
\Resp Ltr to DGrinnell_C10_emails_03
-2017_final revision.docx ADAMS Accession No.
ML17096A412 (document)
SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP NRR/DORL RI/DRP NAME RBarkley JPoole/RB FBower DATE 4/6/1 7 4/6/17 4/11/17 OFFICIAL RECORD CO PY