Line 2: |
Line 2: |
| | number = ML17109A360 | | | number = ML17109A360 |
| | issue date = 11/14/2016 | | | issue date = 11/14/2016 |
| | title = Salem Generating Station - NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) | | | title = NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) |
| | author name = D'Antonio J | | | author name = D'Antonio J |
| | author affiliation = NRC/RGN-I/DRS/OB | | | author affiliation = NRC/RGN-I/DRS/OB |
Revision as of 17:44, 2 April 2019
Similar Documents at Salem |
---|
Category:License-Operator
MONTHYEARML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23208A2462023-05-23023 May 2023 Final QA Related Forms ML22175A2012022-03-30030 March 2022 Final QA Related Forms (Folder 1) ML22207B8342022-03-30030 March 2022 Form ES-201-2 (Folder 1) ML22116A1822022-02-11011 February 2022 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML22175A1972021-11-18018 November 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML21069A1432021-03-10010 March 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A2702021-01-12012 January 2021 Final Qa/Related Forms (Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20301A6322020-10-27027 October 2020 Handouts to Applicants (Folder 3) ML20300A5562020-10-26026 October 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20297A2792020-10-23023 October 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20297A3062020-10-23023 October 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20296A4302020-10-22022 October 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20296A4322020-10-22022 October 2020 Draft Written Examination (Folder 2) ML20279A4372020-10-13013 October 2020 September 9, 2020, NRC Generic Fundamentals Examination for Salem Nuclear Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20240A3222020-08-27027 August 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20240A3182020-08-27027 August 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19289C4412019-10-15015 October 2019 September 4, 2019, NRC Generic Fundamentals Examination Results for Salem Nuclear Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19211C2552019-07-30030 July 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri ML19004A1222019-01-0303 January 2019 Initial Operator Licensing Operating Test Approval ML18135A2482018-05-21021 May 2018 Draft Written Examination (Folder 2) ML18135A2162018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML18135A3012018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) NTD-18-043, Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18107A2302018-04-12012 April 2018 March 7, 2018, NRC Generic Fundamentals Examination Results for Salem Nuclear Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18135A2252018-03-20020 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) ML18074A0552018-03-0909 March 2018 Final Operating Test (Section a, B, and C) (Folder 3) ML18074A0522018-03-0909 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) ML18074A0542018-03-0909 March 2018 Handouts to Applicants (Folder 3) ML18134A1372018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 SRO (Folder 1) ML18149A4942018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 RO (Folder 1) ML18134A1282018-03-0909 March 2018 Final Qa/Related Forms (Forms 1) ML18074A0532018-03-0909 March 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE ML18025A8582018-01-22022 January 2018 Initial Operator Licensing Written Examination Approval ML18017A8212018-01-17017 January 2018 Initial Operator Licensing Test Approval ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18135A3332017-12-11011 December 2017 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML17278A1702017-10-0505 October 2017 September 6, 2017, NRC Generic Fundamentals Examination for Salem Nuclear Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML17201A0612017-07-19019 July 2017 Senior Reactor and Reactor Operator Initial License Examinations - Salem Nuclear Generating Station IR 05000272/20173022017-06-29029 June 2017 Senior Reactor Operator Retake License Examination Report 05000272/2017302 and 05000311/2017302 ML17249A1322017-06-0707 June 2017 Final Qa/Related Forms (Folder 1) ML17174B2102017-06-0606 June 2017 Final Outlines (Folder 3) ML17174B2112017-06-0606 June 2017 Final Operating Test (Section C) (Folder 3) ML17156A5622017-06-0505 June 2017 Operator Licensing Retake Examination Approval LR-N17-0099, Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17249A1342017-04-20020 April 2017 Draft Operating Exam (Section C) (Folder 2) 2023-08-21
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23208A2462023-05-23023 May 2023 Final QA Related Forms ML22175A2012022-03-30030 March 2022 Final QA Related Forms (Folder 1) ML22207B8342022-03-30030 March 2022 Form ES-201-2 (Folder 1) ML22116A1822022-02-11011 February 2022 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML22175A1972021-11-18018 November 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML21069A1432021-03-10010 March 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML21012A2702021-01-12012 January 2021 Final Qa/Related Forms (Folder 1) ML20301A6322020-10-27027 October 2020 Handouts to Applicants (Folder 3) ML20300A5562020-10-26026 October 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20297A3062020-10-23023 October 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20297A2792020-10-23023 October 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20296A4322020-10-22022 October 2020 Draft Written Examination (Folder 2) ML20296A4302020-10-22022 October 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20240A3222020-08-27027 August 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20240A3182020-08-27027 August 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19211C2552019-07-30030 July 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19004A1222019-01-0303 January 2019 Initial Operator Licensing Operating Test Approval ML18135A2482018-05-21021 May 2018 Draft Written Examination (Folder 2) ML18135A2162018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML18135A3012018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) NTD-18-043, Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18135A2252018-03-20020 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) ML18134A1282018-03-0909 March 2018 Final Qa/Related Forms (Forms 1) ML18074A0532018-03-0909 March 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML18074A0522018-03-0909 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) ML18074A0552018-03-0909 March 2018 Final Operating Test (Section a, B, and C) (Folder 3) ML18074A0542018-03-0909 March 2018 Handouts to Applicants (Folder 3) ML18149A4942018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 RO (Folder 1) ML18134A1372018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 SRO (Folder 1) ML18025A8582018-01-22022 January 2018 Initial Operator Licensing Written Examination Approval ML18017A8212018-01-17017 January 2018 Initial Operator Licensing Test Approval ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18135A3332017-12-11011 December 2017 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML17201A0612017-07-19019 July 2017 Senior Reactor and Reactor Operator Initial License Examinations - Salem Nuclear Generating Station IR 05000272/20173022017-06-29029 June 2017 Senior Reactor Operator Retake License Examination Report 05000272/2017302 and 05000311/2017302 ML17249A1322017-06-0707 June 2017 Final Qa/Related Forms (Folder 1) ML17174B2102017-06-0606 June 2017 Final Outlines (Folder 3) ML17174B2112017-06-0606 June 2017 Final Operating Test (Section C) (Folder 3) LR-N17-0099, Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17249A1342017-04-20020 April 2017 Draft Operating Exam (Section C) (Folder 2) ML17249A1332017-04-20020 April 2017 Draft - Outlines (Folder 2) ML17102B2082017-04-11011 April 2017 Senior Reactor Operator Retake License Examination: Salem Nuclear Generating Station, Units 1 and 2 ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17031A3372016-12-19019 December 2016 Handouts to Applicants (Folder 3) ML17109A3512016-12-12012 December 2016 Final Qa/Related Forms (Folder 1) ML17031A3022016-12-12012 December 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17109A3522016-12-12012 December 2016 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17031A2942016-12-12012 December 2016 Final Outlines (Folder 3) 2023-05-23
[Table view] |
Text
Salem Generating Station Initial License Exam 12/12/16 changes made during Prep Week 11/15/16 SRO Admin Al-2 Added S2.0P-SO.CH-0001 to list of procedures to be given applicant.
Modified 2A EDG condition from performing surveillance to tagging out EDG for maintenance.
Added "If any of the activities cannot proceed, explain your reason(s)." to initiating cue in BOTH places. Added reason in body of JPM on page 5 for why New Fuel delivery cannot be performed.
ROAdminA3 Bolded and underlined the first "current" in initiating cue since second "current is bolded and underlined.
SROAdminA3 Modified Initiating Cue to have 3 columns for Releases, Can Release Be Performed, Comp Actions. Removed extra step for WL release at top of page 5. Reordered list of releases to match order they are addressed in JPM. Added critical task asterisk to WL release on page 6. Added note below comp action for Cont press relief to state the compa action may be found in P&L 3.11 in procedure also. SROAdminA2 Moved time from initiating cue to initial conditions.
Modified by using incorrect total rod worth values. Error is because the first value in the Table was used, instead of going down table to correct time in core life (0 EFPH vs. 10,000 EFPH) Added correct values in JPM body. ESG-1 Added power reduction event at the end of initial RCS leak event, and updated ESG to include cue if power reduction is not initiated initially by CRS. Updated ES-301-5.
ESG-2 Combined events 2 (23 Cond pump trip) and 3 (downpower) events into event 2. Added new event 3 charging master flow controller failure. Added new event 21 AFW pump trip to 301-5, the pump trip was already in scenario, just made it into an event on 301-5. ESG-3 Modified scenario to include power ascension at start of scenario and added "R ALL" to 301-5 as Event 1, renumbered remaining events and updated in scenario.
Added event numbers 5-7 in body of scenario.
Added "or completely depressurized" to step at top of page 18.
ESG-4 (now spare ESG) Changed Event 1 from "N" for PO to "R". Updated 301-5. Bolded the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Tech Specs in body of scenario.
Added required boration amount for downpower from 76%-5%. Added that crew may dispatch operator to place 22 BAST in service if it is determined it is not in service. ESG-5 (now 4th ESG in exam) Modified ES-D-1 form to show correct initial power of 47%, not 48.5%. Changed Event 1 from "N" for PO to "R". Changed Event 5 (Steam Dump malfunction) from C for RO/CRS to ALL since PO responds to tum off steam dumps, and that action has effect to shut all but the cooldown steam dump valves. Inplant JPM IP-k Modified cue to state that "the 2A EDG is to be parallel loaded with 2A vital bus" and removed the cue in body of procedure which said the EDG was to be parallel loaded. Inplant JPM IP-j Correct backleage spelling on cue sheet. Modified Task Standard to show venting of 11 AFW pump is required vs venting the elevated temp feed line (13) Sima NC Simb Added all the steps ofRNO 6b to standard Resnapped with CV139 and 140 shut. Changed APPX to Appendix in body of JPM for evaluator cue Removed CT designation from RNO 1.a. CS36 step. Added to the cue that only RO applicants are to be told to go to APPX-7, since SRO's should know what procedure to use. Added evaluator note that stopping RHR pumps at beginning of JPM without stopping CVCS and SI pumps first is failure criteria.
Sime NC Simd NC Sime Changed to NOT an alternate path JPM Updated 301-2 forms Fixed oriface typo Simf NC Simg BOLDED all equipment started and stopped. Simh NC General For Alternate Path JPMs a, c, d, and h placed words in body of JPM stating what is alternate path. JPM b did not do this as it is all RNO stuff which is self evident. Replaced ESG-4 with SPARE ESG-5, ESG-4 is now the spare. Updated ES301-5.