{{#Wiki_filter:ATTACHMENT 5 Summary of Regulatory Commitments The following table identifies commitments made by Exelon Generation Company, LLC (EGC) in this document. Any other actions discussed in the submittal represent intended or planned actions. They are described to the NRC for the NRC's information and are not regulatory commitments.
{{#Wiki_filter:ATTACHMENT 5 Summary of Regulatory Commitments The following table identifies commitments made by Exelon Generation Company, LLC (EGC) in this document. Any other actions discussed in the submittal represent intended or planned actions. They are described to the NRC for the NRC's information and are not regulatory commitments.
COMMITMENT TYPE COMMITMENT COMMITTED DATE OR "OUTAGE" O NE-T IME A CTION (Yes/No)PROGRAMMATIC (Yes/No)Limitations regarding operation with an inoperable LEFM system will be included in the TRM. Prior to uprate implementation Yes No The LEFM system for LGS, Units 1 and 2 will be installed.
COMMITTED              COMMITMENT TYPE COMMITMENT                         DATE OR       ONE-TIME ACTION    PROGRAMMATIC "OUTAGE"           (Yes/No)           (Yes/No)
Prior to uprate implementation Yes No Plant maintenance and calibration procedures will be revised to incorporate Camerons maintenance and calibration requirements.
Limitations regarding operation with an         Prior to uprate          Yes                No inoperable LEFM system will be included in     implementation the TRM.
Prior to uprate implementation Yes No Final acceptance of the site-specific uncertainty analyses will occur after the completion of the commissioning process.
The LEFM system for LGS, Units 1 and 2 will     Prior to uprate           Yes               No be installed.                                  implementation Plant maintenance and calibration               Prior to uprate          Yes                No procedures will be revised to incorporate       implementation Camerons maintenance and calibration requirements.
Prior to uprate implementation Yes No Modifications for the power uprate will be implemented.
Final acceptance of the site-specific           Prior to uprate          Yes                No uncertainty analyses will occur after the       implementation completion of the commissioning process.
Prior to uprate implementation Yes No Necessary procedure revisions for the power uprate will be completed.
Modifications for the power uprate will be     Prior to uprate           Yes               No implemented.                                    implementation Necessary procedure revisions for the power Prior to uprate          Yes                No uprate will be completed.
Prior to uprate implementation Yes No The plant simulator will be modified for the uprated conditions and the changes will be  
implementation The plant simulator will be modified for the Prior to uprate          Yes                No uprated conditions and the changes will be implementation validated in accordance with plant configuration control processes.
 
Maintenance personnel will be qualified on     Prior to work on          No                Yes the LEFM system.                               the system Operator training will be completed prior to Prior to uprate          Yes                No implementation of the proposed power uprate implementation changes.
validated in accordance with plant configuration control processes.
Plant testing for the proposed changes will be As described              Yes                No completed as described in Attachment 6, Section 10.4, "Testing."
Prior to uprate implementation Yes No Maintenance personnel will be qualified on the LEFM system.
Plant-specific analyses for all potentially     Prior to uprate          Yes                No limiting events will be performed on a cycle-   implementation specific basis as part of the reload licensing process.}}
Prior to work on the system No Yes Operator training will be completed prior to implementation of the proposed power uprate changes. Prior to uprate implementation Yes No Plant testing for the proposed changes will be completed as described in Attachment 6, Section 10.4, "Testing."   As described Yes No Plant-specific analyses for all potentially limiting events will be performed on a cycle-specific basis as part of the reload licensing  
 
process. Prior to uprate implementation Yes No}}

Latest revision as of 21:23, 13 November 2019

Attachment 5: Summary of Regulatory Commitments
ML100850401
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 03/25/2010
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML100850379 List:
References
Download: ML100850401 (1)


Text

ATTACHMENT 5 Summary of Regulatory Commitments The following table identifies commitments made by Exelon Generation Company, LLC (EGC) in this document. Any other actions discussed in the submittal represent intended or planned actions. They are described to the NRC for the NRC's information and are not regulatory commitments.

COMMITTED COMMITMENT TYPE COMMITMENT DATE OR ONE-TIME ACTION PROGRAMMATIC "OUTAGE" (Yes/No) (Yes/No)

Limitations regarding operation with an Prior to uprate Yes No inoperable LEFM system will be included in implementation the TRM.

The LEFM system for LGS, Units 1 and 2 will Prior to uprate Yes No be installed. implementation Plant maintenance and calibration Prior to uprate Yes No procedures will be revised to incorporate implementation Camerons maintenance and calibration requirements.

Final acceptance of the site-specific Prior to uprate Yes No uncertainty analyses will occur after the implementation completion of the commissioning process.

Modifications for the power uprate will be Prior to uprate Yes No implemented. implementation Necessary procedure revisions for the power Prior to uprate Yes No uprate will be completed.

implementation The plant simulator will be modified for the Prior to uprate Yes No uprated conditions and the changes will be implementation validated in accordance with plant configuration control processes.

Maintenance personnel will be qualified on Prior to work on No Yes the LEFM system. the system Operator training will be completed prior to Prior to uprate Yes No implementation of the proposed power uprate implementation changes.

Plant testing for the proposed changes will be As described Yes No completed as described in Attachment 6, Section 10.4, "Testing."

Plant-specific analyses for all potentially Prior to uprate Yes No limiting events will be performed on a cycle- implementation specific basis as part of the reload licensing process.