ML14031A344: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 21: Line 21:


==References:==
==References:==
: 1. Docket No. 50-285 2. NRC Letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ," dated March 12,2012 (ML12073A348) (NRC-12-0021) 3. NRC Letter to Nuclear Energy Institute, Endorsement of Nuclear Energy Institute (NEI) 12-07, "Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features," dated May 31 , 2012, (ML12144A 142) 4. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "OPPD 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated November 27,2012 (ML12334A449) (UC-12-0170)  
: 1. Docket No. 50-285 2. NRC Letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ," dated March 12,2012 (ML12073A348) (NRC-12-0021) 3. NRC Letter to Nuclear Energy Institute, Endorsement of Nuclear Energy Institute (NEI) 12-07, "Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features," dated May 31 , 2012, (ML12144A 142) 4. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "OPPD 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated November 27,2012 (ML12334A449) (UC-12-0170)
: 5. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "OPPD Supplemental Response to NRC Request for Information Pursuant to 1 0 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.3 of the Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated August 15, 2013 (ML 13228A098) (UC-13-01 02) 6. NRC Letter to OPPD, Request for Add i tional Information Associated with Term Task Force Recommendation 2.3, Flooding Walkdowns; dated December 23, 2013 (ML 13325A891) (NRC-13-0157)
: 5. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "OPPD Supplemental Response to NRC Request for Information Pursuant to 1 0 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.3 of the Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated August 15, 2013 (ML 13228A098) (UC-13-01 02) 6. NRC Letter to OPPD, Request for Add i tional Information Associated with Term Task Force Recommendation 2.3, Flooding Walkdowns; dated December 23, 2013 (ML 13325A891) (NRC-13-0157)
Subjec t: OPPD Response to NRC 10 CFR 50.54(f) Reques t for I n formation Regarding Nea r-Term Task Force Recommendation 2.3, Flooding -R eview of Available Phy si c a l M arg in (APM) A ss e ss m e n ts On March 12 , 2012, the NRC staff issued Reference 2 requesting information pursuant to T i tle 10 of the Code of Federal Regulat i ons 50.54(f).
Subjec t: OPPD Response to NRC 10 CFR 50.54(f) Reques t for I n formation Regarding Nea r-Term Task Force Recommendation 2.3, Flooding -R eview of Available Phy si c a l M arg in (APM) A ss e ss m e n ts On March 12 , 2012, the NRC staff issued Reference 2 requesting information pursuant to T i tle 10 of the Code of Federal Regulat i ons 50.54(f).
Line 33: Line 33:
==Attachment:==
==Attachment:==


Request for Additional Information Flooding Walkdowns LPC/JKG/mle c: M. L. Dapas, NRC Regional Administrator, Region IV J. M. Sebrosky, NRC Senior Project Manager J. C. Kirkland, NRC Senior Resident Inspector LI C-14-0008 Attachment Page 1 Request for Additional Information Flooding Walkdowns Please provide the following:  
Request for Additional Information Flooding Walkdowns LPC/JKG/mle c: M. L. Dapas, NRC Regional Administrator, Region IV J. M. Sebrosky, NRC Senior Project Manager J. C. Kirkland, NRC Senior Resident Inspector LI C-14-0008 Attachment Page 1 Request for Additional Information Flooding Walkdowns Please provide the following:
: 1. Confirmation that the process for evaluating APM was reviewed; OPPD Response OPPD has completed a review of the process used at Fort Calhoun Station to evaluate the APM. 2. Confirmation that the APM process is now or was always consistent with the guidance in NEI 12-07 and discussed in this RAI; OPPD Response The APM process was always consistent with the guidance in FAQ-030 and NEI 12-07, and discussed in this RAI. 3. If changes are necessary, a general description of any process changes to establish this consistency; OPPD Response No changes were necessary  
: 1. Confirmation that the process for evaluating APM was reviewed; OPPD Response OPPD has completed a review of the process used at Fort Calhoun Station to evaluate the APM. 2. Confirmation that the APM process is now or was always consistent with the guidance in NEI 12-07 and discussed in this RAI; OPPD Response The APM process was always consistent with the guidance in FAQ-030 and NEI 12-07, and discussed in this RAI. 3. If changes are necessary, a general description of any process changes to establish this consistency; OPPD Response No changes were necessary
: 4. As a result of the audits and subsequent interactions with industry during public meetings, NRC staff recognized that evaluation of APM for seals (e.g., flood doors, penetrations, flood gates, etc.) was challenging for some licensees.
: 4. As a result of the audits and subsequent interactions with industry during public meetings, NRC staff recognized that evaluation of APM for seals (e.g., flood doors, penetrations, flood gates, etc.) was challenging for some licensees.
Generally, licensees were expected to use either Approach A or Approach B (described below) to determine the APM for seals: a) If seal pressure ratings were known, the seal ratings were used to determine APM (similar to example 2 in Section 3.13 of NEI12-07).
Generally, licensees were expected to use either Approach A or Approach B (described below) to determine the APM for seals: a) If seal pressure ratings were known, the seal ratings were used to determine APM (similar to example 2 in Section 3.13 of NEI12-07).

Revision as of 12:19, 28 April 2019

OPPD Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Flooding - Review of Available Physical Margin (APM) Assessments
ML14031A344
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/31/2014
From: Cortopassi L P
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LlC-14-0008
Download: ML14031A344 (4)


Text

ilppB ----Omaha Publ i c Po wer D i stri ct 444 South 1ffh Street Mall Omaha, NE 68102-2247 January 3 1, 2014 U C-14-0008 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

References:

1. Docket No. 50-285 2. NRC Letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ," dated March 12,2012 (ML12073A348) (NRC-12-0021) 3. NRC Letter to Nuclear Energy Institute, Endorsement of Nuclear Energy Institute (NEI) 12-07, "Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features," dated May 31 , 2012, (ML12144A 142) 4. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "OPPD 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated November 27,2012 (ML12334A449) (UC-12-0170)
5. Letter from OPPD (L. P. Cortopassi) to NRC (Document Control Desk), "OPPD Supplemental Response to NRC Request for Information Pursuant to 1 0 CFR 50.54(f) Regarding the Flooding Aspects of Recommendations 2.3 of the Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated August 15, 2013 (ML 13228A098) (UC-13-01 02) 6. NRC Letter to OPPD, Request for Add i tional Information Associated with Term Task Force Recommendation 2.3, Flooding Walkdowns; dated December 23, 2013 (ML 13325A891) (NRC-13-0157)

Subjec t: OPPD Response to NRC 10 CFR 50.54(f) Reques t for I n formation Regarding Nea r-Term Task Force Recommendation 2.3, Flooding -R eview of Available Phy si c a l M arg in (APM) A ss e ss m e n ts On March 12 , 2012, the NRC staff issued Reference 2 requesting information pursuant to T i tle 10 of the Code of Federal Regulat i ons 50.54(f).

Enclosure 4 of that letter contains specific requested Info r mation associated with Near-Term Task F orce Recommendation 2.3 for Flooding. Per Reference 3 , the NRC endorsed Nuclear Energy Institute (NEI) 12-07, "Guidelines for Performing Verif i cation Walkdowns of Plant Flood Protection Features," dated May 31 , 2012. In References 4 and 5 , OPPD submitted responses to Refe r ence 2.

U. S. Nuclear Regulatory Commission LlC-14-0008 Page 2 One of the requirements of NEI 12-07 is to identify the available physical margin (APM) associated with each applicable flood protection feature, determine if the margin provided is small, and evaluate any small margins that have potentially significant consequences through the corrective action process. The results of this effort were to be maintained on site for future NRC audits. Following the NRC staff's initial review of the walkdown reports, regulatory site audits were conducted at a sampling of plants. Based on the walkdown reports, reviews, and site audits, the staff identified additional information necessary to allow them to complete their assessments.

Accordingly, in Reference 6, the NRC issued a request for addition information (RAI) to a number of licensees including OPPD. OPPD's response is attached.

If you should you have questions, please contact Mr. Bill Hansher at (402) 533-6894.

No commitments to the NRC are contained in this letter. I declare under penalty of perjury that the foregoing is true and correct. Executed on January 31,2014. Sincerely.

Louis P. Cortopassi Site Vice President and CNO

Attachment:

Request for Additional Information Flooding Walkdowns LPC/JKG/mle c: M. L. Dapas, NRC Regional Administrator, Region IV J. M. Sebrosky, NRC Senior Project Manager J. C. Kirkland, NRC Senior Resident Inspector LI C-14-0008 Attachment Page 1 Request for Additional Information Flooding Walkdowns Please provide the following:

1. Confirmation that the process for evaluating APM was reviewed; OPPD Response OPPD has completed a review of the process used at Fort Calhoun Station to evaluate the APM. 2. Confirmation that the APM process is now or was always consistent with the guidance in NEI 12-07 and discussed in this RAI; OPPD Response The APM process was always consistent with the guidance in FAQ-030 and NEI 12-07, and discussed in this RAI. 3. If changes are necessary, a general description of any process changes to establish this consistency; OPPD Response No changes were necessary
4. As a result of the audits and subsequent interactions with industry during public meetings, NRC staff recognized that evaluation of APM for seals (e.g., flood doors, penetrations, flood gates, etc.) was challenging for some licensees.

Generally, licensees were expected to use either Approach A or Approach B (described below) to determine the APM for seals: a) If seal pressure ratings were known, the seal ratings were used to determine APM (similar to example 2 in Section 3.13 of NEI12-07).

A numerical value for APM was documented.

No further action was performed if the APM value was greater than the pre-established small-margin threshold value. If the APM value was small, an assessment of "significant consequences" was performed and the guidance in NEI 12-07 Section 5.8 was followed.

b) If the seal pressure rating was not known, the APM for seals in a flood barrier is assumed to be greater than the pre-established small-margin threshold value if the following conditions were met: (1) the APM for the barrier in which the seal is located is greater than the small-margin threshold value and there is evidence that the seals were designed/procured, installed, and controlled as flooding seals in accordance with the flooding licensing basis. Note that in order to determine that LI C-14-000S Attachment Page 2 the seal has been controlled as a flooding seal, it was only necessary to determine that the seal configuration has been governed by the plant's design control process since installation.

In this case, the APM for the seal could have been documented as "not small". As part of the RAI response, state if either Approach A or Approach B was used as part of the initial walkdowns or as part of actions taken in response to this RAI. No additional actions are necessary if either Approach A or B was used. If neither Approach A or B was used to determine the APM values for seals (either as part of the walkdowns or as part of actions taken in response to this RAI), then perform the following two actions:

  • Enter the condition into the CAP (note: it is acceptable to utilize a single CAP entry to capture this issue for mult i ple seals). CAP disposition of " undetermined" APM values for seals should consider the guidance provided in NEI 12-07, Section 5.8. The CAP disposition should confirm all seals can perform their intended safety function against floods up to the current licensing basis flood height. Disposition may occur as part of the Integrated Assessment.

If an Integrated Assessment is not performed, determine whether there are significant consequences associated with exceeding the capacity of the seals and take interim action(s), if necessary, via the CAP processes.

These actions do not need to be complete prior to the RAI response.

  • Report the APM as "undetermined" and provide the CAP reference in the RAI response.

OPPD Response The approach used to determine APM for Fort Calhoun Station most closely matches Approach A as described above. Seal pressure ratings were determined to be in accordance with the design basis and provide flood protection to 1,014 feet. As noted in Updated Safety Analysis Report (USAR), Section 2.7.1.2, flooding protection is provided by removable flood barriers that extend to 1,014 feet. USAR Section 2.7 .1.2 also states: The Corps of Engineers estimate of the flood level that might result from the failure of Oahe or Fort Randall dams coincident with the probable maximum flood that produces the 1,009.3 foot flood is 1,014 feet. The numeric value of the difference between the height of the flood barriers and the height of the probable maximum flood was used. The APM value was small, an assessment of "significant consequences" was performed, and the guidance in NEI 12-07 Section 5.S was followed.