ML18092A382: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 85: | Line 85: | ||
===3.2 RADIOLOGICAL=== | ===3.2 RADIOLOGICAL=== | ||
SURVEILLANCE DELETED (Page 3.2-2 through 3.2-10 intentionally deleted) SALEM -UNIT 1 3.2-1 | SURVEILLANCE DELETED (Page 3.2-2 through 3.2-10 intentionally deleted) SALEM -UNIT 1 3.2-1 | ||
{. * | {. * | ||
* 4.0 SPECIAL SURVEILLANCE AND STUDY ACTIVITIES None. [Section 316(b) Studies, Thermal and Chemical Responses of Estuarine Organisms, Thermal Plume Mapping, and Intake Velocity Study -deleted] (Pages 4.1-1 through 4.4-1 intentionally deleted) SALEM -UNIT 1 4.0-1 5.0 5.1 | * 4.0 SPECIAL SURVEILLANCE AND STUDY ACTIVITIES None. [Section 316(b) Studies, Thermal and Chemical Responses of Estuarine Organisms, Thermal Plume Mapping, and Intake Velocity Study -deleted] (Pages 4.1-1 through 4.4-1 intentionally deleted) SALEM -UNIT 1 4.0-1 5.0 5.1 | ||
Line 118: | Line 118: | ||
RECORDS RETENTION (deleted) . . . . . . | RECORDS RETENTION (deleted) . . . . . . | ||
SALEM -UN IT 2 ii . . . . . 5.4-1 5.5-1 5.6-1 5. 7-1 LIST OF TABLES Table No. Title DELETED l SALEM -UN IT 2 ; ; ; | SALEM -UN IT 2 ii . . . . . 5.4-1 5.5-1 5.6-1 5. 7-1 LIST OF TABLES Table No. Title DELETED l SALEM -UN IT 2 ; ; ; | ||
LIST OF FIGURES Figure No. Title DELETED SALEM -UN IT 2 iv l .. 1.0 DEFINITIONS, ABBREVIATIONS AND NOTES 1.1 DEFINITIONS DELETED .(Pages 1.1-2 and 1.1-3 intentionally deleted) SALEM -UN IT 2 1.1-1 | LIST OF FIGURES Figure No. Title DELETED SALEM -UN IT 2 iv l .. 1.0 DEFINITIONS, ABBREVIATIONS AND NOTES 1.1 DEFINITIONS DELETED .(Pages 1.1-2 and 1.1-3 intentionally deleted) SALEM -UN IT 2 1.1-1 | ||
: l. 1.2 NOTES DELETED SALEM -UNIT 2 1.2-1 | : l. 1.2 NOTES DELETED SALEM -UNIT 2 1.2-1 | ||
Revision as of 16:36, 25 April 2019
ML18092A382 | |
Person / Time | |
---|---|
Site: | Salem |
Issue date: | 11/06/1984 |
From: | Public Service Enterprise Group |
To: | |
Shared Package | |
ML18092A380 | List: |
References | |
NUDOCS 8411210033 | |
Download: ML18092A382 (46) | |
Text
-,
- APPEND! X 13 TO FACILITY OPERATING LICENSE NO. DPR-70 ENVIRONMENTAL TECHNICAL SPECIFICATIONS FOR SALEM NUCLEAR GENERATING STATION UNIT 1 PUBLIC SERVICE ELECTRIC AND GAS COMPANY DOCKET NO. 50-272 ( 8411210033 841106 1 PDR ADOCK 05000272 p PDR ENVIRONMENTAL TECHNICAL SPECIFICATIONS TABLE OF CONTENTS Section Title 1.0 DEFINITIONS, ABBREVIATIONS AND NOTES (deleted)
1.1 DEFINITIONS
(deleted)
- ABBREVIATIONS (deleted) . . . NOTES (deleted)
- . . . LIMITING CONDITIONS FOR OPERATION (deleted).
THERMAL EFFLUENTS (de 1 eted) . . . . . . . . . . Page 1.1-1 1.1-1 1.2-1 1.3-1 2.1-1 2.1-1 1.2 1.3 2.0 2.1 2.2 2.3 3.0 3.1 CHEMICAL EFFLUENTS (deleted)
- * > * * * * * *
- 2.2-1 3 .1.1 3.1.1.6 3.1.2 3.2 4.0 5.0 5.1 5.2 5.3 RADIOACTIVE EFFLVENTS (deleted). . . . . ENVIRONMENTAL SURVEILLANCE
- * *
- NON-RADIOLOGICAL SURVEILLANCE . . . . . ' . . . ABIOTIC ********.**** . . . . Meteorological*
Monitoring
- BIOTIC * * * * * * * * * * *
- RADIOLOGICAL SURVEILLANCE (deleted) . . . . . . SPECIAL SURVEILLANCE AND STUDY ACTIVITIES . . . . . . . ADMINISTRATIVE CONTROLS (deleted)
RESPONSiBILITY (deleted)
- ORGANIZATION (deleted)
REVIEW AND AUDIT (deleted)
- . . . . ... SALEM -UN IT 1 i 2.3-1 3.0-1 3.1-1 3.1-1 3.1-7 3.1-3 3.2-1 4 .0-1 . 5.1-1 5.1-1 5.2-1 5.3-1 l \ Section 5.4 5.5 5.6 5.7 ENVIRONMENTAL TECHNICAL SPECIFICATIONS TABLE OF CONTENTS (Cont 1 d) Title ACTION TO BE TAKEN IF A LIMITING CONDITIONS FOR OPERATION I.S EXCEEDED (deleted)
PROCEDURES (deleted)
- * ; * * * * * * *
- PLANT REPORTING REQUIREMENTS (deleted)
RECORDS RETENTION (deleted) . . . .. . SALEM -UNIT 1 ii . . . 5.4-1 5.5-1 5.6-1 5.7-1
\ LIST OF TABLES Table No. Title 3.1-2 Summary of Aquatic, Terrestrial and Aerial Sampling 3.1-23 Program ...***.**...*..*....
SALEM -UNIT 1 i i i LIST OF FIGURES Figure No. Title DELETED SALEM -UNIT 1 iv 1.0 DEFINITIONS, ABBREVIATIONS AND NOTES 1.1 DEFINITIONS DELETED (Pages 1.1-2 and 1.1-3 intentionally deleted) SALEM -UN IT 1 1.1-1
1.2 ABBREVIATIONS
DELETED SALEM -UNIT 1 1.2-1
1.3 NOTES
DELETED SALEM -UNIT 1 1.3-1
2.0 LIMITING
CONDITIONS FOR OPERATION
2.1 THERMAL
EFFLUENTS DELETED (Pages 2.1-2 through 2.1-8 intentionally deleted) SALEM -UNIT 1 2.1-1
..
- 2.2 CHEMICAL EFFLUENTS DELETED (Pages 2.2-2 through 2.2-6 intentionally deleted) SALEM -UN IT 1 2.2-1
2.3 RADIOACTIVE
EFFLUENTS DELETED (Pages 2.3-2 through 2.3-24 intentionally deleted) SALEM -UN IT 1 2.3-1
3.0 ENVIRONMENTAL
SURVEILLANCE The objective of the Environmental Surveillance Program is to determine the effects"of plant operation.
on the ecosystem.'
The program is designed to accomplish this objective through periodic sampling and analyses of key parameters in the vicinity of the Salem Nuclear* Generating Station. The key parameters selected for monitoring are those that could reasonably be expected to be affected by plant operation.
Comparison of surveillance data with preoperational 11 base-line 11 levels will reveal changes and trends that could be attributed to plant operation.
As operating experience and surveillance data are obtained, the Environmental Surveillance Program will be modified to reduce or eliminate surveillance of those parameters that have not been significantly affected by plant operation.
SALEM -UNIT 1 3.0-1
3.1 NONRADIOLOGICAL
SURVEILLANCE 3 .1.1 ABIOTIC 3.1.1.l CHLORINE 3.1.1.2 DISSOLVED GASES (deleted) 3.1.1.3 SUS PENDED SOLIDS (deleted) 3.1.1.4 OTHER CHEMICALS (deleted) 3.1.1.5 CHEMICAL RELEASE (deleted)
DELETED (Pages 3.1-2 through 3.1-6 intentionally deleted) SALEM -UNIT 1 3.1-1
3.1.2 BIOTIC
3.1.2.1 General Ecological Survey The primary objective of this survey is to determine the effect of plant operation on the ecology and environment of the Delaware River Esturary and environs.
The preoperational biological rronitoring was initiated in 1968 and monitoring will be continued for 5 years after Unit No. 2 becomes operationals.
The program shall be discontinued only after approval by NRC staff. These studies will serve as a basis for assessment of the effects of plant operation on the ecology. Study Pl an The study area includes the Delaware River Estuary and some tributaries within approximate 10-mile radius of the station. The biological parameters monitored are listed in Table 3.1-2. Spec if i cation 1. Aquatic Studies -(deleted)
SALEM -UNIT 1 3.1-9 This page is blank intentionally.
Page 3.1-11 through 3.1-13, pages 3.1-16 through 3.1-22 and page 3.2-24 and 25 have been deleted by Ammendment No. 19. SALEM -UNIT 1 3.1-10
3.2 RADIOLOGICAL
SURVEILLANCE DELETED (Page 3.2-2 through 3.2-10 intentionally deleted) SALEM -UNIT 1 3.2-1
{. *
- 4.0 SPECIAL SURVEILLANCE AND STUDY ACTIVITIES None. [Section 316(b) Studies, Thermal and Chemical Responses of Estuarine Organisms, Thermal Plume Mapping, and Intake Velocity Study -deleted] (Pages 4.1-1 through 4.4-1 intentionally deleted) SALEM -UNIT 1 4.0-1 5.0 5.1
- ADMINISTRATIVE CONTROLS RESPONSIBILITY SALEM -UNIT 1 DELETED 5.1-1
---l *-* 5.2 ORGANIZATION DELETED (Page 5.2-2 intentionally deleted) SALEM -UNIT 1 5.2-1
- -5.3 REVIEW AND AUDIT DELETED (Page 5.3-2 intentionally deleted) SALEM -UNIT 1 5.3-1
5.4 ACTION
TO BE TAKEN IF A LIMITING CONDITION FOR OPERATION IS EXCEEDED DELETED SALEM -UN IT 1 5.4-1
5.5 PROCEDURES
DELETED (Page 5.5-2 intentionally deleted) SALEM -UNIT 1 5.5-1 l 5.6 PLANT REPORTING REQUIREMENTS DELETED (Page 5.6-2 through 5.6-8 intentionally deleted) SALEM -UNIT 1 5.6-1
,--' ' 5.7 RECORDS RETENTION SALEM -UNIT 1 DELETED 5.7-1 SALEM -UN IT 2 APPENDIX B TO FACILITY OPERATING LICENSE NO. DPR-75 SALEM NUCLEAR GENERATING STATION UNIT 2 PUBLIC SERVICE ELECTRIC AND GAS COMPANY DOCKET NO. 50-311 ENVIRONMENTAL TECHNICAL SPECIFICATIONS PART I -RADIOLOGICAL DELETED
).** ENVIRONMENTAL TECHNICAL SPECIFICATIONS PART I -RADIOLOGICAL TABLE OF CONTENTS Se ct ion Title 1.cr DEFINITIONS, ABBREVIATIONS ANO NOTES (deleted) 1.1 1.2 2.0 2.1 2.2 2.3 3.0 DEFINITIONS (deleted)
NOTES (deleted)
- . . . e e e *e e LIMITING CONDITIONS FOR OPERATION (deleted).
THERMAL EFFLUENTS (deleted)
CHEMICAL EFFLUENTS (deleted)
- RADIOACTIVE EFFLUENTS (deleted).
ENVIRONMENTAL SURVEILLANCE NON-RADIOLOGICAL SURVEILLANCE . . . . . . . . . . . . ABIOTIC . . . . . ' . . . . .. . . . . . . . . . . . . . . Page 1.1-1 1.1-1 1.2-1 2.1-1 2.1-1 2.2-1 *
- 2.3-1 3.0-1 * * . 3.1-1 3.1 3.1.1 3.1.1.1 3.1.2 3.2 Meteorological Monitoring BIOTIC (deleted)
- RADIOLOGICAL SURVEILLANCE (deleted) . . . . . . . . 4.0 5.0 5.1 5.2 SPECIAL SURVEILLANCE ANO STUDY ACTIVITIES ADMINISTRATIVE CONTROLS (deleted)
RESPONSIBILITY (deleted)
ORGANIZATION (deleted)
5.3 REVIEW
ANO AUDIT (deleted) . . .* . . 3.1-1 3.1-1 3.1-3 3.2-1 4.0-1 5.1-1 5.1-1 5.2-1 5.3-1 SALEM -UN IT 2 i I I ENVIRONMENTAL TECHNICAL SPECIFICATIONS PART I -RADIOLOGICAL TABLE OF CONTENTS (Cont'd} Section Title 5.4 ACTION TO BE TAKEN IF A LIMITING CONDITIONS FOR OPERATION IS EXCEEDED (deleted)
5.5 5.6 5.7 PROCEDURES (de 1 eted) ** * * * * * * * *
- PLANT REPORTING REQUIREMENTS (deleted)
RECORDS RETENTION (deleted) . . . . . .
SALEM -UN IT 2 ii . . . . . 5.4-1 5.5-1 5.6-1 5. 7-1 LIST OF TABLES Table No. Title DELETED l SALEM -UN IT 2 ; ; ;
LIST OF FIGURES Figure No. Title DELETED SALEM -UN IT 2 iv l .. 1.0 DEFINITIONS, ABBREVIATIONS AND NOTES 1.1 DEFINITIONS DELETED .(Pages 1.1-2 and 1.1-3 intentionally deleted) SALEM -UN IT 2 1.1-1
- l. 1.2 NOTES DELETED SALEM -UNIT 2 1.2-1
2.0 LIMITING
CONDITIONS FOR OPERATION
2.1 THERMAL
EFFLUENTS DELETED r, SALEM -UN IT 2 2.1-1
2.2 CHEMICAL
EFFLUENTS DELETED . SALEM -UNIT 2 2.2-1
- 2.3 RADIOACTIVE EFFLUENTS DELETED (Pages 2.3-2 through 2.3-24 intentionally deleted) SALEM -UN IT 2 2.3-1
' ' L
- 3.0 ENVIRONMENTAL SURVEILLANCE The objective of the Environmental Surveillance Program is to detennine the effects of plant operation on the ecosystem.
The program is designed to accomplish this objective through periodic sampling and analyses of key parameters in the vicinity of the Salem Nuclear Generating Station. The key parameters selected for monitoring are those that could reasonably be expected to be affected by plant operation.
Comparison of surveillance data with preoperational "base-line" levels will reveal changes and trends that could be attributed to plant operation.
As operating experience and surveillance data are obtained, the Environmental Surveillance Program will be modified to reduce or eliminate surveillance of those parameters that have not been significantly affected by plant operation.
-. SALEM. -UNIT 2 3.0-l
. ' L
- 3. l NONRADIOLOGICAL SURVEILLANCE 3 .. ,
- l AB IOTIC 3.1.1.l Meteorological Monitoring Objective The objective of meteorological monitoring is to adequately measure and document meteorological conditions at the site. Specification The meteorological monitoring system shall confonn to the reconmendations in Regulatory Guide 1.23, Onsite Meteorological Programs, dated February 17, 1972, and consist of instruments to measure wind speed and direction, air temperature and vertical air temperature differences at heights above ground that are representative of atmospheric conditions that exist at all gaseous effluent release points, as described in Section 3.3.3.4 of. the Safety Technical Specifications.
Reporting Requirements Meteorological data shall be sul'Tlllarized and reported in a fonnat consistent with the recommendations of Regulatory Guide 1.21, Measuring, Evaluating, and Reporting L __ -l
- ' .
- Radioactivity in Solid Wastes and Releases of Radioactive Materials in Liquid and Ga.seous Effluents from Light-Water-Cooled Nuclear Power Plants, Revision 1, dated June, 1974 and Regulatory Guide 1.23, Onsite Meteorological Programs, dated February 17, 1972, and observations in a fonn consistent with National Weather Service procedures.
Sumnaries of data-and observations shall be available to the U. S. Nuclear Regulatory Conuni ssion upon request. If the outage time of any of the required meteorological instruments exceeds seven consecutive days, the total outage time and dates of outage, cause of the outage, and the instrument(s) involved shall be reported within 30 days of the initial time of the outage to the Director, Office of Nuclear Reactor Regulation.
Any tions. to the meteorologi_cal monitoring program as described above shall have written approval of the Director, Office of Nuclear Reactor Regulation, prior to initiation of the modification.
Bases The collection of meteorological data at the plant site will provide infonnation which may be used to develop atmospheric diffusion parameters to estimate potential radiation doses to the public resulting from actual routine or accidental releases of radioactive materials to the atmosphere.
A meteorological data collection program as described above is necessary to meet the requirements of sub-paragraph*
50.36a (a) (2) of 10 CFR Part 50, Appendix E to 10 CFR Part 50, and TO CFR Part 51. SALEM -UNIT_2 3.1-2 J.... ' .... 3.1.2 BIOTIC DELETED SALEM -UNIT 2 3.1-3
. l * '-. 3.2 RADIOLOGICAL SURVEILLANCE DELETED (Page 3.2-2 through 3.2-10 intentionally deleted) SALEM -UNIT 2 3.2-1 i *' l
- I --4.0 SPECIAL SURVEILLANCE AND STUDY ACTIVITIES None. SALEM -UN IT 2 4.0-1
- l * '-' 5.0 ADMINISTRATIVE CONTROLS 5.1 RESPONSIBILITY DELETED SALEM -UNIT 2 5.1-1 l 1.* l II *, I 5.2 ORGANIZATION DELETED (Page 5.2-2 intentionally deleted) SALEM -UN IT 2 5.2-1 l ii/ ( * .. .. *. ,, 5.3 REVIEW AND AUDIT DELETED (Page 5.3-2 intentfonally deleted) SALEM -UNIT 2 5.3-1
- .. L -5.4 ACTION TO BE TAKEN IF A LIMITING CONDITION FOR OPERATION IS EXCEEDED DELETED SALEM -UNIT 2 5.4-1
... 5.5 PROCEDURES DELETED (Page 5.5-2 intentionally deleted) SALEM -UN IT 2 5.5-1
. l: s.t ... "'*; ,, ... *' 5.6 PLANT REPORTING REQJIREMENTS DELETED (Page 5.6-2 through 5.6-8 intentionally deleted) SALEM -UNIT 2 5.6-1