05000266/FIN-2003010-01: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 1: | Line 1: | ||
{{finding | {{finding | ||
| title = Failure | | title = Failure to Perform an Adequate Safety Evaluation for Changes to the Plant AS Described in the USAR | ||
| docket = 05000266, 05000301 | | docket = 05000266, 05000301 | ||
| inspection report = IR 05000266/2003010 | | inspection report = IR 05000266/2003010 |
Revision as of 18:44, 20 February 2018
Site: | Point Beach |
---|---|
Report | IR 05000266/2003010 Section 1R02 |
Date counted | Dec 31, 2003 (2003Q4) |
Type: | TEV: Severity level IV |
cornerstone | Initiating Events |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.02 |
Inspectors (proximate) | R Daley R Winter N Valos |
INPO aspect | |
' | |