05000266/FIN-2003010-01: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{finding
{{finding
| title = Failure To Perform An Adequate Safety Evaluation For Changes To The Plant As Described In The Usar
| title = Failure to Perform an Adequate Safety Evaluation for Changes to the Plant AS Described in the USAR
| docket = 05000266, 05000301
| docket = 05000266, 05000301
| inspection report = IR 05000266/2003010
| inspection report = IR 05000266/2003010

Revision as of 18:44, 20 February 2018

01
Site: Point Beach NextEra Energy icon.png
Report IR 05000266/2003010 Section 1R02
Date counted Dec 31, 2003 (2003Q4)
Type: TEV: Severity level IV
cornerstone Initiating Events
Identified by: NRC identified
Inspection Procedure: IP 71111.02
Inspectors (proximate) R Daley
R Winter
N Valos
INPO aspect
'