05000306/FIN-2016004-05: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 12: Line 12:
| identified by = Licensee
| identified by = Licensee
| Inspection procedure =  
| Inspection procedure =  
| Inspector = G Hausman, G O,'Dwyer J, Bozga K, Riemer L, Haeg M, Garza M, Jones N, Feliz-Adorno P, Laflamme P, Zurawski R, Baker S, Bel
| Inspector = G Hausman, G O'Dwyer, J Bozga, K Riemer, L Haeg, M Garza, M Jones, N Feliz-Adorno, P Laflamme, P Zurawski, R Baker, S Bell
| CCA = N/A for ROP
| CCA = N/A for ROP
| INPO aspect =  
| INPO aspect =  
| description =  Northern States Power CompanyMinnesota (NSPM), Prairie Island Nuclear Generating Plant Renewed Facility Operating License, Appendix B, Additional Conditions, Facility Operating License No. DPR42 and DPR60 (Amendment Nos. 206 and 193, respectively), required, in part, that The Alternate Source Term (AST) License Amendments 206/193 will be implemented after installation of the Unit 2 Replacement Steam Generators (RSGs) within 90 days after the completion of the outage in which the Unit 2 RSGs are installed. Further, implementation requirements incorporated within License Amendment 206/193 stated, in part, that prior to implementation of the AST license amendment, NSPM will revise the Prairie Island Nuclear Generating Plant design and licensing bases to indicate that the Steam Generator Water LevelNarrow Range Instruments are required to meet Regulatory Guide 1.97, Revision 2 requirements.  Contrary to the above, on March 27, 2014, the licensee failed to revise the Prairie Island Nuclear Generating Plant design and licensing bases to indicate that the SGNR instruments were required to meet Regulatory Guide 1.97, Revision 2 requirements.  Because the inspectors answered Yes to Question 1 under Exhibit 2 of  IMC 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, the finding screened as very low safety significance (Green). The above issue was documented in the licensees CAP as CAP 1424460. Corrective actions included replacement of the SGNR instrumentation with Regulatory Guide 1.97 compliant equipment.  
| description =  Northern States Power CompanyMinnesota (NSPM), Prairie Island Nuclear Generating Plant Renewed Facility Operating License, Appendix B, Additional Conditions, Facility Operating License No. DPR42 and DPR60 (Amendment Nos. 206 and 193, respectively), required, in part, that The Alternate Source Term (AST) License Amendments 206/193 will be implemented after installation of the Unit 2 Replacement Steam Generators (RSGs) within 90 days after the completion of the outage in which the Unit 2 RSGs are installed. Further, implementation requirements incorporated within License Amendment 206/193 stated, in part, that prior to implementation of the AST license amendment, NSPM will revise the Prairie Island Nuclear Generating Plant design and licensing bases to indicate that the Steam Generator Water LevelNarrow Range Instruments are required to meet Regulatory Guide 1.97, Revision 2 requirements.  Contrary to the above, on March 27, 2014, the licensee failed to revise the Prairie Island Nuclear Generating Plant design and licensing bases to indicate that the SGNR instruments were required to meet Regulatory Guide 1.97, Revision 2 requirements.  Because the inspectors answered Yes to Question 1 under Exhibit 2 of  IMC 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, the finding screened as very low safety significance (Green). The above issue was documented in the licensees CAP as CAP 1424460. Corrective actions included replacement of the SGNR instrumentation with Regulatory Guide 1.97 compliant equipment.  
}}
}}

Latest revision as of 11:55, 30 May 2018

05
Site: Prairie Island Xcel Energy icon.png
Report IR 05000306/2016004 Section 4OA7
Date counted Dec 31, 2016 (2016Q4)
Type: NCV: Green
cornerstone No Cornerstone
Identified by: Licensee-identified
Inspection Procedure:
Inspectors (proximate) G Hausman
G O'Dwyer
J Bozga
K Riemer
L Haeg
M Garza
M Jones
N Feliz-Adorno
P Laflamme
P Zurawski
R Baker
S Bell
Violation of: License Condition
INPO aspect
'