Line 16: | Line 16: | ||
| event date = 06/22/2004 13:13 EDT | | event date = 06/22/2004 13:13 EDT | ||
| last update date = 06/22/2004 | | last update date = 06/22/2004 | ||
| title = Automatic Reactor Scram Following | | title = Automatic Reactor Scram Following an Electrical Yard Manipulation | ||
| event text = Unit 2 reactor scrammed at 13:13 [EDT] following an electrical yard manipulation. The reactor scram occurred as a result of an RPS [Reactor Protections System] actuation following an automatic trip of the main turbine from a generator lockout. All control rods inserted [fully]. The plant is stable [in mode 3]. No ECCS [Emergency Core Cooling System] or safety relief valve actuations have occurred. This report is being made pursuant to 50.72(b)(2)(iv)(b). At this time the plant is stable, as expected. An investigation is in progress to determine the reason for the electrical fault. | | event text = Unit 2 reactor scrammed at 13:13 [EDT] following an electrical yard manipulation. The reactor scram occurred as a result of an RPS [Reactor Protections System] actuation following an automatic trip of the main turbine from a generator lockout. All control rods inserted [fully]. The plant is stable [in mode 3]. No ECCS [Emergency Core Cooling System] or safety relief valve actuations have occurred. This report is being made pursuant to 50.72(b)(2)(iv)(b). At this time the plant is stable, as expected. An investigation is in progress to determine the reason for the electrical fault. | ||
All plant systems functioned as required and decay heat removal is being performed via bypass to the main condenser. | All plant systems functioned as required and decay heat removal is being performed via bypass to the main condenser. |
Latest revision as of 22:23, 1 March 2018
Where | |
---|---|
Limerick ![]() Pennsylvania (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation | |
Time - Person (Reporting Time:+-2.05 h-0.0854 days <br />-0.0122 weeks <br />-0.00281 months <br />) | |
Opened: | Pete Gardner 15:10 Jun 22, 2004 |
NRC Officer: | Arlon Costa |
Last Updated: | Jun 22, 2004 |