Title | Manual Reactor Scram Following Loss of Recirculation Pumps |
Event Description | Limerick Unit 1 was manually scrammed from 100% power at 0753 hours0.00872 days <br />0.209 hours <br />0.00125 weeks <br />2.865165e-4 months <br /> on 4/19/12 in accordance with plant procedure OT-112 'Recirculation Pump Trip' when both 1A and 1B Recirculation Pump Adjustable Speed Drives (ASDs) tripped due to an electrical fault affecting the 144D and 114A non-safety related 480V Load Centers. The shutdown was normal and the plant is stable in Hot Shutdown with normal pressure control via the Main Steam Bypass valves to the main condenser and normal level control using feedwater. The manual RPS actuation is reportable under 10 CFR 50.72(b)(2).
The Technical Support Center (TSC) Normal Air conditioning systems shut down due to loss of power from the 144D Load Center. The loss of power also affects the flow indication for the Emergency Ventilation system. This is considered a Loss of Emergency Assessment Capability, and reportable under 10 CFR 50.72(b)(3)(xiii). The Emergency TSC Ventilation system is available but flow cannot be verified. During a required activation the TSC, responders would report to the TSC. If conditions required use of the Emergency Ventilation system, the Station Emergency Director would assess habitability in accordance with Station procedures. TSC relocation of personnel would be directed as required until such time that the TSC ventilation system is returned to service The licensee notified the NRC Resident Inspector.
The Technical Support Center (TSC) 144D load center has been re-energized, restoring the emergency ventilation flow indication and emergency assessment capability to its normal stand-by condition." The switchgear was inspected for any potential grounds and then reenergized at approximately 0800 EDT on 4/20/2023. The licensee notified the NRC Resident Inspector. Notified the R1DO (Joustra). |
Where | |
---|---|
Limerick Pennsylvania (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+-0.72 h-0.03 days <br />-0.00429 weeks <br />-9.86256e-4 months <br />) | |
Opened: | Brandon Shultz 11:10 Apr 19, 2012 |
NRC Officer: | Karl Diederich |
Last Updated: | Apr 20, 2012 |
47850 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 47850\u003C/a\u003E - \u003Ca href=\"/Limerick\" title=\"Limerick\"\u003ELimerick\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EManual Reactor Scram Following Loss of Recirculation Pumps\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 47850 - Limerick\n","link":"","lat":40.22646666666667,"lon":-75.58323333333334,"icon":"/w/images/b/be/Constellation_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | Yes, Manual Scram |
Before | Power Operation (100 %) |
After | Hot Shutdown (0 %) |
Limerick with 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
WEEKMONTHYEARENS 563602023-02-06T11:30:0006 February 2023 11:30:00
[Table view]10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Communications and Assessment Capabilities ENS 549962020-11-13T07:45:00013 November 2020 07:45:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Due to High Reactor Pressure Signal ENS 540982019-06-04T05:45:0004 June 2019 05:45:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Scram During Rapid Plant Shutdown ENS 522702016-09-29T21:00:00029 September 2016 21:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Tsc Ventilation Indication Issue Identified Following Surveillance Testing ENS 521012016-07-18T20:00:00018 July 2016 20:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Offsite Communications Capability ENS 519682016-06-01T13:00:0001 June 2016 13:00:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Due to Unexpected Core Flow Change ENS 516142015-12-19T12:02:00019 December 2015 12:02:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Due to Low Reactor Water Level ENS 509512015-04-03T14:00:0003 April 2015 14:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Inoperable Seismic Instrumentation Identified During Historical Review ENS 508472015-02-24T02:40:00024 February 2015 02:40:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram on Reactor High Pressure Signal ENS 503762014-08-17T08:00:00017 August 2014 08:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Emergency Ventilation System Inoperable ENS 498712014-03-05T04:34:0005 March 2014 04:34:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Unit 1 Manually Scrammed During a Rapid Shutdown in Response to a Turbine Ehc Failure ENS 498422014-02-19T15:19:00019 February 2014 15:19:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Emergency Ventilation Failure ENS 492752013-08-13T20:00:00013 August 2013 20:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Planned Maintenance on Technical Support Center Ventilation System Power Supply ENS 486532013-01-07T01:00:0007 January 2013 01:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Planned Corrective Maintenance on the Technical Support Center (Tsc) Hvac Power Supply ENS 486292012-12-28T08:30:00028 December 2012 08:30:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Communications with All Emergency Planning Zone Sirens ENS 481172012-07-18T12:15:00018 July 2012 12:15:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Declared Due to Flashover in the Load Center Transformer Cabinet ENS 480412012-06-21T12:00:00021 June 2012 12:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Planned Maintenance on the Technical Support Center Ventilation ENS 480012012-06-07T13:47:0007 June 2012 13:47:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Ventilation System Maintenance ENS 478502012-04-19T11:53:00019 April 2012 11:53:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Manual Reactor Scram Following Loss of Recirculation Pumps ENS 477542012-03-19T17:00:00019 March 2012 17:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Ventilation Out of Service ENS 473892011-10-29T19:15:00029 October 2011 19:15:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Greater than 25% of Epz Sirens Due to Weather ENS 469732011-06-20T15:56:00020 June 2011 15:56:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Charcoal Failed Testing for Methyl Iodine ENS 469192011-06-03T14:21:0003 June 2011 14:21:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Scram Following a Turbine Trip ENS 469032011-05-29T09:02:00029 May 2011 09:02:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Trip Due to Low Pressure in Ehc System ENS 466412011-02-25T14:10:00025 February 2011 14:10:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Scram Due to Recirculation Pump Trip ENS 464262010-11-18T08:00:00018 November 2010 08:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Planned Technical Support Center Ventilation Corrective Maintenance ENS 463302010-10-14T05:00:00014 October 2010 05:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Emergency Ventilation System Scheduled Maintenance ENS 462902010-09-29T19:25:00029 September 2010 19:25:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Hvac Emergency Damper Failed Quarterly Test ENS 460422010-06-24T00:51:00024 June 2010 00:51:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Manual Reactor Scram Following Loss of Both Recirculation Pumps ENS 460052010-06-14T07:00:00014 June 2010 07:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Planned Maintenance on Tsc Emergency Ventilation System ENS 456932010-02-11T13:00:00011 February 2010 13:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Emergency Ventilation System Maintenance ENS 451532009-06-24T00:30:00024 June 2009 00:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Partial Loss of the Emergency Response Data System (Erds) ENS 451332009-06-16T04:31:00016 June 2009 04:31:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Emergency Response Data System (Erds) Out of Service Due to Computer Problems ENS 442832008-06-11T02:55:00011 June 2008 02:55:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness 54 of 165 Emergency Sirens Inoperable Due to Power Outage ENS 441692008-04-25T21:30:00025 April 2008 21:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Emergency Response Data System Outage ENS 440882008-03-22T23:39:00022 March 2008 23:39:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Turbine Trip Resulting in a Reactor Scram ENS 439912008-02-17T14:00:00017 February 2008 14:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Planned Phone Outage ENS 439492008-02-01T09:45:0001 February 2008 09:45:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Scram as a Result of Turbine Trip ENS 434552007-06-28T13:55:00028 June 2007 13:55:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Greater than 25% of the Epz Sirens for Greater than 1 Hour ENS 433152007-04-24T06:10:00024 April 2007 06:10:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge Automatic Reactor Scram with Eccs Injection on Lowering Reactor Vessel Water Level ENS 427152006-07-19T02:00:00019 July 2006 02:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Siren Capability Due to Adverse Weather ENS 420542005-10-13T02:24:00013 October 2005 02:24:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Scram Due to Reactor High Pressure Signal ENS 418482005-07-18T13:52:00018 July 2005 13:52:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram ENS 408322004-06-22T17:13:00022 June 2004 17:13:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Scram Following an Electrical Yard Manipulation ENS 403292003-11-18T09:35:00018 November 2003 09:35:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Communications Capability ENS 401762003-09-19T08:00:00019 September 2003 08:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Siren Capability Due to Adverse Weather Conditions 2023-02-06T11:30:00 | |