ENS 43393: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 05/28/2007 22:50 PDT
| event date = 05/28/2007 22:50 PDT
| last update date = 05/29/2007
| last update date = 05/29/2007
| title = Emergency Diesel Generator Actuation Due To Momentary Undervoltage Condition
| title = Emergency Diesel Generator Actuation Due to Momentary Undervoltage Condition
| event text = Unit 1 was making preparations to parallel to the grid on 5/28/07.  All busses had been transferred to the Startup power supply (230 KV System).  Operations then started a large 12KV motor, Circulating Water pump 1-2.  Starting this large motor caused a momentary dip in startup voltage.  This voltage dip was sufficient to pick up the undervoltage relay on vital bus G, causing a start of that bus's Emergency Diesel Generator (EDG).  The bus remained supplied by the startup power supply, the EDG did not load.  This valid start of EDG 1-2 is being reported per 10CFR50.72(b)(3)(iv)(A).
| event text = Unit 1 was making preparations to parallel to the grid on 5/28/07.  All busses had been transferred to the Startup power supply (230 KV System).  Operations then started a large 12KV motor, Circulating Water pump 1-2.  Starting this large motor caused a momentary dip in startup voltage.  This voltage dip was sufficient to pick up the undervoltage relay on vital bus G, causing a start of that bus's Emergency Diesel Generator (EDG).  The bus remained supplied by the startup power supply, the EDG did not load.  This valid start of EDG 1-2 is being reported per 10CFR50.72(b)(3)(iv)(A).
The EDG was subsequently shut down and returned to it's normal standby condition.
The EDG was subsequently shut down and returned to it's normal standby condition.

Latest revision as of 21:16, 1 March 2018

ENS 43393 +/-
Where
Diablo Canyon Pacific Gas & Electric icon.png
California (NRC Region 4)
Reporting
10 CFR 50.72(b)(3)(iv)(A), System Actuation
LER: 05000275/LER-2007-003
Emergency Diesel Generator Actuation Due to a Transient Undervoltage Condition
Time - Person (Reporting Time:+-0.82 h-0.0342 days <br />-0.00488 weeks <br />-0.00112 months <br />)
Opened: Gary Anderson
05:01 May 29, 2007
NRC Officer: Bill Huffman
Last Updated: May 29, 2007
43393 - NRC Website
Loading map...