| number = ML15175A488
| number = ML15175A488
| issue date = 06/24/2015
| issue date = 06/24/2015
| title = 2015/06/24 NRR E-mail Capture - Revision 14 Dresden Nuclear Station'S Physical Security Plan (Psp), Training and Qualification Plan (T&Qp), and Safeguards Contingency Plan (SCP)
| title = NRR E-mail Capture - Revision 14 Dresden Nuclear Station'S Physical Security Plan (Psp), Training and Qualification Plan (T&Qp), and Safeguards Contingency Plan (SCP)
| author name = Haskell R S
| author name = Haskell R
| author affiliation = NRC/NRR/DORL/LPLIII-2
| author affiliation = NRC/NRR/DORL/LPLIII-2
| addressee name = Mathews M
| addressee name = Mathews M
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From:Haskell, Russell Sent: Wednesday, June 24, 2015 3:58 PM To: Mathews, Mitchel A:(GenCo-Nuc) (Mitchel.Mathews@exeloncorp.com)
{{#Wiki_filter:NRR-PMDAPEm Resource From:                         Haskell, Russell Sent:                         Wednesday, June 24, 2015 3:58 PM To:                           Mathews, Mitchel A:(GenCo-Nuc) (Mitchel.Mathews@exeloncorp.com)


==Subject:==
==Subject:==
Revision 14 Dresden Nuclear Station's Phys ical Security Plan (PSP), Training and Qualification Plan (T&QP), and Safeguards Contingency Plan (SCP)Mr. Mitchell Mathews, By letter dated February 10, 2015, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15049A073), Exelon Generation Company, LLC submitted the Dresden Nuclear Station's Physical Security Plan (PSP), Training and Qualification Plan, (T&QP) and Safeguards Contingency Plan (SCP), Revision 14, under the provisions of Title 10 of the Code of Federal Regulation (10 CFR) 50.54(p)(2). The review of the Licensee security plan was conducted consistent with the applicable requirements of 10 CFR Part 73 as well as the guidance contained within the Office of Nuclear Security and Incident Response (NSIR) Procedure LIC 800 "Security Review Procedure for 10 CFR 50.54(p)(2)" and the U.S. Nuclear Regulatory Commission (NRC)-endorsed Nuclear Energy Institute (NEI) 03-12, Revision 7, Template for Security Plans as appropriate.  
Revision 14 Dresden Nuclear Stations Physical Security Plan (PSP), Training and Qualification Plan (T&QP), and Safeguards Contingency Plan (SCP)
 
Mr. Mitchell Mathews, By letter dated February 10, 2015, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15049A073), Exelon Generation Company, LLC submitted the Dresden Nuclear Stations Physical Security Plan (PSP),
The staff determined that changes in revision 14, of the security plans complied with 10 CFR 50.54(p). The licensee changes conform to the NEI 03-12 template, Revision 7, endorsed by NRC.
Training and Qualification Plan, (T&QP) and Safeguards Contingency Plan (SCP), Revision 14, under the provisions of Title 10 of the Code of Federal Regulation (10 CFR) 50.54(p)(2). The review of the Licensee security plan was conducted consistent with the applicable requirements of 10 CFR Part 73 as well as the guidance contained within the Office of Nuclear Security and Incident Response (NSIR) Procedure LIC 800 Security Review Procedure for 10 CFR 50.54(p)(2) and the U.S. Nuclear Regulatory Commission (NRC)-endorsed Nuclear Energy Institute (NEI) 03-12, Revision 7, Template for Security Plans as appropriate.
 
The staff determined that changes in revision 14, of the security plans complied with 10 CFR 50.54(p). The licensee changes conform to the NEI 03-12 template, Revision 7, endorsed by NRC.
The staff determined that the licensee properly concluded that the reported changes did not result in a decrease in safeguards effectiveness and recommends no further regulatory actions. The effectiveness of the implementation of this revision is subject to future NRC review and inspection.
The staff determined that the licensee properly concluded that the reported changes did not result in a decrease in safeguards effectiveness and recommends no further regulatory actions. The effectiveness of the implementation of this revision is subject to future NRC review and inspection.
Russell S. Haskell II United States Nuclear Regulatory Commission (NRC)
Russell S. Haskell II United States Nuclear Regulatory Commission (NRC)
Reactor Systems Engineer NRR/DORL/LPL 3-2  
Reactor Systems Engineer NRR/DORL/LPL 3-2 P.O.C.:Dresden Nuclear Power Stations 2,3 Russell.Haskell@NRC.Gov;  (301) 415-1129; Office: O-7D21; Mail-Stop O-8G9A 1


P.O.C.:Dresden Nuclear Power Stations 2,3  Russell.Haskell@NRC.Gov
Hearing Identifier:     NRR_PMDA Email Number:           2174 Mail Envelope Properties     (695c0e66ac7a4bb7a2d240a8cc8714b9)
;  (301) 415-1129; Office: O-7D21; Mail-Stop O-8G9A
 
Hearing Identifier: NRR_PMDA Email Number: 2174   Mail Envelope Properties   (695c0e66ac7a4bb7a2d240a8cc8714b9)


==Subject:==
==Subject:==
Revision 14 Dresden Nuclear Station's Physical Security Plan (PSP), Training and Qualification Plan (T&QP), and Safeguards Contingency Plan (SCP) Sent Date:   6/24/2015 3:58:25 PM Received Date: 6/24/2015 3:58:26 PM From:   Haskell, Russell Created By:   Russell.Haskell@nrc.gov Recipients:     "Mathews, Mitchel A:(GenCo-Nuc) (Mitchel.Mathews@exeloncorp.com)" <Mitchel.Mathews@exeloncorp.com>
Revision 14 Dresden Nuclear Stations Physical Security Plan (PSP), Training and Qualification Plan (T&QP), and Safeguards Contingency Plan (SCP)
Tracking Status: None Post Office:   HQPWMSMRS05.nrc.gov
Sent Date:               6/24/2015 3:58:25 PM Received Date:           6/24/2015 3:58:26 PM From:                   Haskell, Russell Created By:             Russell.Haskell@nrc.gov Recipients:
 
"Mathews, Mitchel A:(GenCo-Nuc) (Mitchel.Mathews@exeloncorp.com)"
Files     Size     Date & Time MESSAGE   1648     6/24/2015 3:58:26 PM
<Mitchel.Mathews@exeloncorp.com>
 
Tracking Status: None Post Office:             HQPWMSMRS05.nrc.gov Files                           Size                     Date & Time MESSAGE                         1648                     6/24/2015 3:58:26 PM Options Priority:                       Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Recipients Received:}}

Latest revision as of 10:51, 5 February 2020

NRR E-mail Capture - Revision 14 Dresden Nuclear Station'S Physical Security Plan (Psp), Training and Qualification Plan (T&Qp), and Safeguards Contingency Plan (SCP)
ML15175A488
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 06/24/2015
From: Haskell R
Plant Licensing Branch III
To: Mathews M
Exelon Corp
References
Download: ML15175A488 (2)


Text

NRR-PMDAPEm Resource From: Haskell, Russell Sent: Wednesday, June 24, 2015 3:58 PM To: Mathews, Mitchel A:(GenCo-Nuc) (Mitchel.Mathews@exeloncorp.com)

Subject:

Revision 14 Dresden Nuclear Stations Physical Security Plan (PSP), Training and Qualification Plan (T&QP), and Safeguards Contingency Plan (SCP)

Mr. Mitchell Mathews, By letter dated February 10, 2015, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15049A073), Exelon Generation Company, LLC submitted the Dresden Nuclear Stations Physical Security Plan (PSP),

Training and Qualification Plan, (T&QP) and Safeguards Contingency Plan (SCP), Revision 14, under the provisions of Title 10 of the Code of Federal Regulation (10 CFR) 50.54(p)(2). The review of the Licensee security plan was conducted consistent with the applicable requirements of 10 CFR Part 73 as well as the guidance contained within the Office of Nuclear Security and Incident Response (NSIR) Procedure LIC 800 Security Review Procedure for 10 CFR 50.54(p)(2) and the U.S. Nuclear Regulatory Commission (NRC)-endorsed Nuclear Energy Institute (NEI) 03-12, Revision 7, Template for Security Plans as appropriate.

The staff determined that changes in revision 14, of the security plans complied with 10 CFR 50.54(p). The licensee changes conform to the NEI 03-12 template, Revision 7, endorsed by NRC.

The staff determined that the licensee properly concluded that the reported changes did not result in a decrease in safeguards effectiveness and recommends no further regulatory actions. The effectiveness of the implementation of this revision is subject to future NRC review and inspection.

Russell S. Haskell II United States Nuclear Regulatory Commission (NRC)

Reactor Systems Engineer NRR/DORL/LPL 3-2 P.O.C.:Dresden Nuclear Power Stations 2,3 Russell.Haskell@NRC.Gov; (301) 415-1129; Office: O-7D21; Mail-Stop O-8G9A 1

Hearing Identifier: NRR_PMDA Email Number: 2174 Mail Envelope Properties (695c0e66ac7a4bb7a2d240a8cc8714b9)

Subject:

Revision 14 Dresden Nuclear Stations Physical Security Plan (PSP), Training and Qualification Plan (T&QP), and Safeguards Contingency Plan (SCP)

Sent Date: 6/24/2015 3:58:25 PM Received Date: 6/24/2015 3:58:26 PM From: Haskell, Russell Created By: Russell.Haskell@nrc.gov Recipients:

"Mathews, Mitchel A:(GenCo-Nuc) (Mitchel.Mathews@exeloncorp.com)"

<Mitchel.Mathews@exeloncorp.com>

Tracking Status: None Post Office: HQPWMSMRS05.nrc.gov Files Size Date & Time MESSAGE 1648 6/24/2015 3:58:26 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: