| title = Reactor Protection System (Rps) Actuation With The Reactor In Hot Shutdown
| title = Reactor Protection System (Rps) Actuation with the Reactor in Hot Shutdown
| event text = Pursuant to 10CFR50.72(b)(3)(iv)(A), notifications are being performed for a valid actuation of the reactor protection system resulting in a full scram.  The actuation was a result of the reactor mode switch being placed from the refuel position to the shutdown position without the scram bypass jumpers installed.  The reactor was subcritical with all rods inserted at the time of the actuation.  All systems functioned as designed.
| event text = Pursuant to 10CFR50.72(b)(3)(iv)(A), notifications are being performed for a valid actuation of the reactor protection system resulting in a full scram.  The actuation was a result of the reactor mode switch being placed from the refuel position to the shutdown position without the scram bypass jumpers installed.  The reactor was subcritical with all rods inserted at the time of the actuation.  All systems functioned as designed.
The licensee notified the NRC Resident Inspector.
The licensee notified the NRC Resident Inspector.

Latest revision as of 20:52, 1 March 2018

ENS 49648 +/-
Where
Oyster Creek
New Jersey (NRC Region 1)
Reporting
10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+2.73 h0.114 days <br />0.0162 weeks <br />0.00374 months <br />)
Opened: Steven Johnston
03:41 Dec 18, 2013
NRC Officer: Vince Klco
Last Updated: Dec 18, 2013