ML13268A448: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/19/2013
| issue date = 09/19/2013
| title = Transmittal of Annual Report and Minor Amendment (#8) to the Technical Specifications for NRC Reactor License R-110
| title = Transmittal of Annual Report and Minor Amendment (#8) to the Technical Specifications for NRC Reactor License R-110
| author name = Grimes H D
| author name = Grimes H
| author affiliation = Idaho State Univ
| author affiliation = Idaho State Univ
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Idaho StateUNIVERSITY Office for Research and Economic Development 921 South 8th Avenue, Stop 8130 0 Pocatello, Idaho 83209-8130 September 19, 2013NRC Document Control DeskU.S. Nuclear Regulatory Commission One White Flint North, MS OWEN-1 E1311555 Rockville PikeRockville, MD 20852-2738
{{#Wiki_filter:Idaho UNIVERSITY State Office for Research and Economic Development 921 South 8th Avenue, Stop 8130 0 Pocatello, Idaho 83209-8130 September 19, 2013 NRC Document Control Desk U.S. Nuclear Regulatory Commission One White Flint North, MS OWEN-1 E13 11555 Rockville Pike Rockville, MD 20852-2738


==SUBJECT:==
==SUBJECT:==
Transmittal of Annual Report and Minor Amendment (#8) to the Technical Specifications for NRC Reactor License R-110 The two copies of each enclosure are:
: 1. The Annual Report for calendar year 2012 for the AGN-201 Reactor, NRC License R- 110.
Docket #50-284.
: 2. Amendment #8 for the Technical Specifications for the same reactor. This amendment is a minor change to the organization chart for the university. The name of the college where the reactor is located and administered has been changed from "College of Engineering" to "College of Science and Engineering". Also, the reporting line for the Reactor Safety Committee is now shown specifically as being to the Reactor Administrator.
Please transmit one copy of each of these documents to the license program manager.
Mr, Duane A. Hardesty Research and Test Reactors Mail Stop: 0-12 D03 Phone: (301)415-3724 Sincerely, Howard Grimes Vice President for Research and Economic Development Encl: (4) ec: Dr. Jay Kunze, Reactor Administrator Phone: (208) 282-3134
* Fax: (208) 282-4487 0 www.isu.edu/research ISU is an Equal Opportunity Employer


Transmittal of Annual Report and Minor Amendment
University Officer and Dean of the College of Science and Engineering may be the same individual (2)The Reactor Administrator could be the Dean of Science and Engineering, or the Chair or a faculty member of the Department of Nuclear Engineering and Health Physics. However, regarding NRC licenses, the Reactor Administrator reports to the Dean of the College of Science and Engineering and not necessarily through the Department of Nuclear Engineering and Health Physics, which is a department in the College of Science and Engineering.
(#8) to the Technical Specifications for NRC Reactor License R-110The two copies of each enclosure are:1. The Annual Report for calendar year 2012 for the AGN-201 Reactor, NRC License R- 110.Docket #50-284.2. Amendment
(3) The Reactor Supervisor reports td the Reactor Administrator, and may not necessarily report through the Chair of the Nuclear Engineering and Health Phys8ics Department.
#8 for the Technical Specifications for the same reactor.
(4) Requires a NRC Senior Reactor Operators (SRO) License
This amendment is a minorchange to the organization chart for the university.
* Requires a NRC Reactor Operators License (or an SRO license), except per 10 CFR 55.13 Figure 1. Administrative Organization of the ISU AGN-201 Reactor Facility, NRC License R- I10, chain of corrnmand in regard to nuclear operation and safety. Dotted lines represent communication channels.
The name of the college where the reactor islocated and administered has been changed from "College of Engineering" to "College of Scienceand Engineering".
Persons holding positions on the Administrative organization shall meet or exceed the qualification requirements of ANSI/ANS-15.4-1988, "Selection and Training of Personnel for Research Reactors."
Also, the reporting line for the Reactor Safety Committee is now shownspecifically as being to the Reactor Administrator.
6.1.5    Reactor Operators Reactor Operators shall be responsible for the manipulation of the reactor controls, monitoring of instrumentation, operation of the reactor-related equipment, and maintenance of the complete and current records during operation of the facility. Reactor Operators shall hold a valid Reactor Operator's license issued by the U.S. Nuclear Regulatory Commission.
Please transmit one copy of each of these documents to the license program manager.Mr, Duane A. HardestyResearch and Test ReactorsMail Stop: 0-12 D03Phone: (301)415-3724 Sincerely, Howard GrimesVice President for Research and Economic Development Encl: (4)ec: Dr. Jay Kunze, Reactor Administrator Phone: (208) 282-3134
AGN-20 I - Technical Specifications, Amendment 48 Transmitted to NRC September 20, 2013:                                                      Page 21 of 31
* Fax: (208) 282-4487 0 www.isu.edu/research ISU is an Equal Opportunity Employer University Officer and Dean of the College of Science and Engineering may be the sameindividual (2) The Reactor Administrator could be the Dean of Science and Engineering, or the Chair or afaculty member of the Department of Nuclear Engineering and Health Physics.
 
However,regarding NRC licenses, the Reactor Administrator reports to the Dean of the College ofScience and Engineering and not necessarily through the Department of NuclearEngineering and Health Physics, which is a department in the College of Science andEngineering.
Idaho State University AGN-201M Reactor Facility License R-1 10, Docket No. 50-284 Annual Operating Report for 2012 Calendar Year
(3) The Reactor Supervisor reports td the Reactor Administrator, and may not necessarily reportthrough the Chair of the Nuclear Engineering and Health Phys8ics Department.
: 1. Narrative Summary A. Changes in Facility Design, Performance Characteristics, and Operating Procedures:
(4) Requires a NRC Senior Reactor Operators (SRO) LicenseRequires a NRC Reactor Operators License (or an SRO license),
There were no changes in facility design, performance characteristics, and operating procedures relating to reactor safety or operations during the reporting period.
except per 10 CFR 55.13Figure 1. Administrative Organization of the ISU AGN-201 Reactor Facility, NRC License R- I10, chain ofcorrnmand in regard to nuclear operation and safety. Dotted lines represent communication channels.
B. Results of Major Surveillance Tests and Inspections:
Persons holding positions on the Administrative organization shall meet or exceed the qualification requirements of ANSI/ANS-15.4-1988, "Selection and Training of Personnel for ResearchReactors."
(1) Channel tests perfon'ned on all safety channels and scram interlocks were found to be satisfactory and within specifications. Channels 1, 2, & 3 were tested 8/10/2012, 5/2/2012, & 8/20/2012 respectively.
6.1.5 Reactor Operators Reactor Operators shall be responsible for the manipulation of the reactor controls, monitoring ofinstrumentation, operation of the reactor-related equipment, and maintenance of the complete andcurrent records during operation of the facility.
(2) Power level (4/2/2012) and period check (3/22/2012) experiments were performed with satisfactory results.
Reactor Operators shall hold a valid ReactorOperator's license issued by the U.S. Nuclear Regulatory Commission.
(3) The shield water tank was inspected (6/11/2012) and no leaks or excessive corrosion were observed. The water level interlock tested satisfactorily (6/11/2012).
AGN-20 I -Technical Specifications, Amendment 48Transmitted to NRC September 20, 2013: Page 21 of 31 Idaho State University AGN-201M Reactor FacilityLicense R-1 10, Docket No. 50-284Annual Operating Report for 2012 Calendar Year1. Narrative SummaryA. Changes in Facility Design, Performance Characteristics, and Operating Procedures:
(4) The seismic displacement & temperature interlocks were tested and found satisfactory (7/26/2012).
There were no changes in facility design, performance characteristics, and operating procedures relating to reactor safety or operations during the reporting period.B. Results of Major Surveillance Tests and Inspections:
(5) (a) Control element capsules (cladding) were inspected (6/28/12) and found to be in good condition with no evidence of deterioration since the previous inspection.
(1) Channel tests perfon'ned on all safety channels and scram interlocks were found tobe satisfactory and within specifications.
(b) The control rod drive mechanisms were inspected (6/28/12) and tested with satisfactory results.
Channels 1, 2, & 3 were tested8/10/2012, 5/2/2012,
(c) Ejection times were measured for all SCRAM-able rods and found to be less than I seconds (d) The reactivity worth of all safety and control rods were measured, as well as the time required to drive each rod to its fully inserted position. Reactivity insertion rates were determined to be less than 0.042%A1kk s-' ($0.058 s-') for all rods.
& 8/20/2012 respectively.
(e) The shutdown margin was determined to be greater than 2.2%Ak/k ($3.0) with both the most reactive SCRAM-able rod and the fine control rod fully inserted.
(2) Power level (4/2/2012) and period check (3/22/2012) experiments were performed with satisfactory results.(3) The shield water tank was inspected (6/11/2012) and no leaks or excessive corrosion were observed.
8/15/12.
The water level interlock tested satisfactorily (6/11/2012).
(f) All surveillances were      within the    appropriate  Technical Specification requirements.
(4) The seismic displacement
 
& temperature interlocks were tested and foundsatisfactory (7/26/2012).
Idaho State University AGN-201M Reactor 2011 Annual Report Page 2 of 10
(5) (a) Control element capsules (cladding) were inspected (6/28/12) and found to bein good condition with no evidence of deterioration since the previousinspection.
      ?  Operating History and Energy Output.
(b) The control rod drive mechanisms were inspected (6/28/12) and tested withsatisfactory results.(c) Ejection times were measured for all SCRAM-able rods and found to be lessthan I seconds(d) The reactivity worth of all safety and control rods were measured, as well asthe time required to drive each rod to its fully inserted position.
The reactor was operated at power levels up to 4.9 watts for a total of 148 watt-hours of thermal energy during this reporting period. A summary of monthly operations for 2012 is given in Table I.
Reactivity insertion rates were determined to be less than 0.042%A1kk s-' ($0.058 s-') forall rods.(e) The shutdown margin was determined to be greater than 2.2%Ak/k
Table 1. Summary of Monthly Reactor Operations (1 January 2012 through 31 December 2012)
($3.0) withboth the most reactive SCRAM-able rod and the fine control rod fully inserted.
Month                              Energy (W-hr)
8/15/12.(f) All surveillances were within the appropriate Technical Specification requirements.
January                                    0.0 February                                    9.9 March                                    11.9 April                                    17.9 May                                      8.6 June                                      8.3 June                                      6,2 August                                    14.6 September                                  31.3 October                                    15.8 November                                    17.1 December                                    6.5 Total                                    148.0 The 0.148 kWh consumed 7.5 micrograms of U-235. During the calendar year, a number of students went through reactor operator training. During the calendar year, four students took NRC licensing exams. Two were awarded Reactor-Operator (RO) licenses and one was awarded a Senior Reactor-Operator (SRO) license. Two operator-licenses were terminated during the year because students left the university.
Idaho State University AGN-201M Reactor2011 Annual ReportPage 2 of 10? Operating History and Energy Output.The reactor was operated at power levels up to 4.9 watts for a total of 148 watt-hours ofthermal energy during this reporting period. A summary of monthly operations for 2012 isgiven in Table I.Table 1. Summary of Monthly Reactor Operations (1 January 2012 through 31 December 2012)MonthJanuaryFebruaryMarchAprilMayJuneJuneAugustSeptember OctoberNovemberDecemberTotalEnergy (W-hr)0.09.911.917.98.68.36,214.631.315.817.16.5148.0The 0.148 kWh consumed 7.5 micrograms of U-235. During the calendar year, a numberof students went through reactor operator training.
: 3. A. Unscheduled Shutdowns and Corrective Actions Taken.
During the calendar year, four studentstook NRC licensing exams. Two were awarded Reactor-Operator (RO) licenses and onewas awarded a Senior Reactor-Operator (SRO) license.
None.
Two operator-licenses wereterminated during the year because students left the university.
B. Inadvertent Scrams and Action Taken.
: 3. A. Unscheduled Shutdowns and Corrective Actions Taken.None.B. Inadvertent Scrams and Action Taken.There were 159 inadvertent scrams during this reporting period. Table I1 summarizes theinadvertent scrams, known or suspected cause, and action taken.
There were 159 inadvertent scrams during this reporting period. Table I1 summarizes the inadvertent scrams, known or suspected cause, and action taken.
Idaho State University AGN-201 M Reactor2011 Annual ReportPage 3 of 10Table II. Summary of Inadvertent Scrarns(1 January 2012 through 31 December 2012)Date FTime Scram Type Cause Action2/1/12 15:43 Channel I Low Operator Error Restart16:21 Channel I Low Operator Error Shutdown2/2/12 14:13 Channel 1 High Range Change Error Restart14:43 Not Indicated Suspected Electrical Transient*
 
Shutdown2/8/12 16:09 Channel 3 High Range Change Error Restart16:19 Channel I High Range Change Error Restart16:22 Period Operator Error Restart2/9/12 13:51 Channel 3 High Signal Irregularity Restart14:17 Period Operator Error Restart15:03 Period Insertion of Source Restart15:13 Channel I High Range Change Error Restart2/13/12 23:36 Channel I Low Low Power Operation Restart0:02 Channel 1 High Low Powver Operation Restart2/16/12 13:35 Channel I Low Loss of Signal Restart14:07 Channel I Low Loss of Signal RestartMagnet Over-2/22/12 13:50 Current Magnet Current SCRAM Set Too Low Restart2/27/12 17:14 Channel 3 High Range Change Error Restart18:04 Not Indicated Suspected Electrical Transient*
Idaho State University AGN-201 M Reactor 2011 Annual Report Page 3 of 10 Table II. Summary of Inadvertent Scrarns (1 January 2012 through 31 December 2012)
Shutdown3/21/12 15:56 Channel I Low Loss of Signal Shutdown4/2/12 16:52 Channel I Low Loss of Signal Restart4/4/12 11:11 Channel I Low Loss of Signal RestartMagnet Over-4/9/12 16:38 Current Magnet Current SCRAM Set Too Low Restart5/9/12 16:48 Channel 3 High Signal Irregularity Restart17:06 Channel 3 High Signal Irregularity Restart5/15/12 16:40 Channel 3 High Signal Irregularity  
Date 2/1/12 FTime 15:43 Scram Type Channel I Low       Operator Error Cause                  Action Restart 16:21 Channel I Low       Operator Error                               Shutdown 2/2/12   14:13 Channel 1 High       Range Change Error                           Restart 14:43 Not Indicated       Suspected Electrical Transient*             Shutdown 2/8/12   16:09 Channel 3 High       Range Change Error                           Restart 16:19 Channel I High       Range Change Error                           Restart 16:22 Period               Operator Error                               Restart 2/9/12   13:51 Channel 3 High       Signal Irregularity                         Restart 14:17 Period               Operator Error                               Restart 15:03 Period               Insertion of Source                         Restart 15:13 Channel I High       Range Change Error                           Restart 2/13/12   23:36 Channel I Low       Low Power Operation                         Restart 0:02 Channel 1 High       Low Powver Operation                         Restart 2/16/12   13:35 Channel I Low       Loss of Signal                               Restart 14:07 Channel I Low       Loss of Signal                               Restart Magnet Over-2/22/12   13:50 Current             Magnet Current SCRAM Set Too Low             Restart 2/27/12   17:14 Channel 3 High       Range Change Error                           Restart 18:04 Not Indicated       Suspected Electrical Transient*             Shutdown 3/21/12   15:56 Channel I Low       Loss of Signal                               Shutdown 4/2/12   16:52 Channel I Low       Loss of Signal                               Restart 4/4/12   11:11 Channel I Low       Loss of Signal                               Restart Magnet Over-4/9/12   16:38 Current             Magnet Current SCRAM Set Too Low             Restart 5/9/12   16:48 Channel 3 High       Signal Irregularity                         Restart 17:06 Channel 3 High       Signal Irregularity                         Restart 5/15/12   16:40 Channel 3 High       Signal Irregularity & Range Change Error   Restart 19:43 Channel 3 High       Over Estimation of Oscillator Reactivity   Restart 5/18/12   11:37 Channel 3 High       Range Change Error                         Restart 14:36 Not Indicated         Range Change Error                         Restart Magnet Over-5/23/12   16:47 Current             Suspected Electrical Transient*             Restart Magnet Over-         Suspected Signal Interference & Detector is 17:18 Current             Insulated                                   Restart Magnet Over-5/24/12   11:14 Current             Suspected Electrical Transient*             Shutdown 6/5/12   16:27 Period               Chanel #1 Raise Interference               Restart 6/6/12   16:37 Channel I High       Range Change Error                         Restart
& Range Change Error Restart19:43 Channel 3 High Over Estimation of Oscillator Reactivity Restart5/18/12 11:37 Channel 3 High Range Change Error Restart14:36 Not Indicated Range Change Error RestartMagnet Over-5/23/12 16:47 Current Suspected Electrical Transient*
 
RestartMagnet Over- Suspected Signal Interference  
Idaho State University AGN-201M Reactor 2011 Annual Report Page 4 of 10 T               T                                                  r 7/13/12  15:42  Channel 3 High  Operator Error (Training)                         Restart 15:50   Channel 3 High   Operator En-or (Training)                         Restart 16:10   Channel 3 Low   Signal u     Teegularity                               Restart 8/7/12. 16:47   Channel 3 Low   Suspected Electrical Transient*                   Restart 8/8/12   16:18   Channel 1 Low   Removing the Start Up Source                       Restart 16:30   Channel I Low   Signal Irregularity                               Restart 8/10/12   13:10   Channel I Low   Suspected Signal Irregularity                     Restart Investigate 13:29   Channel I Low   Detector Stuck When Raise Pressed                 & Restart 14:28   Channel I Low   Suspected Signal Irregularity                     Restart 8/30/12   13:34   Channel I       Supervisor Re-Set Time Constant During Operation   Shutdown 8/31/12   10:39   Channel I Low   Signal Irregularity                               Shutdown 14:59   Channel 3 High   Range Change Error                                 Restart 15:08   Channel I High   Suspected Signal Irregularity                     Shutdown 9/5/12 20:24   Channel 3 High   Range Change Error                                 Restart 21:33   Channel 3 High   Range Change Error                                 Restart 9/6/12   11:26   Channel I Low   Range Change Error                                 Restart 11:35   Channel I Low   Range Change Error                                 Restart 9/6/12   17:35   Channel 3 High   Occurred During Range Change                       Restart 17:41   Raise Button     Raising Detector Caused Additional Signal Noise   Restart 9/7/12   12:38   Channel 1 Low   Suspected Signal Irregularity                     Restart 12:58   Channel I Low   Suspected Signal Irregularity                     Restart 9/12/12   14:52   Channel 3 High   Operator Error (Training)                         Restart 9/13/12   9:11   Channel 3 High   Operator Error                                     Restart 9:33   Channel 3 High   Erratic Response Changing to 3x10^(-9) Range       Restart 10:10   Channel 3 High   Erratic Signal                                     Restart 10:23   Channel 3 High   Operator Error                                     Restart 14:00   Not Indicated   Occurred During Raising Ch #I                     Restart 14:38   Channel 3 High   Signal Irregularity During Range Change           Restart 9/14/12   12:59   Not Indicated   Occurred During Raising Ch #1                     Restart 14:07   Channel I Low   Suspected Signal Irregularity                     Shutdown 9/15/12   11:28   Channel 3 High   Range Change ErTor                                 Restart 15:07   Channel 3 High   Signal Irregularity During Range Change           Restart 9/18/12   9:58   Channel 3 Low   Accidently Hitting the Console                     Restart 9/19/12   19:40   Channel 3 High   Range Change Error                                 Restart 19:55   Channel I High   Range Change Error                                 Restart Adjust Cable 9/24/12   14:37   Period scram     Raising Detector Caused Additional Signal Noise   & Restart 20:01   Channel I Low   Operator Error                                     Restart Investigate 9/25/12   12:59   Channel 1 Low   Suspected Electrical Transient*                     & Restart
& Detector is17:18 Current Insulated RestartMagnet Over-5/24/12 11:14 Current Suspected Electrical Transient*
 
Shutdown6/5/12 16:27 Period Chanel #1 Raise Interference Restart6/6/12 16:37 Channel I High Range Change Error Restart Idaho State University AGN-201M Reactor2011 Annual ReportPage 4 of 10T T r7/13/1215:42Channel 3 HighOperator Error (Training)
Idaho State University AGN-201M Reactor 201 1 Annual Report Page 5 of 10 14:09  Channel I Low  Suspected Electrical Transient*                 Restart 9/27/12   11:42 Channel I Low   Raising Detector Caused Additional Signal Noise Restart 14:39 Raise Button   Raising Detector Caused Additional Signal Noise Restart 101112  20:29 Channel 3 High   Signal Detegularity During Range Change         Restart 10/5/12   10:34 Channel 3 High Range Change Error                             Restart 10/9/12   16:32 Channel 1 Low   Suspected Signal Irregularity                   Restart 10/10/12   13:08 Channel 3 High Noise in Range 3x10A(-8) & 10x10A(-9)           Restart 18:06 Channel 3 High Signal Inregularity                             Restart 10/11/12   10:41 Channel 1 High Range Change Error                             Restart 10:48 Period         Removing the Start Up Source                   Restart 12:38 Channel I High Range Change Error                             Restart 13:50 ChI low         Loss of Signal                                 Restart 14:29 Period         Raising Detector Caused Additional Signal Noise Restart 10/16/12   13:28 Loss of Power   Building Loss Power Briefly                     Restart 10/17/12   12:06 Channel I Low   Loss of Signal                                 Restart 19:40 Period         Bumping of the Console                         Restart 10/18/12   14:27 Channel 3 High Range Change Error                             Restart Channel 3 Low Range Change Error                             Restart 10/19/12   13:25 Channel 3 High Range Change Error                             Restart 16:35 Bumped Console Bumped Chair into Console                       Restart 10/23/12   9:53 Period         Power Transient                                 Restart 12:14 Period         Signal Irregularity                             Restart 13:23 Channel 2 Low Suspected Signal Irregularity                   Restart 15:37 Period         Electrical Transient* (Period within Range)   Restart 17:58 Period         Electrical Transient* (Period within Range)   Restart 10/24/12 15:44 Channel 3 High Range Change Error                             Restart 10/29/12 19:50 Channel 3 High Range Change Error                             Restart 20:34 Channel 3 High Range Change Error                             Restart 20:36 Channel 3 High Range Change Error                             Restart 10/30/12   9:28 Channel I Low   Loss of Signal                                 Restart 10/31/12   9:43 Channel 3 High Range Change Error                             Restart 11/1/12 13:27 Not Indicated   Activating Channel I Solenoid                 Restart 11/5/12   9:59 Channel I Low   Suspected Electrical Transient*               Restart 10:03 Period         Suspected Electrical Transient*               Restart 2.1:30 Channel 3 High Range Change Error                             Restart 21:49 Channel I Low   Suspected Electrical Transient*                 Restart 11/7/12 19:48 Channel I Low   Loss of Siunal                                 Restart 11/8/12 10:15 Channel 3 High   Operator Error (Training)                       Restart 11:14 Channel 3 Low   Suspected Electrical Transient*               Shutdown 11/9/12 13:19 Channel 1 Low   Under Estimation of Oscillator Reactivity       Restart 16:46 Channel I Low   Suspected Electrical Transient*                 Shutdown
Restart15:50 Channel 3 High Operator En-or (Training)
 
Restart16:10 Channel 3 Low Signal u Teegularity Restart8/7/12. 16:47 Channel 3 Low Suspected Electrical Transient*
Idaho State University AGN-201 M Reactor 2011 Annual Report Page 6 of 10 11/13/12    12:58 1 Loss of Power            Loss of Power to Circuit                                IShutdown 11/15/12     13:37 Period                     Raising Detector Caused Additional Signal Noise           Restart 11/21/12     14:28   Channel 3. High         Signal Irregularity During Range Change                   Restart 12/13/12     13:43   Channel 3 Low           Range Change Error                                       Restart 13:52   Period                 Inserted Poly Rod Too Quickly                             Restart 14:12   Period                 Raising Detector Caused Additional Signal Noise           Restart 15:52   Channel 3 Low           Signal Irregularity                                     Restart 16:00   Period                   Raising Detector Caused Additional Signal Noise         Restart 12/14/12     11:53   Channel 1 Low           Operator Error                                           Restart 12/20/12     12:59   Period                 Raising Detector Caused Additional Signal Noise           Restart 12/21/12     12:43   Channel I Low           Suspected Electrical Transient*                         Restart 13:01   Channel I Low           Suspected Electrical Transient*                         Restart 15:00   Channel 3 High           Range Change Error                                       Restart 12/27/12     14:06   Channel 1 Low           Signal Irregularity During Range Change                 Restart 12/2S/12     16:15   Channel I Low           Suspected Electrical Transient*                         Restart 12/31/12     10:47   Channel 1 Low           Suspected Signal Irregularity                           Restart 11:06   Channel 1 High           Non-Reproducible Rate Meter Issue                       Restart
Restart8/8/12 16:18 Channel 1 Low Removing the Start Up Source Restart16:30 Channel I Low Signal Irregularity Restart8/10/12 13:10 Channel I Low Suspected Signal Irregularity RestartInvestigate 13:29 Channel I Low Detector Stuck When Raise Pressed & Restart14:28 Channel I Low Suspected Signal Irregularity Restart8/30/12 13:34 Channel I Supervisor Re-Set Time Constant During Operation Shutdown8/31/12 10:39 Channel I Low Signal Irregularity Shutdown14:59 Channel 3 High Range Change Error Restart15:08 Channel I High Suspected Signal Irregularity Shutdown9/5/12 20:24 Channel 3 High Range Change Error Restart21:33 Channel 3 High Range Change Error Restart9/6/12 11:26 Channel I Low Range Change Error Restart11:35 Channel I Low Range Change Error Restart9/6/12 17:35 Channel 3 High Occurred During Range Change Restart17:41 Raise Button Raising Detector Caused Additional Signal Noise Restart9/7/12 12:38 Channel 1 Low Suspected Signal Irregularity Restart12:58 Channel I Low Suspected Signal Irregularity Restart9/12/12 14:52 Channel 3 High Operator Error (Training)
* Electrical transients are signal & power irregularities associated with using older vacuum tube based analogue circuitry.
Restart9/13/12 9:11 Channel 3 High Operator Error Restart9:33 Channel 3 High Erratic Response Changing to 3x10^(-9)
Range Restart10:10 Channel 3 High Erratic Signal Restart10:23 Channel 3 High Operator Error Restart14:00 Not Indicated Occurred During Raising Ch #I Restart14:38 Channel 3 High Signal Irregularity During Range Change Restart9/14/12 12:59 Not Indicated Occurred During Raising Ch #1 Restart14:07 Channel I Low Suspected Signal Irregularity Shutdown9/15/12 11:28 Channel 3 High Range Change ErTor Restart15:07 Channel 3 High Signal Irregularity During Range Change Restart9/18/12 9:58 Channel 3 Low Accidently Hitting the Console Restart9/19/12 19:40 Channel 3 High Range Change Error Restart19:55 Channel I High Range Change Error RestartAdjustCable9/24/12 14:37 Period scram Raising Detector Caused Additional Signal Noise & Restart20:01 Channel I Low Operator Error RestartInvestigate 9/25/12 12:59 Channel 1 Low Suspected Electrical Transient*  
& Restart Idaho State University AGN-201M Reactor201 1 Annual ReportPage 5 of 1014:09Channel I LowSuspected Electrical Transient*
Restart9/27/12 11:42 Channel I Low Raising Detector Caused Additional Signal Noise Restart14:39 Raise Button Raising Detector Caused Additional Signal Noise Restart101112 20:29 Channel 3 High Signal Detegularity During Range Change Restart10/5/12 10:34 Channel 3 High Range Change Error Restart10/9/12 16:32 Channel 1 Low Suspected Signal Irregularity Restart10/10/12 13:08 Channel 3 High Noise in Range 3x10A(-8)  
& 10x10A(-9)
Restart18:06 Channel 3 High Signal Inregularity Restart10/11/12 10:41 Channel 1 High Range Change Error Restart10:48 Period Removing the Start Up Source Restart12:38 Channel I High Range Change Error Restart13:50 ChI low Loss of Signal Restart14:29 Period Raising Detector Caused Additional Signal Noise Restart10/16/12 13:28 Loss of Power Building Loss Power Briefly Restart10/17/12 12:06 Channel I Low Loss of Signal Restart19:40 Period Bumping of the Console Restart10/18/12 14:27 Channel 3 High Range Change Error RestartChannel 3 Low Range Change Error Restart10/19/12 13:25 Channel 3 High Range Change Error Restart16:35 Bumped Console Bumped Chair into Console Restart10/23/12 9:53 Period Power Transient Restart12:14 Period Signal Irregularity Restart13:23 Channel 2 Low Suspected Signal Irregularity Restart15:37 Period Electrical Transient*  
(Period within Range) Restart17:58 Period Electrical Transient*  
(Period within Range) Restart10/24/12 15:44 Channel 3 High Range Change Error Restart10/29/12 19:50 Channel 3 High Range Change Error Restart20:34 Channel 3 High Range Change Error Restart20:36 Channel 3 High Range Change Error Restart10/30/12 9:28 Channel I Low Loss of Signal Restart10/31/12 9:43 Channel 3 High Range Change Error Restart11/1/12 13:27 Not Indicated Activating Channel I Solenoid Restart11/5/12 9:59 Channel I Low Suspected Electrical Transient*
Restart10:03 Period Suspected Electrical Transient*
Restart2.1:30 Channel 3 High Range Change Error Restart21:49 Channel I Low Suspected Electrical Transient*
Restart11/7/12 19:48 Channel I Low Loss of Siunal Restart11/8/12 10:15 Channel 3 High Operator Error (Training)
Restart11:14 Channel 3 Low Suspected Electrical Transient*
Shutdown11/9/12 13:19 Channel 1 Low Under Estimation of Oscillator Reactivity Restart16:46 Channel I Low Suspected Electrical Transient*
Shutdown Idaho State University AGN-201 M Reactor2011 Annual ReportPage 6 of 1011/13/1212:58 1 Loss of PowerLoss of Power to CircuitIShutdown 11/15/12 13:37 Period Raising Detector Caused Additional Signal Noise Restart11/21/12 14:28 Channel 3. High Signal Irregularity During Range Change Restart12/13/12 13:43 Channel 3 Low Range Change Error Restart13:52 Period Inserted Poly Rod Too Quickly Restart14:12 Period Raising Detector Caused Additional Signal Noise Restart15:52 Channel 3 Low Signal Irregularity Restart16:00 Period Raising Detector Caused Additional Signal Noise Restart12/14/12 11:53 Channel 1 Low Operator Error Restart12/20/12 12:59 Period Raising Detector Caused Additional Signal Noise Restart12/21/12 12:43 Channel I Low Suspected Electrical Transient*
Restart13:01 Channel I Low Suspected Electrical Transient*
Restart15:00 Channel 3 High Range Change Error Restart12/27/12 14:06 Channel 1 Low Signal Irregularity During Range Change Restart12/2S/12 16:15 Channel I Low Suspected Electrical Transient*
Restart12/31/12 10:47 Channel 1 Low Suspected Signal Irregularity Restart11:06 Channel 1 High Non-Reproducible Rate Meter Issue Restart* Electrical transients are signal & power irregularities associated with using older vacuum tubebased analogue circuitry.
: 4. Safety-Related Corrective Maintenance:
: 4. Safety-Related Corrective Maintenance:
1/31/2012:
1/31/2012: Channel 3 detector changed its response output and was replaced with a comparable BF3 tube. In addition the SHV connector was replaced with one designed for RG-59 cable and recalibrated.
Channel 3 detector changed its response output and was replaced with a comparable BF3 tube. In addition the SHV connector was replaced with one designed for RG-59cable and recalibrated.
3/6/2012: The down indicator switch on the FCR had been knocked out of place, causing the drive to continue to drive out despite being in the bottom position and the interlock OK light bulb failed. The switch was repositioned for proper operation and the light bulb replaced.
3/6/2012:
3/14/2013: A bad cable connection causing a short, preventing the magnet to energize, was located.
The down indicator switch on the FCR had been knocked out of place, causing the driveto continue to drive out despite being in the bottom position and the interlock OK lightbulb failed. The switch was repositioned for proper operation and the light bulbreplaced.
A bypass cable fixed the problem and the main cable connection fixed to return normal functionality.
3/14/2013:
3/21/2012: The Channel 3 detector lost signal, a connection problem was the likely cause. The detector chamber was removed and all connecting cables were replaced with new connections, returning functionality to the system.
A bad cable connection causing a short, preventing the magnet to energize, was located.A bypass cable fixed the problem and the main cable connection fixed to return normalfunctionality.
5/25/2012:The rod drop box was rebuilt with new wiring after a significant amount of troubleshooting.
3/21/2012:
5/30/2012: A power outage cause damage to Channel 2. Vacuum tubes V-12, V-14 & V-17, power line fuse, and the 1.5-volt battery were replaced.
The Channel 3 detector lost signal, a connection problem was the likely cause. Thedetector chamber was removed and all connecting cables were replaced with newconnections, returning functionality to the system.5/25/2012:The rod drop box was rebuilt with new wiring after a significant amount oftroubleshooting.
 
5/30/2012:
Idaho State University AGN-201M Reactor 2011 Annual Report Page 7 of 10 6/5/2012:   Magnet current was found to be high (0.9 mA) and after replacing the V-7 vacuum tube the current returned to a normal 0.6 mA.
A power outage cause damage to Channel 2. Vacuum tubes V-12, V-14 & V-17, powerline fuse, and the 1.5-volt battery were replaced.
8/30/2012: Channel I was having signal problems due to improper cabling and connectors. The system was rebuilt in a way so that the detector's position does not stress the signal cable and removes the need to raise the detector.
Idaho State University AGN-201M Reactor2011 Annual ReportPage 7 of 106/5/2012:
10/4/12:   The analogue position display primary gear broke so that the tens digit wouldn't turn.
Magnet current was found to be high (0.9 mA) and after replacing the V-7 vacuum tubethe current returned to a normal 0.6 mA.8/30/2012:
The unit was replaced with a comparable spare.
Channel I was having signal problems due to improper cabling and connectors.
12/3/12:   Channel 2 failed pre-start checks. The F-I (250V 3A) fuse, V-13 6Y6GA vacuum tube, V-12 6BW4 vacuum tube, and the V-I 6BW4 vacuum tube was replaced in Channel 2 to return functionality.
Thesystem was rebuilt in a way so that the detector's position does not stress the signalcable and removes the need to raise the detector.
12/12/12: During operation the Safety Rod I dropped out properly, however the chassis jammed in position. It was found that the twin drive screws were uneven; they were greased and reset into position. In addition there was a problem with the "Lp" microswitch; the microswitch and the wiring were replaced.
10/4/12:
The analogue position display primary gear broke so that the tens digit wouldn't turn.The unit was replaced with a comparable spare.12/3/12:
Channel 2 failed pre-start checks. The F-I (250V 3A) fuse, V-13 6Y6GA vacuum tube,V-12 6BW4 vacuum tube, and the V-I 6BW4 vacuum tube was replaced in Channel 2to return functionality.
12/12/12:
During operation the Safety Rod I dropped out properly, however the chassis jammed inposition.
It was found that the twin drive screws were uneven; they were greased andreset into position.
In addition there was a problem with the "Lp" microswitch; themicroswitch and the wiring were replaced.
: 5. Modifications.
: 5. Modifications.
A. Changes in Facility Design.None.B. Changes to Procedures.
A. Changes in Facility Design.
None.C. Experiments.
None.
Experimental procedure 12 Oscillator Experiment was revised to have descriptions for bothlinear and rotary oscillators and guidelines for operating them simultaneously.
B. Changes to Procedures.
None.
C. Experiments.
Experimental procedure 12 Oscillator Experiment was revised to have descriptions for both linear and rotary oscillators and guidelines for operating them simultaneously.
D. Reactor Safety Committee.
D. Reactor Safety Committee.
As of the end of the reporting period, membership of the Reactor Safety Committee (RSC)consisted of the following individuals:
As of the end of the reporting period, membership of the Reactor Safety Committee (RSC) consisted of the following individuals:
Frank H. Just -Chair (retired fromn FIN.)Jay F. Kunze -Reactor Administrator Adam L. Mallicoat  
Frank H. Just - Chair (retired fromn FIN.)
-Reactor Supervisor Richard R. Brey -Department ChairPeter Farina -Radiation Safety OfficerRobert Boston. PE, CHP (DOE-ID)Kermit Bunde (DOE-ID)
Jay F. Kunze - Reactor Administrator Adam L. Mallicoat - Reactor Supervisor Richard R. Brey - Department Chair Peter Farina - Radiation Safety Officer Robert Boston. PE, CHP (DOE-ID)
Idaho State University AGN-201M Reactor2011 Annual ReportPage 8 of 10Richard E. McCracken (retired from INL)6. Summary of Changes Reportable under 10 CFR 50.59.The paper chart recorder set up for the detector channels 2 & 3 were changed to utilize a digitalchart recorder.
Kermit Bunde (DOE-ID)
The new recorder is capable recording data and displaying the response overtime and cannot impact reactor operation as installed.
 
The data is stored on a removable flashdrive for easy analysis and storage.7. Radioactive Effluents.
Idaho State University AGN-201M Reactor 2011 Annual Report Page 8 of 10 Richard E. McCracken (retired from INL)
A. Liquid Waste -Total Activity Released:
: 6. Summary of Changes Reportable under 10 CFR 50.59.
None.B. Gaseous Waste -Total Estimated Activity Released:
The paper chart recorder set up for the detector channels 2 & 3 were changed to utilize a digital chart recorder. The new recorder is capable recording data and displaying the response over time and cannot impact reactor operation as installed. The data is stored on a removable flash drive for easy analysis and storage.
14.4 ýtCi ofAr-41.The AGN-201 Reactor was operated for 148 watt-hours at power levels up toapproximately 4.9 watts. At this power level Ar-41 production is negligible andsubstantially below the effluent concentration limit given in 10 CFR 20 Appendix B, Table2. The total activity of Ar-41 released to the environment was conservatively estimated at14.4 i.Ci. This activity corresponds to the total activity of all gaseous radioactive effluentfrom the facility.
: 7. Radioactive Effluents.
A monthly summary of calculated gaseous releases is given in Table IV.Table IV. Summary of Monthly Gaseous Radioactive Effluent Releases(1 January 2012 through 31 December 2012)Ar-41Month (VCi)January 0.0February 1.0March 1.2April 1.7May 0.8June 0.8June 0.6August 1.4September 3.0October 1.5November 1.7December 0.6Total 14.4C. Solid Waste -Total Activity:
A. Liquid Waste - Total Activity Released: None.
B. Gaseous Waste - Total Estimated Activity Released: 14.4 ýtCi ofAr-41.
The AGN-201 Reactor was operated for 148 watt-hours at power levels up to approximately 4.9 watts. At this power level Ar-41 production is negligible and substantially below the effluent concentration limit given in 10 CFR 20 Appendix B, Table
: 2. The total activity of Ar-41 released to the environment was conservatively estimated at 14.4 i.Ci. This activity corresponds to the total activity of all gaseous radioactive effluent from the facility. A monthly summary of calculated gaseous releases is given in Table IV.
Table IV. Summary of Monthly Gaseous Radioactive Effluent Releases (1 January 2012 through 31 December 2012)
Ar-41 Month        (VCi)
January         0.0 February        1.0 March          1.2 April          1.7 May          0.8 June          0.8 June          0.6 August          1.4 September        3.0 October          1.5 November          1.7 December          0.6 Total        14.4 C. Solid Waste - Total Activity: None.
 
Idaho State University AGN-201M Reactor 2012 Amiual Report Page 9 of 10 8, The latest environmental radiation surveys, performed at the facility boundary while the reactor was operating at 60% of full licensed power (3.0 watt), measured a maximum combined neutron and gamma dose equivalent rate of less than 2.0 mrem hr' at the outside walls of the building proximal to the reactor. The total equivalent dose rate at 100% power at these locations was less than 4 mrem hr".
9,  Radiation Exposures.
The Radiation Safety Officer reviews personnel radiation exposures quarterly. Annual reports of ionizing radiation doses are provided by the Radiation Safety Officer to all monitored personnel as required under the provisions of 10 CFR 19.
Personnel with duties in the reactor laboratory on either a regular or occasional basis have been issued radiation dosimeters by the Idaho State University Technical Safety Office.
The duty category and whole body exposure for the 2012 monitoring period of personnel are summarized in Table V:
Table V. Personnel Radiation Monitored for 1/1/2011-12/31/2011 Name                                  Exposure by Type (mrem)
Deep      Lens    Shallow Aryal, Harishchandra                  2          2            2 Baker, Ben                            50        49          46 Baral, Madhav                          2          2            1 Bishart, Bishara                      1          1            1 Bundy, Deric                          3          4          10 Burrows, Ian J                        7          6            6 Gorham, Mackenzie                    <1        <1          <1 Horkley, Matt                          2          2            1 Imel, George                          <1        <1          <1 Jash, Soumadipta                      <1        <1          <1 Kamerman, David                      <1        <1          <1 Krieger, Michael                      11        12          12 Kunze, Jay                            <1        <1          <1 Langbehn, Adam                        7          6            6 Loveland, Ryan                        14        13          12 Lum, Edward                            1          1            1 Mallicoat, Adam                        2          2            1 Misner, Jesse                          3          3            2 Nelson, Alan                          2          2            2 Nelson, Marcus                        <1        <1          <1 Nimmagadda, Jyothier Klumar          <1        <1          <1 Riley, Tony                            3          2            2 Steele, Dallin                        <1        <1          <1
 
Idaho State University AGN-201M Reactor 2012 Annual Report Page 10ofl0 Stewart, Trevor                        3        3            2 Tam, Austin                            1        1          <1 Tormohlen, Derick                    <1        <1.          <1 Wachs, Katelyn                        2        3            3 Chaczko, Malwina                      <1        <1          <1 isaacs, Daniel                        <1        <1          <1 McBeath, Scott                        <1        <1          <1 Nelson, Katherine                      3        2            2 Hart, Paul                            <1      <1            4 The 10 CFR 20.1201 occupational dose limits to adults are: total 5 rem, lens of eye 15 reni, shallow 50 rem, and deep 50 remn. The doses received for all reactor laboratory personnel during 2012 are well below the dose limits of 10 CFR 20.1201, and well below ISU ALARA limits (1 REM per year, 0.3 REM per quarter).
Anytime a member of the public visits the reactor pin dosimeters are issued for the extent of the tour. A minimum of I dosimeter to every 5 people is issued for a representative group dose. During the 2012 calendar year there were 476 recorded visitors to the facility.
A summary of the public dose exposure is presented in Table VI.
Table VI. Summary Whole-Body Exposures to the Public (I January 2012 through 31 December 2012)
Estimated whole-body                                      Number of individuals exposure range (mrem):                                        in each range:
No Observable Dose                                                  433 1.0 mrem*                                                            30 Greater than 1.0 but below 5.0 mrem                                  12 Greater than 5.0 but below 10.0 mrem                                  1 Total number of individuals reported                                476
        *Below 1.0 mrem is considered un-measureable None of the 476 visitors to the facility during 2012 received a measurable dose that would exceed the annual 0.5 remn dose limit of 10 CFR 20.1301. Note there was only one reading that was above 5 mrem, this is likely due to the shock of dropping the dosimeter.
Therefore, the average and maximum doses received by personnel and the public are well within NRC guidelines.
Report prepared by:    Adam Mallicoat, Reactor Manager-/Supervisor Augutst 30th, 2012
 
Dean, College of Science and Engineeringo",2
                  . University Officer and Dean of the College of Science and Engineering may be the same individual (21The Reactor Administrator could be the Dean of Science and Engineering, or the Chair or a faculty member of the Department of Nuclear Engineering and Health Physics. However.
regarding NRC licenses, the Reactor Administrator reports to the Dean of the College of Science and Engineering and not necessarily through the Department of Nuclear Engineering and Health Physics, which is a department in the College of Science and Engineering.
* The Reactor Supervisor reports to the Reactor Administrator, and may not necessarily report through the Chair of the Nuclear Engineering and Health PhysSics Department.
                    " Requires a NRC Senior Reactor Operators (SRO) License
                  '*t Requires a NRC Reactor Operators License (or an SRO license), except per 10 CFR 55.13 Figure 1. Administrative Organization of the ISU AGN-201 Reactor Facility, NRC License R- I10, chain of command in regard to nuclear operation and safety. Dotted lines represent communication channels.
Persons holding positions on the Administrative organization shall meet or- exceed the qualification requirements of ANSI/ANS- 15.4-1988, "Selection and Training of Personnel for Research Reactors."
6.1.5  Reactor Operators Reactor Operators shall be responsible for the manipulation of the reactor controls, monitoring of instrumentation, operation of the reactor-related equipment, and maintenance of the complete and current records during operation of the facility. Reactor Operators shall hold a valid Reactor Operator's license issuIed by the U.S. Nuclear Regulatory Commission.
AGN-20 I - Technical Specifications, Amendment #8 Transmitted to NRC September 20, 2013:                                                    Page 21 of 31
 
Idaho State University AGN-201M Reactor Facility License R-110, Docket No. 50-284 Annual Operating Report for 2012 Calendar Year
: 1. Nan-ative Summary A. Changes in Facility Design, Performance Characteristics, and Operating Procedures:
There were no changes in facility design, performance characteristics, and operating procedures relating to reactor safety or operations during the reporting period.
B. Results of Major Surveillance Tests and Inspections:
(1) Channel tests performed on all safety channels and scram interlocks were found to be satisfactory and within specifications.        Channels 1, 2, & 3 were tested 8/10/2012, 5/2/2012, & 8/20/2012 respectively.
(2) Power level (4/2/2012) and period check (3/22/2012) experiments were performed with satisfactory results.
(3) The shield water tank was inspected (6/11/2012) and no leaks or excessive corrosion were observed. The water level interlock tested satisfactorily (6/11/2012).
(4) The seismic displacement & temperature          interlocks were tested and found satisfactory (7/26/2012).
(5) (a) Control element capsules (cladding) were inspected (6/28/12) and found to be in good condition with no evidence of deterioration since the previous inspection.
(b) The control rod drive mechanisms were inspected (6/28/12) and tested with satisfactory results.
(c) Ejection times were measured for all SCRAM-able rods and found to be less than I seconds (d) The reactivity worth of all safety and control rods were measured, as well as the time required to drive each rod to its fully inserted position. Reactivity insertion rates were determined to be less than 0.042%Ak/k s-' ($0.058 s ') for all rods.
(e) The shutdown margin was determined to be greater than 2.2%Ak/k ($3.0) with both the most reactive SCRAM-able rod and the fine control rod fully inserted.
8/15/12.
(f) All surveillances      were  within  the  appropriate  Technical    Specification requirements.
 
Idaho State University AGN-201M Reactor 2011 Annual Report Page 2 of 10 Operating History and Energy Output.
The reactor was operated.at power levels up to 4.9 watts for a total of 148 watt-hours of thermal energy during this reporting period. A summary of monthly operations for 2012 is given in Table I.
Table I. Summary of Monthly Reactor Operations (1 January 2012 through 31 December 2012)
Month                              Energy (W-hr)
January                                    0.0 February                                    9.9 March                                    11.9 April                                  17.9 May                                      8.6 June                                      8.3 June                                    6.2 August                                    14.6 September                                  31.3 October                                    15.8 November                                    17.1 December                                    6.5 Total                                  148.0 The 0.148 kWh consumed 7.5 micrograms of U-235. During the calendar year, a number of students went through reactor operator training. During the calendar year, four students took NRC licensing exams. Two were awarded Reactor-Operator (RO) licenses and one was awarded a Senior Reactor-Operator (SRO) license. Two operator-licenses were terminated during the year because students left the university.
: 3. A. Unscheduled Shutdowns and Con-ective Actions Taken.
None.
None.
Idaho State University AGN-201M Reactor2012 Amiual ReportPage 9 of 108, The latest environmental radiation
B. Inadvertent Scrams and Action Taken.
: surveys, performed at the facility boundary while thereactor was operating at 60% of full licensed power (3.0 watt), measured a maximumcombined neutron and gamma dose equivalent rate of less than 2.0 mrem hr' at the outsidewalls of the building proximal to the reactor.
There were 159 inadvertent scrams during this reporting period. Table II summarizes the inadvertent scramns, known or suspected cause, and action taken.
The total equivalent dose rate at 100% power atthese locations was less than 4 mrem hr".9, Radiation Exposures.
 
The Radiation Safety Officer reviews personnel radiation exposures quarterly.
Idaho State University AGN-201M Reactor 2011 Annual Report Page 3 of 10 Table 11. Summary of Inadvertent Scrams (1 January 2012 through 31 December 20. 2)
Annualreports of ionizing radiation doses are provided by the Radiation Safety Officer to allmonitored personnel as required under the provisions of 10 CFR 19.Personnel with duties in the reactor laboratory on either a regular or occasional basis havebeen issued radiation dosimeters by the Idaho State University Technical Safety Office.The duty category and whole body exposure for the 2012 monitoring period of personnel are summarized in Table V:Table V. Personnel Radiation Monitored for 1/1/2011-12/31/2011 Name Exposure by Type (mrem)Deep Lens ShallowAryal, Harishchandra 2 2 2Baker, Ben 50 49 46Baral, Madhav 2 2 1Bishart, Bishara 1 1 1Bundy, Deric 3 4 10Burrows, Ian J 7 6 6Gorham, Mackenzie
Date    Time [    Scram Type                               Cause                  Action 2/1/12    15:43 Channel i Low        Operator Error                              Restart 16:21 Channel I Low        Operator Error                              Shutdown 2/2/12    14:13 Channel 1 High      Range Change Error                          Restart 14:43 Not Indicated        Suspected Electrical Transient*              Shutdown 2/8/12    16:09 Channel 3 High      Range Change Error                          Restart 16:19 Channel 1 High      Range Change Error                          Restart 16:22 Period              Operator Error                              Restart 2/9/12    13:51 Channel 3 High      Signal Irregularity                          Restart 14:17 Period                Operator Error                              Restart 15:03 Period                Insertion of Source                        Restart 15:13 Channel 1 High        Range Change Error                          Restart 2/13/12  23:36 Channel I Low        Low Power Operation                        Restart 0:02  Channel I High        Low Power Operation                        Restart 2/16/12  13:35 Channel 1 Low        Loss of Signal                              Restart 14:07 Channel 1 Low        Loss of Signal                              Restart Magnet Over-2/22/12  13:50 CmTent                Magnet Current SCRAM Set Too Low            Restart 2/27/12  17:14 Channel 3 High        Range Change Enror                          Restart 18:04 Not Indicated        Suspected Electrical Transient*            Shutdown 3/21/12  15:56 Channel I Low        Loss of Signal                              Shutdown 4/2/12  16:52 Channel I Low        Loss of Signal                              Restart 4/4/12  11:11 Channel 1 Low        Loss of Signal                              Restart Magnet Over-4/9/12  16:38 Current              Magnet Current SCRAM Set Too Low            Restart 5/9/12  16:48 Channel 3 High        Signal Irregularity                        Restart 17:06 Channel 3 High        Signal Irregularity                        Restart 5/15/12  16:40 Channel 3 High        Signal Irregularity & Range Change Enror    Restart 19:43 Channel 3 High        Over Estimation of Oscillator Reactivity    Restart 5/18/12  11:37 Channel 3 High        Range Change Error                          Restart 14:36 Not Indicated        Range Change Enror                          Restart Magnet Over-5/23/12  16:47 Current              Suspected Electrical Transient*            Restart Magnet Over-         Suspected Signal Interference & Detector is 17:18 Current              Insulated                                  Restart Magnet Over-5/24/12  11:14 Current              Suspected Electrical Transient*            Shutdown 6/5/12  16:27 Period                Chanel #1 Raise Interference                Restart 6/6/12  16:37 Channel I High        Range Change Error                          Restart
<1 <1 <1Horkley, Matt 2 2 1Imel, George <1 <1 <1Jash, Soumadipta
 
<1 <1 <1Kamerman, David <1 <1 <1Krieger, Michael 11 12 12Kunze, Jay <1 <1 <1Langbehn, Adam 7 6 6Loveland, Ryan 14 13 12Lum, Edward 1 1 1Mallicoat, Adam 2 2 1Misner, Jesse 3 3 2Nelson, Alan 2 2 2Nelson, Marcus <1 <1 <1Nimmagadda, Jyothier Klumar <1 <1 <1Riley, Tony 3 2 2Steele, Dallin <1 <1 <1 Idaho State University AGN-201M Reactor2012 Annual ReportPage 10ofl0Stewart, Trevor 3 3 2Tam, Austin 1 1 <1Tormohlen, Derick <1 <1. <1Wachs, Katelyn 2 3 3Chaczko, Malwina <1 <1 <1isaacs, Daniel <1 <1 <1McBeath, Scott <1 <1 <1Nelson, Katherine 3 2 2Hart, Paul <1 <1 4The 10 CFR 20.1201 occupational dose limits to adults are: total 5 rem, lens of eye 15 reni,shallow 50 rem, and deep 50 remn. The doses received for all reactor laboratory personnel during 2012 are well below the dose limits of 10 CFR 20.1201, and well below ISUALARA limits (1 REM per year, 0.3 REM per quarter).
Idaho State University AGN-201 M Reactor 201 1 Annual Report Page 4 of 10 7/13/12  15:42  Channel 3 Hi-gh  Operator Error (Training)                       Restart 15:50  Channel 3 High  Operator Error (Training)                       Restart 16:10  Channel  3 Low  Signal Irregularity                              Restart 8/7/12  16:47  Channel  I Low  *SuspectedElectrical Transient*                  Restart 8/8/12  16:18  Channel  I Low  Removing the Start Up Source                    Restart 16:30  Channel  I Low  Signal Irregularity                              Restart 8/10/12  13:10 Channel  I Low  Suspected Signal Irregularity                    Restart Investigate 13:29 Channel I Low    Detector Stuck When Raise Pressed                & Restart 14:28 Channel I Low    Suspected Signal Irregularity                    Restart 8/30/12   13:34 Channel I        Supervisor Re-Set Time Constant During Operation Shutdown 8/31/12   10:39 Channel I Low    Signal Irregularity                              Shutdown 14:59 Channel 3 High  Range Change Error                              Restart 15:08 Channel I High  Suspected Signal Irregularity                    Shutdown 9/5/12  20:24  Channel 3 High  Range Change Error                              Restart 21:33  Channel 3 High  Range Change Error                              Restart 9/6/12   11:26 Channel I Low    Range Change Error                              Restart 11:35 Channel I Low    Range Change Error                              Restart 9/6/12  17:35 Channel 3 High  Occurred During Range Change                    Restart 17:41 Raise Button    Raising Detector Caused Additional Signal Noise  Restart 9/7/12  12:38 Channel I Low    Suspected Signal Irregularity                  Restart 12:58 Channel I Low    Suspected Signal Irregularity                  Restart 9/12/12  14:52 Channel 3 High  Operator Error (Training)                       Restart 9/13/12  9:11  Channel 3 High  Operator Error                                    Restart 9:33  Channel 3 High    Erratic Response Changing to 3x10"(-9) Range    Restart 10:10 Channel 3 High    Erratic Signal                                  Restart 10:23 Channel 3 High    Operator Error                                  Restart 14:00 Not Indicated    Occurred During Raising Ch #1                    Restart 14:38 Channel 3 High    Signal Irregularity During Range Change          Restart 9/14/12  12:59 Not Indicated    Occurred During Raising Ch #1                   Restart 14:07 Channel I Low     Suspected Signal Irregularity                    Shutdown 9/15/12   11:28 Channel 3 High   Range Change Error                               Restart 15:07 Channel 3 High   Signal Irregularity During Range Change         Restart 9/18/12  9:58  Channel 3 Low    Accidently Hitting the Console                  Restart 9/19/12  19:40 Channel 3 High   Range Change Error                               Restart 19:55 Channel I High    Range Change Error                               Restart Adjust Cable 9/24/12   14:37 Period scram      Raising Detector Caused Additional Signal Noise  & Restart 20:01  Channel I Low    Operator Error                                   Restart Investigate 9/25/12   12:59 Channel I Low     Suspected Electrical Transient*                  & Restart
Anytime a member of the public visits the reactor pin dosimeters are issued for the extentof the tour. A minimum of I dosimeter to every 5 people is issued for a representative group dose. During the 2012 calendar year there were 476 recorded visitors to the facility.
 
A summary of the public dose exposure is presented in Table VI.Table VI. Summary Whole-Body Exposures to the Public(I January 2012 through 31 December 2012)Estimated whole-body exposure range (mrem):Number of individuals in each range:No Observable Dose 4331.0 mrem* 30Greater than 1.0 but below 5.0 mrem 12Greater than 5.0 but below 10.0 mrem 1Total number of individuals reported476*Below 1.0 mrem is considered un-measureable None of the 476 visitors to the facility during 2012 received a measurable dose that wouldexceed the annual 0.5 remn dose limit of 10 CFR 20.1301.
Idaho State University AGN-201M Reactor 2011 Annual Report Page 5 of 10 14:09 Channel 1 Low   Suspected Electrical Transient*                Restart 9/27/12   11:42 Channel I Low   Raising Detector Caused Additional Signal Noise Restart 14:39 Raise Button    Raising Detector Caused Additional Signal Noise Restart 10/1/12 20:29  Channel 3 High Signal Irregularity During Range Change         Restart 10/5/12   10:34 Channel 3 High  Range Change ErTor                              Restart 10/9/12   16:32 Channel I Low   Suspected Signal Irregularity                  Restart 10/10/12   13:08 Channel 3 High  Noise in Range 3x10^(-S) & 10xl0"(-9)          Restart 18:06 Channel  3 High  Signal Irregularity                            Restart 10/11/12   10:41 Channel  I High  Range Change ErTor                              Restart 10:48 Period          Removing the Start Up Source                    Restart 12:38 Channel I High   Range Change Error                              Restart 13:50 Chl low          Loss of Signal                                  Restart 14:29 Period          Raising Detector Caused Additional Signal Noise Restart 10/16/12   13:28 Loss of Power    Building Loss Power Briefly                    Restart 10/17/12  12:06 Channel I Low    Loss of Signal                                 Restart 19:40 Period          Bumping of the Console                          Restart 10/18/12   14:27 Channel 3 High Range Change Error                             Restart Channel  3 Low  Range Change Error                              Restart 10/19/12   13:25 Channel  3 High  Range Change Error                              Restart 16:35 Bumped  Console Bumped Chair into Console                      Restart 10/23/12   9:53  Period          Power Transient                                Restart 12:14 Period           Signal Irregularity                            Restart 13:23 Channel 2 Low  Suspected Signal Irregularity                  Restart 15:37 Period          Electrical Transient* (Period within Range)     Restart 17:58 Period          Electrical Transient* (Period within Range)     Restart 10/24/12   15:44 Channel 3 High  Range Change Error                              Restart 10/29/12   19:50 Channel 3 High  Range Change Error                              Restart 20:34 Channel 3 High  Range Change Error                              Restart 20:36 Channel 3 High  Range Change Error                              Restart 10/30/12  9:28 Channel 1 Low   Loss of Signal                                 Restart 10/31/12   9:43 Channel 3 High   Range Change Error                             Restart 11/1/12  13:27 Not Indicated    Activating Channel I Solenoid                  Restart 11/5/12   9:59 Channel I Low    Suspected Electrical Transient*                Restart 10:03 Period          Suspected Electrical Transient*                Restart 21:30 Channel 3 High   Range Change Error                             Restart 21:49 Channel I Low   Suspected Electrical Transient*                Restart 11/7/12  19:48 Channel I Low   Loss of Signal                                  Restart 11/8/12   10:15 Channel 3 High   Operator Error (Training)                      Restart 11:14 Channel 3 Low    Suspected Electrical Transient*                Shutdown 11/9/12   13:19 Channel I Low   Under Estimation ofOscillator Reactivity        Restart 16:46 Channel I Low   Suspected Electrical Transient*                Shutdown
Note there was only one readingthat was above 5 mrem, this is likely due to the shock of dropping the dosimeter.
 
Therefore, the average and maximum doses received by personnel and the public are wellwithin NRC guidelines.
Idaho State University AGN-201M Reactor 2011 Annual Report Page 6 of 10 1 1/13/12   12:58    Loss of Power          Loss of Power to Circuit                                Shutdown 11/15/12    13:37    Period                  Raising Detector Caused Additional Signal Noise          Restart 11/21/12    14:28    Channel 3 High         Signal Irregularity During Range Change                  Restart 12/13/12    13:43    Channel 3 Low          RangeChange Error                                       Restart 13:52    Period                  Inserted Poly Rod Too Quickly                            Restart 14:12    Period                  Raising Detector Caused Additional Signal Noise          Restart 15:52    Channel 3 Low          Signal Irregularity                                     Restart 16:00    Period                  Raising Detector Caused Additional Signal Noise          Restart 12/14/12     11:53    Channel 1 Low          Operator Error                                          Restart 12/20/12    12:59   Period                  Raising Detector Caused Additional Signal Noise          Restart 12/21/12     12:43    Channel I Low          Suspected Electrical Transient*                          Restart 13:01    Channel I Low          Suspected Electrical Transient*                          Restart 15:00    Channel 3 High         Range Change Error                                      Restart 12/27/12- 14:06      Channel I Low           Signal Irregularity During Range Change                  Restart 12/28/12 16:15        Channel I Low          Suspected Electrical Transient*                          Restart 12/31/12 10:47        Channel I Low           Suspected Signal Irregularity                            Restart
Report prepared by: Adam Mallicoat, Reactor Manager-/Supervisor Augutst 30th, 2012 Dean, College ofScience and Engineeringo",2
          . 11:06    Channel I High          Non-Reproducible Rate Meter Issue                        Restart
.University Officer and Dean of the College of Science and Engineering may be the sameindividual (21 The Reactor Administrator could be the Dean of Science and Engineering, or the Chair or afaculty member of the Department of Nuclear Engineering and Health Physics.
* Electrical transients are signal & power irregularities associated with using older vacuum robe based analogue circuitry.
However.regarding NRC licenses, the Reactor Administrator reports to the Dean of the College ofScience and Engineering and not necessarily through the Department of NuclearEngineering and Health Physics, which is a department in the College of Science andEngineering.The Reactor Supervisor reports to the Reactor Administrator, and may not necessarily reportthrough the Chair of the Nuclear Engineering and Health PhysSics Department.
" Requires a NRC Senior Reactor Operators (SRO) LicenseRequires a NRC Reactor Operators License (or an SRO license),
except per 10 CFR 55.13Figure 1. Administrative Organization of the ISU AGN-201 Reactor Facility, NRC License R- I10, chain ofcommand in regard to nuclear operation and safety. Dotted lines represent communication channels.
Persons holding positions on the Administrative organization shall meet or- exceed the qualification requirements of ANSI/ANS-15.4-1988, "Selection and Training of Personnel for ResearchReactors."
6.1.5 Reactor Operators Reactor Operators shall be responsible for the manipulation of the reactor controls, monitoring ofinstrumentation, operation of the reactor-related equipment, and maintenance of the complete andcurrent records during operation of the facility.
Reactor Operators shall hold a valid ReactorOperator's license issuIed by the U.S. Nuclear Regulatory Commission.
AGN-20 I -Technical Specifications, Amendment
#8Transmitted to NRC September 20, 2013: Page 21 of 31 Idaho State University AGN-201M Reactor FacilityLicense R-110, Docket No. 50-284Annual Operating Report for 2012 Calendar Year1. Nan-ative SummaryA. Changes in Facility Design, Performance Characteristics, and Operating Procedures:
There were no changes in facility design, performance characteristics, and operating procedures relating to reactor safety or operations during the reporting period.B. Results of Major Surveillance Tests and Inspections:
(1) Channel tests performed on all safety channels and scram interlocks were found tobe satisfactory and within specifications.
Channels 1, 2, & 3 were tested8/10/2012, 5/2/2012,
& 8/20/2012 respectively.
(2) Power level (4/2/2012) and period check (3/22/2012) experiments were performed with satisfactory results.(3) The shield water tank was inspected (6/11/2012) and no leaks or excessive corrosion were observed.
The water level interlock tested satisfactorily (6/11/2012).
(4) The seismic displacement
& temperature interlocks were tested and foundsatisfactory (7/26/2012).
(5) (a) Control element capsules (cladding) were inspected (6/28/12) and found to bein good condition with no evidence of deterioration since the previousinspection.
(b) The control rod drive mechanisms were inspected (6/28/12) and tested withsatisfactory results.(c) Ejection times were measured for all SCRAM-able rods and found to be lessthan I seconds(d) The reactivity worth of all safety and control rods were measured, as well asthe time required to drive each rod to its fully inserted position.
Reactivity insertion rates were determined to be less than 0.042%Ak/k s-' ($0.058 s ') forall rods.(e) The shutdown margin was determined to be greater than 2.2%Ak/k
($3.0) withboth the most reactive SCRAM-able rod and the fine control rod fully inserted.
8/15/12.(f) All surveillances were within the appropriate Technical Specification requirements.
Idaho State University AGN-201M Reactor2011 Annual ReportPage 2 of 10Operating History and Energy Output.The reactor was operated.at power levels up to 4.9 watts for a total of 148 watt-hours ofthermal energy during this reporting period. A summary of monthly operations for 2012 isgiven in Table I.Table I. Summary of Monthly Reactor Operations (1 January 2012 through 31 December 2012)MonthJanuaryFebruaryMarchAprilMayJuneJuneAugustSeptember OctoberNovemberDecemberTotalEnergy (W-hr)0.09.911.917.98.68.36.214.631.315.817.16.5148.0The 0.148 kWh consumed 7.5 micrograms of U-235. During the calendar year, a numberof students went through reactor operator training.
During the calendar year, four studentstook NRC licensing exams. Two were awarded Reactor-Operator (RO) licenses and onewas awarded a Senior Reactor-Operator (SRO) license.
Two operator-licenses wereterminated during the year because students left the university.
: 3. A. Unscheduled Shutdowns and Con-ective Actions Taken.None.B. Inadvertent Scrams and Action Taken.There were 159 inadvertent scrams during this reporting period. Table II summarizes theinadvertent
: scramns, known or suspected cause, and action taken.
Idaho State University AGN-201M Reactor2011 Annual ReportPage 3 of 10Table 11. Summary of Inadvertent Scrams(1 January 2012 through 31 December
: 20. 2)Date Time [ Scram Type Cause Action2/1/12 15:43 Channel i Low Operator Error Restart16:21 Channel I Low Operator Error Shutdown2/2/12 14:13 Channel 1 High Range Change Error Restart14:43 Not Indicated Suspected Electrical Transient*
Shutdown2/8/12 16:09 Channel 3 High Range Change Error Restart16:19 Channel 1 High Range Change Error Restart16:22 Period Operator Error Restart2/9/12 13:51 Channel 3 High Signal Irregularity Restart14:17 Period Operator Error Restart15:03 Period Insertion of Source Restart15:13 Channel 1 High Range Change Error Restart2/13/12 23:36 Channel I Low Low Power Operation Restart0:02 Channel I High Low Power Operation Restart2/16/12 13:35 Channel 1 Low Loss of Signal Restart14:07 Channel 1 Low Loss of Signal RestartMagnet Over-2/22/12 13:50 CmTent Magnet Current SCRAM Set Too Low Restart2/27/12 17:14 Channel 3 High Range Change Enror Restart18:04 Not Indicated Suspected Electrical Transient*
Shutdown3/21/12 15:56 Channel I Low Loss of Signal Shutdown4/2/12 16:52 Channel I Low Loss of Signal Restart4/4/12 11:11 Channel 1 Low Loss of Signal RestartMagnet Over-4/9/12 16:38 Current Magnet Current SCRAM Set Too Low Restart5/9/12 16:48 Channel 3 High Signal Irregularity Restart17:06 Channel 3 High Signal Irregularity Restart5/15/12 16:40 Channel 3 High Signal Irregularity
& Range Change Enror Restart19:43 Channel 3 High Over Estimation of Oscillator Reactivity Restart5/18/12 11:37 Channel 3 High Range Change Error Restart14:36 Not Indicated Range Change Enror RestartMagnet Over-5/23/12 16:47 Current Suspected Electrical Transient*
RestartMagnet Over- Suspected Signal Interference
& Detector is17:18 Current Insulated RestartMagnet Over-5/24/12 11:14 Current Suspected Electrical Transient*
Shutdown6/5/12 16:27 Period Chanel #1 Raise Interference Restart6/6/12 16:37 Channel I High Range Change Error Restart Idaho State University AGN-201 M Reactor201 1 Annual ReportPage 4 of 107/13/1215:42Channel 3 Hi-ghOperator Error (Training)
Restart15:50 Channel 3 High Operator Error (Training)
Restart16:10 Channel 3 Low Signal Irregularity Restart8/7/12 16:47 Channel I Low *Suspected Electrical Transient*
Restart8/8/12 16:18 Channel I Low Removing the Start Up Source Restart16:30 Channel I Low Signal Irregularity Restart8/10/12 13:10 Channel I Low Suspected Signal Irregularity RestartInvestigate 13:29 Channel I Low Detector Stuck When Raise Pressed & Restart14:28 Channel I Low Suspected Signal Irregularity Restart8/30/12 13:34 Channel I Supervisor Re-Set Time Constant During Operation Shutdown8/31/12 10:39 Channel I Low Signal Irregularity Shutdown14:59 Channel 3 High Range Change Error Restart15:08 Channel I High Suspected Signal Irregularity Shutdown9/5/12 20:24 Channel 3 High Range Change Error Restart21:33 Channel 3 High Range Change Error Restart9/6/12 11:26 Channel I Low Range Change Error Restart11:35 Channel I Low Range Change Error Restart9/6/12 17:35 Channel 3 High Occurred During Range Change Restart17:41 Raise Button Raising Detector Caused Additional Signal Noise Restart9/7/12 12:38 Channel I Low Suspected Signal Irregularity Restart12:58 Channel I Low Suspected Signal Irregularity Restart9/12/12 14:52 Channel 3 High Operator Error (Training)
Restart9/13/12 9:11 Channel 3 High Operator Error Restart9:33 Channel 3 High Erratic Response Changing to 3x10"(-9)
Range Restart10:10 Channel 3 High Erratic Signal Restart10:23 Channel 3 High Operator Error Restart14:00 Not Indicated Occurred During Raising Ch #1 Restart14:38 Channel 3 High Signal Irregularity During Range Change Restart9/14/12 12:59 Not Indicated Occurred During Raising Ch #1 Restart14:07 Channel I Low Suspected Signal Irregularity Shutdown9/15/12 11:28 Channel 3 High Range Change Error Restart15:07 Channel 3 High Signal Irregularity During Range Change Restart9/18/12 9:58 Channel 3 Low Accidently Hitting the Console Restart9/19/12 19:40 Channel 3 High Range Change Error Restart19:55 Channel I High Range Change Error RestartAdjustCable9/24/12 14:37 Period scram Raising Detector Caused Additional Signal Noise & Restart20:01 Channel I Low Operator Error RestartInvestigate 9/25/12 12:59 Channel I Low Suspected Electrical Transient*
& Restart Idaho State University AGN-201M Reactor2011 Annual ReportPage 5 of 1014:09Channel 1 LowSuspected Electrical Transient*
Restart9/27/12 11:42 Channel I Low Raising Detector Caused Additional Signal Noise Restart14:39 Raise Button Raising Detector Caused Additional Signal Noise Restart10/1/12 20:29 Channel 3 High Signal Irregularity During Range Change Restart10/5/12 10:34 Channel 3 High Range Change ErTor Restart10/9/12 16:32 Channel I Low Suspected Signal Irregularity Restart10/10/12 13:08 Channel 3 High Noise in Range 3x10^(-S)
& 10xl0"(-9)
Restart18:06 Channel 3 High Signal Irregularity Restart10/11/12 10:41 Channel I High Range Change ErTor Restart10:48 Period Removing the Start Up Source Restart12:38 Channel I High Range Change Error Restart13:50 Chl low Loss of Signal Restart14:29 Period Raising Detector Caused Additional Signal Noise Restart10/16/12 13:28 Loss of Power Building Loss Power Briefly Restart10/17/12 12:06 Channel I Low Loss of Signal Restart19:40 Period Bumping of the Console Restart10/18/12 14:27 Channel 3 High Range Change Error RestartChannel 3 Low Range Change Error Restart10/19/12 13:25 Channel 3 High Range Change Error Restart16:35 Bumped Console Bumped Chair into Console Restart10/23/12 9:53 Period Power Transient Restart12:14 Period Signal Irregularity Restart13:23 Channel 2 Low Suspected Signal Irregularity Restart15:37 Period Electrical Transient*
(Period within Range) Restart17:58 Period Electrical Transient*
(Period within Range) Restart10/24/12 15:44 Channel 3 High Range Change Error Restart10/29/12 19:50 Channel 3 High Range Change Error Restart20:34 Channel 3 High Range Change Error Restart20:36 Channel 3 High Range Change Error Restart10/30/12 9:28 Channel 1 Low Loss of Signal Restart10/31/12 9:43 Channel 3 High Range Change Error Restart11/1/12 13:27 Not Indicated Activating Channel I Solenoid Restart11/5/12 9:59 Channel I Low Suspected Electrical Transient*
Restart10:03 Period Suspected Electrical Transient*
Restart21:30 Channel 3 High Range Change Error Restart21:49 Channel I Low Suspected Electrical Transient*
Restart11/7/12 19:48 Channel I Low Loss of Signal Restart11/8/12 10:15 Channel 3 High Operator Error (Training)
Restart11:14 Channel 3 Low Suspected Electrical Transient*
Shutdown11/9/12 13:19 Channel I Low Under Estimation ofOscillator Reactivity Restart16:46 Channel I Low Suspected Electrical Transient*
Shutdown Idaho State University AGN-201M Reactor2011 Annual ReportPage 6 of 101 1/13/1212:58Loss of PowerLoss of Power to CircuitShutdown11/15/12 13:37 Period Raising Detector Caused Additional Signal Noise Restart11/21/12 14:28 Channel 3 High Signal Irregularity During Range Change Restart12/13/12 13:43 Channel 3 Low RangeChange Error Restart13:52 Period Inserted Poly Rod Too Quickly Restart14:12 Period Raising Detector Caused Additional Signal Noise Restart15:52 Channel 3 Low Signal Irregularity Restart16:00 Period Raising Detector Caused Additional Signal Noise Restart12/14/12 11:53 Channel 1 Low Operator Error Restart12/20/12 12:59 Period Raising Detector Caused Additional Signal Noise Restart12/21/12 12:43 Channel I Low Suspected Electrical Transient*
Restart13:01 Channel I Low Suspected Electrical Transient*
Restart15:00 Channel 3 High Range Change Error Restart12/27/12-14:06 Channel I Low Signal Irregularity During Range Change Restart12/28/12 16:15 Channel I Low Suspected Electrical Transient*
Restart12/31/12 10:47 Channel I Low Suspected Signal Irregularity Restart.11:06 Channel I High Non-Reproducible Rate Meter Issue Restart* Electrical transients are signal & power irregularities associated with using older vacuum robebased analogue circuitry.
: 4. Safety-Related Corrective Maintenance:
: 4. Safety-Related Corrective Maintenance:
1/31/2012:
1/31/2012: Channel 3 detector changed its response output and was replaced with a comparable BF3 tube. In addition the SHV connector was replaced with one designed for RG-59 cable and recalibrated.
Channel 3 detector changed its response output and was replaced with a comparable BF3 tube. In addition the SHV connector was replaced with one designed for RG-59cable and recalibrated.
3/6/2012: The down indicator switch on the FCR had been knocked out of place, causing the drive to continue to drive out despite being in the bottom position and the interlock OK light bulb failed. The switch was repositioned for proper operation and the light bulb replaced.
3/6/2012:
3/14/2013: A bad cable connection causing a short, preventing the magnet to energize, was located.
The down indicator switch on the FCR had been knocked out of place, causing the driveto continue to drive out despite being in the bottom position and the interlock OK lightbulb failed. The switch was repositioned for proper operation and the light bulbreplaced.
A bypass cable fixed the problem and the main cable connection fixed to return normal functionality.
3/14/2013:
3/21/2012: The Channel 3 detector lost signal, a connection problem was the likely cause. The detector chamber was removed and all connecting cables were replaced with new connections, returning functionality to the system.
A bad cable connection causing a short, preventing the magnet to energize, was located.A bypass cable fixed the problem and the main cable connection fixed to return normalfunctionality.
5/25/2012:The rod drop box was rebuilt with new wiring after a significant amount of troubleshooting.
3/21/2012:
5/30/2012: A power outage cause damage to Channel 2. Vacuum tubes V-12, V-14 & V-17. power line fuse, and the 1.5-volt battery were replaced.
The Channel 3 detector lost signal, a connection problem was the likely cause. Thedetector chamber was removed and all connecting cables were replaced with newconnections, returning functionality to the system.5/25/2012:The rod drop box was rebuilt with new wiring after a significant amount oftroubleshooting.
 
5/30/2012:
Idaho State University AGN-201M Reactor 2011 Annual Report Page 7 of 10 6/5/2012:   Magnet current was found to be high (0.9 mA) and after replacing the V-7 vacuum tube the current returned to a normal 0.6 mA.
A power outage cause damage to Channel 2. Vacuum tubes V-12, V-14 & V-17. powerline fuse, and the 1.5-volt battery were replaced.
8/30/2012: Channel I was having signal problems due to improper cabling and connectors. The system was rebuilt in a way so that the detector's position does not stress the signal cable and removes the need to raise the detector.
Idaho State University AGN-201M Reactor2011 Annual ReportPage 7 of 106/5/2012:
10/4/12:   The analogue position display primary gear broke so that the tens digit wouldn't turn.
Magnet current was found to be high (0.9 mA) and after replacing the V-7 vacuum tubethe current returned to a normal 0.6 mA.8/30/2012:
The unit was replaced with a comparable spare.
Channel I was having signal problems due to improper cabling and connectors.
12/3/12:   Channel 2 failed pre-start checks. The F-I (250V 3A) fuse, V-13 6Y6GA vacuum tube, V-12 6BW4 vacuum tube, and the V-I 6BW4 vacuum tube was replaced in Channel 2 to return functionality.
Thesystem was rebuilt in a way so that the detector's position does not stress the signalcable and removes the need to raise the detector.
12/12/12: During operation the Safety Rod I dropped out properly, however the chassis jammed in position. It was found that the twin drive screws were uneven; they were greased and reset into position. In addition there was a problem with the "up" microswitch; the microswitch and the wiring were replaced.
10/4/12:
The analogue position display primary gear broke so that the tens digit wouldn't turn.The unit was replaced with a comparable spare.12/3/12:
Channel 2 failed pre-start checks. The F-I (250V 3A) fuse, V-13 6Y6GA vacuum tube,V-12 6BW4 vacuum tube, and the V-I 6BW4 vacuum tube was replaced in Channel 2to return functionality.
12/12/12:
During operation the Safety Rod I dropped out properly, however the chassis jammed inposition.
It was found that the twin drive screws were uneven; they were greased andreset into position.
In addition there was a problem with the "up" microswitch; themicroswitch and the wiring were replaced.
: 5. Modifications.
: 5. Modifications.
A. Changes in Facility Design.None.B. Changes to Procedures.
A. Changes in Facility Design.
None.C. Experiments.
None.
Experimental procedure 12 Oscillator Experiment was revised to have descriptions for bothlinear and rotary oscillators and guidelines for operating them simultaneously.
B. Changes to Procedures.
None.
C. Experiments.
Experimental procedure 12 Oscillator Experiment was revised to have descriptions for both linear and rotary oscillators and guidelines for operating them simultaneously.
D. Reactor Safety Committee.
D. Reactor Safety Committee.
As of the end of the reporting period, membership of the Reactor Safety Committee (RSC)consisted of the following individuals:
As of the end of the reporting period, membership of the Reactor Safety Committee (RSC) consisted of the following individuals:
Frank Fl. Just -Chair (retired from INL)Jay F. Kunze -Reactor Administrator Adam L. Mallicoat  
Frank Fl. Just - Chair (retired from INL)
-Reactor Supervisor Richard R. Brey -Department ChairPeter Farina -Radiation Safety OfficerRobert Boston, PE, CHP (DOE-ID)Kermit Bunde (DOE-ID)
Jay F. Kunze - Reactor Administrator Adam L. Mallicoat - Reactor Supervisor Richard R. Brey - Department Chair Peter Farina - Radiation Safety Officer Robert Boston, PE, CHP (DOE-ID)
Idaho State University AGN-201M Reactor2011 Annual ReportPage 8 of 10Richard E. McCracken (retired from INL)6. Summary of Changes Reportable under 10 CFR 50.59.The paper chart recorder set up for the detector channels 2 & 3 were changed to utilize a digitalchart recorder.
Kermit Bunde (DOE-ID)
The new recorder is capable recording data and displaying the response overtime and cannot impact reactor operation as installed.
 
The data is stored on a removable flashdrive for easy analysis and storage.7. Radioactive Effluents.
Idaho State University AGN-201M Reactor 2011 Annual Report Page 8 of 10 Richard E. McCracken (retired from INL)
A. Liquid Waste -Total Activity Released:
: 6. Summary of Changes Reportable under 10 CFR 50.59.
None.B. Gaseous Waste -Total Estimated Activity Released:
The paper chart recorder set up for the detector channels 2 & 3 were changed to utilize a digital chart recorder. The new recorder is capable recording data and displaying the response over time and cannot impact reactor operation as installed. The data is stored on a removable flash drive for easy analysis and storage.
14.4 1.tCi of Ar-41.The AGN-201 Reactor was operated for 148 watt-hours at power levels up toapproximately 4.9 watts. At this power level Ar-41 production is negligible andsubstantially below the effluent concentration limit given in 10 CFR 20 Appendix B, Table2. The total activity of Ar-41 released to the environment was conservatively estimated at14.4 [tCi. This activity corresponds to the total activity of all gaseous radioactive effluentfrom the facility.
: 7. Radioactive Effluents.
A monthly summary of calculated gaseous releases is given in Table IV.Table IV. Summary of Monthly Gaseous Radioactive Effluent Releases(1 January 2012 through 31 December 2012)Ar-41Month (vCi)January 0.0February 1.0March 1.2April 1.7May 0.8June 0.8June 0.6August 1.4September 3.0October 1.5November 1.7December 0.6Total 14.4C. Solid Waste -Total Activity:
A. Liquid Waste - Total Activity Released: None.
None.
B. Gaseous Waste -Total Estimated Activity Released: 14.4 1.tCi of Ar-41.
Idaho State University AGN-201M Reactor2012 Annual ReportPage 9 of 108. The latest environmental radiation  
The AGN-201 Reactor was operated for 148 watt-hours at power levels up to approximately 4.9 watts. At this power level Ar-41 production is negligible and substantially below the effluent concentration limit given in 10 CFR 20 Appendix B, Table
: surveys, performed at the facility boundary while thereactor was operating at 60% of full licensed power (3.0 watt), measured a maximumcombined neutron and gamma dose equivalent rate of less than 2.0 mrem hr-' at the outsidewalls of the building proximal to the reactor.
: 2. The total activity of Ar-41 released to the environment was conservatively estimated at 14.4 [tCi. This activity corresponds to the total activity of all gaseous radioactive effluent from the facility. A monthly summary of calculated gaseous releases is given in Table IV.
The total equivalent dose rate at 100% power atthese locations was less than 4 mrrem hr1.9. Radiation Exposures.
Table IV. Summary of Monthly Gaseous Radioactive Effluent Releases (1 January 2012 through 31 December 2012)
The Radiation Safety Officer reviews personnel radiation exposures quarterly.
Ar-41 Month        (vCi)
Annualreports of ionizing radiation doses are provided by the Radiation Safety Officer to allmonitored personnel as required under the provisions of 10 CFR 19.Personnel with duties in the reactor laboratory on either a regular or occasional basis havebeen issued radiation dosimeters by the Idaho State University Technical Safety Office.The duty category and whole body exposure for the 2012 monitoring period of personnel are summarized in Table V:.Table V. Personnel Radiation Monitored for 1/1/2011-12/31/2011 Name Exposure by Type (mrem)Deep Lens ShallowAryal, Harishchandra 2 2 2Baker, Ben so 49 46Baral, Madhav 2 2 1Bishart, Bishara 1 1 1Bundy, Deric 3 4 10Burrows, Ian J 7 6 6Gorham, Mackenzie  
January         0.0 February        1.0 March          1.2 April        1.7 May          0.8 June          0.8 June          0.6 August          1.4 September        3.0 October          1.5 November          1.7 December          0.6 Total        14.4 C. Solid Waste - Total Activity: None.
<1 <1 <1Horkley, Matt 2 2 1Imel, George <1 <1 <1Jash, Soumadipta  
 
<1 <1 <1Kamerman, David <1 <1 <1Krieger, Michael 11 12 12Kunze, Jay <1 <1 <1Langbehn, Adam 7 6 6Loveland, Ryan 14 13 12Lum, Edward 1 1 1Mallicoat, Adam 2 2 1Misner, Jesse 3 3 2Nelson, Alan 2 2 2Nelson, Marcus <1 <1 <1Nimmagadda, Jyothier Kumar <1 <1 <1Riley, Tony 3 2 2Steele, Dallin <1 <1 <1 Idaho State University AGN-201M Reactor2012 Almual ReportPage 10 of 10Stewart, Trevor 3 3 2Tam, Austin 1 1 <1Tormohlen, Derick. <1 <1 <1Wachs, Katelyn 2 3 3Chaczko, Malwina <1 <1 <1Isaacs, Daniel <1 <1 <1McBeath, Scott <1 <1 <1Nelson, Katherine 3 2 2Hart, Paul <1 <1 4The 10 CFR 20.1201 occupational dose limits to adults are: total 5 rem, lens of eye 15 rem,shallow 50 rem, and deep 50 rem. The doses received for all reactor laboratory personnel during 2012 are well below the dose limits of 10 CFR 20.1201, and well below ISUALARA limits (I REM per year, 0.3 REM per quarter).
Idaho State University AGN-201M Reactor 2012 Annual Report Page 9 of 10
Anytime a member of the public visits the reactor pin dosimeters are issued for the extentof the tour. A minimum of I dosimeter to every 5 people is issued for a representative group dose. During the 2012 calendar year there were 476 recorded visitors to the facility.
: 8. The latest environmental radiation surveys, performed at the facility boundary while the reactor was operating at 60% of full licensed power (3.0 watt), measured a maximum combined neutron and gamma dose equivalent rate of less than 2.0 mrem hr-' at the outside walls of the building proximal to the reactor. The total equivalent dose rate at 100% power at these locations was less than 4 mrrem hr 1 .
A summary of the public dose exposure is presented in Table VI.Table VI. Summary Whole-Body Exposures to the Public(1 January 2012 through 31 December 2012)Estimated whole-body exposure range (mrem):Number of individuals in each range:No Observable Dose 4331.0 mrem* 30Greater than 1.0 but below 5.0 mrem 12Greater than 5.0 but below 10.0 mrem 1Total number of individuals reported476*Below 1.0 mrem is considered un-measureable None of the 476 visitors to the facility during 2012 received a measurable dose that wouldexceed the annual 0.5 rem dose limit of 10 CFR 20.1301.
: 9. Radiation Exposures.
Note there was only one readingthat was above 5 n-rem, this is likely due to the shock of dropping the dosimeter.
The Radiation Safety Officer reviews personnel radiation exposures quarterly. Annual reports of ionizing radiation doses are provided by the Radiation Safety Officer to all monitored personnel as required under the provisions of 10 CFR 19.
Therefore, the average and maximum doses received by personnel and the public are wellwithin NRC guidelines.
Personnel with duties in the reactor laboratory on either a regular or occasional basis have been issued radiation dosimeters by the Idaho State University Technical Safety Office.
Report prepared by: Adam nIMallicoat, Reactor Manager/Supervisor August 30th, 2012}}
The duty category and whole body exposure for the 2012 monitoring period of personnel are summarized in Table V:
                . Table V. Personnel Radiation Monitored for 1/1/2011-12/31/2011 Name                                   Exposure by Type (mrem)
Deep       Lens   Shallow Aryal, Harishchandra                   2          2           2 Baker, Ben                           so         49         46 Baral, Madhav                         2         2           1 Bishart, Bishara                       1         1           1 Bundy, Deric                           3         4           10 Burrows, Ian J                         7         6           6 Gorham, Mackenzie                     <1         <1           <1 Horkley, Matt                         2         2           1 Imel, George                         <1         <1           <1 Jash, Soumadipta                     <1         <1           <1 Kamerman, David                       <1         <1           <1 Krieger, Michael                     11         12           12 Kunze, Jay                           <1         <1           <1 Langbehn, Adam                         7         6            6 Loveland, Ryan                       14         13           12 Lum, Edward                           1         1           1 Mallicoat, Adam                       2         2           1 Misner, Jesse                         3         3           2 Nelson, Alan                           2          2           2 Nelson, Marcus                       <1         <1           <1 Nimmagadda, Jyothier Kumar           <1         <1           <1 Riley, Tony                           3         2            2 Steele, Dallin                       <1         <1           <1
 
Idaho State University AGN-201M Reactor 2012 Almual Report Page 10 of 10 Stewart, Trevor                           3       3           2 Tam, Austin                               1       1           <1 Tormohlen, Derick.                       <1       <1           <1 Wachs, Katelyn                           2       3            3 Chaczko, Malwina                         <1       <1           <1 Isaacs, Daniel                           <1       <1           <1 McBeath, Scott                           <1       <1           <1 Nelson, Katherine                         3       2           2 Hart, Paul                               <1       <1           4 The 10 CFR 20.1201 occupational dose limits to adults are: total 5 rem, lens of eye 15 rem, shallow 50 rem, and deep 50 rem. The doses received for all reactor laboratory personnel during 2012 are well below the dose limits of 10 CFR 20.1201, and well below ISU ALARA limits (I REM per year, 0.3 REM per quarter).
Anytime a member of the public visits the reactor pin dosimeters are issued for the extent of the tour. A minimum of I dosimeter to every 5 people is issued for a representative group dose. During the 2012 calendar year there were 476 recorded visitors to the facility.
A summary of the public dose exposure is presented in Table VI.
Table VI. Summary Whole-Body Exposures to the Public (1 January 2012 through 31 December 2012)
Estimated whole-body                                         Number of individuals exposure range (mrem):                                         in each range:
No Observable Dose                                                   433 1.0 mrem*                                                             30 Greater than 1.0 but below 5.0 mrem                                   12 Greater than 5.0 but below 10.0 mrem                                   1 Total number of individuals reported                                  476
      *Below 1.0 mrem is considered un-measureable None of the 476 visitors to the facility during 2012 received a measurable dose that would exceed the annual 0.5 rem dose limit of 10 CFR 20.1301. Note there was only one reading that was above 5 n-rem, this is likely due to the shock of dropping the dosimeter.
Therefore, the average and maximum doses received by personnel and the public are well within NRC guidelines.
Report prepared by:   AdamnIMallicoat, Reactor Manager/Supervisor August 30th, 2012}}

Latest revision as of 13:10, 4 November 2019

Transmittal of Annual Report and Minor Amendment (#8) to the Technical Specifications for NRC Reactor License R-110
ML13268A448
Person / Time
Site: Idaho State University
Issue date: 09/19/2013
From: Grimes H
Idaho State University
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML13268A448 (23)


Text

Idaho UNIVERSITY State Office for Research and Economic Development 921 South 8th Avenue, Stop 8130 0 Pocatello, Idaho 83209-8130 September 19, 2013 NRC Document Control Desk U.S. Nuclear Regulatory Commission One White Flint North, MS OWEN-1 E13 11555 Rockville Pike Rockville, MD 20852-2738

SUBJECT:

Transmittal of Annual Report and Minor Amendment (#8) to the Technical Specifications for NRC Reactor License R-110 The two copies of each enclosure are:

1. The Annual Report for calendar year 2012 for the AGN-201 Reactor, NRC License R- 110.

Docket #50-284.

2. Amendment #8 for the Technical Specifications for the same reactor. This amendment is a minor change to the organization chart for the university. The name of the college where the reactor is located and administered has been changed from "College of Engineering" to "College of Science and Engineering". Also, the reporting line for the Reactor Safety Committee is now shown specifically as being to the Reactor Administrator.

Please transmit one copy of each of these documents to the license program manager.

Mr, Duane A. Hardesty Research and Test Reactors Mail Stop: 0-12 D03 Phone: (301)415-3724 Sincerely, Howard Grimes Vice President for Research and Economic Development Encl: (4) ec: Dr. Jay Kunze, Reactor Administrator Phone: (208) 282-3134

  • Fax: (208) 282-4487 0 www.isu.edu/research ISU is an Equal Opportunity Employer

University Officer and Dean of the College of Science and Engineering may be the same individual (2)The Reactor Administrator could be the Dean of Science and Engineering, or the Chair or a faculty member of the Department of Nuclear Engineering and Health Physics. However, regarding NRC licenses, the Reactor Administrator reports to the Dean of the College of Science and Engineering and not necessarily through the Department of Nuclear Engineering and Health Physics, which is a department in the College of Science and Engineering.

(3) The Reactor Supervisor reports td the Reactor Administrator, and may not necessarily report through the Chair of the Nuclear Engineering and Health Phys8ics Department.

(4) Requires a NRC Senior Reactor Operators (SRO) License

  • Requires a NRC Reactor Operators License (or an SRO license), except per 10 CFR 55.13 Figure 1. Administrative Organization of the ISU AGN-201 Reactor Facility, NRC License R- I10, chain of corrnmand in regard to nuclear operation and safety. Dotted lines represent communication channels.

Persons holding positions on the Administrative organization shall meet or exceed the qualification requirements of ANSI/ANS-15.4-1988, "Selection and Training of Personnel for Research Reactors."

6.1.5 Reactor Operators Reactor Operators shall be responsible for the manipulation of the reactor controls, monitoring of instrumentation, operation of the reactor-related equipment, and maintenance of the complete and current records during operation of the facility. Reactor Operators shall hold a valid Reactor Operator's license issued by the U.S. Nuclear Regulatory Commission.

AGN-20 I - Technical Specifications, Amendment 48 Transmitted to NRC September 20, 2013: Page 21 of 31

Idaho State University AGN-201M Reactor Facility License R-1 10, Docket No. 50-284 Annual Operating Report for 2012 Calendar Year

1. Narrative Summary A. Changes in Facility Design, Performance Characteristics, and Operating Procedures:

There were no changes in facility design, performance characteristics, and operating procedures relating to reactor safety or operations during the reporting period.

B. Results of Major Surveillance Tests and Inspections:

(1) Channel tests perfon'ned on all safety channels and scram interlocks were found to be satisfactory and within specifications. Channels 1, 2, & 3 were tested 8/10/2012, 5/2/2012, & 8/20/2012 respectively.

(2) Power level (4/2/2012) and period check (3/22/2012) experiments were performed with satisfactory results.

(3) The shield water tank was inspected (6/11/2012) and no leaks or excessive corrosion were observed. The water level interlock tested satisfactorily (6/11/2012).

(4) The seismic displacement & temperature interlocks were tested and found satisfactory (7/26/2012).

(5) (a) Control element capsules (cladding) were inspected (6/28/12) and found to be in good condition with no evidence of deterioration since the previous inspection.

(b) The control rod drive mechanisms were inspected (6/28/12) and tested with satisfactory results.

(c) Ejection times were measured for all SCRAM-able rods and found to be less than I seconds (d) The reactivity worth of all safety and control rods were measured, as well as the time required to drive each rod to its fully inserted position. Reactivity insertion rates were determined to be less than 0.042%A1kk s-' ($0.058 s-') for all rods.

(e) The shutdown margin was determined to be greater than 2.2%Ak/k ($3.0) with both the most reactive SCRAM-able rod and the fine control rod fully inserted.

8/15/12.

(f) All surveillances were within the appropriate Technical Specification requirements.

Idaho State University AGN-201M Reactor 2011 Annual Report Page 2 of 10

? Operating History and Energy Output.

The reactor was operated at power levels up to 4.9 watts for a total of 148 watt-hours of thermal energy during this reporting period. A summary of monthly operations for 2012 is given in Table I.

Table 1. Summary of Monthly Reactor Operations (1 January 2012 through 31 December 2012)

Month Energy (W-hr)

January 0.0 February 9.9 March 11.9 April 17.9 May 8.6 June 8.3 June 6,2 August 14.6 September 31.3 October 15.8 November 17.1 December 6.5 Total 148.0 The 0.148 kWh consumed 7.5 micrograms of U-235. During the calendar year, a number of students went through reactor operator training. During the calendar year, four students took NRC licensing exams. Two were awarded Reactor-Operator (RO) licenses and one was awarded a Senior Reactor-Operator (SRO) license. Two operator-licenses were terminated during the year because students left the university.

3. A. Unscheduled Shutdowns and Corrective Actions Taken.

None.

B. Inadvertent Scrams and Action Taken.

There were 159 inadvertent scrams during this reporting period. Table I1 summarizes the inadvertent scrams, known or suspected cause, and action taken.

Idaho State University AGN-201 M Reactor 2011 Annual Report Page 3 of 10 Table II. Summary of Inadvertent Scrarns (1 January 2012 through 31 December 2012)

Date 2/1/12 FTime 15:43 Scram Type Channel I Low Operator Error Cause Action Restart 16:21 Channel I Low Operator Error Shutdown 2/2/12 14:13 Channel 1 High Range Change Error Restart 14:43 Not Indicated Suspected Electrical Transient* Shutdown 2/8/12 16:09 Channel 3 High Range Change Error Restart 16:19 Channel I High Range Change Error Restart 16:22 Period Operator Error Restart 2/9/12 13:51 Channel 3 High Signal Irregularity Restart 14:17 Period Operator Error Restart 15:03 Period Insertion of Source Restart 15:13 Channel I High Range Change Error Restart 2/13/12 23:36 Channel I Low Low Power Operation Restart 0:02 Channel 1 High Low Powver Operation Restart 2/16/12 13:35 Channel I Low Loss of Signal Restart 14:07 Channel I Low Loss of Signal Restart Magnet Over-2/22/12 13:50 Current Magnet Current SCRAM Set Too Low Restart 2/27/12 17:14 Channel 3 High Range Change Error Restart 18:04 Not Indicated Suspected Electrical Transient* Shutdown 3/21/12 15:56 Channel I Low Loss of Signal Shutdown 4/2/12 16:52 Channel I Low Loss of Signal Restart 4/4/12 11:11 Channel I Low Loss of Signal Restart Magnet Over-4/9/12 16:38 Current Magnet Current SCRAM Set Too Low Restart 5/9/12 16:48 Channel 3 High Signal Irregularity Restart 17:06 Channel 3 High Signal Irregularity Restart 5/15/12 16:40 Channel 3 High Signal Irregularity & Range Change Error Restart 19:43 Channel 3 High Over Estimation of Oscillator Reactivity Restart 5/18/12 11:37 Channel 3 High Range Change Error Restart 14:36 Not Indicated Range Change Error Restart Magnet Over-5/23/12 16:47 Current Suspected Electrical Transient* Restart Magnet Over- Suspected Signal Interference & Detector is 17:18 Current Insulated Restart Magnet Over-5/24/12 11:14 Current Suspected Electrical Transient* Shutdown 6/5/12 16:27 Period Chanel #1 Raise Interference Restart 6/6/12 16:37 Channel I High Range Change Error Restart

Idaho State University AGN-201M Reactor 2011 Annual Report Page 4 of 10 T T r 7/13/12 15:42 Channel 3 High Operator Error (Training) Restart 15:50 Channel 3 High Operator En-or (Training) Restart 16:10 Channel 3 Low Signal u Teegularity Restart 8/7/12. 16:47 Channel 3 Low Suspected Electrical Transient* Restart 8/8/12 16:18 Channel 1 Low Removing the Start Up Source Restart 16:30 Channel I Low Signal Irregularity Restart 8/10/12 13:10 Channel I Low Suspected Signal Irregularity Restart Investigate 13:29 Channel I Low Detector Stuck When Raise Pressed & Restart 14:28 Channel I Low Suspected Signal Irregularity Restart 8/30/12 13:34 Channel I Supervisor Re-Set Time Constant During Operation Shutdown 8/31/12 10:39 Channel I Low Signal Irregularity Shutdown 14:59 Channel 3 High Range Change Error Restart 15:08 Channel I High Suspected Signal Irregularity Shutdown 9/5/12 20:24 Channel 3 High Range Change Error Restart 21:33 Channel 3 High Range Change Error Restart 9/6/12 11:26 Channel I Low Range Change Error Restart 11:35 Channel I Low Range Change Error Restart 9/6/12 17:35 Channel 3 High Occurred During Range Change Restart 17:41 Raise Button Raising Detector Caused Additional Signal Noise Restart 9/7/12 12:38 Channel 1 Low Suspected Signal Irregularity Restart 12:58 Channel I Low Suspected Signal Irregularity Restart 9/12/12 14:52 Channel 3 High Operator Error (Training) Restart 9/13/12 9:11 Channel 3 High Operator Error Restart 9:33 Channel 3 High Erratic Response Changing to 3x10^(-9) Range Restart 10:10 Channel 3 High Erratic Signal Restart 10:23 Channel 3 High Operator Error Restart 14:00 Not Indicated Occurred During Raising Ch #I Restart 14:38 Channel 3 High Signal Irregularity During Range Change Restart 9/14/12 12:59 Not Indicated Occurred During Raising Ch #1 Restart 14:07 Channel I Low Suspected Signal Irregularity Shutdown 9/15/12 11:28 Channel 3 High Range Change ErTor Restart 15:07 Channel 3 High Signal Irregularity During Range Change Restart 9/18/12 9:58 Channel 3 Low Accidently Hitting the Console Restart 9/19/12 19:40 Channel 3 High Range Change Error Restart 19:55 Channel I High Range Change Error Restart Adjust Cable 9/24/12 14:37 Period scram Raising Detector Caused Additional Signal Noise & Restart 20:01 Channel I Low Operator Error Restart Investigate 9/25/12 12:59 Channel 1 Low Suspected Electrical Transient* & Restart

Idaho State University AGN-201M Reactor 201 1 Annual Report Page 5 of 10 14:09 Channel I Low Suspected Electrical Transient* Restart 9/27/12 11:42 Channel I Low Raising Detector Caused Additional Signal Noise Restart 14:39 Raise Button Raising Detector Caused Additional Signal Noise Restart 101112 20:29 Channel 3 High Signal Detegularity During Range Change Restart 10/5/12 10:34 Channel 3 High Range Change Error Restart 10/9/12 16:32 Channel 1 Low Suspected Signal Irregularity Restart 10/10/12 13:08 Channel 3 High Noise in Range 3x10A(-8) & 10x10A(-9) Restart 18:06 Channel 3 High Signal Inregularity Restart 10/11/12 10:41 Channel 1 High Range Change Error Restart 10:48 Period Removing the Start Up Source Restart 12:38 Channel I High Range Change Error Restart 13:50 ChI low Loss of Signal Restart 14:29 Period Raising Detector Caused Additional Signal Noise Restart 10/16/12 13:28 Loss of Power Building Loss Power Briefly Restart 10/17/12 12:06 Channel I Low Loss of Signal Restart 19:40 Period Bumping of the Console Restart 10/18/12 14:27 Channel 3 High Range Change Error Restart Channel 3 Low Range Change Error Restart 10/19/12 13:25 Channel 3 High Range Change Error Restart 16:35 Bumped Console Bumped Chair into Console Restart 10/23/12 9:53 Period Power Transient Restart 12:14 Period Signal Irregularity Restart 13:23 Channel 2 Low Suspected Signal Irregularity Restart 15:37 Period Electrical Transient* (Period within Range) Restart 17:58 Period Electrical Transient* (Period within Range) Restart 10/24/12 15:44 Channel 3 High Range Change Error Restart 10/29/12 19:50 Channel 3 High Range Change Error Restart 20:34 Channel 3 High Range Change Error Restart 20:36 Channel 3 High Range Change Error Restart 10/30/12 9:28 Channel I Low Loss of Signal Restart 10/31/12 9:43 Channel 3 High Range Change Error Restart 11/1/12 13:27 Not Indicated Activating Channel I Solenoid Restart 11/5/12 9:59 Channel I Low Suspected Electrical Transient* Restart 10:03 Period Suspected Electrical Transient* Restart 2.1:30 Channel 3 High Range Change Error Restart 21:49 Channel I Low Suspected Electrical Transient* Restart 11/7/12 19:48 Channel I Low Loss of Siunal Restart 11/8/12 10:15 Channel 3 High Operator Error (Training) Restart 11:14 Channel 3 Low Suspected Electrical Transient* Shutdown 11/9/12 13:19 Channel 1 Low Under Estimation of Oscillator Reactivity Restart 16:46 Channel I Low Suspected Electrical Transient* Shutdown

Idaho State University AGN-201 M Reactor 2011 Annual Report Page 6 of 10 11/13/12 12:58 1 Loss of Power Loss of Power to Circuit IShutdown 11/15/12 13:37 Period Raising Detector Caused Additional Signal Noise Restart 11/21/12 14:28 Channel 3. High Signal Irregularity During Range Change Restart 12/13/12 13:43 Channel 3 Low Range Change Error Restart 13:52 Period Inserted Poly Rod Too Quickly Restart 14:12 Period Raising Detector Caused Additional Signal Noise Restart 15:52 Channel 3 Low Signal Irregularity Restart 16:00 Period Raising Detector Caused Additional Signal Noise Restart 12/14/12 11:53 Channel 1 Low Operator Error Restart 12/20/12 12:59 Period Raising Detector Caused Additional Signal Noise Restart 12/21/12 12:43 Channel I Low Suspected Electrical Transient* Restart 13:01 Channel I Low Suspected Electrical Transient* Restart 15:00 Channel 3 High Range Change Error Restart 12/27/12 14:06 Channel 1 Low Signal Irregularity During Range Change Restart 12/2S/12 16:15 Channel I Low Suspected Electrical Transient* Restart 12/31/12 10:47 Channel 1 Low Suspected Signal Irregularity Restart 11:06 Channel 1 High Non-Reproducible Rate Meter Issue Restart

  • Electrical transients are signal & power irregularities associated with using older vacuum tube based analogue circuitry.
4. Safety-Related Corrective Maintenance:

1/31/2012: Channel 3 detector changed its response output and was replaced with a comparable BF3 tube. In addition the SHV connector was replaced with one designed for RG-59 cable and recalibrated.

3/6/2012: The down indicator switch on the FCR had been knocked out of place, causing the drive to continue to drive out despite being in the bottom position and the interlock OK light bulb failed. The switch was repositioned for proper operation and the light bulb replaced.

3/14/2013: A bad cable connection causing a short, preventing the magnet to energize, was located.

A bypass cable fixed the problem and the main cable connection fixed to return normal functionality.

3/21/2012: The Channel 3 detector lost signal, a connection problem was the likely cause. The detector chamber was removed and all connecting cables were replaced with new connections, returning functionality to the system.

5/25/2012:The rod drop box was rebuilt with new wiring after a significant amount of troubleshooting.

5/30/2012: A power outage cause damage to Channel 2. Vacuum tubes V-12, V-14 & V-17, power line fuse, and the 1.5-volt battery were replaced.

Idaho State University AGN-201M Reactor 2011 Annual Report Page 7 of 10 6/5/2012: Magnet current was found to be high (0.9 mA) and after replacing the V-7 vacuum tube the current returned to a normal 0.6 mA.

8/30/2012: Channel I was having signal problems due to improper cabling and connectors. The system was rebuilt in a way so that the detector's position does not stress the signal cable and removes the need to raise the detector.

10/4/12: The analogue position display primary gear broke so that the tens digit wouldn't turn.

The unit was replaced with a comparable spare.

12/3/12: Channel 2 failed pre-start checks. The F-I (250V 3A) fuse, V-13 6Y6GA vacuum tube, V-12 6BW4 vacuum tube, and the V-I 6BW4 vacuum tube was replaced in Channel 2 to return functionality.

12/12/12: During operation the Safety Rod I dropped out properly, however the chassis jammed in position. It was found that the twin drive screws were uneven; they were greased and reset into position. In addition there was a problem with the "Lp" microswitch; the microswitch and the wiring were replaced.

5. Modifications.

A. Changes in Facility Design.

None.

B. Changes to Procedures.

None.

C. Experiments.

Experimental procedure 12 Oscillator Experiment was revised to have descriptions for both linear and rotary oscillators and guidelines for operating them simultaneously.

D. Reactor Safety Committee.

As of the end of the reporting period, membership of the Reactor Safety Committee (RSC) consisted of the following individuals:

Frank H. Just - Chair (retired fromn FIN.)

Jay F. Kunze - Reactor Administrator Adam L. Mallicoat - Reactor Supervisor Richard R. Brey - Department Chair Peter Farina - Radiation Safety Officer Robert Boston. PE, CHP (DOE-ID)

Kermit Bunde (DOE-ID)

Idaho State University AGN-201M Reactor 2011 Annual Report Page 8 of 10 Richard E. McCracken (retired from INL)

6. Summary of Changes Reportable under 10 CFR 50.59.

The paper chart recorder set up for the detector channels 2 & 3 were changed to utilize a digital chart recorder. The new recorder is capable recording data and displaying the response over time and cannot impact reactor operation as installed. The data is stored on a removable flash drive for easy analysis and storage.

7. Radioactive Effluents.

A. Liquid Waste - Total Activity Released: None.

B. Gaseous Waste - Total Estimated Activity Released: 14.4 ýtCi ofAr-41.

The AGN-201 Reactor was operated for 148 watt-hours at power levels up to approximately 4.9 watts. At this power level Ar-41 production is negligible and substantially below the effluent concentration limit given in 10 CFR 20 Appendix B, Table

2. The total activity of Ar-41 released to the environment was conservatively estimated at 14.4 i.Ci. This activity corresponds to the total activity of all gaseous radioactive effluent from the facility. A monthly summary of calculated gaseous releases is given in Table IV.

Table IV. Summary of Monthly Gaseous Radioactive Effluent Releases (1 January 2012 through 31 December 2012)

Ar-41 Month (VCi)

January 0.0 February 1.0 March 1.2 April 1.7 May 0.8 June 0.8 June 0.6 August 1.4 September 3.0 October 1.5 November 1.7 December 0.6 Total 14.4 C. Solid Waste - Total Activity: None.

Idaho State University AGN-201M Reactor 2012 Amiual Report Page 9 of 10 8, The latest environmental radiation surveys, performed at the facility boundary while the reactor was operating at 60% of full licensed power (3.0 watt), measured a maximum combined neutron and gamma dose equivalent rate of less than 2.0 mrem hr' at the outside walls of the building proximal to the reactor. The total equivalent dose rate at 100% power at these locations was less than 4 mrem hr".

9, Radiation Exposures.

The Radiation Safety Officer reviews personnel radiation exposures quarterly. Annual reports of ionizing radiation doses are provided by the Radiation Safety Officer to all monitored personnel as required under the provisions of 10 CFR 19.

Personnel with duties in the reactor laboratory on either a regular or occasional basis have been issued radiation dosimeters by the Idaho State University Technical Safety Office.

The duty category and whole body exposure for the 2012 monitoring period of personnel are summarized in Table V:

Table V. Personnel Radiation Monitored for 1/1/2011-12/31/2011 Name Exposure by Type (mrem)

Deep Lens Shallow Aryal, Harishchandra 2 2 2 Baker, Ben 50 49 46 Baral, Madhav 2 2 1 Bishart, Bishara 1 1 1 Bundy, Deric 3 4 10 Burrows, Ian J 7 6 6 Gorham, Mackenzie <1 <1 <1 Horkley, Matt 2 2 1 Imel, George <1 <1 <1 Jash, Soumadipta <1 <1 <1 Kamerman, David <1 <1 <1 Krieger, Michael 11 12 12 Kunze, Jay <1 <1 <1 Langbehn, Adam 7 6 6 Loveland, Ryan 14 13 12 Lum, Edward 1 1 1 Mallicoat, Adam 2 2 1 Misner, Jesse 3 3 2 Nelson, Alan 2 2 2 Nelson, Marcus <1 <1 <1 Nimmagadda, Jyothier Klumar <1 <1 <1 Riley, Tony 3 2 2 Steele, Dallin <1 <1 <1

Idaho State University AGN-201M Reactor 2012 Annual Report Page 10ofl0 Stewart, Trevor 3 3 2 Tam, Austin 1 1 <1 Tormohlen, Derick <1 <1. <1 Wachs, Katelyn 2 3 3 Chaczko, Malwina <1 <1 <1 isaacs, Daniel <1 <1 <1 McBeath, Scott <1 <1 <1 Nelson, Katherine 3 2 2 Hart, Paul <1 <1 4 The 10 CFR 20.1201 occupational dose limits to adults are: total 5 rem, lens of eye 15 reni, shallow 50 rem, and deep 50 remn. The doses received for all reactor laboratory personnel during 2012 are well below the dose limits of 10 CFR 20.1201, and well below ISU ALARA limits (1 REM per year, 0.3 REM per quarter).

Anytime a member of the public visits the reactor pin dosimeters are issued for the extent of the tour. A minimum of I dosimeter to every 5 people is issued for a representative group dose. During the 2012 calendar year there were 476 recorded visitors to the facility.

A summary of the public dose exposure is presented in Table VI.

Table VI. Summary Whole-Body Exposures to the Public (I January 2012 through 31 December 2012)

Estimated whole-body Number of individuals exposure range (mrem): in each range:

No Observable Dose 433 1.0 mrem* 30 Greater than 1.0 but below 5.0 mrem 12 Greater than 5.0 but below 10.0 mrem 1 Total number of individuals reported 476

  • Below 1.0 mrem is considered un-measureable None of the 476 visitors to the facility during 2012 received a measurable dose that would exceed the annual 0.5 remn dose limit of 10 CFR 20.1301. Note there was only one reading that was above 5 mrem, this is likely due to the shock of dropping the dosimeter.

Therefore, the average and maximum doses received by personnel and the public are well within NRC guidelines.

Report prepared by: Adam Mallicoat, Reactor Manager-/Supervisor Augutst 30th, 2012

Dean, College of Science and Engineeringo",2

. University Officer and Dean of the College of Science and Engineering may be the same individual (21The Reactor Administrator could be the Dean of Science and Engineering, or the Chair or a faculty member of the Department of Nuclear Engineering and Health Physics. However.

regarding NRC licenses, the Reactor Administrator reports to the Dean of the College of Science and Engineering and not necessarily through the Department of Nuclear Engineering and Health Physics, which is a department in the College of Science and Engineering.

  • The Reactor Supervisor reports to the Reactor Administrator, and may not necessarily report through the Chair of the Nuclear Engineering and Health PhysSics Department.

" Requires a NRC Senior Reactor Operators (SRO) License

'*t Requires a NRC Reactor Operators License (or an SRO license), except per 10 CFR 55.13 Figure 1. Administrative Organization of the ISU AGN-201 Reactor Facility, NRC License R- I10, chain of command in regard to nuclear operation and safety. Dotted lines represent communication channels.

Persons holding positions on the Administrative organization shall meet or- exceed the qualification requirements of ANSI/ANS- 15.4-1988, "Selection and Training of Personnel for Research Reactors."

6.1.5 Reactor Operators Reactor Operators shall be responsible for the manipulation of the reactor controls, monitoring of instrumentation, operation of the reactor-related equipment, and maintenance of the complete and current records during operation of the facility. Reactor Operators shall hold a valid Reactor Operator's license issuIed by the U.S. Nuclear Regulatory Commission.

AGN-20 I - Technical Specifications, Amendment #8 Transmitted to NRC September 20, 2013: Page 21 of 31

Idaho State University AGN-201M Reactor Facility License R-110, Docket No. 50-284 Annual Operating Report for 2012 Calendar Year

1. Nan-ative Summary A. Changes in Facility Design, Performance Characteristics, and Operating Procedures:

There were no changes in facility design, performance characteristics, and operating procedures relating to reactor safety or operations during the reporting period.

B. Results of Major Surveillance Tests and Inspections:

(1) Channel tests performed on all safety channels and scram interlocks were found to be satisfactory and within specifications. Channels 1, 2, & 3 were tested 8/10/2012, 5/2/2012, & 8/20/2012 respectively.

(2) Power level (4/2/2012) and period check (3/22/2012) experiments were performed with satisfactory results.

(3) The shield water tank was inspected (6/11/2012) and no leaks or excessive corrosion were observed. The water level interlock tested satisfactorily (6/11/2012).

(4) The seismic displacement & temperature interlocks were tested and found satisfactory (7/26/2012).

(5) (a) Control element capsules (cladding) were inspected (6/28/12) and found to be in good condition with no evidence of deterioration since the previous inspection.

(b) The control rod drive mechanisms were inspected (6/28/12) and tested with satisfactory results.

(c) Ejection times were measured for all SCRAM-able rods and found to be less than I seconds (d) The reactivity worth of all safety and control rods were measured, as well as the time required to drive each rod to its fully inserted position. Reactivity insertion rates were determined to be less than 0.042%Ak/k s-' ($0.058 s ') for all rods.

(e) The shutdown margin was determined to be greater than 2.2%Ak/k ($3.0) with both the most reactive SCRAM-able rod and the fine control rod fully inserted.

8/15/12.

(f) All surveillances were within the appropriate Technical Specification requirements.

Idaho State University AGN-201M Reactor 2011 Annual Report Page 2 of 10 Operating History and Energy Output.

The reactor was operated.at power levels up to 4.9 watts for a total of 148 watt-hours of thermal energy during this reporting period. A summary of monthly operations for 2012 is given in Table I.

Table I. Summary of Monthly Reactor Operations (1 January 2012 through 31 December 2012)

Month Energy (W-hr)

January 0.0 February 9.9 March 11.9 April 17.9 May 8.6 June 8.3 June 6.2 August 14.6 September 31.3 October 15.8 November 17.1 December 6.5 Total 148.0 The 0.148 kWh consumed 7.5 micrograms of U-235. During the calendar year, a number of students went through reactor operator training. During the calendar year, four students took NRC licensing exams. Two were awarded Reactor-Operator (RO) licenses and one was awarded a Senior Reactor-Operator (SRO) license. Two operator-licenses were terminated during the year because students left the university.

3. A. Unscheduled Shutdowns and Con-ective Actions Taken.

None.

B. Inadvertent Scrams and Action Taken.

There were 159 inadvertent scrams during this reporting period. Table II summarizes the inadvertent scramns, known or suspected cause, and action taken.

Idaho State University AGN-201M Reactor 2011 Annual Report Page 3 of 10 Table 11. Summary of Inadvertent Scrams (1 January 2012 through 31 December 20. 2)

Date Time [ Scram Type Cause Action 2/1/12 15:43 Channel i Low Operator Error Restart 16:21 Channel I Low Operator Error Shutdown 2/2/12 14:13 Channel 1 High Range Change Error Restart 14:43 Not Indicated Suspected Electrical Transient* Shutdown 2/8/12 16:09 Channel 3 High Range Change Error Restart 16:19 Channel 1 High Range Change Error Restart 16:22 Period Operator Error Restart 2/9/12 13:51 Channel 3 High Signal Irregularity Restart 14:17 Period Operator Error Restart 15:03 Period Insertion of Source Restart 15:13 Channel 1 High Range Change Error Restart 2/13/12 23:36 Channel I Low Low Power Operation Restart 0:02 Channel I High Low Power Operation Restart 2/16/12 13:35 Channel 1 Low Loss of Signal Restart 14:07 Channel 1 Low Loss of Signal Restart Magnet Over-2/22/12 13:50 CmTent Magnet Current SCRAM Set Too Low Restart 2/27/12 17:14 Channel 3 High Range Change Enror Restart 18:04 Not Indicated Suspected Electrical Transient* Shutdown 3/21/12 15:56 Channel I Low Loss of Signal Shutdown 4/2/12 16:52 Channel I Low Loss of Signal Restart 4/4/12 11:11 Channel 1 Low Loss of Signal Restart Magnet Over-4/9/12 16:38 Current Magnet Current SCRAM Set Too Low Restart 5/9/12 16:48 Channel 3 High Signal Irregularity Restart 17:06 Channel 3 High Signal Irregularity Restart 5/15/12 16:40 Channel 3 High Signal Irregularity & Range Change Enror Restart 19:43 Channel 3 High Over Estimation of Oscillator Reactivity Restart 5/18/12 11:37 Channel 3 High Range Change Error Restart 14:36 Not Indicated Range Change Enror Restart Magnet Over-5/23/12 16:47 Current Suspected Electrical Transient* Restart Magnet Over- Suspected Signal Interference & Detector is 17:18 Current Insulated Restart Magnet Over-5/24/12 11:14 Current Suspected Electrical Transient* Shutdown 6/5/12 16:27 Period Chanel #1 Raise Interference Restart 6/6/12 16:37 Channel I High Range Change Error Restart

Idaho State University AGN-201 M Reactor 201 1 Annual Report Page 4 of 10 7/13/12 15:42 Channel 3 Hi-gh Operator Error (Training) Restart 15:50 Channel 3 High Operator Error (Training) Restart 16:10 Channel 3 Low Signal Irregularity Restart 8/7/12 16:47 Channel I Low *SuspectedElectrical Transient* Restart 8/8/12 16:18 Channel I Low Removing the Start Up Source Restart 16:30 Channel I Low Signal Irregularity Restart 8/10/12 13:10 Channel I Low Suspected Signal Irregularity Restart Investigate 13:29 Channel I Low Detector Stuck When Raise Pressed & Restart 14:28 Channel I Low Suspected Signal Irregularity Restart 8/30/12 13:34 Channel I Supervisor Re-Set Time Constant During Operation Shutdown 8/31/12 10:39 Channel I Low Signal Irregularity Shutdown 14:59 Channel 3 High Range Change Error Restart 15:08 Channel I High Suspected Signal Irregularity Shutdown 9/5/12 20:24 Channel 3 High Range Change Error Restart 21:33 Channel 3 High Range Change Error Restart 9/6/12 11:26 Channel I Low Range Change Error Restart 11:35 Channel I Low Range Change Error Restart 9/6/12 17:35 Channel 3 High Occurred During Range Change Restart 17:41 Raise Button Raising Detector Caused Additional Signal Noise Restart 9/7/12 12:38 Channel I Low Suspected Signal Irregularity Restart 12:58 Channel I Low Suspected Signal Irregularity Restart 9/12/12 14:52 Channel 3 High Operator Error (Training) Restart 9/13/12 9:11 Channel 3 High Operator Error Restart 9:33 Channel 3 High Erratic Response Changing to 3x10"(-9) Range Restart 10:10 Channel 3 High Erratic Signal Restart 10:23 Channel 3 High Operator Error Restart 14:00 Not Indicated Occurred During Raising Ch #1 Restart 14:38 Channel 3 High Signal Irregularity During Range Change Restart 9/14/12 12:59 Not Indicated Occurred During Raising Ch #1 Restart 14:07 Channel I Low Suspected Signal Irregularity Shutdown 9/15/12 11:28 Channel 3 High Range Change Error Restart 15:07 Channel 3 High Signal Irregularity During Range Change Restart 9/18/12 9:58 Channel 3 Low Accidently Hitting the Console Restart 9/19/12 19:40 Channel 3 High Range Change Error Restart 19:55 Channel I High Range Change Error Restart Adjust Cable 9/24/12 14:37 Period scram Raising Detector Caused Additional Signal Noise & Restart 20:01 Channel I Low Operator Error Restart Investigate 9/25/12 12:59 Channel I Low Suspected Electrical Transient* & Restart

Idaho State University AGN-201M Reactor 2011 Annual Report Page 5 of 10 14:09 Channel 1 Low Suspected Electrical Transient* Restart 9/27/12 11:42 Channel I Low Raising Detector Caused Additional Signal Noise Restart 14:39 Raise Button Raising Detector Caused Additional Signal Noise Restart 10/1/12 20:29 Channel 3 High Signal Irregularity During Range Change Restart 10/5/12 10:34 Channel 3 High Range Change ErTor Restart 10/9/12 16:32 Channel I Low Suspected Signal Irregularity Restart 10/10/12 13:08 Channel 3 High Noise in Range 3x10^(-S) & 10xl0"(-9) Restart 18:06 Channel 3 High Signal Irregularity Restart 10/11/12 10:41 Channel I High Range Change ErTor Restart 10:48 Period Removing the Start Up Source Restart 12:38 Channel I High Range Change Error Restart 13:50 Chl low Loss of Signal Restart 14:29 Period Raising Detector Caused Additional Signal Noise Restart 10/16/12 13:28 Loss of Power Building Loss Power Briefly Restart 10/17/12 12:06 Channel I Low Loss of Signal Restart 19:40 Period Bumping of the Console Restart 10/18/12 14:27 Channel 3 High Range Change Error Restart Channel 3 Low Range Change Error Restart 10/19/12 13:25 Channel 3 High Range Change Error Restart 16:35 Bumped Console Bumped Chair into Console Restart 10/23/12 9:53 Period Power Transient Restart 12:14 Period Signal Irregularity Restart 13:23 Channel 2 Low Suspected Signal Irregularity Restart 15:37 Period Electrical Transient* (Period within Range) Restart 17:58 Period Electrical Transient* (Period within Range) Restart 10/24/12 15:44 Channel 3 High Range Change Error Restart 10/29/12 19:50 Channel 3 High Range Change Error Restart 20:34 Channel 3 High Range Change Error Restart 20:36 Channel 3 High Range Change Error Restart 10/30/12 9:28 Channel 1 Low Loss of Signal Restart 10/31/12 9:43 Channel 3 High Range Change Error Restart 11/1/12 13:27 Not Indicated Activating Channel I Solenoid Restart 11/5/12 9:59 Channel I Low Suspected Electrical Transient* Restart 10:03 Period Suspected Electrical Transient* Restart 21:30 Channel 3 High Range Change Error Restart 21:49 Channel I Low Suspected Electrical Transient* Restart 11/7/12 19:48 Channel I Low Loss of Signal Restart 11/8/12 10:15 Channel 3 High Operator Error (Training) Restart 11:14 Channel 3 Low Suspected Electrical Transient* Shutdown 11/9/12 13:19 Channel I Low Under Estimation ofOscillator Reactivity Restart 16:46 Channel I Low Suspected Electrical Transient* Shutdown

Idaho State University AGN-201M Reactor 2011 Annual Report Page 6 of 10 1 1/13/12 12:58 Loss of Power Loss of Power to Circuit Shutdown 11/15/12 13:37 Period Raising Detector Caused Additional Signal Noise Restart 11/21/12 14:28 Channel 3 High Signal Irregularity During Range Change Restart 12/13/12 13:43 Channel 3 Low RangeChange Error Restart 13:52 Period Inserted Poly Rod Too Quickly Restart 14:12 Period Raising Detector Caused Additional Signal Noise Restart 15:52 Channel 3 Low Signal Irregularity Restart 16:00 Period Raising Detector Caused Additional Signal Noise Restart 12/14/12 11:53 Channel 1 Low Operator Error Restart 12/20/12 12:59 Period Raising Detector Caused Additional Signal Noise Restart 12/21/12 12:43 Channel I Low Suspected Electrical Transient* Restart 13:01 Channel I Low Suspected Electrical Transient* Restart 15:00 Channel 3 High Range Change Error Restart 12/27/12- 14:06 Channel I Low Signal Irregularity During Range Change Restart 12/28/12 16:15 Channel I Low Suspected Electrical Transient* Restart 12/31/12 10:47 Channel I Low Suspected Signal Irregularity Restart

. 11:06 Channel I High Non-Reproducible Rate Meter Issue Restart

  • Electrical transients are signal & power irregularities associated with using older vacuum robe based analogue circuitry.
4. Safety-Related Corrective Maintenance:

1/31/2012: Channel 3 detector changed its response output and was replaced with a comparable BF3 tube. In addition the SHV connector was replaced with one designed for RG-59 cable and recalibrated.

3/6/2012: The down indicator switch on the FCR had been knocked out of place, causing the drive to continue to drive out despite being in the bottom position and the interlock OK light bulb failed. The switch was repositioned for proper operation and the light bulb replaced.

3/14/2013: A bad cable connection causing a short, preventing the magnet to energize, was located.

A bypass cable fixed the problem and the main cable connection fixed to return normal functionality.

3/21/2012: The Channel 3 detector lost signal, a connection problem was the likely cause. The detector chamber was removed and all connecting cables were replaced with new connections, returning functionality to the system.

5/25/2012:The rod drop box was rebuilt with new wiring after a significant amount of troubleshooting.

5/30/2012: A power outage cause damage to Channel 2. Vacuum tubes V-12, V-14 & V-17. power line fuse, and the 1.5-volt battery were replaced.

Idaho State University AGN-201M Reactor 2011 Annual Report Page 7 of 10 6/5/2012: Magnet current was found to be high (0.9 mA) and after replacing the V-7 vacuum tube the current returned to a normal 0.6 mA.

8/30/2012: Channel I was having signal problems due to improper cabling and connectors. The system was rebuilt in a way so that the detector's position does not stress the signal cable and removes the need to raise the detector.

10/4/12: The analogue position display primary gear broke so that the tens digit wouldn't turn.

The unit was replaced with a comparable spare.

12/3/12: Channel 2 failed pre-start checks. The F-I (250V 3A) fuse, V-13 6Y6GA vacuum tube, V-12 6BW4 vacuum tube, and the V-I 6BW4 vacuum tube was replaced in Channel 2 to return functionality.

12/12/12: During operation the Safety Rod I dropped out properly, however the chassis jammed in position. It was found that the twin drive screws were uneven; they were greased and reset into position. In addition there was a problem with the "up" microswitch; the microswitch and the wiring were replaced.

5. Modifications.

A. Changes in Facility Design.

None.

B. Changes to Procedures.

None.

C. Experiments.

Experimental procedure 12 Oscillator Experiment was revised to have descriptions for both linear and rotary oscillators and guidelines for operating them simultaneously.

D. Reactor Safety Committee.

As of the end of the reporting period, membership of the Reactor Safety Committee (RSC) consisted of the following individuals:

Frank Fl. Just - Chair (retired from INL)

Jay F. Kunze - Reactor Administrator Adam L. Mallicoat - Reactor Supervisor Richard R. Brey - Department Chair Peter Farina - Radiation Safety Officer Robert Boston, PE, CHP (DOE-ID)

Kermit Bunde (DOE-ID)

Idaho State University AGN-201M Reactor 2011 Annual Report Page 8 of 10 Richard E. McCracken (retired from INL)

6. Summary of Changes Reportable under 10 CFR 50.59.

The paper chart recorder set up for the detector channels 2 & 3 were changed to utilize a digital chart recorder. The new recorder is capable recording data and displaying the response over time and cannot impact reactor operation as installed. The data is stored on a removable flash drive for easy analysis and storage.

7. Radioactive Effluents.

A. Liquid Waste - Total Activity Released: None.

B. Gaseous Waste -Total Estimated Activity Released: 14.4 1.tCi of Ar-41.

The AGN-201 Reactor was operated for 148 watt-hours at power levels up to approximately 4.9 watts. At this power level Ar-41 production is negligible and substantially below the effluent concentration limit given in 10 CFR 20 Appendix B, Table

2. The total activity of Ar-41 released to the environment was conservatively estimated at 14.4 [tCi. This activity corresponds to the total activity of all gaseous radioactive effluent from the facility. A monthly summary of calculated gaseous releases is given in Table IV.

Table IV. Summary of Monthly Gaseous Radioactive Effluent Releases (1 January 2012 through 31 December 2012)

Ar-41 Month (vCi)

January 0.0 February 1.0 March 1.2 April 1.7 May 0.8 June 0.8 June 0.6 August 1.4 September 3.0 October 1.5 November 1.7 December 0.6 Total 14.4 C. Solid Waste - Total Activity: None.

Idaho State University AGN-201M Reactor 2012 Annual Report Page 9 of 10

8. The latest environmental radiation surveys, performed at the facility boundary while the reactor was operating at 60% of full licensed power (3.0 watt), measured a maximum combined neutron and gamma dose equivalent rate of less than 2.0 mrem hr-' at the outside walls of the building proximal to the reactor. The total equivalent dose rate at 100% power at these locations was less than 4 mrrem hr 1 .
9. Radiation Exposures.

The Radiation Safety Officer reviews personnel radiation exposures quarterly. Annual reports of ionizing radiation doses are provided by the Radiation Safety Officer to all monitored personnel as required under the provisions of 10 CFR 19.

Personnel with duties in the reactor laboratory on either a regular or occasional basis have been issued radiation dosimeters by the Idaho State University Technical Safety Office.

The duty category and whole body exposure for the 2012 monitoring period of personnel are summarized in Table V:

. Table V. Personnel Radiation Monitored for 1/1/2011-12/31/2011 Name Exposure by Type (mrem)

Deep Lens Shallow Aryal, Harishchandra 2 2 2 Baker, Ben so 49 46 Baral, Madhav 2 2 1 Bishart, Bishara 1 1 1 Bundy, Deric 3 4 10 Burrows, Ian J 7 6 6 Gorham, Mackenzie <1 <1 <1 Horkley, Matt 2 2 1 Imel, George <1 <1 <1 Jash, Soumadipta <1 <1 <1 Kamerman, David <1 <1 <1 Krieger, Michael 11 12 12 Kunze, Jay <1 <1 <1 Langbehn, Adam 7 6 6 Loveland, Ryan 14 13 12 Lum, Edward 1 1 1 Mallicoat, Adam 2 2 1 Misner, Jesse 3 3 2 Nelson, Alan 2 2 2 Nelson, Marcus <1 <1 <1 Nimmagadda, Jyothier Kumar <1 <1 <1 Riley, Tony 3 2 2 Steele, Dallin <1 <1 <1

Idaho State University AGN-201M Reactor 2012 Almual Report Page 10 of 10 Stewart, Trevor 3 3 2 Tam, Austin 1 1 <1 Tormohlen, Derick. <1 <1 <1 Wachs, Katelyn 2 3 3 Chaczko, Malwina <1 <1 <1 Isaacs, Daniel <1 <1 <1 McBeath, Scott <1 <1 <1 Nelson, Katherine 3 2 2 Hart, Paul <1 <1 4 The 10 CFR 20.1201 occupational dose limits to adults are: total 5 rem, lens of eye 15 rem, shallow 50 rem, and deep 50 rem. The doses received for all reactor laboratory personnel during 2012 are well below the dose limits of 10 CFR 20.1201, and well below ISU ALARA limits (I REM per year, 0.3 REM per quarter).

Anytime a member of the public visits the reactor pin dosimeters are issued for the extent of the tour. A minimum of I dosimeter to every 5 people is issued for a representative group dose. During the 2012 calendar year there were 476 recorded visitors to the facility.

A summary of the public dose exposure is presented in Table VI.

Table VI. Summary Whole-Body Exposures to the Public (1 January 2012 through 31 December 2012)

Estimated whole-body Number of individuals exposure range (mrem): in each range:

No Observable Dose 433 1.0 mrem* 30 Greater than 1.0 but below 5.0 mrem 12 Greater than 5.0 but below 10.0 mrem 1 Total number of individuals reported 476

  • Below 1.0 mrem is considered un-measureable None of the 476 visitors to the facility during 2012 received a measurable dose that would exceed the annual 0.5 rem dose limit of 10 CFR 20.1301. Note there was only one reading that was above 5 n-rem, this is likely due to the shock of dropping the dosimeter.

Therefore, the average and maximum doses received by personnel and the public are well within NRC guidelines.

Report prepared by: AdamnIMallicoat, Reactor Manager/Supervisor August 30th, 2012