ML16343A194: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:IINNDDIIAANNAA AANNDD MMIICCHHIIGGAANN PPOOWWEERRDD.. CC.. CCOOOOKK NNUUCCLLEEAARR PPLLAANNTTUUPPDDAATTEEDD FFIINNAALL SSAAFFEETTYY AANNAALLYYSSIISSRREEPPOORRTTRevision:16.6Table:14.1-5 Page:1 of 1UNIT 1DONALD C. COOK NUCLEAR PLANT UNIT 1 SGTP PROGRAM INPUTASSUMPTIONS FOR RCS VOLUMES 1INITIAL CONDITIONSINPUT ASSUMPTIONS0% SGTP30% SGTPReactor Vessel (ft 3)46434643Steam Generators (ft 3 - Total) 435723442 (2)Reactor Coolant Pumps (ft 3 - Total)324 324Loop Piping (ft 3 - Total) 11851185Surge Line Piping (ft 3)4343Pressurizer (ft 3)18341834Total RCS Volume (ft
{{#Wiki_filter:I I N N D D I I A A N N A A A A N N D D M M I I C C H H I I G G A A N N P P O O W W E E R R D D.. C C.. C C O O O O K K N N U U C C L L E E A A R R P P L L A A N N T T U U P P D D A A T T E E D D F F I I N N A A L L S S A A F F E E T T Y Y A A N N A A L L Y Y S S I I S S R R E E P P O O R R T TRevision:16.6Table:14.1-5 Page:1 of 1UNIT 1DONALD C. COOK NUCLEAR PLANT UNIT 1 SGTP PROGRAM INPUTASSUMPTIONS FOR RCS VOLUMES 1 INITIAL CONDITIONSINPUT ASSUMPTIONS0% SGTP30% SGTPReactor Vessel (ft 3)4643 4643Steam Generators (ft 3 - Total)4357 2 3442 (2)Reactor Coolant Pumps (ft 3 - Total)324 324Loop Piping (ft 3 - Total)1185 1185Surge Line Piping (ft 3)43 43Pressurizer (ft 3)1834 1834Total RCS Volume (ft
: 3) (Ambient Conditions) 12,38611,471Total RCS Volume (ft 3)(Hot Conditions includes 3% for thermal expansion) 12,75811,815 1 The volumes presented in this table represent the reactor coolant system volumes from theWestinghouse IMP database SEC-LIS-4428-C3. Note that the volumes documented in thistable are slightly different than those used in the Westinghouse analysis of record, but havebeen evaluated for acceptability as documented in letter AEP-99-485.
: 3) (Ambient Conditions) 12,386 11,471Total RCS Volume (ft 3)(Hot Conditions includes 3% for thermal expansion) 12,758 11,815 1 The volumes presented in this table represent the reactor coolant system volumes from theWestinghouse IMP database SEC-LIS-4428-C3. Note that the volumes documented in thistable are slightly different than those used in the Westinghouse analysis of record, but havebeen evaluated for acceptability as documented in letter AEP-99-485.
2 The SG tube volume is assumed to be 762 ft 3/SG (3048 ft 3 total). The increase in SG tubeplugging from 0% to 30% results in a total reduction in SG tube volume of approximately 915
2 The SG tube volume is assumed to be 762 ft 3/SG (3048 ft 3 total). The increase in SG tubeplugging from 0% to 30% results in a total reduction in SG tube volume of approximately 915


ft3. The reduction between the SG tube volume and SG tube plugging is assumed to be a linearrelationship;  e.g. at 15% SGTP, total volume reduction is 0.15*(3048 ft
ft 3. The reduction between the SG tube volume and SG tube plugging is assumed to be a linearrelationship;  e.g. at 15% SGTP, total volume reduction is 0.15*(3048 ft
: 3) = 457.2 ft 3.}}
: 3) = 457.2 ft 3.}}

Latest revision as of 02:45, 8 July 2018

Donald C. Cook Nuclear Plant, Units 1 & 2, Revision 27 to Updated Final Safety Analysis Report, Chapter 14, Table 14.1-5 - Sgtp Program Input Assumptions for RCS Volumes
ML16343A194
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/24/2016
From:
Indiana Michigan Power Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16336A263 List: ... further results
References
AEP-NRC-2016-42
Download: ML16343A194 (1)


Text

I I N N D D I I A A N N A A A A N N D D M M I I C C H H I I G G A A N N P P O O W W E E R R D D.. C C.. C C O O O O K K N N U U C C L L E E A A R R P P L L A A N N T T U U P P D D A A T T E E D D F F I I N N A A L L S S A A F F E E T T Y Y A A N N A A L L Y Y S S I I S S R R E E P P O O R R T TRevision:16.6Table:14.1-5 Page:1 of 1UNIT 1DONALD C. COOK NUCLEAR PLANT UNIT 1 SGTP PROGRAM INPUTASSUMPTIONS FOR RCS VOLUMES 1 INITIAL CONDITIONSINPUT ASSUMPTIONS0% SGTP30% SGTPReactor Vessel (ft 3)4643 4643Steam Generators (ft 3 - Total)4357 2 3442 (2)Reactor Coolant Pumps (ft 3 - Total)324 324Loop Piping (ft 3 - Total)1185 1185Surge Line Piping (ft 3)43 43Pressurizer (ft 3)1834 1834Total RCS Volume (ft

3) (Ambient Conditions) 12,386 11,471Total RCS Volume (ft 3)(Hot Conditions includes 3% for thermal expansion) 12,758 11,815 1 The volumes presented in this table represent the reactor coolant system volumes from theWestinghouse IMP database SEC-LIS-4428-C3. Note that the volumes documented in thistable are slightly different than those used in the Westinghouse analysis of record, but havebeen evaluated for acceptability as documented in letter AEP-99-485.

2 The SG tube volume is assumed to be 762 ft 3/SG (3048 ft 3 total). The increase in SG tubeplugging from 0% to 30% results in a total reduction in SG tube volume of approximately 915

ft 3. The reduction between the SG tube volume and SG tube plugging is assumed to be a linearrelationship; e.g. at 15% SGTP, total volume reduction is 0.15*(3048 ft

3) = 457.2 ft 3.