ML17331B048: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 07/31/1993 | | issue date = 07/31/1993 | ||
| title = Rev 1 to Monthly Operating Rept for Jul 1993 for DC Cook Nuclear Plant Unit 1,correcting Gross Electrical Energy Generation yr-to-date | | title = Rev 1 to Monthly Operating Rept for Jul 1993 for DC Cook Nuclear Plant Unit 1,correcting Gross Electrical Energy Generation yr-to-date | ||
| author name = | | author name = Janisse J, Turner D | ||
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG | | author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG | ||
| addressee name = | | addressee name = | ||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:N.R.C. | {{#Wiki_filter:N.R.C. | ||
OPERATING DATA REPORT DOCKET NO. | |||
50-315 DATE 22/Oct/93 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS | |||
: 1. Unit Name D. | |||
C. | |||
Cook Unit 1 | |||
: 2. Reporting Period July 93 | |||
: 3. Licensed Thermal Power (MWt) 3250 4. | |||
Name Plate Rating (Gross MWe) 1152 | |||
: 5. Design Electrical Rating (Net MWe) 1020 6. | |||
Maximum Dependable Capacity (GROSS MWe) 1056 7. | |||
Maximum Dependable Capacity (Net MWe) 1000 notes Rev. | |||
1 Corrected the Gross Generation YTD 22/Oct/93 DG Turner | |||
: 8. If Changes Occur in Capacity Ratings (Items no. | |||
3 through 7) Since Last Report Give Reasons 9. | |||
Power Level To Which Restricted. If Any (Net MWe) | |||
: 10. Reasons For Restrictions. If Any: | |||
: 11. Hours in Reporting Period 12. | |||
No. of Hrs. Reactor Was Critical | |||
: 13. Reactor Reserve Shutdown Hours | |||
: 14. Hours Generator on Line | |||
: 15. Unit Reserve Shutdown Hours | |||
: 16. Gross Therm. | |||
Energy Gen. | |||
(MWH) | |||
: 17. Gross Elect. | |||
Energy Gen. | |||
(MWH) | |||
: 18. Net Elect. | |||
Energy Gen. | |||
(MWH) | |||
: 19. Unit Service Factor | |||
: 20. Unit Availability Factor | |||
: 21. Unit Capacity Factor (MDC Net) | |||
: 22. Unit Capacity Factor (DER Net) | |||
: 23. Unit Forced Outage Rate 24. | |||
Shutdowns Scheduled over Next Six None This Mo. | |||
Yr. to Date 744.0 5087.0 744.0 5087.0 0 ' | |||
0.0 744.0 5087.0 0.0 0.0 2408039 16317784 774020 5295110 746796 5109331 100.0 100.0 100.0 100.0 100.4 100.4 98.4 98.5 0.0 0.0 Months (Type, Date,and Cumm. | |||
162887.0 121981.4 463.0 119935.6 321 ' | |||
351760107 114238470 109871696 74.6 74 6 | |||
67 ~ 1 65.4 | |||
===6.2 Duration)=== | |||
: 25. If Shut Down At End of Report: Period, Estimated Date of Startup: | |||
: 26. Units in Test Status (Prior to Commercial Operation): | |||
Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved | |||
( | |||
9311160039 931105 PDR ADOCK 05000315 | |||
.R P,DR | |||
P | |||
~ | |||
I t | |||
L U | |||
vf V}} | |||
Latest revision as of 14:19, 7 January 2025
| ML17331B048 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 07/31/1993 |
| From: | Janisse J, Doreen Turner INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | |
| Shared Package | |
| ML17331B046 | List: |
| References | |
| NUDOCS 9311160039 | |
| Download: ML17331B048 (2) | |
Text
N.R.C.
OPERATING DATA REPORT DOCKET NO.
50-315 DATE 22/Oct/93 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.
C.
Cook Unit 1
- 2. Reporting Period July 93
- 3. Licensed Thermal Power (MWt) 3250 4.
Name Plate Rating (Gross MWe) 1152
- 5. Design Electrical Rating (Net MWe) 1020 6.
Maximum Dependable Capacity (GROSS MWe) 1056 7.
Maximum Dependable Capacity (Net MWe) 1000 notes Rev.
1 Corrected the Gross Generation YTD 22/Oct/93 DG Turner
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through 7) Since Last Report Give Reasons 9.
Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions. If Any:
- 11. Hours in Reporting Period 12.
No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Therm.
Energy Gen.
(MWH)
- 17. Gross Elect.
Energy Gen.
(MWH)
- 18. Net Elect.
Energy Gen.
(MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate 24.
Shutdowns Scheduled over Next Six None This Mo.
Yr. to Date 744.0 5087.0 744.0 5087.0 0 '
0.0 744.0 5087.0 0.0 0.0 2408039 16317784 774020 5295110 746796 5109331 100.0 100.0 100.0 100.0 100.4 100.4 98.4 98.5 0.0 0.0 Months (Type, Date,and Cumm.
162887.0 121981.4 463.0 119935.6 321 '
351760107 114238470 109871696 74.6 74 6
67 ~ 1 65.4
6.2 Duration)
- 25. If Shut Down At End of Report: Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved
(
9311160039 931105 PDR ADOCK 05000315
.R P,DR
P
~
I t
L U
vf V