ML16343A194: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:I I N N D D I I A A N N A A A A N N D D M M I I C C H H I I G G A A N N P P O O W W E E R R D D.. C C.. C C O O O O K K N N U U C C L L E E A A R R P P L L A A N N T T U U P P D D A A T T E E D D F F I I N N A A L L S S A A F F E E T T Y Y A A N N A A L L Y Y S S I I S S R R E E P P O O R R T TRevision:16.6Table:14.1-5 Page:1 of 1UNIT 1DONALD C. COOK NUCLEAR PLANT UNIT 1 SGTP PROGRAM INPUTASSUMPTIONS FOR RCS VOLUMES 1 INITIAL CONDITIONSINPUT ASSUMPTIONS0% SGTP30% SGTPReactor Vessel (ft 3)4643 4643Steam Generators (ft 3 - Total)4357 2 3442 (2)Reactor Coolant Pumps (ft 3 - Total)324 324Loop Piping (ft 3 - Total)1185 1185Surge Line Piping (ft 3)43 43Pressurizer (ft 3)1834 1834Total RCS Volume (ft | ||
}} | : 3) (Ambient Conditions) 12,386 11,471Total RCS Volume (ft 3)(Hot Conditions includes 3% for thermal expansion) 12,758 11,815 1 The volumes presented in this table represent the reactor coolant system volumes from theWestinghouse IMP database SEC-LIS-4428-C3. Note that the volumes documented in thistable are slightly different than those used in the Westinghouse analysis of record, but havebeen evaluated for acceptability as documented in letter AEP-99-485. | ||
2 The SG tube volume is assumed to be 762 ft 3/SG (3048 ft 3 total). The increase in SG tubeplugging from 0% to 30% results in a total reduction in SG tube volume of approximately 915 | |||
ft 3. The reduction between the SG tube volume and SG tube plugging is assumed to be a linearrelationship; e.g. at 15% SGTP, total volume reduction is 0.15*(3048 ft | |||
: 3) = 457.2 ft 3.}} |
Latest revision as of 02:45, 8 July 2018
ML16343A194 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 10/24/2016 |
From: | Indiana Michigan Power Co |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML16336A263 | List:
|
References | |
AEP-NRC-2016-42 | |
Download: ML16343A194 (1) | |
Text
I I N N D D I I A A N N A A A A N N D D M M I I C C H H I I G G A A N N P P O O W W E E R R D D.. C C.. C C O O O O K K N N U U C C L L E E A A R R P P L L A A N N T T U U P P D D A A T T E E D D F F I I N N A A L L S S A A F F E E T T Y Y A A N N A A L L Y Y S S I I S S R R E E P P O O R R T TRevision:16.6Table:14.1-5 Page:1 of 1UNIT 1DONALD C. COOK NUCLEAR PLANT UNIT 1 SGTP PROGRAM INPUTASSUMPTIONS FOR RCS VOLUMES 1 INITIAL CONDITIONSINPUT ASSUMPTIONS0% SGTP30% SGTPReactor Vessel (ft 3)4643 4643Steam Generators (ft 3 - Total)4357 2 3442 (2)Reactor Coolant Pumps (ft 3 - Total)324 324Loop Piping (ft 3 - Total)1185 1185Surge Line Piping (ft 3)43 43Pressurizer (ft 3)1834 1834Total RCS Volume (ft
- 3) (Ambient Conditions) 12,386 11,471Total RCS Volume (ft 3)(Hot Conditions includes 3% for thermal expansion) 12,758 11,815 1 The volumes presented in this table represent the reactor coolant system volumes from theWestinghouse IMP database SEC-LIS-4428-C3. Note that the volumes documented in thistable are slightly different than those used in the Westinghouse analysis of record, but havebeen evaluated for acceptability as documented in letter AEP-99-485.
2 The SG tube volume is assumed to be 762 ft 3/SG (3048 ft 3 total). The increase in SG tubeplugging from 0% to 30% results in a total reduction in SG tube volume of approximately 915
ft 3. The reduction between the SG tube volume and SG tube plugging is assumed to be a linearrelationship; e.g. at 15% SGTP, total volume reduction is 0.15*(3048 ft
- 3) = 457.2 ft 3.