| notification date = 11/12/2025 16:02
| notification date = 11/12/2025 16:02
| retracted = Yes
| notification by = Daniel Mueller
| notification by = Daniel Mueller
| NRC officer = Ian Howard
| NRC officer = Ian Howard
| event date = 11/12/2025 07:48 CST
| event date = 11/12/2025 07:48 CST
| last update date = 11/12/2025
| last update date = 11/20/2025
| title = Actuation of Auxiliary Feedwater System
| title = Actuation of Auxiliary Feedwater System
| event text = The following information was provided by the licensee via phone and email:
| event text = The following information was provided by the licensee via phone and email:
Line 23: Line 24:
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
Decay heat is being removed via steam dump valves to the main condenser.
Decay heat is being removed via steam dump valves to the main condenser.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20251113en.html#en58035
* * * RETRACTION ON NOVEMBER 20, 2025, AT 1409 EST FROM ZACH MILLIGAN TO JORDAN WINGATE * * *
The following is a summary of the retraction provided by the licensee via phone and email.
Event Notification 58035, made on November 12, 2025, pursuant to 10 CFR 50.72(b)(3)(iv)(A), is being retracted following a review of the cause of the auxiliary feedwater system's automatic actuation. The AFW system actuation was traced to a power supply malfunction, which also caused the auxiliary feedwater pumps to align with essential service water. Because the actuation resulted from a spurious power supply failure, rather than signals triggered by plant conditions or parameters meeting system initiation criteria, it is considered invalid and not reportable under 10 CFR 50.72(b)(3)(iv)(A).
The NRC Resident Inspector has been informed.
Notified R4DO (Drake)
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20251121en.html#en58035
}}{{unit info
}}{{unit info
| Unit = 1
| Unit = 1

Latest revision as of 07:20, 21 November 2025

ENS 58035 +/- *RETRACTED*
Where
Callaway Ameren icon.png
Missouri (NRC Region 4)
Reporting
10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+2.23 h0.0929 days <br />0.0133 weeks <br />0.00305 months <br />)
Opened: Daniel Mueller
16:02 Nov 12, 2025
NRC Officer: Ian Howard