Line 2: |
Line 2: |
| | number = ML14058A207 | | | number = ML14058A207 |
| | issue date = 02/19/2014 | | | issue date = 02/19/2014 |
| | title = Prairie Island Technical Specifications (3801 TS Markup) | | | title = Technical Specifications (3801 TS Markup) |
| | author name = | | | author name = |
| | author affiliation = NRC/NRR/DORL | | | author affiliation = NRC/NRR/DORL |
Line 9: |
Line 9: |
| | docket = 05000282, 05000306 | | | docket = 05000282, 05000306 |
| | license number = DPR-042, DPR-060 | | | license number = DPR-042, DPR-060 |
| | contact person = Wall S P | | | contact person = Wall S |
| | case reference number = TAC MF3275, TAC MF3276 | | | case reference number = TAC MF3275, TAC MF3276 |
| | package number = ML14057A374 | | | package number = ML14057A374 |
Line 19: |
Line 19: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:AC Sources-Operating 3.8.1 Prairie Island Unit 1 - Amendment No. 158 175 Units 1 and 2 3.8.1-6 Unit 2 - Amendment No. 149 165 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.1 Verify correct breaker alignment and indicated power availability for each required path. | | {{#Wiki_filter:AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.1 Verify correct breaker alignment and indicated 7 days power availability for each required path. |
| 7 days SR 3.8.1.2 ----------------------------NOTES-------------------------- 1. Performance of SR 3.8.1.6 satisfies this SR.
| | SR 3.8.1.2 ----------------------------NOTES-------------------------- |
| : 2. All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading. 3. A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR in consideration of manufacturer's recommendations. When modified start procedures are not used, the time, voltage, and frequency tolerances of SR 3.8.1.6 must be met. ---------------------------------------------------------------- Verify each DG starts from standby conditions and achieves steady state voltage > 40843740 V and < 44004580 V, and frequency > 59.558.8 Hz and < 60.561.2 Hz. | | : 1. Performance of SR 3.8.1.6 satisfies this SR. |
| | : 2. All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading. |
| | : 3. A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR in consideration of manufacturers recommendations. When modified start procedures are not used, the time, voltage, and frequency tolerances of SR 3.8.1.6 must be met. |
| | Verify each DG starts from standby conditions and 31 days achieves steady state voltage > 40843740 V and |
| | < 44004580 V, and frequency > 59.558.8 Hz and |
| | < 60.561.2 Hz. |
| | Prairie Island Unit 1 - Amendment No. 158 175 Units 1 and 2 3.8.1-6 Unit 2 - Amendment No. 149 165 |
|
| |
|
| 31 days
| | AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued) |
| | SURVEILLANCE FREQUENCY SR 3.8.1.6 ----------------------------NOTE--------------------------- |
| | All DG starts may be preceded by an engine prelube period. |
| | Verify each DG starts from standby condition and 184 days achieves: |
| | : a. In < 10 seconds, voltage > 3740 V and frequency > 58.8 Hz; and |
| | : b. Steady state voltage > 40843740 V and |
| | < 44004580 V, and frequency > 59.558.8 Hz and < 60.561.2 Hz. |
| | SR 3.8.1.7 Verify each DG does not trip during and following a 24 months load rejection of: |
| | : 1. Unit 1 > 650 kW; and |
| | : 2. Unit 2 > 860 kW. |
| | SR 3.8.1.8 Verify each DG's automatic trips are bypassed on an -------NOTE------ |
| | actual or simulated safety injection signal except: SR 3.0.2 interval extension (1.25 |
| | : a. Engine overspeed; times the interval) applies |
| | : b. Generator differential current; and to this SR |
| | : c. Ground fault (Unit 1 only). |
| | 24 months Prairie Island Unit 1 - Amendment No. 158 194 Units 1 and 2 3.8.1-8 Unit 2 - Amendment No. 149 183 |
|
| |
|
| AC Sources-Operating 3.8.1 Prairie Island Unit 1 - Amendment No. 158 194 Units 1 and 2 3.8.1-8 Unit 2 - Amendment No. 149 183 SURVEILLANCE REQUIREMENTS (continued) SURVEILLANCE FREQUENCY SR 3.8.1.6 ----------------------------NOTE--------------------------- All DG starts may be preceded by an engine prelube period. | | AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued) |
| ---------------------------------------------------------------- Verify each DG starts from standby condition and achieves: a. In < 10 seconds, voltage > 3740 V and frequency > 58.8 Hz; and b. Steady state voltage > 40843740 V and < 44004580 V, and frequency > 59.558.8 Hz and < 60.561.2 Hz.
| | SURVEILLANCE FREQUENCY SR 3.8.1.9 ----------------------------NOTES-------------------------- |
| | | : 1. Momentary transients outside the load and power factor ranges do not invalidate this test. |
| 184 days SR 3.8.1.7 Verify each DG does not trip during and following a load rejection of: 1. Unit 1 > 650 kW; and 2. Unit 2 > 860 kW.
| | : 2. If performed with DG synchronized with offsite power, it shall be performed at a power factor |
| 24 months SR 3.8.1.8 Verify each DG's automatic trips are bypassed on an actual or simulated safety injection signal except: a. Engine overspeed; b. Generator differential current; and c. Ground fault (Unit 1 only).
| | < 0.85. However, if grid conditions do not permit, the power factor limit is not required to be met. Under this condition the power factor shall be maintained as close to the limit as practicable. |
| -------NOTE------
| | Verify each DG operates for > 24 hours: 24 months |
| SR 3.0.2 interval extension (1.25 times the interval) applies to this SR
| | : a. For > 2 hours loaded: |
| ---------------------
| | Unit 1 > 2832 kW, and |
| | | < 3000 kW Unit 2 > 5400 kW, and |
| 24 months
| | < 5940 kW; and |
| | | : b. For the remaining hours of the test loaded: |
| AC Sources-Operating 3.8.1 Prairie Island Unit 1 - Amendment No. 158 189 196 Units 1 and 2 3.8.1-9 Unit 2 - Amendment No. 149 178 185 SURVEILLANCE REQUIREMENTS (continued) SURVEILLANCE FREQUENCY SR 3.8.1.9 ----------------------------NOTES-------------------------- 1. Momentary transients outside the load and power factor ranges do not invalidate this test.
| | Unit 1 > 2500 kW, and Unit 2 > 4860 kW; and |
| : 2. If performed with DG synchronized with offsite power, it shall be performed at a power factor | | : c. Achieves steady state voltage > 40843740 V and < 44004580 V; and frequency > 59.558.8 Hz and < 60.561.2 Hz. |
| < 0.85. However, if grid conditions do not permit, the power factor limit is not required to be met. Under this condition the power factor shall be maintained as close to the limit as practicable. --------------------------------------------------------------- Verify each DG operates for > 24 hours: a. For > 2 hours loaded: | | Prairie Island Unit 1 - Amendment No. 158 189 196 Units 1 and 2 3.8.1-9 Unit 2 - Amendment No. 149 178 185}} |
| Unit 1 > 2832 kW, and < 3000 kW Unit 2 > 5400 kW, and < 5940 kW; and b. For the remaining hours of the test loaded: | |
| Unit 1 > 2500 kW, and Unit 2 > 4860 kW; and c. Achieves steady state voltage > 40843740 V and < 44004580 V; and frequency > 59.558.8 Hz and < 60.561.2 Hz. | |
| | |
| 24 months
| |
| | |
| }} | |
Letter Sequence Other |
---|
|
|
MONTHYEARML14027A2312014-02-0505 February 2014 Notice of Pre-Application Meeting with Xcel Energy Concerning Prairie Island Nuclear Generating Plant, Units 1 and 2, to Discuss Licensee'S Proposed Changes to the Emergency Diesel Generator Voltage and Frequency Limits Project stage: Meeting ML14058A2512014-02-19019 February 2014 3801 Markup Bases Project stage: Other ML14058A2072014-02-19019 February 2014 Technical Specifications (3801 TS Markup) Project stage: Other ML14058A1732014-02-19019 February 2014 Diesel Generator Steady State Voltage and Frequency Limits - Prairie Island Nuclear Generating Plant Meeting February 19, 2014 Project stage: Meeting ML14056A4942014-03-10010 March 2014 Summary of the February 19, 2014, Pre-Application Meeting to Discuss the Diesel Generator Voltage and Frequency Limits License Request Project stage: Meeting 2014-02-05
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML24221A3622024-09-27027 September 2024 Issuance of Amendment Nos. 245 and 233 Revise Technical Specification 3.8.1, AC Sources-Operating, Surveillance Requirement 3.8.1.2, Note 3 ML24071A1162024-05-0101 May 2024 Issuance of Amendment Nos. 244 and 232 Revise TS 3.7.8, Cooling Water (Cl) System ML24008A1292024-03-0505 March 2024 Enclosure 2 - PI ISFSI Amendment 12 Section 4.0 Design Features Technical Specifications ML22357A1002023-03-31031 March 2023 And Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendments Standard Emergency Plan and Consolidated Emergency Operations Facility ML22181A0002022-08-17017 August 2022 Issuance of Amendments Reactor Trip System Power Range Instrumentation Channels L-PI-22-003, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0707 June 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22061A2062022-04-0101 April 2022 Issuance of Amendments TSTF-471, Rev. 1, TSTF-571-T, and Administrative Changes to Technical Specification Section 5.0 L-PI-21-029, Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.12021-10-0707 October 2021 Exigent License Amendment Request to Revise Technical Specification 3.7.8 to Allow a One-Time Extension of the Completion Time of Required Action B.1 ML20346A0202021-03-15015 March 2021 Issuance of Amendment Nos. 235 and 223, Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML20356A0022021-02-0505 February 2021 Issuance of Amendment Nos. 234 and 222, Revise Technical Specifications 3.2.1 and 5.6.5 Identified in Westinghouse Nuclear Safety Advisory Letters NSAL-09-05, Revision 1, and NSAL-15-1 ML20210M0142020-09-0808 September 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Issuance of Amendment Nos. 204, 231, and 219 TSTF-529 Clarify Use and Application Rules L-PI-20-001, License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-12020-01-29029 January 2020 License Amendment Request to Address Issues Identified in Westinghouse Nuclear Safety Advisory Letter NSAL-09-5, Revision 1, and NSAL-15-1 L-PI-19-041, Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements2019-12-23023 December 2019 Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements L-PI-19-040, License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency2019-10-0707 October 2019 License Amendment Request: Revise Technical Specification 5.5.14 to Permanently Extend Containment Leakage Rate Test Frequency ML19045A4802019-04-16016 April 2019 Issuance of Amendment Nos. 226 and 214 Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML19029A0942019-01-29029 January 2019 Issuance of Amendment No. 213, One-Time Technical Specification Change to Extend Completion Time for EDGs D5 and D6 (Emergency Circumstances) ML17362A2022018-03-0505 March 2018 Issuance of Amendment Concerning Revision to the Prairie Island Nuclear Generating Plant, Units 1 and 2 Emergency Plan (CAC Nos. MF9345 and MF9346; EPID L-2017-LLA-0175) ML16133A4062016-06-16016 June 2016 Issuance of Amendment Nos. 217 and 205, Adoption of Technical Specifications Task Force TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation (CAC Nos. MF6449 and MF6450) ML15264A2092015-11-30030 November 2015 Issuance of Amendment Nos. 216 and 204 Regarding Revisions to Technical Specification 3.3.3 and Renewed Facility Operating License ML15229A1762015-08-26026 August 2015 Issuance of Amendment Nos. 215 and 203 Regarding Revision to Licensing Basis Analysis for a Waste Gas Decay Tank Rupture ML15209A5122015-07-17017 July 2015 Technical Specifications - Updating Instructions -Effective Date: 7/24/2015 ML15209A5092015-07-17017 July 2015 Technical Specifications - Updating Instructions L-PI-15-030, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2015-06-29029 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process ML15086A0462015-05-21021 May 2015 Issuance of Amendment Nos. 214 and 202 Regarding Revisions to Technical Specification 3.8.1, AC Sources - Operating ML15062A0132015-05-20020 May 2015 Issuance of Amendments 213 and 201 to Revise TS 3.5.3, ECCS - Shutdown L-PI-15-004, Supplement to License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3, ECCS (Emergency Core Cooling System)- Shutdown2015-02-26026 February 2015 Supplement to License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3, ECCS (Emergency Core Cooling System)- Shutdown L-PI-14-034, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.3, Event Monitoring (EM) Instrumentation, and Additional Conditions Related to Alternative Source Term License Amendment Implementation2014-12-11011 December 2014 License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.3, Event Monitoring (EM) Instrumentation, and Additional Conditions Related to Alternative Source Term License Amendment Implementation ML14058A2072014-02-19019 February 2014 Technical Specifications (3801 TS Markup) ML13214A0292013-08-0202 August 2013 Correction Letter for License Amendment Nos. 207 (Unit 1) and 194 (Unit 2) ML13113A4002013-07-0202 July 2013 License Amendments TSTF-510 L-PI-13-030, License Amendment Request (LAR) to Add a Methodology to Technical Specification (TS) 5.6.5, Core Operating Limits Report (Colr).2013-05-23023 May 2013 License Amendment Request (LAR) to Add a Methodology to Technical Specification (TS) 5.6.5, Core Operating Limits Report (Colr). ML13093A3442013-05-0909 May 2013 License Amendments for Fuel Oil System and TSTF-501 L-PI-12-028, License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating Emergency Diesel Generator Voltage Limits2012-05-15015 May 2012 License Amendment Request (LAR) to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating Emergency Diesel Generator Voltage Limits L-PI-12-013, Response to Requests for Additional Information Associated with Adoption of the Alternative Source Term (AST) Methodology2012-02-24024 February 2012 Response to Requests for Additional Information Associated with Adoption of the Alternative Source Term (AST) Methodology ML1129011152011-12-0101 December 2011 Issuance of Amendments Revision of Technical Specifications 5.2.1, Onsite and Offsite Organizations and TS 5.3, Plant Staff Qualifications. L-PI-11-037, License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 Re Cooling Water System & 3.8.3 Re Diesel Fuel Oil2011-08-11011 August 2011 License Amendment Request to Add Diesel Fuel Oil License Bases and Revise Technical Specifications 3.7.8 Re Cooling Water System & 3.8.3 Re Diesel Fuel Oil ML11172A0202011-06-27027 June 2011 Technical Specifications, Unit 1, Renewed Facility Operating License for Prairie Island Nuclear Generating Plant ML11172A0222011-06-27027 June 2011 Technical Specifications, Unit 2, Renewed Facility Operating License for Prairie Island Nuclear Generating Plant L-PI-11-016, License Amendment Request (LAR) to Revise Surveillance Requirement (SR) Footnote in Technical Specification (TS) 3.8.1, AC Sources - Operating.2011-02-0303 February 2011 License Amendment Request (LAR) to Revise Surveillance Requirement (SR) Footnote in Technical Specification (TS) 3.8.1, AC Sources - Operating. L-PI-10-104, Supplement to Exigent License Amendment Request to Modify Technical Specifications Surveillance Requirement 3.8.1.102010-10-20020 October 2010 Supplement to Exigent License Amendment Request to Modify Technical Specifications Surveillance Requirement 3.8.1.10 ML1025715492010-09-16016 September 2010 Correction to Amendment Nos. 195 and 184 Regarding Technical Specification Changes to Control Room Habitability Requirements ML0925703672009-09-15015 September 2009 Correction to Technical Specifications (TAC Nos. MD9142 and MD9143) L-PI-08-080, License Amendment Request (LAR) to Revise Emergency Diesel Generator (EDG) Test Loads in Surveillance Requirement (SR) 3.8.1.3 and SR 3.8.1.92008-11-0404 November 2008 License Amendment Request (LAR) to Revise Emergency Diesel Generator (EDG) Test Loads in Surveillance Requirement (SR) 3.8.1.3 and SR 3.8.1.9 ML0826815912008-09-22022 September 2008 (PINGP-1 and 2), Technical Specifications ISFSI, Issuance of Amendments to Conform the Facility Operating Licenses to Reflect Transfer of Operating Authority (TAC L24245) ML0826812912008-09-22022 September 2008 Revised Operating Licenses & Technical Specifications, Issuance of Amendments to Conform the Facility Operating Licenses to Reflect Transfer of Operating Authority (TAC L24245, MD9622 and MD9623) ML0820504452008-07-18018 July 2008 Tech Spec Pages for Amendments 186 & 176 Adopting Provisions of Regulatory Guide (Rg) 1.52 Revision 3 ML0818402342008-06-27027 June 2008 Prairie, Units 1 and 2, Tech Spec Pages for Amendments 185 and 175 Regarding Incorporation of TS Task Force Travelers TSTF-479, TSTF-485 and TSTF-497 ML0812705062008-05-0101 May 2008 Submittal of Entire Re-Issue of ISFSI Technical Specifications ML0801404252008-01-28028 January 2008 Issuance of Amendments (TAC Nos. MD4209 & MD4210) - Tech Specs ML0735204002007-12-14014 December 2007 Technical Specifications in Support of Containment Sump Resolution 2024-09-27
[Table view] |
Text
AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.1 Verify correct breaker alignment and indicated 7 days power availability for each required path.
SR 3.8.1.2 ----------------------------NOTES--------------------------
- 1. Performance of SR 3.8.1.6 satisfies this SR.
- 2. All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.
- 3. A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR in consideration of manufacturers recommendations. When modified start procedures are not used, the time, voltage, and frequency tolerances of SR 3.8.1.6 must be met.
Verify each DG starts from standby conditions and 31 days achieves steady state voltage > 40843740 V and
< 44004580 V, and frequency > 59.558.8 Hz and
< 60.561.2 Hz.
Prairie Island Unit 1 - Amendment No. 158 175 Units 1 and 2 3.8.1-6 Unit 2 - Amendment No. 149 165
AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.8.1.6 ----------------------------NOTE---------------------------
All DG starts may be preceded by an engine prelube period.
Verify each DG starts from standby condition and 184 days achieves:
- a. In < 10 seconds, voltage > 3740 V and frequency > 58.8 Hz; and
- b. Steady state voltage > 40843740 V and
< 44004580 V, and frequency > 59.558.8 Hz and < 60.561.2 Hz.
SR 3.8.1.7 Verify each DG does not trip during and following a 24 months load rejection of:
- 1. Unit 1 > 650 kW; and
- 2. Unit 2 > 860 kW.
SR 3.8.1.8 Verify each DG's automatic trips are bypassed on an -------NOTE------
actual or simulated safety injection signal except: SR 3.0.2 interval extension (1.25
- a. Engine overspeed; times the interval) applies
- b. Generator differential current; and to this SR
- c. Ground fault (Unit 1 only).
24 months Prairie Island Unit 1 - Amendment No. 158 194 Units 1 and 2 3.8.1-8 Unit 2 - Amendment No. 149 183
AC Sources-Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.8.1.9 ----------------------------NOTES--------------------------
- 1. Momentary transients outside the load and power factor ranges do not invalidate this test.
- 2. If performed with DG synchronized with offsite power, it shall be performed at a power factor
< 0.85. However, if grid conditions do not permit, the power factor limit is not required to be met. Under this condition the power factor shall be maintained as close to the limit as practicable.
Verify each DG operates for > 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s: 24 months
- a. For > 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded:
Unit 1 > 2832 kW, and
< 3000 kW Unit 2 > 5400 kW, and
< 5940 kW; and
- b. For the remaining hours of the test loaded:
Unit 1 > 2500 kW, and Unit 2 > 4860 kW; and
- c. Achieves steady state voltage > 40843740 V and < 44004580 V; and frequency > 59.558.8 Hz and < 60.561.2 Hz.
Prairie Island Unit 1 - Amendment No. 158 189 196 Units 1 and 2 3.8.1-9 Unit 2 - Amendment No. 149 178 185