ENS 57629: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 24: Line 24:
Hatch Nuclear Plant Units 1 and 2
Hatch Nuclear Plant Units 1 and 2
Vogtle Electric Generating Plant Units 1 and 2
Vogtle Electric Generating Plant Units 1 and 2
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20250327en.html#en57629
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20250328en.html#en57629
}}
}}


{{ENS-Nav}}
{{ENS-Nav}}

Latest revision as of 06:20, 28 March 2025

ENS 57629 +/-
Where
Hatch 1 And 2, Vogtle 1 And 2
Birmingham, Alabama (NRC Region 2)
Organization: Southern Nuclear, Fleet Regulatory
Reporting
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect
Time - Person (Reporting Time:+12.82 h0.534 days <br />0.0763 weeks <br />0.0176 months <br />)
Opened: Catherine Galloway
17:49 Mar 26, 2025
NRC Officer: Josue Ramirez
Last Updated: Mar 26, 2025
57629 - NRC Website