ML11200A115: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML11200A115
| number = ML11200A115
| issue date = 07/14/2011
| issue date = 07/14/2011
| title = 07/14/11 Meeting Slides - TVA Phase 0 Meeting with NRC Bellefonte Units 1 & 2 Main Control Room Modernization
| title = Meeting Slides - TVA Phase 0 Meeting with NRC Bellefonte Units 1 & 2 Main Control Room Modernization
| author name = Hinson A
| author name = Hinson A
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
Line 14: Line 14:
| page count = 21
| page count = 21
}}
}}
=Text=
{{#Wiki_filter:TVA Phase 0 Meeting with NRC Bellefonte Units 1 & 2 Main Control Room Modernization Alvin Hinson - TVA I&C Engineering Manager July 14, 2011 July 14, 2011          Bellefonte MCR/HFE Phase 0 Meeting 1
TVA, AREVA
* Desmond Raymond - AREVA HFE Manager
* Bob Kershner - HFE Engineering Discipline Lead
* Dominick Logalbo - HFE Analysis Lead
* Jim Hawks - TVA Oversight
* Jerry Mauck - TVA Oversight July 14, 2011        Bellefonte MCR/HFE Phase 0 Meeting 3
Bellefonte MCR/HFE
===Background===
* Control room designed and built in early 1980s
* Bailey equipment installed in main control room July 14, 2011        Bellefonte MCR/HFE Phase 0 Meeting 4
Bellefonte MCR/HFE Background (continued)
* Detailed control room design review performed in early 1980s to address TMI action item I.D.1
* 795 HEDs identified with 425 HED still to be resolved
* Some legacy issues, documented as HEDs, remain to be resolved July 14, 2011              Bellefonte MCR/HFE Phase 0 Meeting 6
Bellefonte MCR/HFE Background (continued)
July 14, 2011      Bellefonte MCR/HFE Phase 0 Meeting 7
Bellefonte MCR/HFE Background (continued)
* MCR/HFE modernization will address:
      - Unresolved HEDs that required significant modifications to correct
      - Obsolescence of existing controls and indication
* Modernization of balance of plant I&C offered opportunity for use of integrated controls, displays, and alarms
      - Significantly better than the relocation, paint, tape, and label fixes previously envisioned July 14, 2011            Bellefonte MCR/HFE Phase 0 Meeting    8
Conceptual Plan for Modern Bellefonte Control Room
* Consolidate number of panels with safety related components
* Normal control from sitting work stations
* Safety-related control from standing work stations
* Safety-related work stations set on each side of unit supervisor desk July 14, 2011          Bellefonte MCR/HFE Phase 0 Meeting 9
Conceptual Plan for Modern Bellefonte Control Room (continued)
* Shift turnover/briefing room and shift manager office added
* Use of mosaic technology for safety-related work stations
* Use of group-view panel for plant overview monitoring safety and crew situational awareness July 14, 2011          Bellefonte MCR/HFE Phase 0 Meeting 10
Conceptual Control Room Layout July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 11
Conceptual Control Room Layout July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 12
Conceptual Plan for Operation
* General Concept of Operations -
Normal Operation
      - RO1 controls reactivity and NSSS from non-safety controls
      - RO2 controls turbine and BOP from non-safety Controls July 14, 2011            Bellefonte MCR/HFE Phase 0 Meeting 13
Conceptual Plan for Operation (continued)
* General Concept of Operations -
Emergency
===Response===
      - RO1 performs safety-related actions of EOPs from safety panel (and EDG panel, if required)
      - RO2 performs supporting EOP actions from non-safety panels July 14, 2011            Bellefonte MCR/HFE Phase 0 Meeting 14
Conceptual Plan for Operation (continued)
* General Concept of Operations - Loss of Offsite Power
      - RO1 performs safety-related actions of AOPs from safety panel
      - RO2 recovers electrical power at EDG panel and directs field operations July 14, 2011            Bellefonte MCR/HFE Phase 0 Meeting 15
Conceptual Plan for Operation (continued)
* General Concept of Operations - High Workload Surveillance Testing
      - RO1 controls reactivity and NSSS from non-safety controls
      - RO2 controls turbine and BOP from non-safety controls
      - RO3 performs surveillance at safety panel or EDG panel, as required July 14, 2011              Bellefonte MCR/HFE Phase 0 Meeting 16
HFE Process Operating PRA/HRA Experience Review Risk-Significant Human Actions
* Bellefonte Human                                                          Requirements Management Factors Engineering Plan                                                        FRA/FA Design Assessment
      - Integrated plan based on                                                  Task Analysis NUREG 0700 and NUREG 0711                                                                      DESIGN
* Uses previous CRDR                        HED Training Program Development HSI Design Procedure Development work as operating experience input                                                              HFE V&V
* Builds on industry experience from B&W                                                            Design Implementation operating plants Human Performance Monitoring July 14, 2011            Bellefonte MCR/HFE Phase 0 Meeting                                                                        17
Conceptual Control Room Mockup July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 18
Conceptual Control Room Mockup (continued)
July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 19
Conceptual Control Room Mockup (continued)
July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 20
Questions
* Open Discussion July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 21}}

Latest revision as of 02:54, 6 December 2019

Meeting Slides - TVA Phase 0 Meeting with NRC Bellefonte Units 1 & 2 Main Control Room Modernization
ML11200A115
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 07/14/2011
From: Hinson A
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
Hinson A
Shared Package
ML11200A124 List:
References
Download: ML11200A115 (21)


Text

TVA Phase 0 Meeting with NRC Bellefonte Units 1 & 2 Main Control Room Modernization Alvin Hinson - TVA I&C Engineering Manager July 14, 2011 July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 1

TVA, AREVA

  • Desmond Raymond - AREVA HFE Manager
  • Bob Kershner - HFE Engineering Discipline Lead
  • Dominick Logalbo - HFE Analysis Lead
  • Jim Hawks - TVA Oversight
  • Jerry Mauck - TVA Oversight July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 3

Bellefonte MCR/HFE

Background

  • Control room designed and built in early 1980s
  • Bailey equipment installed in main control room July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 4

Bellefonte MCR/HFE Background (continued)

  • Detailed control room design review performed in early 1980s to address TMI action item I.D.1
  • 795 HEDs identified with 425 HED still to be resolved
  • Some legacy issues, documented as HEDs, remain to be resolved July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 6

Bellefonte MCR/HFE Background (continued)

July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 7

Bellefonte MCR/HFE Background (continued)

  • MCR/HFE modernization will address:

- Unresolved HEDs that required significant modifications to correct

- Obsolescence of existing controls and indication

  • Modernization of balance of plant I&C offered opportunity for use of integrated controls, displays, and alarms

- Significantly better than the relocation, paint, tape, and label fixes previously envisioned July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 8

Conceptual Plan for Modern Bellefonte Control Room

  • Consolidate number of panels with safety related components
  • Normal control from sitting work stations
  • Safety-related control from standing work stations
  • Safety-related work stations set on each side of unit supervisor desk July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 9

Conceptual Plan for Modern Bellefonte Control Room (continued)

  • Shift turnover/briefing room and shift manager office added
  • Use of mosaic technology for safety-related work stations
  • Use of group-view panel for plant overview monitoring safety and crew situational awareness July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 10

Conceptual Control Room Layout July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 11

Conceptual Control Room Layout July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 12

Conceptual Plan for Operation

  • General Concept of Operations -

Normal Operation

- RO1 controls reactivity and NSSS from non-safety controls

- RO2 controls turbine and BOP from non-safety Controls July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 13

Conceptual Plan for Operation (continued)

  • General Concept of Operations -

Emergency

Response

- RO1 performs safety-related actions of EOPs from safety panel (and EDG panel, if required)

- RO2 performs supporting EOP actions from non-safety panels July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 14

Conceptual Plan for Operation (continued)

  • General Concept of Operations - Loss of Offsite Power

- RO1 performs safety-related actions of AOPs from safety panel

- RO2 recovers electrical power at EDG panel and directs field operations July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 15

Conceptual Plan for Operation (continued)

  • General Concept of Operations - High Workload Surveillance Testing

- RO1 controls reactivity and NSSS from non-safety controls

- RO2 controls turbine and BOP from non-safety controls

- RO3 performs surveillance at safety panel or EDG panel, as required July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 16

HFE Process Operating PRA/HRA Experience Review Risk-Significant Human Actions

  • Bellefonte Human Requirements Management Factors Engineering Plan FRA/FA Design Assessment

- Integrated plan based on Task Analysis NUREG 0700 and NUREG 0711 DESIGN

  • Uses previous CRDR HED Training Program Development HSI Design Procedure Development work as operating experience input HFE V&V
  • Builds on industry experience from B&W Design Implementation operating plants Human Performance Monitoring July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 17

Conceptual Control Room Mockup July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 18

Conceptual Control Room Mockup (continued)

July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 19

Conceptual Control Room Mockup (continued)

July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 20

Questions

  • Open Discussion July 14, 2011 Bellefonte MCR/HFE Phase 0 Meeting 21