ML14233A193: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(11 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14233A193
| number = ML14233A193
| issue date = 08/21/2014
| issue date = 08/21/2014
| title = Salem Nuclear Generating Station, Units 1 and 2 - Acceptance Review - License Amendment Request to Adopt TSTF-510, Revision 2
| title = Acceptance Review - License Amendment Request to Adopt TSTF-510, Revision 2
| author name = Sanders C J
| author name = Sanders C
| author affiliation = NRC/NRR/DORL/LPLI-2
| author affiliation = NRC/NRR/DORL/LPLI-2
| addressee name = Duke P R
| addressee name = Duke P
| addressee affiliation = PSEG Nuclear, LLC
| addressee affiliation = PSEG Nuclear, LLC
| docket = 05000272, 05000311
| docket = 05000272, 05000311
Line 13: Line 13:
| document type = Acceptance Review Letter, E-Mail
| document type = Acceptance Review Letter, E-Mail
| page count = 1
| page count = 1
| project = TAC:MF4574, TAC:MF4575
| stage = Acceptance Review
}}
}}
=Text=
{{#Wiki_filter:1 Sanders, Carleen From:
Sanders, Carleen Sent:
Thursday, August 21, 2014 10:06 AM To:
Duke, Paul R. (Paul.Duke@pseg.com)
==Subject:==
Salem Unit 1 & 2: Acceptance Review Request to Use TSTF-510 (MF4574 and MF4575)
: Paul,
ByletterdatedJuly28,2014(ADAMSAccessionNo.ML14210A484),PSEGNuclearLLC(PSEG)submittedalicense amendmentrequestforSalemNuclearGeneratingStation,UnitNos.1and2(Salem).Theproposedamendmentwould modifytechnicalspecification(TS)requirementsregardingsteamgeneratortubeinspectionsandreportingasdescribed inTSTF510,Revision2,RevisiontoSteamGeneratorProgramInspectionFrequenciesandTubeSampleSelection.In addition,theproposedamendmentwouldreviseSalemUnitNo.2sTSs6.8.4.i,SteamGenerator(SG)Program, 6.9.1.10,SteamGeneratorTubeInspectionReport,andthebasessectionof3/4.4.6,SteamGenerator(SG)Tube Integrity,toremoveunnecessaryinformationrelatedtotheoriginalSalemUnitNo.2Westinghousesteamgenerators.
ThepurposeofthisletteristoprovidetheresultsoftheU.S.NuclearRegulatoryCommission(NRC)staffsacceptance reviewofthisamendmentrequest.Theacceptancereviewwasperformedtodetermineifthereissufficienttechnical informationinscopeanddepthtoallowtheNRCstafftocompleteitsdetailedtechnicalreview.Theacceptancereview isalsointendedtoidentifywhethertheapplicationhasanyreadilyapparentinformationinsufficienciesinits characterizationoftheregulatoryrequirementsorthelicensingbasisoftheplant.
ConsistentwithSection50.90ofTitle10oftheCodeofFederalRegulations(10CFR),anamendmenttothelicense (includingthetechnicalspecifications)mustfullydescribethechangesrequested,andfollowingasfarasapplicable,the formprescribedfororiginalapplications.Section50.34of10CFRaddressesthecontentoftechnicalinformation required.Thissectionstipulatesthatthesubmittaladdressthedesignandoperatingcharacteristics,unusualornovel designfeatures,andprincipalsafetyconsiderations.
TheNRCstaffhasreviewedyourapplicationandconcludedthatitdoesprovidetechnicalinformationinsufficientdetail toenabletheNRCstafftocompleteitsdetailedtechnicalreviewandmakeanindependentassessmentregardingthe acceptabilityoftheproposedamendmentintermsofregulatoryrequirementsandtheprotectionofpublichealthand safetyandtheenvironment.Giventhelesserscopeanddepthoftheacceptancereviewascomparedtothedetailed technicalreview,theremaybeinstancesinwhichissuesthatimpacttheNRCstaffsabilitytocompletethedetailed technicalreviewareidentifieddespitecompletionofanadequateacceptancereview.Youwillbeadvisedofanyfurther informationneededtosupporttheNRCstaffsdetailedtechnicalreviewbyseparatecorrespondence.
Ifyouhaveanyquestions,pleasecontactmeat3014151603
CarleenSanders,ProjectManager PlantLicensingBranchI2 DivisionofOperatingReactorLicensing OfficeofNuclearReactorRegulation
DocketNos.50272and50311}}

Latest revision as of 17:20, 10 January 2025

Acceptance Review - License Amendment Request to Adopt TSTF-510, Revision 2
ML14233A193
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/21/2014
From: Sanders C
Plant Licensing Branch 1
To: Duke P
Public Service Enterprise Group
Sanders C
References
TAC MF4574, TAC MF4575
Download: ML14233A193 (1)


Text

1 Sanders, Carleen From:

Sanders, Carleen Sent:

Thursday, August 21, 2014 10:06 AM To:

Duke, Paul R. (Paul.Duke@pseg.com)

Subject:

Salem Unit 1 & 2: Acceptance Review Request to Use TSTF-510 (MF4574 and MF4575)

Paul,

ByletterdatedJuly28,2014(ADAMSAccessionNo.ML14210A484),PSEGNuclearLLC(PSEG)submittedalicense amendmentrequestforSalemNuclearGeneratingStation,UnitNos.1and2(Salem).Theproposedamendmentwould modifytechnicalspecification(TS)requirementsregardingsteamgeneratortubeinspectionsandreportingasdescribed inTSTF510,Revision2,RevisiontoSteamGeneratorProgramInspectionFrequenciesandTubeSampleSelection.In addition,theproposedamendmentwouldreviseSalemUnitNo.2sTSs6.8.4.i,SteamGenerator(SG)Program, 6.9.1.10,SteamGeneratorTubeInspectionReport,andthebasessectionof3/4.4.6,SteamGenerator(SG)Tube Integrity,toremoveunnecessaryinformationrelatedtotheoriginalSalemUnitNo.2Westinghousesteamgenerators.

ThepurposeofthisletteristoprovidetheresultsoftheU.S.NuclearRegulatoryCommission(NRC)staffsacceptance reviewofthisamendmentrequest.Theacceptancereviewwasperformedtodetermineifthereissufficienttechnical informationinscopeanddepthtoallowtheNRCstafftocompleteitsdetailedtechnicalreview.Theacceptancereview isalsointendedtoidentifywhethertheapplicationhasanyreadilyapparentinformationinsufficienciesinits characterizationoftheregulatoryrequirementsorthelicensingbasisoftheplant.

ConsistentwithSection50.90ofTitle10oftheCodeofFederalRegulations(10CFR),anamendmenttothelicense (includingthetechnicalspecifications)mustfullydescribethechangesrequested,andfollowingasfarasapplicable,the formprescribedfororiginalapplications.Section50.34of10CFRaddressesthecontentoftechnicalinformation required.Thissectionstipulatesthatthesubmittaladdressthedesignandoperatingcharacteristics,unusualornovel designfeatures,andprincipalsafetyconsiderations.

TheNRCstaffhasreviewedyourapplicationandconcludedthatitdoesprovidetechnicalinformationinsufficientdetail toenabletheNRCstafftocompleteitsdetailedtechnicalreviewandmakeanindependentassessmentregardingthe acceptabilityoftheproposedamendmentintermsofregulatoryrequirementsandtheprotectionofpublichealthand safetyandtheenvironment.Giventhelesserscopeanddepthoftheacceptancereviewascomparedtothedetailed technicalreview,theremaybeinstancesinwhichissuesthatimpacttheNRCstaffsabilitytocompletethedetailed technicalreviewareidentifieddespitecompletionofanadequateacceptancereview.Youwillbeadvisedofanyfurther informationneededtosupporttheNRCstaffsdetailedtechnicalreviewbyseparatecorrespondence.

Ifyouhaveanyquestions,pleasecontactmeat3014151603

CarleenSanders,ProjectManager PlantLicensingBranchI2 DivisionofOperatingReactorLicensing OfficeofNuclearReactorRegulation

DocketNos.50272and50311