ML14233A193
| ML14233A193 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 08/21/2014 |
| From: | Sanders C Plant Licensing Branch 1 |
| To: | Duke P Public Service Enterprise Group |
| Sanders C | |
| References | |
| TAC MF4574, TAC MF4575 | |
| Download: ML14233A193 (1) | |
Text
1 Sanders, Carleen From:
Sanders, Carleen Sent:
Thursday, August 21, 2014 10:06 AM To:
Duke, Paul R. (Paul.Duke@pseg.com)
Subject:
Salem Unit 1 & 2: Acceptance Review Request to Use TSTF-510 (MF4574 and MF4575)
- Paul,
ByletterdatedJuly28,2014(ADAMSAccessionNo.ML14210A484),PSEGNuclearLLC(PSEG)submittedalicense amendmentrequestforSalemNuclearGeneratingStation,UnitNos.1and2(Salem).Theproposedamendmentwould modifytechnicalspecification(TS)requirementsregardingsteamgeneratortubeinspectionsandreportingasdescribed inTSTF510,Revision2,RevisiontoSteamGeneratorProgramInspectionFrequenciesandTubeSampleSelection.In addition,theproposedamendmentwouldreviseSalemUnitNo.2sTSs6.8.4.i,SteamGenerator(SG)Program, 6.9.1.10,SteamGeneratorTubeInspectionReport,andthebasessectionof3/4.4.6,SteamGenerator(SG)Tube Integrity,toremoveunnecessaryinformationrelatedtotheoriginalSalemUnitNo.2Westinghousesteamgenerators.
ThepurposeofthisletteristoprovidetheresultsoftheU.S.NuclearRegulatoryCommission(NRC)staffsacceptance reviewofthisamendmentrequest.Theacceptancereviewwasperformedtodetermineifthereissufficienttechnical informationinscopeanddepthtoallowtheNRCstafftocompleteitsdetailedtechnicalreview.Theacceptancereview isalsointendedtoidentifywhethertheapplicationhasanyreadilyapparentinformationinsufficienciesinits characterizationoftheregulatoryrequirementsorthelicensingbasisoftheplant.
ConsistentwithSection50.90ofTitle10oftheCodeofFederalRegulations(10CFR),anamendmenttothelicense (includingthetechnicalspecifications)mustfullydescribethechangesrequested,andfollowingasfarasapplicable,the formprescribedfororiginalapplications.Section50.34of10CFRaddressesthecontentoftechnicalinformation required.Thissectionstipulatesthatthesubmittaladdressthedesignandoperatingcharacteristics,unusualornovel designfeatures,andprincipalsafetyconsiderations.
TheNRCstaffhasreviewedyourapplicationandconcludedthatitdoesprovidetechnicalinformationinsufficientdetail toenabletheNRCstafftocompleteitsdetailedtechnicalreviewandmakeanindependentassessmentregardingthe acceptabilityoftheproposedamendmentintermsofregulatoryrequirementsandtheprotectionofpublichealthand safetyandtheenvironment.Giventhelesserscopeanddepthoftheacceptancereviewascomparedtothedetailed technicalreview,theremaybeinstancesinwhichissuesthatimpacttheNRCstaffsabilitytocompletethedetailed technicalreviewareidentifieddespitecompletionofanadequateacceptancereview.Youwillbeadvisedofanyfurther informationneededtosupporttheNRCstaffsdetailedtechnicalreviewbyseparatecorrespondence.
Ifyouhaveanyquestions,pleasecontactmeat3014151603
CarleenSanders,ProjectManager PlantLicensingBranchI2 DivisionofOperatingReactorLicensing OfficeofNuclearReactorRegulation
DocketNos.50272and50311