ML14233A193

From kanterella
Jump to navigation Jump to search

Acceptance Review - License Amendment Request to Adopt TSTF-510, Revision 2
ML14233A193
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/21/2014
From: Sanders C
Plant Licensing Branch 1
To: Duke P
Public Service Enterprise Group
Sanders C
References
TAC MF4574, TAC MF4575
Download: ML14233A193 (1)


Text

1 Sanders, Carleen From:

Sanders, Carleen Sent:

Thursday, August 21, 2014 10:06 AM To:

Duke, Paul R. (Paul.Duke@pseg.com)

Subject:

Salem Unit 1 & 2: Acceptance Review Request to Use TSTF-510 (MF4574 and MF4575)

Paul,

ByletterdatedJuly28,2014(ADAMSAccessionNo.ML14210A484),PSEGNuclearLLC(PSEG)submittedalicense amendmentrequestforSalemNuclearGeneratingStation,UnitNos.1and2(Salem).Theproposedamendmentwould modifytechnicalspecification(TS)requirementsregardingsteamgeneratortubeinspectionsandreportingasdescribed inTSTF510,Revision2,RevisiontoSteamGeneratorProgramInspectionFrequenciesandTubeSampleSelection.In addition,theproposedamendmentwouldreviseSalemUnitNo.2sTSs6.8.4.i,SteamGenerator(SG)Program, 6.9.1.10,SteamGeneratorTubeInspectionReport,andthebasessectionof3/4.4.6,SteamGenerator(SG)Tube Integrity,toremoveunnecessaryinformationrelatedtotheoriginalSalemUnitNo.2Westinghousesteamgenerators.

ThepurposeofthisletteristoprovidetheresultsoftheU.S.NuclearRegulatoryCommission(NRC)staffsacceptance reviewofthisamendmentrequest.Theacceptancereviewwasperformedtodetermineifthereissufficienttechnical informationinscopeanddepthtoallowtheNRCstafftocompleteitsdetailedtechnicalreview.Theacceptancereview isalsointendedtoidentifywhethertheapplicationhasanyreadilyapparentinformationinsufficienciesinits characterizationoftheregulatoryrequirementsorthelicensingbasisoftheplant.

ConsistentwithSection50.90ofTitle10oftheCodeofFederalRegulations(10CFR),anamendmenttothelicense (includingthetechnicalspecifications)mustfullydescribethechangesrequested,andfollowingasfarasapplicable,the formprescribedfororiginalapplications.Section50.34of10CFRaddressesthecontentoftechnicalinformation required.Thissectionstipulatesthatthesubmittaladdressthedesignandoperatingcharacteristics,unusualornovel designfeatures,andprincipalsafetyconsiderations.

TheNRCstaffhasreviewedyourapplicationandconcludedthatitdoesprovidetechnicalinformationinsufficientdetail toenabletheNRCstafftocompleteitsdetailedtechnicalreviewandmakeanindependentassessmentregardingthe acceptabilityoftheproposedamendmentintermsofregulatoryrequirementsandtheprotectionofpublichealthand safetyandtheenvironment.Giventhelesserscopeanddepthoftheacceptancereviewascomparedtothedetailed technicalreview,theremaybeinstancesinwhichissuesthatimpacttheNRCstaffsabilitytocompletethedetailed technicalreviewareidentifieddespitecompletionofanadequateacceptancereview.Youwillbeadvisedofanyfurther informationneededtosupporttheNRCstaffsdetailedtechnicalreviewbyseparatecorrespondence.

Ifyouhaveanyquestions,pleasecontactmeat3014151603

CarleenSanders,ProjectManager PlantLicensingBranchI2 DivisionofOperatingReactorLicensing OfficeofNuclearReactorRegulation

DocketNos.50272and50311