ML24135A383: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 19: | Line 19: | ||
{{#Wiki_filter:KP-NRC-2405-005 | {{#Wiki_filter:KP-NRC-2405-005 | ||
May 14, 2024 | May 14, 2024 Docket No. 50-611 Docket No. 50-612 | ||
US Nuclear Regulatory Commission ATTN: | US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 | ||
==Subject:== | ==Subject:== | ||
Line 30: | Line 30: | ||
: 2. Nuclear Regulatory Commission, Kairos Power, LLC Hermes 2 General Audit Plan, October 3, 2023 (ML23268A446) | : 2. Nuclear Regulatory Commission, Kairos Power, LLC Hermes 2 General Audit Plan, October 3, 2023 (ML23268A446) | ||
: 3. Email, Michael Orenak (Nuclear Regulatory Commission) to Drew Peebles (Kairos Power) and Darrell Gardner (Kairos Power), Request for Confirmation of Information | : 3. Email, Michael Orenak (Nuclear Regulatory Commission) to Drew Peebles (Kairos Power) and Darrell Gardner (Kairos Power), Request for Confirmation of Information | ||
#3 for Hermes 2, May 14, 2024 (ML24135A125) | |||
In July 2023, Kairos Power LLC submitted its Preliminary Safety Analysis Report (PSAR) (Reference 1) in support of the construction permit application (CPA) for the Hermes 2 non-power reactor. In October 2023, the Nuclear Regulatory Commission provided the Hermes 2 General Audit Plan (Reference 2). As a result of that audit, the Nuclear Regulatory Commission (NRC) provided a request for confirmation of information (RCIs) that the staff will use in their preliminary safety evaluation (Reference 3). The enclosure to this letter provides Kairos Powers confirmation of that RCI. Kairos Power requests NRC review of this information in support of continued review of the Hermes 2 CPA. | In July 2023, Kairos Power LLC submitted its Preliminary Safety Analysis Report (PSAR) (Reference 1) in support of the construction permit application (CPA) for the Hermes 2 non-power reactor. In October 2023, the Nuclear Regulatory Commission provided the Hermes 2 General Audit Plan (Reference 2). As a result of that audit, the Nuclear Regulatory Commission (NRC) provided a request for confirmation of information (RCIs) that the staff will use in their preliminary safety evaluation (Reference 3). The enclosure to this letter provides Kairos Powers confirmation of that RCI. Kairos Power requests NRC review of this information in support of continued review of the Hermes 2 CPA. | ||
Line 41: | Line 41: | ||
Peter Hastings, PE Vice President, Regulatory Affairs and Quality | Peter Hastings, PE Vice President, Regulatory Affairs and Quality | ||
Kairos Power LLC www.kairospower.com 707 W Tower Ave | Kairos Power LLC www.kairospower.com 707 W Tower Ave 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 KP-NRC-2405-0 05 Page 2 | ||
==Enclosure:== | ==Enclosure:== | ||
: 1) | : 1) Kairos Power Response to NRC Request for Confirmation of Information for the Review of the Hermes 2 PSAR Chapter 5 | ||
xc (w/enclosure): | xc (w/enclosure): | ||
Joshua Borromeo, Chief, NRR Advanced Reactor Licensing Branch Michael Orenak, Project Manager, NRR Advanced Reactor Licensing Branch Matthew Hiser, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Brian Bettes, Project Manager, NRR Advanced Reactor Licensing Branch Cayetano Santos Jr., Project Manager, NRR Advanced Reactor Licensing Branch}} | Joshua Borromeo, Chief, NRR Advanced Reactor Licensing Branch Michael Orenak, Project Manager, NRR Advanced Reactor Licensing Branch Matthew Hiser, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Brian Bettes, Project Manager, NRR Advanced Reactor Licensing Branch Cayetano Santos Jr., Project Manager, NRR Advanced Reactor Licensing Branch}} |
Latest revision as of 14:06, 4 October 2024
ML24135A383 | |
Person / Time | |
---|---|
Site: | Hermes File:Kairos Power icon.png |
Issue date: | 05/14/2024 |
From: | Hastings P Kairos Power |
To: | Office of Nuclear Reactor Regulation, Document Control Desk |
Shared Package | |
ML24135A382 | List: |
References | |
KP-NRC-2405-005 | |
Download: ML24135A383 (1) | |
Text
KP-NRC-2405-005
May 14, 2024 Docket No. 50-611 Docket No. 50-612
US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Kairos Power LLC Transmittal of Response to NRC Request for Confirmation of Information for the Review of the Hermes 2 PSAR Chapter 5
References:
- 1. Letter, Kairos Power LLC to Document Control Desk Submittal of the Construction Permit Application for the Hermes 2 Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes 2), Revision 0 July 14, 2023, (ML23195A122)
- 2. Nuclear Regulatory Commission, Kairos Power, LLC Hermes 2 General Audit Plan, October 3, 2023 (ML23268A446)
- 3. Email, Michael Orenak (Nuclear Regulatory Commission) to Drew Peebles (Kairos Power) and Darrell Gardner (Kairos Power), Request for Confirmation of Information
- 3 for Hermes 2, May 14, 2024 (ML24135A125)
In July 2023, Kairos Power LLC submitted its Preliminary Safety Analysis Report (PSAR) (Reference 1) in support of the construction permit application (CPA) for the Hermes 2 non-power reactor. In October 2023, the Nuclear Regulatory Commission provided the Hermes 2 General Audit Plan (Reference 2). As a result of that audit, the Nuclear Regulatory Commission (NRC) provided a request for confirmation of information (RCIs) that the staff will use in their preliminary safety evaluation (Reference 3). The enclosure to this letter provides Kairos Powers confirmation of that RCI. Kairos Power requests NRC review of this information in support of continued review of the Hermes 2 CPA.
If you have any questions or need any additional information, please contact Austin Clark at clark@kairospower.com or (704) 247-6310 Ext. 1337, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on May 14, 2024.
Peter Hastings, PE Vice President, Regulatory Affairs and Quality
Kairos Power LLC www.kairospower.com 707 W Tower Ave 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 KP-NRC-2405-0 05 Page 2
Enclosure:
- 1) Kairos Power Response to NRC Request for Confirmation of Information for the Review of the Hermes 2 PSAR Chapter 5
xc (w/enclosure):
Joshua Borromeo, Chief, NRR Advanced Reactor Licensing Branch Michael Orenak, Project Manager, NRR Advanced Reactor Licensing Branch Matthew Hiser, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Brian Bettes, Project Manager, NRR Advanced Reactor Licensing Branch Cayetano Santos Jr., Project Manager, NRR Advanced Reactor Licensing Branch