ENS 56658: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 9: Line 9:
| unit = 3
| unit = 3
| utype = W-3-LP, W-3-LP
| utype = W-3-LP, W-3-LP
| cfr = 10 CFR 50.72(b)(2)(iv)(B)
| cfr = 10 CFR 50.72(b)(2)(iv)(B), 10 CFR 50.72(b)(3)(iv)(A)
| emergency class = Non Emergency
| emergency class = Non Emergency
| notification date = 08/04/2023 15:30
| notification date = 08/04/2023 15:30

Latest revision as of 14:57, 4 January 2024

ENS 56658 +/-
Where
Turkey Point NextEra Energy icon.png
Florida (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-1.83 h-0.0763 days <br />-0.0109 weeks <br />-0.00251 months <br />)
Opened: Arturo Alvarez
15:30 Aug 4, 2023
NRC Officer: Ernest West
Last Updated: Aug 4, 2023
56658 - NRC Website
Loading map...