ML17038A273: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(9 intermediate revisions by the same user not shown) | |||
Line 5: | Line 5: | ||
| author name = | | author name = | ||
| author affiliation = Entergy Operations, Inc | | author affiliation = Entergy Operations, Inc | ||
| addressee name = Keegan E | | addressee name = Keegan E | ||
| addressee affiliation = NRC/NRR/DLR | | addressee affiliation = NRC/NRR/DLR | ||
| docket = 05000382 | | docket = 05000382 | ||
Line 13: | Line 13: | ||
| document type = Response to Request for Additional Information (RAI) | | document type = Response to Request for Additional Information (RAI) | ||
| page count = 3 | | page count = 3 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:DEPARTMENT OF THE ARMY NEW ORLEANS DISTRICT, CORPS OF ENGINEERS P. 0. BOX 60267 NEW ORLEANS, LOUISIANA 70160-0267 September 19, 2013 REPLY TO ATIENTIONOF Operations Division Operations Manager, Completed Works Mr. Joseph Dantin - President Board of Commissioners Lafourche Basin Levee District Post Office Box 670 Vacherie, Louisiana 70090 | |||
==Dear Mr. Dantin:== | |||
We have received an application for a Department of the Army permit dated July 15, 2013, from Entergy- Waterford 3, concerning permission to replace four dolphins on the right descending Mississippi River bank, vicinity of second order levee station 443+00, in St. Bernard Parish, Louisiana. | |||
We have no objection to your Board's issuance of a permit for that portion of the work which is under your jurisdiction provided: | |||
: a. The work is accomplished in accordance with the above referenced application, vicinity map and accompanying drawings, copy enclosed. | |||
: b. All pile driving work is performed and completed while the stage of the Mississippi River is below elevation +15.0 feet on the Carrollton gage, at New Orleans, Louisiana. Information concerning current river stages may be obtained on our website at www.mvn.usace.army.mil. | |||
: c. Riprap is placed around all piles that penetrate through the revetment in accordance with the Corps of Engineers standard drawing, "Repair Procedures Required When Penetrating Revetments With Piles, Caissons and/or Pile Clusters," file No. H-18-45204, copy enclosed. | |||
: d. Any damage to the bank resulting from the applicant's activities is repaired at the applicant's expense. | |||
: e. That should changes in the location or section of the existing levee and/or river, or in the generally prevailing conditions in the vicinity, be required in the future in the public interest, the applicant shall make changes in the project concerned, or in the arrangement thereof, as may be necessary to satisfactorily meet the situation and shall bear the cost thereof. | |||
This letter of no objection is based upon engineering criteria, and no interpretation or comments regarding local laws, zoning, or ordinances concerning property rights, etc., have been made. Additionally, this letter of no objection does not obviate the applicant's requirement to obtain federal, state, or local permits required by law. | |||
If we can be of any further assistance, please feel free to call Mr. Albert Terry of my office, at (504) 862-2311. Additionally, future correspondence concerning this project should reference our permit number 13-592. This will allow us to more easily locate records of previous correspondence, and thus provide a quicker response. | |||
Please furnish this office a copy of your permit if the applicant's proposal is approved by your Board. | |||
Sincerely, A~1.~~ | |||
Operations Manager, Completed Works Enclosures Copies Furnished: | |||
CPRA, Baton Rouge, Attn: Rhonda Braud CPRA, Baton Rouge, Attn: Antonio German Entergy - Waterford 3 Attn: Mr. Gerald Davey | |||
~ ." | |||
PILE CAISSON SPUD PILE PILE CLUSTER (BUOY AND ANCHOR CHA I Nl STONE RJPRAP STONE STONE STONE ASPHALT RIPRAP ASPHALT WILLOW WILLOW OR A.C. | |||
OR A.C. ASPHALT MATTRESS WILLOW MA TT RESS OR A.C. | |||
MATTRESS RIVER BANK RIVER BANK RIVER BANK RIVER BANK w | |||
~ | |||
0 w | |||
~ | |||
0 0 | |||
w | |||
~ "~ | |||
w | |||
"'w> | |||
0 u | |||
z 0 ~ | |||
>- z | |||
~ | |||
~ | |||
G'; | |||
~~~~; | |||
STONE COVERAGE REQUIRED OVER TOT AL AREA B )~ ffi~ ~ | |||
~~~ ! | |||
~ ~~ ~~ ! | |||
NOTES: ~ 8~ ~~ ~ | |||
~ | |||
I. SIZE OF RIPRAP TO VARY BETWEEN 6 POUNDS AND 125 POUNDS " | |||
WITH 40 PERCENT TO 60 PERCENT OF THE STONE WITHIN THE "',,; mi"':0;:. | |||
DIMENSIONS IN FEET FOR j Hi~ | |||
RANGE OF 25 POUNDS TO 75 POUNDS. | |||
PROTECTION AREA REQUIRED DEPTH OF WATER IN FEET SPUD PILE 2. WHEN PENETRATING THE UPPER BANK PAVING IN A REVETMENT AREA PILE WITH PILES, CAISSONS AND/OR PILE CLUSTERS, A 10 INCH THICK AT POINT OF PENETRATION PILE CAISSON <BUOY AND CLUSTER RIPRAP STONE LAYER SHALL BE PLACED OVER ALL AREAS WHERE | |||
~§~ | |||
AT TIME OF STONE PLACEMENT ANCHOR CHAIN) 8~~ | |||
~;~~ | |||
THE BANK PAVING IS DISTURBED BY DRIVING OPERATIONS. | |||
x y x y x y x y I' - 10' 3 1.5 5 2 3 I Ai §~~d | |||
: 3. WHEN USING AN ANCHOR CHAIN AND BUOY SYSTEM, THE ANCHOR 11' - 40' 41' - 60' 5 | |||
8 2 | |||
3 8 | |||
12 3 | |||
4 7 | |||
12 3 | |||
4 6 | |||
10 2 | |||
3 CHAIN MUST BE ATTACHED AT THE TOP OF THE PILE TO MINIMIZE REVETMENT DAMAGE. | |||
;u~}} |
Latest revision as of 19:50, 4 February 2020
ML17038A273 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 02/07/2017 |
From: | Entergy Operations |
To: | Keegan E Division of License Renewal |
ELAINE KEEGAN, NRR/DLR, 415-8517 | |
Shared Package | |
ML17018A143 | List:
|
References | |
Download: ML17038A273 (3) | |
Text
DEPARTMENT OF THE ARMY NEW ORLEANS DISTRICT, CORPS OF ENGINEERS P. 0. BOX 60267 NEW ORLEANS, LOUISIANA 70160-0267 September 19, 2013 REPLY TO ATIENTIONOF Operations Division Operations Manager, Completed Works Mr. Joseph Dantin - President Board of Commissioners Lafourche Basin Levee District Post Office Box 670 Vacherie, Louisiana 70090
Dear Mr. Dantin:
We have received an application for a Department of the Army permit dated July 15, 2013, from Entergy- Waterford 3, concerning permission to replace four dolphins on the right descending Mississippi River bank, vicinity of second order levee station 443+00, in St. Bernard Parish, Louisiana.
We have no objection to your Board's issuance of a permit for that portion of the work which is under your jurisdiction provided:
- a. The work is accomplished in accordance with the above referenced application, vicinity map and accompanying drawings, copy enclosed.
- b. All pile driving work is performed and completed while the stage of the Mississippi River is below elevation +15.0 feet on the Carrollton gage, at New Orleans, Louisiana. Information concerning current river stages may be obtained on our website at www.mvn.usace.army.mil.
- c. Riprap is placed around all piles that penetrate through the revetment in accordance with the Corps of Engineers standard drawing, "Repair Procedures Required When Penetrating Revetments With Piles, Caissons and/or Pile Clusters," file No. H-18-45204, copy enclosed.
- d. Any damage to the bank resulting from the applicant's activities is repaired at the applicant's expense.
- e. That should changes in the location or section of the existing levee and/or river, or in the generally prevailing conditions in the vicinity, be required in the future in the public interest, the applicant shall make changes in the project concerned, or in the arrangement thereof, as may be necessary to satisfactorily meet the situation and shall bear the cost thereof.
This letter of no objection is based upon engineering criteria, and no interpretation or comments regarding local laws, zoning, or ordinances concerning property rights, etc., have been made. Additionally, this letter of no objection does not obviate the applicant's requirement to obtain federal, state, or local permits required by law.
If we can be of any further assistance, please feel free to call Mr. Albert Terry of my office, at (504) 862-2311. Additionally, future correspondence concerning this project should reference our permit number 13-592. This will allow us to more easily locate records of previous correspondence, and thus provide a quicker response.
Please furnish this office a copy of your permit if the applicant's proposal is approved by your Board.
Sincerely, A~1.~~
Operations Manager, Completed Works Enclosures Copies Furnished:
CPRA, Baton Rouge, Attn: Rhonda Braud CPRA, Baton Rouge, Attn: Antonio German Entergy - Waterford 3 Attn: Mr. Gerald Davey
~ ."
PILE CAISSON SPUD PILE PILE CLUSTER (BUOY AND ANCHOR CHA I Nl STONE RJPRAP STONE STONE STONE ASPHALT RIPRAP ASPHALT WILLOW WILLOW OR A.C.
OR A.C. ASPHALT MATTRESS WILLOW MA TT RESS OR A.C.
MATTRESS RIVER BANK RIVER BANK RIVER BANK RIVER BANK w
~
0 w
~
0 0
w
~ "~
w
"'w>
0 u
z 0 ~
>- z
~
~
G';
~~~~;
STONE COVERAGE REQUIRED OVER TOT AL AREA B )~ ffi~ ~
~~~ !
~ ~~ ~~ !
NOTES: ~ 8~ ~~ ~
~
I. SIZE OF RIPRAP TO VARY BETWEEN 6 POUNDS AND 125 POUNDS "
WITH 40 PERCENT TO 60 PERCENT OF THE STONE WITHIN THE "',,; mi"':0;:.
DIMENSIONS IN FEET FOR j Hi~
RANGE OF 25 POUNDS TO 75 POUNDS.
PROTECTION AREA REQUIRED DEPTH OF WATER IN FEET SPUD PILE 2. WHEN PENETRATING THE UPPER BANK PAVING IN A REVETMENT AREA PILE WITH PILES, CAISSONS AND/OR PILE CLUSTERS, A 10 INCH THICK AT POINT OF PENETRATION PILE CAISSON <BUOY AND CLUSTER RIPRAP STONE LAYER SHALL BE PLACED OVER ALL AREAS WHERE
~§~
AT TIME OF STONE PLACEMENT ANCHOR CHAIN) 8~~
~;~~
THE BANK PAVING IS DISTURBED BY DRIVING OPERATIONS.
x y x y x y x y I' - 10' 3 1.5 5 2 3 I Ai §~~d
- 3. WHEN USING AN ANCHOR CHAIN AND BUOY SYSTEM, THE ANCHOR 11' - 40' 41' - 60' 5
8 2
3 8
12 3
4 7
12 3
4 6
10 2
3 CHAIN MUST BE ATTACHED AT THE TOP OF THE PILE TO MINIMIZE REVETMENT DAMAGE.
- u~