SAFEGUARDS INFORMATION
                              SAFEGUARDS INFORMATION
..
                                          MAR 18 887
MAR 18 887
      Georgia Power Company
Georgia Power Company
      ATTN:   Mr. James P. O'Reilly
ATTN:
              Senior Vice President - Nuclear
Mr. James P. O'Reilly
                  Operations
Senior Vice President - Nuclear
      P. O. Box 4545
Operations
      Atlanta, GA 30302
P. O. Box 4545
      Gentlemen:
Atlanta, GA 30302
      SUBJECT:   NRC INSPECTION REPORT NOS. 50-321/86-37 AND 50-366/86-37
Gentlemen:
      Thank you for your responses of January 16 and 30,1987, to our Notice of
SUBJECT:
      Violation issued on December 17, 1986, concerning activities conducted at your
NRC INSPECTION REPORT NOS. 50-321/86-37 AND 50-366/86-37
      Hatch facility.   We have evaluated your response and found that it meets the
Thank you for your responses of January 16 and 30,1987, to our Notice of
      requirements 10 CFR 2.201. We will examine the implementation of your
Violation issued on December 17, 1986, concerning activities conducted at your
      corrective actions during future inspections.
Hatch facility.
      After careful consideration of the basis for your request that the violations be
We have evaluated your response and found that it meets the
      withdrawn, we have concluded for the reasons presented in the enclosure to this
requirements 10 CFR 2.201.
      letter that the violations should remain as presented in the Notice of
We will examine the implementation of your
      Violation.
corrective actions during future inspections.
      In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, Safeguards Information is
After careful consideration of the basis for your request that the violations be
      exempt from public disclosure. Therefore, the enclosure to this letter will not
withdrawn, we have concluded for the reasons presented in the enclosure to this
      be placed in the NRC's Public Document Room.
letter that the violations should remain as presented in the Notice of
      Should you have any questions about this letter, please contact us.
Violation.
                                              Sincerely,
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, Safeguards Information is
                                              Luis A. Reyes, Director
exempt from public disclosure.
                                              Division of Reactor Projects
Therefore, the enclosure to this letter will not
i     Enclosure:
be placed in the NRC's Public Document Room.
Should you have any questions about this letter, please contact us.
Sincerely,
Luis A. Reyes, Director
Division of Reactor Projects
i
Enclosure:
'
'
      Staff Assessment of Licensee Response
Staff Assessment of Licensee Response
!       (Safeguards Information)
!
(Safeguards Information)
'
'
      cc w/ enc 1:
cc w/ enc 1:
      J. T. Beckham, Vice President, Nuclear
J. T. Beckham, Vice President, Nuclear
        Operations
Operations
;    H. C. Nix, Site Operations, General
H. C. Nix, Site Operations, General
        Manager
;
r    A. Fraser, Acting Site QA Supervisor
Manager
l     L. Gucwa, Manager, Nuclear Safety
A. Fraser, Acting Site QA Supervisor
        and Licensing
r
l                                                                    ENCLOSURE CONTAINS
l
                                                                      SAFEGU.m0S INFORMATION
L. Gucwa, Manager, Nuclear Safety
      bec w/ encl:   (See page 2)                                   tJPON SEPARATION THIS
l
                                                                    PAGE IS DECONTROLLED.
and Licensing
    g?832a88cR E88@p                 EGUARDS INFORMATION                      M            \
ENCLOSURE CONTAINS
SAFEGU.m0S INFORMATION
bec w/ encl:
(See page 2)
tJPON SEPARATION THIS
PAGE IS DECONTROLLED.
g?832a88cR E88@p
EGUARDS INFORMATIONM
\\


      '
'
  '
SAFEGUARDS INFORMATION
                          SAFEGUARDS INFORMATION
'
        Georgia Power Company             2                 MAR 181987
MAR 181987
        bec w/ enc 1:
Georgia Power Company
        IE File
2
        NMSS/SGPL
bec w/ enc 1:
        NRR/DL/SSPB
IE File
        bec w/o encl:
NMSS/SGPL
        NRC Resident Inspector
NRR/DL/SSPB
        Document Control Desk, 016
bec w/o encl:
        State of Georgia
NRC Resident Inspector
    .
Document Control Desk, 016
      RII                   I       --
State of Georgia
                                                I
.
                                                  '
RII
      ATillman:er               re     /   Cli   b JStohr
I
      03/f/87             03//g/87         03/ /B7
'
                                                          03//7 /87
I
      RII                 RII               RII.'
--
      FCan     11         VBro   ee       GJ         En0LCSURE CONTAINS
b JStohr
      03/jy/87                                         :!>.P :CL'AROS INFCFMATION
ATillman:er
                          03/gj/87          03/f/87
re
                                                /      LPOi! SEPARATION Ti!IS
/
                                                        PACE IS DEC0!ITROLLSD.
Cli
                                SAFEGUARDS INFORMATION
03/f/87
03//g/87
03/ /B7
03//7 /87
RII
RII
RII.'
FCan
11
VBro
ee
GJ
En0LCSURE CONTAINS
03/jy/87
03/gj/87
03/f/87
:!>.P :CL'AROS INFCFMATION
/
LPOi! SEPARATION Ti!IS
PACE IS DEC0!ITROLLSD.
SAFEGUARDS INFORMATION
j-
j-


      ,
Ge$rg;a N*ev Company
        Ge$rg;a N*ev Company
,
                                                            *
**
    ** 333 Pecmont Avenue                         .
333 Pecmont Avenue
,,      Atlanta. Georg<a 30308             r
*
        Teiephone 404 526 6526                 t.
.
                                                  '
Atlanta. Georg<a 30308
                                                        tJRCi;GN,_n
,,
        Ma ong Accress
r
                                                      i tlan:a Ga'
'
        Nst Office Bos 4545
Teiephone 404 526 6526
          Attanta. Georgia 30302
t.
                                                                                        GeorgiaPower
tJRCi;GN,_n
                                              37 FEB 3*      P l: 04
i tlan:a Ga'
          L T. oucwe                                                               $(-1941
Ma ong Accress
          Manager Nuclear safety
Nst Office Bos 4545
          and Ucensing
37 FEB 3
                                                                                    0093b
P l: 04
                                                January 30, 1987
GeorgiaPower
        U.S. Nuclear Regulatory Comission
Attanta. Georgia 30302
        ATTN:        Document Control Desk
*
        Washington, D.C. 20555
L T. oucwe
                                            NRC 00CKETS 50-321, 50-366
$(-1941
                                        OPERATING LICENSES DPR-57, NPF-5
Manager Nuclear safety
                                    EDWIN 1. HATCH NUCLEAR PLANT UNITS 1, 2                                     ~
0093b
                                              INSPECTION REPORT 86-37
and Ucensing
                                                                                                Inspection      6
January 30, 1987
          Gentlemen:
U.S. Nuclear Regulatory Comission
                                                                1987, in response to I.E. it a complete
Document Control Desk
                  By our letter dated January 16,
ATTN:
            Report 86-37, Georgia Power Company                           1, 1987.     noted
Washington, D.C. 20555
                                                                                      Due         our intent to subm
NRC 00CKETS 50-321, 50-366
                                                                                            to unforeseen
OPERATING LICENSES DPR-57, NPF-5
                                the Security Plan by FebruaryThe revised plan is scheduled to be
EDWIN 1. HATCH NUCLEAR PLANT UNITS 1, 2
            revision       to
~
            circumstances, this has been delayed.
INSPECTION REPORT 86-37
            submitted by March 31, 1987.
6
                    If you have any questions, please contact this office.
1987, in response to I.E.
                                                                        Sincerely,       .
Inspection
                                                                        4 r.h [G                           .
Gentlemen:
                                                              _
it a complete
                                                                        L. T. Gucwa
By our letter dated January 16,
              HJB/sjb
Report 86-37, Georgia Power Company noted our intent to subm
                                                              U.S. Nuclear Regulatory Commission _                 l
1,
              c:    Georgia Powar Company                   Dr. J, N. Grace,, Regional Administrator   -
1987.
                      Mr. J. P. O'Reilly                     Mr. P. Holmes-Ray, Senior Resident
Due to unforeseen
                      Mr. J. T. Beckham, Jr.                       Inspector - Hatch
the Security Plan by FebruaryThe revised plan is scheduled to be
                      Mr. H. C. Nix, Jr.
revision to
  _
circumstances, this has been delayed.
                    g -fl9 N
submitted by March 31, 1987.
If you have any questions, please contact this office.
.
Sincerely,
4 r.h [G
.
L. T. Gucwa
_
HJB/sjb
U.S. Nuclear Regulatory Commission _
Georgia Powar Company
Dr. J, N. Grace,, Regional Administrator
l
Mr. J. P. O'Reilly
Mr. P. Holmes-Ray, Senior Resident
-
c:
Mr. J. T. Beckham, Jr.
Inspector - Hatch
Mr. H. C. Nix, Jr.
_
g -fl9 N


  _
_
    l'   ;     Georg a Nws' Comcam
l'
    **           an Ge ga         *                        ,
;
                wemum
Georg a Nws' Comcam
                                                      -
*
        4
**
                Ma t;r'g Add'955
an Ge ga
                N5t O't.ce Bos 4$4$
,
                At'aMa Georg a 30302
-
                                        ENCLOSURE CONTAINS SAFEGUARDS INFORMATION Georgia      '
wemum
                                                                                                    Pbwer
4
                                                                                                        ,
Ma t;r'g Add'955
                L. t ove.,.
N5t O't.ce Bos 4$4$
                                        UPON SEPARATION THIS PAGE DECONTROLLED
At'aMa Georg a 30302
                Managet Nuctear Safety
ENCLOSURE CONTAINS SAFEGUARDS INFORMATIONGeorgia Pbwer
                and Licens ng
'
                                                                                  SL-1837
UPON SEPARATION THIS PAGE DECONTROLLED
                                                                                  00llb
,
                                                    January 16, 1987
L. t ove.,.
                                                                                                  a
Managet Nuctear Safety
            U.S. Nuclear Regulatory Commission                                                   w
and Licens ng
                                                                                                              --
SL-1837
                                                                                                  ,
00llb
            ATTN:       Document Control Desk
January 16, 1987
            Washington, D.C. 20555                                                               g
a
                                                                                                *        UI?
U.S. Nuclear Regulatory Commission
                                                NRC DOCKETS 50-321,50-366                                 EO
w
                                            OPERATING LICENSES DPR-57, NPF-5                             "
--
                                          EDWIN I. HATCP NUCLEAR PLAN UNITS 1, 2                 2           $
ATTN:
                                                  INSPECTION REPORT 86-37_
Document Control Desk
                                                                                                ..       fz
,
                                                                                                          -
Washington, D.C. 20555
                                                                                                a         M
g
                                                                                                4-
UI?
            Gentlemen:
*
                    This letter is in response to the Notice of Violation cited in Inspection             The
NRC DOCKETS 50-321,50-366
            Report Nos. 50-321/86-37 and SC-366/86-37, dated December 17, 1986.
EO
            referenced report relates to an NRC inspection conducted November 17-20,
OPERATING LICENSES DPR-57, NPF-5
            1986. The inspection covered a broad range of the security operations at the
EDWIN I. HATCP NUCLEAR PLAN UNITS 1, 2
            plant and resulted in the identiff cation of two . Severity Level V findings.- .
2
                    Georgia Power Company (GPC) has undertaken numercus security improvements
$
            at both Plant Hatch and Plant Vogtie, and at our Corporate office to further
"
            enhance the Nuclear Security Program, as indicated in previous correspondence
INSPECTION REPORT 86-37_
            and meetings. We specifically wt.sh to note that GPC has created and fully
fz
            - staffed a corporate nuclear security organization that monitors               andRegulatory
..
                                                                                  The recent       provides
-
            assistance and direction to Plant:           Security Operations.
a
              Effectiveness Review of Plant Hatch, which concentrated - on actual physical
M
              security issues, resulted in a favorable preliminary report on the security
4-
                                              We belfewe this review is but another confirmation of
Gentlemen:
            operation of the plant.our efforts to achieve excellenc:e and the exemplary results a
This letter is in response to the Notice of Violation cited in Inspection
!             the past year.
Report Nos. 50-321/86-37 and SC-366/86-37, dated December 17, 1986.
                    Georgia Power Company beliewes that the effort and attention                   given to
The
                                                                                          of perforinance
referenced report relates to an NRC inspection conducted November 17-20,
              these two minor _ findings and               the related     implications
The inspection covered a broad range of the security operations at the
              indicators and noncompliance stat-istics is contrary to effective and eff.icient               2~,
1986.
              regulatory practices inherent im the NRC's Enforcement                 Policy (10   CFR
plant and resulted in the identiff cation of two . Severity Level V findings.-
                                                                                                  safeguards
.
              Appendix C).            In our view,       neither of the findings had
Georgia Power Company (GPC) has undertaken numercus security improvements
              significance. The enclosure to this letter addresses                  in detail these two
at both Plant Hatch and Plant Vogtie, and at our Corporate office to further
enhance the Nuclear Security Program, as indicated in previous correspondence
and meetings. We specifically wt.sh to note that GPC has created and fully
- staffed a corporate nuclear security organization that monitors and provides
Security Operations.
The recent Regulatory
assistance and direction to Plant:
Effectiveness Review of Plant Hatch, which concentrated - on actual physical
security issues, resulted in a favorable preliminary report on the security
We belfewe this review is but another confirmation of
operation of the plant.our efforts to achieve excellenc:e and the exemplary results a
!
the past year.
Georgia Power Company beliewes that the effort and attention given to
these two minor _ findings and
the related
implications
of perforinance
indicators and noncompliance stat-istics is contrary to effective and eff.icient
regulatory practices inherent im the NRC's Enforcement Policy (10 CFR
2~,
!
!
Appendix
C).
In
our
view,
neither
of
the
findings
had
safeguards
significance.
The enclosure to
this letter addresses in detail these two
taken by GPC.
In addition, the enclosure
'
'
                                                          taken by  GPC.    In addition, the enclosure
minor findings and the actions
              minor findings and the actions
describes the reasons which suppcort our request that these two violations be
l            describes the reasons which suppcort our request that these two violations be
l
              withdrawn. Our request that thesse two proposals be withdrawn is respectfully
Our request that thesse two proposals be withdrawn is respectfully
l
l
j
j
i              submitted. An affirmative response would reinforce the positive movement our
withdrawn.
              nuclear security program has alrenady made.
An affirmative response would reinforce the positive movement our
                                        ENCLOSURE CONTFAINS SAFEGUARDS INFORMATION
i
                                        UPON SEPARATI0!6N THIS PAGE IS DECONTROLLED
submitted.
                M NI
nuclear security program has alrenady made.
ENCLOSURE CONTFAINS SAFEGUARDS INFORMATION
UPON SEPARATI0!6N THIS PAGE IS DECONTROLLED
M NI


i   .
i
        *'
.
  ..                                                                                       .
*'
      Georgia Power A
..
                                                                          ENCLOSURE CONTAINS SAFEGUARDS INFORMATI0f.
.
                                                                          UPON SEPARATIWN THIS PAGE 15 DECONTROLLED
Georgia Power A
                U.S. Nuclear Regulatory Commission
ENCLOSURE CONTAINS SAFEGUARDS INFORMATI0f.
                January 16, 1987
UPON SEPARATIWN THIS PAGE 15 DECONTROLLED
                Page 2
U.S. Nuclear Regulatory Commission
                    The enclosure to this letter is exempt from disclosure in accordance with
January 16, 1987
                10 CFR 2.790(d) and 10 CFR 73.27. If you have any questions, please contact
Page 2
                this office.
The enclosure to this letter is exempt from disclosure in accordance with
                                                                                                            Sincerely,
10 CFR 2.790(d) and 10 CFR 73.27.
                                                                                                          ff & =
If you have any questions, please contact
                                                                                                            L. T. Gucwa
this office.
                JMF/sjb
Sincerely,
                Enclosure
ff & =
                c: w/o Enclosure
L. T. Gucwa
                  Georgia Power Company                                                             U.S. Nuclear Regulatory Commission ~
JMF/sjb
                    Mr. J. P. O'Reilly                                                               Dr. J. N. Grace, Regional Administrator
Enclosure
                    Mr. J. T. Beckham, Jr.                                                           Mr. P. Holmes-Ray, Senior Resident
c: w/o Enclosure
                    Mr. H. C. Nix, Jr.
Georgia Power Company
                                                                                                    _
U.S. Nuclear Regulatory Commission ~
                                                                                                            Inspector - Hatch
Mr. J. P. O'Reilly
                                                                                      .                                   _
Dr. J. N. Grace, Regional Administrator
                                            _
Mr. J. T. Beckham, Jr.
                                                                            ENCLOSURE CONTAINS SAFEGUARD INFORMATION
Mr. P. Holmes-Ray, Senior Resident
                                                                          UPON SEPARATIUJN TH15 PAGE 15 ULCUNTRULLED
Mr. H. C. Nix, Jr.
                                                                                '
Inspector - Hatch
                                                                                                                                                                                      -
_
                                                                                  -
.
                                                                                                                        .
_
                                                                                                                                                                                    e
_
          . _ .
ENCLOSURE CONTAINS SAFEGUARD INFORMATION
                    __ . _ . . _ _ _ . _ . _ _ _ _ _ _ . _ _ . _ , . . . ,             _ . _ _ _ _       _     _. _.     __ . _ _ _ _ _ , _ . _ _ _ . _ _ _ _ _ . . _ _ _ . _ .,     _
UPON SEPARATIUJN TH15 PAGE 15 ULCUNTRULLED
'
-
-
.
e
. _ .
__ . _ . . _ _ _ . _ . _ _ _ _ _ _ . _ _ . _ , . . . ,
_ . _ _ _ _
_
_. _.
__ . _ _ _ _ _ , _ . _ _ _ . _ _ _ _ _ . . _ _ _ . _ .,
_
}}
}}

Latest revision as of 23:24, 23 May 2025

Ack Receipt of 870116 & 30 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-321/86-37 & 50-366/86-37.Violations Will Remain as Presented in Notice. Assessment of Licensee Response Withheld (Ref 10CFR2.790)
ML20204F785
Person / Time
Site: Hatch  
Issue date: 03/18/1987
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
References
NUDOCS 8703260270
Download: ML20204F785 (2)


See also: IR 05000321/1986037

Text

SAFEGUARDS INFORMATION

..

MAR 18 887

Georgia Power Company

ATTN:

Mr. James P. O'Reilly

Senior Vice President - Nuclear

Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NOS. 50-321/86-37 AND 50-366/86-37

Thank you for your responses of January 16 and 30,1987, to our Notice of

Violation issued on December 17, 1986, concerning activities conducted at your

Hatch facility.

We have evaluated your response and found that it meets the

requirements 10 CFR 2.201.

We will examine the implementation of your

corrective actions during future inspections.

After careful consideration of the basis for your request that the violations be

withdrawn, we have concluded for the reasons presented in the enclosure to this

letter that the violations should remain as presented in the Notice of

Violation.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, Safeguards Information is

exempt from public disclosure.

Therefore, the enclosure to this letter will not

be placed in the NRC's Public Document Room.

Should you have any questions about this letter, please contact us.

Sincerely,

Luis A. Reyes, Director

Division of Reactor Projects

i

Enclosure:

'

Staff Assessment of Licensee Response

!

(Safeguards Information)

'

cc w/ enc 1:

J. T. Beckham, Vice President, Nuclear

Operations

H. C. Nix, Site Operations, General

Manager

A. Fraser, Acting Site QA Supervisor

r

l

L. Gucwa, Manager, Nuclear Safety

l

and Licensing

ENCLOSURE CONTAINS

SAFEGU.m0S INFORMATION

bec w/ encl:

(See page 2)

tJPON SEPARATION THIS

PAGE IS DECONTROLLED.

g?832a88cR E88@p

EGUARDS INFORMATIONM

\\

'

SAFEGUARDS INFORMATION

'

MAR 181987

Georgia Power Company

2

bec w/ enc 1:

IE File

NMSS/SGPL

NRR/DL/SSPB

bec w/o encl:

NRC Resident Inspector

Document Control Desk, 016

State of Georgia

.

RII

I

'

I

--

b JStohr

ATillman:er

re

/

Cli

03/f/87

03//g/87

03/ /B7

03//7 /87

RII

RII

RII.'

FCan

11

VBro

ee

GJ

En0LCSURE CONTAINS

03/jy/87

03/gj/87

03/f/87

!>.P :CL'AROS INFCFMATION

/

LPOi! SEPARATION Ti!IS

PACE IS DEC0!ITROLLSD.

SAFEGUARDS INFORMATION

j-

Ge$rg;a N*ev Company

,

333 Pecmont Avenue

.

Atlanta. Georg<a 30308

,,

r

'

Teiephone 404 526 6526

t.

tJRCi;GN,_n

i tlan:a Ga'

Ma ong Accress

Nst Office Bos 4545

37 FEB 3

P l: 04

GeorgiaPower

Attanta. Georgia 30302

L T. oucwe

$(-1941

Manager Nuclear safety

0093b

and Ucensing

January 30, 1987

U.S. Nuclear Regulatory Comission

Document Control Desk

ATTN:

Washington, D.C. 20555

NRC 00CKETS 50-321, 50-366

OPERATING LICENSES DPR-57, NPF-5

EDWIN 1. HATCH NUCLEAR PLANT UNITS 1, 2

~

INSPECTION REPORT 86-37

6

1987, in response to I.E.

Inspection

Gentlemen:

it a complete

By our letter dated January 16,

Report 86-37, Georgia Power Company noted our intent to subm

1,

1987.

Due to unforeseen

the Security Plan by FebruaryThe revised plan is scheduled to be

revision to

circumstances, this has been delayed.

submitted by March 31, 1987.

If you have any questions, please contact this office.

.

Sincerely,

4 r.h [G

.

L. T. Gucwa

_

HJB/sjb

U.S. Nuclear Regulatory Commission _

Georgia Powar Company

Dr. J, N. Grace,, Regional Administrator

l

Mr. J. P. O'Reilly

Mr. P. Holmes-Ray, Senior Resident

-

c:

Mr. J. T. Beckham, Jr.

Inspector - Hatch

Mr. H. C. Nix, Jr.

_

g -fl9 N

_

l'

Georg a Nws' Comcam

an Ge ga

,

-

wemum

4

Ma t;r'g Add'955

N5t O't.ce Bos 4$4$

At'aMa Georg a 30302

ENCLOSURE CONTAINS SAFEGUARDS INFORMATIONGeorgia Pbwer

'

UPON SEPARATION THIS PAGE DECONTROLLED

,

L. t ove.,.

Managet Nuctear Safety

and Licens ng

SL-1837

00llb

January 16, 1987

a

U.S. Nuclear Regulatory Commission

w

--

ATTN:

Document Control Desk

,

Washington, D.C. 20555

g

UI?

NRC DOCKETS 50-321,50-366

EO

OPERATING LICENSES DPR-57, NPF-5

EDWIN I. HATCP NUCLEAR PLAN UNITS 1, 2

2

$

"

INSPECTION REPORT 86-37_

fz

..

-

a

M

4-

Gentlemen:

This letter is in response to the Notice of Violation cited in Inspection

Report Nos. 50-321/86-37 and SC-366/86-37, dated December 17, 1986.

The

referenced report relates to an NRC inspection conducted November 17-20,

The inspection covered a broad range of the security operations at the

1986.

plant and resulted in the identiff cation of two . Severity Level V findings.-

.

Georgia Power Company (GPC) has undertaken numercus security improvements

at both Plant Hatch and Plant Vogtie, and at our Corporate office to further

enhance the Nuclear Security Program, as indicated in previous correspondence

and meetings. We specifically wt.sh to note that GPC has created and fully

- staffed a corporate nuclear security organization that monitors and provides

Security Operations.

The recent Regulatory

assistance and direction to Plant:

Effectiveness Review of Plant Hatch, which concentrated - on actual physical

security issues, resulted in a favorable preliminary report on the security

We belfewe this review is but another confirmation of

operation of the plant.our efforts to achieve excellenc:e and the exemplary results a

!

the past year.

Georgia Power Company beliewes that the effort and attention given to

these two minor _ findings and

the related

implications

of perforinance

indicators and noncompliance stat-istics is contrary to effective and eff.icient

regulatory practices inherent im the NRC's Enforcement Policy (10 CFR

2~,

!

Appendix

C).

In

our

view,

neither

of

the

findings

had

safeguards

significance.

The enclosure to

this letter addresses in detail these two

taken by GPC.

In addition, the enclosure

'

minor findings and the actions

describes the reasons which suppcort our request that these two violations be

l

Our request that thesse two proposals be withdrawn is respectfully

l

j

withdrawn.

An affirmative response would reinforce the positive movement our

i

submitted.

nuclear security program has alrenady made.

ENCLOSURE CONTFAINS SAFEGUARDS INFORMATION

UPON SEPARATI0!6N THIS PAGE IS DECONTROLLED

M NI

i

.

  • '

..

.

Georgia Power A

ENCLOSURE CONTAINS SAFEGUARDS INFORMATI0f.

UPON SEPARATIWN THIS PAGE 15 DECONTROLLED

U.S. Nuclear Regulatory Commission

January 16, 1987

Page 2

The enclosure to this letter is exempt from disclosure in accordance with

10 CFR 2.790(d) and 10 CFR 73.27.

If you have any questions, please contact

this office.

Sincerely,

ff & =

L. T. Gucwa

JMF/sjb

Enclosure

c: w/o Enclosure

Georgia Power Company

U.S. Nuclear Regulatory Commission ~

Mr. J. P. O'Reilly

Dr. J. N. Grace, Regional Administrator

Mr. J. T. Beckham, Jr.

Mr. P. Holmes-Ray, Senior Resident

Mr. H. C. Nix, Jr.

Inspector - Hatch

_

.

_

_

ENCLOSURE CONTAINS SAFEGUARD INFORMATION

UPON SEPARATIUJN TH15 PAGE 15 ULCUNTRULLED

'

-

-

.