ML993230184: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(11 intermediate revisions by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:Mr. Glen A. Watford, Manager Nuclear Fuel Engineering GE Nuclear Energy November 10, 1999 P. 0. Box 780 Wilmington, NC 28402
 
==SUBJECT:==
AMENDMENT 26 TO GE LICENSING TOPICAL REPORT NEDE-2401 1-P-A, "GESTAR I'" - IMPLEMENTING IMPROVED GE STEADY-STATE METHODS (TAC NO. MA6481)
 
==Dear Mr. Watford:==
By {{letter dated|date=October 22, 1999|text=letter dated October 22, 1999}}, General Electric Nuclear Energy (GENE), submitted a request for review of Amendment 26 to GESTAR as a standard amendment. GESTAR Amendment 26 was submitted by {{letter dated|date=August 13, 1999|text=letter dated August 13, 1999}}, as an administrative change, and involved three areas. These areas were: (1) clarifying classification of BWR 6 pressure regulator failure downscale event; (2) implementing improved General Electric (GE) steady-state methods; and (3) incorporation of Boiling Water Reactor Owners Group (BWOG) approved stability options.
This submittal was later supplemented by letters of September 17 and October 14, 1999. The NRC staff has reviewed Item 2 of the submittal, in relation to the GE improved steady-state methods, and has prepared the enclosed safety evaluation. We find Item 2 of the proposed Amendment 26 is acceptable, as discussed in the safety evaluation. Items 1 and 3 will be addressed under a separate cover letter.
 
Sincerely, Stuart A. Richards, Director Original Signed By:
 
Project Directorate IV and Decommissioning Division of Licensing Project Management Office of Nuclear Regulator Regulation
 
Project No. 691 DISTRIBUTION:
 
==Enclosure:==
Safety Evaluation File Center PUBLIC cc w/encl: See next page PDIV-2 Reading SRichards RScholl (e-mail SE a V.
ACRS....
OGC EKenderick
* See previous concurrence I o receive a copy ot tills document, indicate 77, in the box OFFICE PDIII/2/PM C PDIV-2/LA C PDIV_2/SC PDIV/PD NAME RPulsifer:am* E. Peyton
* SDembek* SRichards DATE 11/9/99 11/8/99 11/ 9/99 11/10/99
 
, UIWIEN I AIV-.: L:IP'IIII FICAULIIRIECOEa.wpd OFFICAL RECORD ONLY cr) Fý
'YA UNITED STATES
 
La.,0 NUCLEAR REGULATORY COMMISSION A' WASHINGTON, D.C. 20555-0001 November 10, 1999
 
Mr. Glen A. Watford, Manager Nuclear Fuel Engineering GE Nuclear Energy P. O. Box 780 Wilmington, NC 28402
 
==SUBJECT:==
AMENDMENT 26 TO GE LICENSING TOPICAL REPORT NEDE-24011-P-A, "GESTAR 11" - IMPLEMENTING IMPROVED GE STEADY-STATE METHODS (TAC NO. MA6481)
 
==Dear Mr. Watford:==
By {{letter dated|date=October 22, 1999|text=letter dated October 22, 1999}}, General Electric Nuclear Energy (GENE), submitted a request for review of Amendment 26 to GESTAR as a standard amendment. GESTAR Amendment 26 was submitted by {{letter dated|date=August 13, 1999|text=letter dated August 13, 1999}}, as an administrative change, and involved three areas. These areas were: (1) clarifying classification of BWR 6 pressure regulator failure downscale event; (2) implementing improved General Electric (GE) steady state methods; and (3) incorporation of Boiling Water Reactor Owners Group (BWOG) approved stability options. This submittal was later supplemented by letters of September 17 and October 14, 1999. The NRC staff has reviewed Item 2 of the submittal, in relation to the GE improved steady-state methods, and has prepared the enclosed safety evaluation. We find Item 2 of the proposed Amendment 26 acceptable, as discussed in the safety evaluation.
Items 1 and 3 will be addressed under a separate cover letter.
 
Sincerely,
 
Stuart A. Richards, Director Project Directorate IV and Decommissioning Division of Licensing Project Management Office of Nuclear Regulator Regulation
 
Project No. 691
 
==Enclosure:==
Safety Evaluation
 
cc w/encl: See next page Boiling Water Reactor Owners Group Project No. 691
 
cc:
Mr. W. Glenn Warren Mr. George T. Jones BWR Owners' Group Chairman PP& L, Inc.
Southern Nuclear Company MC GENA6-1 42 Inverness Parkway Two North Ninth Street PO Box 1295 Allentown, PA 18101 Birmingham, AL 35201 Mr. John Kelly Mr. James M. Kenny New York Power Authority BWR Owners' Group Vice Chairman 14th Floor Mail Stop 14K PP&L, Inc. Centroplex Building Mail Code GENA6-1 123 Main Street Allentown, PA 18101-1179 White Plains, NY 10601
 
Mr. Thomas J. Rausch Mr. Thomas G. Hurst RRG Chairman GE Nuclear Energy Commonwealth Edison Company M/C 182 Nuclear Fuel Services 175 Curtner Avenue 1400 Opus Place, 4th Floor San Jose, CA 95125 Downers Grove, IL 60515-5701 Mr. Drew B. Fetters Mr. Thomas A. Green PECO Energy GE Nuclear Energy Nuclear Group Headquarters M/C 182 MC 61A-3 175 Curtner Avenue 965 Chesterbrook Blvd. San Jose, CA 95125
 
Wayne, PA 19087-5691
 
Mr. H. Lewis Sumner Southern Nuclear Company 40 Inverness Parkway PO Box 1295 Birmingham, GA 35201
 
Mr. Carl D. Terry Vice President, Nuclear Engineering Niagara Mohawk Power Corporation Nine Mile Point - Station OPS Bldg/2nd Floor PO Box 63 Lycoming, NY 13093}}

Latest revision as of 05:01, 14 September 2024

Amendment 26 to GE Licensing Topical Report NEDE-24011-P-A, Gestar II - Implementing Improved GE STEADY-STATE Methods
ML993230184
Person / Time
Site: Boiling Water Reactor Owners Group
Issue date: 11/10/1999
From: Richards S
NRC/NRR/DLPM/LPD4
To: Watford G
General Electric Co
References
TAC MA6481
Download: ML993230184 (3)


Text

Mr. Glen A. Watford, Manager Nuclear Fuel Engineering GE Nuclear Energy November 10, 1999 P. 0. Box 780 Wilmington, NC 28402

SUBJECT:

AMENDMENT 26 TO GE LICENSING TOPICAL REPORT NEDE-2401 1-P-A, "GESTAR I'" - IMPLEMENTING IMPROVED GE STEADY-STATE METHODS (TAC NO. MA6481)

Dear Mr. Watford:

By letter dated October 22, 1999, General Electric Nuclear Energy (GENE), submitted a request for review of Amendment 26 to GESTAR as a standard amendment. GESTAR Amendment 26 was submitted by letter dated August 13, 1999, as an administrative change, and involved three areas. These areas were: (1) clarifying classification of BWR 6 pressure regulator failure downscale event; (2) implementing improved General Electric (GE) steady-state methods; and (3) incorporation of Boiling Water Reactor Owners Group (BWOG) approved stability options.

This submittal was later supplemented by letters of September 17 and October 14, 1999. The NRC staff has reviewed Item 2 of the submittal, in relation to the GE improved steady-state methods, and has prepared the enclosed safety evaluation. We find Item 2 of the proposed Amendment 26 is acceptable, as discussed in the safety evaluation. Items 1 and 3 will be addressed under a separate cover letter.

Sincerely, Stuart A. Richards, Director Original Signed By:

Project Directorate IV and Decommissioning Division of Licensing Project Management Office of Nuclear Regulator Regulation

Project No. 691 DISTRIBUTION:

Enclosure:

Safety Evaluation File Center PUBLIC cc w/encl: See next page PDIV-2 Reading SRichards RScholl (e-mail SE a V.

ACRS....

OGC EKenderick

  • See previous concurrence I o receive a copy ot tills document, indicate 77, in the box OFFICE PDIII/2/PM C PDIV-2/LA C PDIV_2/SC PDIV/PD NAME RPulsifer:am* E. Peyton
  • SDembek* SRichards DATE 11/9/99 11/8/99 11/ 9/99 11/10/99

, UIWIEN I AIV-.: L:IP'IIII FICAULIIRIECOEa.wpd OFFICAL RECORD ONLY cr) Fý

'YA UNITED STATES

La.,0 NUCLEAR REGULATORY COMMISSION A' WASHINGTON, D.C. 20555-0001 November 10, 1999

Mr. Glen A. Watford, Manager Nuclear Fuel Engineering GE Nuclear Energy P. O. Box 780 Wilmington, NC 28402

SUBJECT:

AMENDMENT 26 TO GE LICENSING TOPICAL REPORT NEDE-24011-P-A, "GESTAR 11" - IMPLEMENTING IMPROVED GE STEADY-STATE METHODS (TAC NO. MA6481)

Dear Mr. Watford:

By letter dated October 22, 1999, General Electric Nuclear Energy (GENE), submitted a request for review of Amendment 26 to GESTAR as a standard amendment. GESTAR Amendment 26 was submitted by letter dated August 13, 1999, as an administrative change, and involved three areas. These areas were: (1) clarifying classification of BWR 6 pressure regulator failure downscale event; (2) implementing improved General Electric (GE) steady state methods; and (3) incorporation of Boiling Water Reactor Owners Group (BWOG) approved stability options. This submittal was later supplemented by letters of September 17 and October 14, 1999. The NRC staff has reviewed Item 2 of the submittal, in relation to the GE improved steady-state methods, and has prepared the enclosed safety evaluation. We find Item 2 of the proposed Amendment 26 acceptable, as discussed in the safety evaluation.

Items 1 and 3 will be addressed under a separate cover letter.

Sincerely,

Stuart A. Richards, Director Project Directorate IV and Decommissioning Division of Licensing Project Management Office of Nuclear Regulator Regulation

Project No. 691

Enclosure:

Safety Evaluation

cc w/encl: See next page Boiling Water Reactor Owners Group Project No. 691

cc:

Mr. W. Glenn Warren Mr. George T. Jones BWR Owners' Group Chairman PP& L, Inc.

Southern Nuclear Company MC GENA6-1 42 Inverness Parkway Two North Ninth Street PO Box 1295 Allentown, PA 18101 Birmingham, AL 35201 Mr. John Kelly Mr. James M. Kenny New York Power Authority BWR Owners' Group Vice Chairman 14th Floor Mail Stop 14K PP&L, Inc. Centroplex Building Mail Code GENA6-1 123 Main Street Allentown, PA 18101-1179 White Plains, NY 10601

Mr. Thomas J. Rausch Mr. Thomas G. Hurst RRG Chairman GE Nuclear Energy Commonwealth Edison Company M/C 182 Nuclear Fuel Services 175 Curtner Avenue 1400 Opus Place, 4th Floor San Jose, CA 95125 Downers Grove, IL 60515-5701 Mr. Drew B. Fetters Mr. Thomas A. Green PECO Energy GE Nuclear Energy Nuclear Group Headquarters M/C 182 MC 61A-3 175 Curtner Avenue 965 Chesterbrook Blvd. San Jose, CA 95125

Wayne, PA 19087-5691

Mr. H. Lewis Sumner Southern Nuclear Company 40 Inverness Parkway PO Box 1295 Birmingham, GA 35201

Mr. Carl D. Terry Vice President, Nuclear Engineering Niagara Mohawk Power Corporation Nine Mile Point - Station OPS Bldg/2nd Floor PO Box 63 Lycoming, NY 13093