Risk-Informed Process for Evaluation: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page with "'''Risk-Informed Process for Evaluation (has acronym::RIPE)''' This process can be used to evaluate the safety significance of an issue, and if it is determined to be of...") |
StriderTol (talk | contribs) No edit summary |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
'''Risk-Informed Process for Evaluation ([[has acronym::RIPE]])''' | '''Risk-Informed Process for Evaluation ([[has acronym::RIPE]])''' | ||
This process can be used to evaluate the safety significance of an issue, and if it is determined to be of low safety | This process can be used to evaluate the safety significance of an issue, and if it is determined to be of low safety significance, a LAR or exemption request can be submitted to the NRC and qualified streamlined NRC review. | ||
Approved for plants with an approved [[TSTF::TSTF-505]]. | Approved for plants with an approved [[TSTF::TSTF-505]]. | ||
NEI issued [[NEI::NEI 21-01]]. Scope includes [[TSTF::TSTF-425]]. | NEI issued [[NEI::NEI 21-01]]. Scope includes [[TSTF::TSTF-425]]. | ||
==See also== | |||
* [[NEI::NEI 21-01, Industry Guidance to Support Implementation of NRC Risk-Informed Process for Evaluations]] | |||
{{topic-Nav}} | |||
Latest revision as of 15:39, 27 May 2025
Risk-Informed Process for Evaluation (RIPE)
This process can be used to evaluate the safety significance of an issue, and if it is determined to be of low safety significance, a LAR or exemption request can be submitted to the NRC and qualified streamlined NRC review.
Approved for plants with an approved TSTF-505.
NEI issued NEI 21-01. Scope includes TSTF-425.