ML20245K026: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:g                                   .                                         .
{{#Wiki_filter:g
                                                                                                      :
.
  *
.l
  ,,
:
    ..      .
.
                  -
OCs/aM
                                                                                  OCs/aM
*
                                                                                    //             .l,
-
                        -
//
                          .
..
                    -
.
                .
,
                                              AUG 01-1989
,,
                        -
-
        Docket No. 50-302
.
        License No. DPR-72                                                                           l
-
                                                                                                      1
.
                                                                                                    I
AUG 01-1989
        Florida Power Corporation                                                                    j
-
        Mr. W. S. Wilgus,.Vice President,                                                            j
Docket No. 50-302
            Nuclear Operations                                                                      1
License No. DPR-72
        ATTN: Manager, Nuclear Operations                                                          J
                  Licensing
        P. 0. Box 219-NA-21
        Crystal River, FL 32629
                                                                                                    i
        Gentiemen:                                                                                ']
        SUBJECT: NOTICE OF VIOLATION
                    (NRC INSPECTION REPORT N0. 50-302/89-15)
        This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by.
        P. Holmes-Ray on June 3 - July 7,1989. The inspection included a review of
        activities authorized for your Crystal River facility. At the conclusion of the              ;
        inspection, the findings were discussed with those members of your staff
        identified-in the enclosed inspection report.
        Areas examined during the inspection are identified in the report. Within these
        areas, the inspection consisted of selective ' examinations of procedures and
        representative records, interviews with personnel, and observation of activities
        in progress.
        The inspection findings indicate that certain activities appeared to violate NRC
        requirements. The violations, references to pertinent requirements, and elements
        to be included in your response, are described in the enclosed Notice of Violation.        i
                                                                                                    ,
        Violation B.2 described in the enclosed Notice is similar to a violation contained
        in the Notice sent to you by our letter dated March 11, 1988. Because "similar
        violations,"    as described in the NRC Enforcement Policy, are of significant            j
        concern to the NRC, please give particular attention in your response to the                1
        identification of the root cause of this problem and your corrective action to
        prevent recurrence.
        In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
        10, Code of Federal Regulations, a copy of this letter and its enclosures will be          .i
        placed in the NRC Public Document Room.
                                                                                                      ;
                                                                                                      I
l
l
            8908180283 890801       "
1
            PDR   ADOCK 05000302
I
            G                 PNV
Florida Power Corporation
                                                                                                      !
j
                                                            c.                               l'
Mr. W. S. Wilgus,.Vice President,
                                                  -
j
                                                                                            _XE_of_j
Nuclear Operations
1
ATTN: Manager, Nuclear Operations
J
Licensing
P. 0. Box 219-NA-21
Crystal River, FL 32629
i
Gentiemen:
']
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT N0. 50-302/89-15)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by.
P. Holmes-Ray on June 3 - July 7,1989.
The inspection included a review of
activities authorized for your Crystal River facility. At the conclusion of the
;
inspection, the findings were discussed with those members of your staff
identified-in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective ' examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities appeared to violate NRC
requirements. The violations, references to pertinent requirements, and elements
to be included in your response, are described in the enclosed Notice of Violation.
i
,
Violation B.2 described in the enclosed Notice is similar to a violation contained
in the Notice sent to you by our letter dated March 11, 1988.
Because "similar
violations,"
as described in the NRC Enforcement Policy, are of significant
j
concern to the NRC, please give particular attention in your response to the
1
identification of the root cause of this problem and your corrective action to
prevent recurrence.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and its enclosures will be
.i
placed in the NRC Public Document Room.
;
I
l
8908180283 890801
"
PDR
ADOCK 05000302
G
PNV
!
c.
l'
_XE_of_j
-


                                                                                              1
1
    .       .                                                                                 '
.
                        ,
'
          .         .
.
  .
,
              Florida Power Corporation             2                         AUG 011989
.
                            .
.
                                                                                              l
.
              The responses directed by this letter and the enclosures are not subject to the i
Florida Power Corporation
              clearance procedures of the Office of Management and Budget as required by the
2
              Paperwork Reduction Act of 1980, Pub. L. No. 96-511.
AUG 011989
              Should you have any questions concerning this letter, please contact us.
.
                                                      Sincerely,
l
                                                        Original signed by                   ;
The responses directed by this letter and the enclosures are not subject to the
                                                      Marvin Sinkule, Chief
i
                                                      Reactor Projects Branch 2             j
clearance procedures of the Office of Management and Budget as required by the
                                                      Division of Reactor Projects           i
Paperwork Reduction Act of 1980, Pub. L. No. 96-511.
              Enclosures:
Should you have any questions concerning this letter, please contact us.
              1. Notice of Violation                                                         I
Sincerely,
              2. NRC Inspection Report
Original signed by
                                                                                              l
;
              CC w/enCls:
Marvin Sinkule, Chief
              P. F. McKee, Director, Nuclear
Reactor Projects Branch 2
                Plant Operations
j
              R. C. Widell, Director, Nuclear
Division of Reactor Projects
                Operations Site Support                                                       !
i
              State of Florida                                                                 l
Enclosures:
                                                                                              !
1.
              bec w/encis:
Notice of Violation
              NRC Resident Inspector
I
              NRC Section Chief
2.
              HRC Project Engineer
NRC Inspection Report
              Document Control Desk
l
                                                                                              .
CC w/enCls:
                                                                                              !
P. F. McKee, Director, Nuclear
Plant Operations
R. C. Widell, Director, Nuclear
Operations Site Support
!
State of Florida
l
!
bec w/encis:
NRC Resident Inspector
NRC Section Chief
HRC Project Engineer
Document Control Desk
.
!
l
l
l
l
l
l
              RII DR               R1                 RI :               RII:E   ,
RII DR
                                  RCrlenjak          MSi kule            G    1
R1
      $[gPMadden-
RI :
              07/3 j/89                                 7/ /89
RII:E
                                  $q/89                                  Og/g/9
,
$[gPMadden-
$q/89
7/ /89
Og/g/9
RCrlenjak
MSi kule
G
1
07/ j/89
3
}}
}}

Latest revision as of 00:58, 2 December 2024

Forwards Insp Rept 50-302/89-15 on 890603-0707 & Notice of Violation.Violation B.2 in Notice Similar to Violation Contained in NRC .Particular Attention Should Be Directed Toward Root Cause of Problem & Corrective Actions
ML20245K026
Person / Time
Site: Crystal River 
Issue date: 08/01/1989
From: Sinkule M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Wilgus W
FLORIDA POWER CORP.
Shared Package
ML20245K029 List:
References
NUDOCS 8908180283
Download: ML20245K026 (2)


See also: IR 05000302/1989015

Text

g

.

.l

.

OCs/aM

-

//

..

.

,

,,

-

.

-

.

AUG 01-1989

-

Docket No. 50-302

License No. DPR-72

l

1

I

Florida Power Corporation

j

Mr. W. S. Wilgus,.Vice President,

j

Nuclear Operations

1

ATTN: Manager, Nuclear Operations

J

Licensing

P. 0. Box 219-NA-21

Crystal River, FL 32629

i

Gentiemen:

']

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT N0. 50-302/89-15)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by.

P. Holmes-Ray on June 3 - July 7,1989.

The inspection included a review of

activities authorized for your Crystal River facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified-in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective ' examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities appeared to violate NRC

requirements. The violations, references to pertinent requirements, and elements

to be included in your response, are described in the enclosed Notice of Violation.

i

,

Violation B.2 described in the enclosed Notice is similar to a violation contained

in the Notice sent to you by our letter dated March 11, 1988.

Because "similar

violations,"

as described in the NRC Enforcement Policy, are of significant

j

concern to the NRC, please give particular attention in your response to the

1

identification of the root cause of this problem and your corrective action to

prevent recurrence.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and its enclosures will be

.i

placed in the NRC Public Document Room.

I

l

8908180283 890801

"

PDR

ADOCK 05000302

G

PNV

!

c.

l'

_XE_of_j

-

1

.

'

.

,

.

.

.

Florida Power Corporation

2

AUG 011989

.

l

The responses directed by this letter and the enclosures are not subject to the

i

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No.96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Original signed by

Marvin Sinkule, Chief

Reactor Projects Branch 2

j

Division of Reactor Projects

i

Enclosures:

1.

Notice of Violation

I

2.

NRC Inspection Report

l

CC w/enCls:

P. F. McKee, Director, Nuclear

Plant Operations

R. C. Widell, Director, Nuclear

Operations Site Support

!

State of Florida

l

!

bec w/encis:

NRC Resident Inspector

NRC Section Chief

HRC Project Engineer

Document Control Desk

.

!

l

l

l

RII DR

R1

RI :

RII:E

,

$[gPMadden-

$q/89

7/ /89

Og/g/9

RCrlenjak

MSi kule

G

1

07/ j/89

3