* l!                                                                               10CFR50.36 L    fs                                gmgns Electric & Gas Company .           n . u n
10CFR50.36 gmgns Electric & Gas Company.
    *2                                                                         Nuclear Operations cgo gig 29218 a um.c.,m September 30, 1987 l                                                                                                           1 I
L fs n. u n
Documerit Control Desk l         U. S. Nuclear Regulatory Commission
*2 cgo gig 29218 Nuclear Operations a um.c.,m September 30, 1987 l
1 I
Documerit Control Desk l
U. S. Nuclear Regulatory Commission
: Washington, DC 20555 Attention: Dr. T. E. Murley l
: Washington, DC 20555 Attention: Dr. T. E. Murley l


Line 27: Line 30:
==Dear Sir:==
==Dear Sir:==
In a letter dated May ~15,1987, South Carolina Electric & Gas Company.
In a letter dated May ~15,1987, South Carolina Electric & Gas Company.
subndtted the results of F* tube inspections in accordance with the requirements'of Technical Specifications, Section 4.4.5.5.d. The inspection-results were from the third inservice eddy current examination of Virgil C.
subndtted the results of F* tube inspections in accordance with the requirements'of Technical Specifications, Section 4.4.5.5.d.
The inspection-results were from the third inservice eddy current examination of Virgil C.
Summer Raclear Station steam generator tubing performed during the months of March and April 1987.
Summer Raclear Station steam generator tubing performed during the months of March and April 1987.
A recent review of this letter and its attachments identified a typographical error on Attachment I in Row 41, Column 25 of Steam Generator "A." The indication location in the May 15 submittal should have been TEH+9.6 instead of TEH+19.6. The error has'been corrected in the amended attachment to this letter.
A recent review of this letter and its attachments identified a typographical error on Attachment I in Row 41, Column 25 of Steam Generator "A."
As addressed in the original submittal, the following basic program was used for' each steam generator: 100 percent of rows 45 through 49 (all columns) for full length of tubing; a 4x4 matrix of the remainder of i.he tubes, full length of tubing; a sample of the peripheral tubes, full length of tubes; all row 1 & 2 to the 14th support (14C) outlet side and an inspection of all inlet tube sheet regions within the remaining balance of steam generator tubes. The examination was conducted utilizing digital multifrequency techniques, k     DON 0
The indication location in the May 15 submittal should have been TEH+9.6 instead of TEH+19.6. The error has'been corrected in the amended attachment to this letter.
* O I l
As addressed in the original submittal, the following basic program was used for' each steam generator:
100 percent of rows 45 through 49 (all columns) for full length of tubing; a 4x4 matrix of the remainder of i.he tubes, full length of tubing; a sample of the peripheral tubes, full length of tubes; all row 1 & 2 to the 14th support (14C) outlet side and an inspection of all inlet tube sheet regions within the remaining balance of steam generator tubes. The examination was conducted utilizing digital multifrequency techniques, k
DON 0 O
I l


m I'   .
mI' f'I Document Control Desk L 6
f'I                 .'    ,. .
. September.30, 1987-Page 2 1
Document Control Desk L6          . September.30, 1987-Page 2 1
N
N
                                ~
~
The-attachments provide the identification, by row and. column, of each tube left in service for which F* was applied. All' measurements are made from the tube end (TEH) and'are in inches.- For further clarification, the code "DRI"'
The-attachments provide the identification, by row and. column, of each tube left in service for which F* was applied. All' measurements are made from the tube end (TEH) and'are in inches.- For further clarification, the code "DRI"'
indicates distorted-roll with possible indication, and "NDD" indicates no detectable discontinuity; "% TW" indicates'% through wall, and "F* location"
indicates distorted-roll with possible indication, and "NDD" indicates no detectable discontinuity; "% TW" indicates'% through wall, and "F* location"
            'is.the highest point above the tube end at which the F* criteria can be applied'in accordance with Technical Specifications, Section 4.4.5.4.
'is.the highest point above the tube end at which the F* criteria can be applied'in accordance with Technical Specifications, Section 4.4.5.4.
If you'should have any questions, please advise.
If you'should have any questions, please advise.
rytrulyy[rs, 1
rytrulyy[rs, 1
D.   .IN um h CJM/ DAN:jez.
D.
Attachments c:     0. W. Dixon,' Jr./T. C. Nichols, Jr.
.IN um h CJM/ DAN:jez.
Attachments c:
: 0. W. Dixon,' Jr./T. C. Nichols, Jr.
E. C. Roberts
E. C. Roberts
: 0. S. Bradham D. R. Moore W..A. Williams, Jr.
: 0. S. Bradham D. R. Moore W..A. Williams, Jr.
J. N. Grace-Group Managers                                                         i; W. R. Baehr                                                             I C. A. Price                                                             i R. B. Clary-W. R. Higgins C. L. Ligon (NSRC)
J. N. Grace-Group Managers i;
W. R. Baehr I
C. A. Price i
R. B. Clary-W. R. Higgins C. L. Ligon (NSRC)
R. M. Campbell, Jr.
R. M. Campbell, Jr.
          .          K. E. Nodland J. C. Snelson G. O. Percival R. L. Prevatte J. B. Knotts, Jr.
K. E. Nodland J. C. Snelson G. O. Percival R. L. Prevatte J. B. Knotts, Jr.
S. R. Hunt RTS NPCF File
S. R. Hunt RTS NPCF File


Attachment I to Document Control Desk Letter September 30, 1987 Page 1 of 1 ATTACHMENT I SOUTH CAROLINA ELECTRIC & GAS COMPANY VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 STEAM GENERATOR TUBE F* LIST S/G:   "A" R0W I"   ^   N COL       % TW                       F* LOCATION L     0 1       6         86     TEH+7.6         TEH+19.3 3       7         96     TEH+2.8         TEH+19.3 3     15         76   TEH+17.8         TEH+18.8 6     10         49   TEH+3.5         TEH+19.3 6     18         71   TEH+6.2         TEH+18.4 7     14         44   TEH+13.8         TEH+19.4 7     60         54   TEH+6.5         TEH+19.2 11     82       80     TEH+14.1         TEH+19.2 12     32       41     TEH+18.1         TEH+19.4 15     55       40     TEH+17.9         TEH+19.2 16       99       67     TEH+18.3         TEH+19.3 18       95       76     TEH+5.6         TEH+19.1 24       7       87     TEH+17.1         TEH+18.9 25       46       76     TEH+15.7         TEH+19.6 27       53       40     TEH+15.1         TEH+19.6 29       31       94     TEH+16.5         TEH+19.3 29       38       71     TEH+16.4         TEH+19.2 30     46         65     TEH+5.1         TEH+19.1 30       58       56     TEH+16.1         TEH+19.6 32     52         40     TEH+18.3         TEH+19.6 32     64         88     TEH+18.1         TEH+19.6 35     101       78     TEH+18.1         TEH+19.6 37     57         70     TEH+18.2         TEH+19.6 38     41         79     TEH+16.1         TEH+19.2 39     70         77     TEH+19.5         TEH+19.6 39     77         84     TEH+18.0         TEH+19.4 40     42         40     TEH+14.2         TEH+16.1 41     25         84     TEH+9.6         TEH+19.4 41     71         85     TEH+18.9         TEH+19.6 43     73         87     TEH+13.2         TEH+19.1 43       82         57     TEH+15.2         TEH+19.1 Total number of tubes with F* applied:     31
Attachment I to Document Control Desk Letter September 30, 1987 Page 1 of 1 ATTACHMENT I SOUTH CAROLINA ELECTRIC & GAS COMPANY VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 STEAM GENERATOR TUBE F* LIST S/G:
"A" I"
^
N R0W COL
% TW F* LOCATION L
0 1
6 86 TEH+7.6 TEH+19.3 3
7 96 TEH+2.8 TEH+19.3 3
15 76 TEH+17.8 TEH+18.8 6
10 49 TEH+3.5 TEH+19.3 6
18 71 TEH+6.2 TEH+18.4 7
14 44 TEH+13.8 TEH+19.4 7
60 54 TEH+6.5 TEH+19.2 11 82 80 TEH+14.1 TEH+19.2 12 32 41 TEH+18.1 TEH+19.4 15 55 40 TEH+17.9 TEH+19.2 16 99 67 TEH+18.3 TEH+19.3 18 95 76 TEH+5.6 TEH+19.1 24 7
87 TEH+17.1 TEH+18.9 25 46 76 TEH+15.7 TEH+19.6 27 53 40 TEH+15.1 TEH+19.6 29 31 94 TEH+16.5 TEH+19.3 29 38 71 TEH+16.4 TEH+19.2 30 46 65 TEH+5.1 TEH+19.1 30 58 56 TEH+16.1 TEH+19.6 32 52 40 TEH+18.3 TEH+19.6 32 64 88 TEH+18.1 TEH+19.6 35 101 78 TEH+18.1 TEH+19.6 37 57 70 TEH+18.2 TEH+19.6 38 41 79 TEH+16.1 TEH+19.2 39 70 77 TEH+19.5 TEH+19.6 39 77 84 TEH+18.0 TEH+19.4 40 42 40 TEH+14.2 TEH+16.1 41 25 84 TEH+9.6 TEH+19.4 41 71 85 TEH+18.9 TEH+19.6 43 73 87 TEH+13.2 TEH+19.1 43 82 57 TEH+15.2 TEH+19.1 Total number of tubes with F* applied:
31


F Attachment.II to Document Control Desk Letter September 30, 1987
F Attachment.II to Document Control Desk Letter September 30, 1987
:,-  . Pag @'I of 3 ATTACHMENT II SOUTH CAROLINA ELECTRIC & GAS COMPANY VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 STEAM GENERATOR TUBE F* LIST S/G:   "B" F* Application on Unplugged Tubes R0W       COL I      N
. Pag @'I of 3 ATTACHMENT II SOUTH CAROLINA ELECTRIC & GAS COMPANY VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 STEAM GENERATOR TUBE F* LIST S/G:
                                            % TW                   F* LOCATION 2         58       40   TEH+18.7     ,TEH+19.4 2         60       96   TEH+16.4       TEH+18.3 3         14       91   TEH+15.6       TEH+18.9 3       69         52   TEH+3.8       TEH+17.9 3       71         88   TEH+6.5       TEH+19.4 4       63       93     TEH+17.0       TEH+19.4
"B" F* Application on Unplugged Tubes I
                                                                                ]
N R0W COL
5         7       89     TEH+18.9       TEH+19.1     l 5-       24         59   TEH+6.8       TEH+19.3 5       67       40     TEH+16.3       TEH+19.3     3 6       40       89     TEH+13.6       TEH+19.1 6       72       46     TEH+3.2       TEH+18.8 7       37       40     TEH+16.5       TEH+18.5 8       31       98     TEH+16.5       TEH+19.1
% TW F* LOCATION 2
                                                                              ~
58 40 TEH+18.7
8       69       83     TEH+18.2       TEH+19.0 10       24       88     TEH+16.7       TEH+19.0 10       27       90     TEH+16.1       TEH+19.3 11       21       40     TEH+15.0       TEH+19.0 11       30       96     TEH+18.9       TEH+19.2 11       40       40     TEH+18.9       TEH+19.1 12       25       62     TEH+5.9       TEH+19.1 12       56       40     TEH+19.0       TEH+19.2 15       19       40     TEH+17.8       TEH+18.8 15       27       56     TEH+11.9       TEH+19.1 15       39       99     TEH+10.7       TEH+19.0 16       58       65     TEH+1.2       TEH+16.9     l 17       12       95     TEH+11.8       TEH+19.2     l l
,TEH+19.4 2
1 l
60 96 TEH+16.4 TEH+18.3 3
l I
14 91 TEH+15.6 TEH+18.9 3
69 52 TEH+3.8 TEH+17.9 3
71 88 TEH+6.5 TEH+19.4 4
63 93 TEH+17.0 TEH+19.4
]
5 7
89 TEH+18.9 TEH+19.1 5-24 59 TEH+6.8 TEH+19.3 5
67 40 TEH+16.3 TEH+19.3 3
6 40 89 TEH+13.6 TEH+19.1 6
72 46 TEH+3.2 TEH+18.8 7
37 40 TEH+16.5 TEH+18.5 8
31 98 TEH+16.5 TEH+19.1
~
8 69 83 TEH+18.2 TEH+19.0 10 24 88 TEH+16.7 TEH+19.0 10 27 90 TEH+16.1 TEH+19.3 11 21 40 TEH+15.0 TEH+19.0 11 30 96 TEH+18.9 TEH+19.2 11 40 40 TEH+18.9 TEH+19.1 12 25 62 TEH+5.9 TEH+19.1 12 56 40 TEH+19.0 TEH+19.2 15 19 40 TEH+17.8 TEH+18.8 15 27 56 TEH+11.9 TEH+19.1 15 39 99 TEH+10.7 TEH+19.0 16 58 65 TEH+1.2 TEH+16.9 17 12 95 TEH+11.8 TEH+19.2


Attachment.II to Document Control Desk Letter September 30, 1987-
Attachment.II to Document Control Desk Letter September 30, 1987-
  . _Page 2 of 3 ATTACHMENT II SOUTH CAROLINA ELECTRIC & GAS COMPANY VIRGIL C. SUMMER NUCLEAR STATION ' UNIT 1 STEAM GENERATOR TUBE F* LIST S/G:   "B" F* Application on Unplugged Tubes R0W I       N COL     % TW                   F* LOCATION 18         9       95   TEH+13.0       TEH+19.1 19       18       40   TEH+16.4       TEH+19.2 19       19       94   TEH+16.2       TEH+19.1 20         41       83   TEH+17.8       TEH+18.1 20         65       74   TEH+17.1       TEH+19.1 23         28       98   TEH+17.5       TEH+19.1 24         20       96   TEH+4.3         TEH+19.0 27         22       40   TEH+15.1       TEH+19.1 27       89       56   TEH+13.0       TEH+17.3 29       28       83   TEH+11.5       TEH+19.1 30       41       91   TEH+6.1         TEH+19.0 31       55       88   TEH+11.7       TEH+19.1     :
_Page 2 of 3 ATTACHMENT II SOUTH CAROLINA ELECTRIC & GAS COMPANY VIRGIL C. SUMMER NUCLEAR STATION ' UNIT 1 STEAM GENERATOR TUBE F* LIST S/G:
32       25       86   TEH+12.2       TEH+19.1 32       33       64   TEH+11.5       TEH+19.1 33       32       98   TEH+17.5       TEH+19.1 33       40       91   TEH+17.3       TEH+19.1 34       30       83   TEH+18.5       TEH+19.6 34       65       88   TEH+12.9       TEH+19.1 37       71       50   TEH+8.8         TEH+19.6 38       63       71   TEH+0.3         TEH+19.4     l 39       48       88   TEH+16.9       TEH+18.1     !
"B" F* Application on Unplugged Tubes I
40       62       89   TEH+0.4         TEH+16.7 40       67       40   TEH+17.2       TEH+19.1 40       71       93   TEH+16.0       TEH+18.9     i 42       44       47   TEH+17.0       TEH+19.2     1 44       30       77   TEH+14.4       TEH+19.1 i                                                                               !
N R0W COL
l L'       .                                                                      i
% TW F* LOCATION 18 9
95 TEH+13.0 TEH+19.1 19 18 40 TEH+16.4 TEH+19.2 19 19 94 TEH+16.2 TEH+19.1 20 41 83 TEH+17.8 TEH+18.1 20 65 74 TEH+17.1 TEH+19.1 23 28 98 TEH+17.5 TEH+19.1 24 20 96 TEH+4.3 TEH+19.0 27 22 40 TEH+15.1 TEH+19.1 27 89 56 TEH+13.0 TEH+17.3 29 28 83 TEH+11.5 TEH+19.1 30 41 91 TEH+6.1 TEH+19.0 31 55 88 TEH+11.7 TEH+19.1 32 25 86 TEH+12.2 TEH+19.1 32 33 64 TEH+11.5 TEH+19.1 33 32 98 TEH+17.5 TEH+19.1 33 40 91 TEH+17.3 TEH+19.1 34 30 83 TEH+18.5 TEH+19.6 34 65 88 TEH+12.9 TEH+19.1 37 71 50 TEH+8.8 TEH+19.6 38 63 71 TEH+0.3 TEH+19.4 l
39 48 88 TEH+16.9 TEH+18.1 40 62 89 TEH+0.4 TEH+16.7 40 67 40 TEH+17.2 TEH+19.1 40 71 93 TEH+16.0 TEH+18.9 i
42 44 47 TEH+17.0 TEH+19.2 1
44 30 77 TEH+14.4 TEH+19.1 i
l L'
i


f                                                                                                           I Attachment II to Document' Control Desk Letter September 30, 1987
f I
  . Page 3 of 3                                                                                           1 ATTACHMENT II                                                       l SOUTH CAROLINA ELECTRIC & GAS COMPANY J
Attachment II to Document' Control Desk Letter September 30, 1987 Page 3 of 3 1
VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1                                           i STEAM GENERATOR TUBE f* LIST                                               ,
ATTACHMENT II l
                                                                                                              .1 S/G: _ "B"                                                         l i
SOUTH CAROLINA ELECTRIC & GAS COMPANY J
F* Application on Unplugged Tubes                                                         j i
VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 i
R0W       COL     % TW I      N F* LOCATION 5         33       40     TEH+17.0     TEH+19.4 f
STEAM GENERATOR TUBE f* LIST S/G: _
5         60       72     TEH+8.2       TEH+19.4 9         49       94     TEH+18.7     TEH+19.2 l
"B" l
i F* Application on Unplugged Tubes j
i I
N R0W COL
% TW F* LOCATION 5
33 40 TEH+17.0 TEH+19.4 f
5 60 72 TEH+8.2 TEH+19.4 9
49 94 TEH+18.7 TEH+19.2 l


p
p Attachment III to Document Control Desk Letter l.
      ~  Attachment III to Document Control Desk Letter
September 30, 1987
: l.       September 30, 1987 L   .-  Page 1 of 1 ATTACHMENT III SOUTH CAROLINA ELECTRIC.& GAS COMPF.NY           .
~
VIRGIL ~C. SUMMER NUCLEAR STATION, UNIT 1 STEAM GENERATOR TUBE F* LIST S/G: "B"                         {
L Page 1 of 1 ATTACHMENT III SOUTH CAROLINA ELECTRIC.& GAS COMPF.NY VIRGIL ~C. SUMMER NUCLEAR STATION, UNIT 1 STEAM GENERATOR TUBE F* LIST
F* Application to previously plugged tubes                 l IN       N R0W     COL       % TW                   F* LOCATION 1
{
2       72         91   TEH+18.9       TEH+19.4
S/G:
                                                                                .{ "
"B" F* Application to previously plugged tubes l
3       72       DRI   TEH+3.3         TEH+19.4 5       73       DRI   TEH+8.1         TEH+19.4 34       68         60   TEH+14.2       TEH+16.0 5       64       DRI   TEH+5.4         TEH+19.4 i
IN N
4       67         92   TEH+15.4       TEH+19.3 11       73-       91   TEH+19.1       TEH+19.2     i 8       76     '
R0W COL
DRI   TEH+17.3       TEH+19.0 34       40         72   TEH+2.0         TEH+19.4 44       42         96   TEH+19.1       TEH+19.2       l 44       35         60   TEH+5.3         TEH+19.4       i 7         9       DRI   TEH+16.0       TEH+19.0 24         9       NDD   TEH+           TEH+19.0 47       57       NDD   TEH+           TEH+19.0       i t
% TW F* LOCATION 1
34       64       95   TEH+13.6       TE3+19.4       )
2 72 91 TEH+18.9 TEH+19.4
32       65       86   TEH+18.3       TEH+19.4 31       65         74   TEH+12.8       TEH+19.4 35       44         79   TEH+1.2         TEH+19.3 F* applied to previously plugged tubes: 18                   j F* applied to unplugged tubes:               55 Total F* applied for Steam Generator "B": 73
.{
3 72 DRI TEH+3.3 TEH+19.4 5
73 DRI TEH+8.1 TEH+19.4 34 68 60 TEH+14.2 TEH+16.0 5
64 DRI TEH+5.4 TEH+19.4 i
4 67 92 TEH+15.4 TEH+19.3 11 73-91 TEH+19.1 TEH+19.2 i
8 76 DRI TEH+17.3 TEH+19.0 34 40 72 TEH+2.0 TEH+19.4 44 42 96 TEH+19.1 TEH+19.2 l
44 35 60 TEH+5.3 TEH+19.4 i
7 9
DRI TEH+16.0 TEH+19.0 24 9
NDD TEH+
TEH+19.0 47 57 NDD TEH+
TEH+19.0 i
t 34 64 95 TEH+13.6 TE3+19.4
)
32 65 86 TEH+18.3 TEH+19.4 31 65 74 TEH+12.8 TEH+19.4 35 44 79 TEH+1.2 TEH+19.3 F* applied to previously plugged tubes:
18 j
F* applied to unplugged tubes:
55 Total F* applied for Steam Generator "B": 73


  . Attachment IV to Document Control Desk Letter S ptember 30, 1987 Page 1 of 1 t
Attachment IV to Document Control Desk Letter S ptember 30, 1987 Page 1 of 1 t
ATTACHMENT IV SOUTH CAROLINA ELECTRIC & GAS COMPANY VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1         .
ATTACHMENT IV SOUTH CAROLINA ELECTRIC & GAS COMPANY VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 STEAM GENERATOR TUBE F* LIST S/G:
STEAM GENERATOR TUBE F* LIST S/G: "C" R0W       COL     ' % TW IND A   N 0
"C" R0W COL
F* LOCATION 1       35         82   TEH+1.2       TEH+19.1 3         4         41   TEH+19.0     TEH+19.1 3       93         92   TEH+16.3     TEH+18.9 4         5-       40   TEH+17.9     TEH+18.9 22       102         88   TEH+18.6     TEH+19.4 4       27         92   TEH+17.8     TEH+19.1 5       13         40   TEH+18.7     TEH+19.4 6       40         40   TEH+18.5     TEH+19.1 8       20         90   TEH+19.1     TEH+19.6 8       41         59-   TEH+18.8     TEH+19.2 12       19         40   TEH+15.9     TEH+19.6 17       13         40   TEH+18.6     TEH+19.3 14       44         55   TEH+17.6     TEH+19.2 23       37         59   TEH+17.0     TEH+19.4 26       26         56   TEH+18.8     TEH+19.3 26       44         86   TEH+15.9     TEH+19.2 27       27         40   TEH+12.9     TEH+19.1 35       31         73   TEH+17.7     TEH+19.1 35       35         81   TEH+18.0     TEH+19.3       !
' % TW IND A N
45       75         81   TEH+15.8     TEH+19.3       l 9       53         93   TEH+18.4     TEH+19.4       )
F* LOCATION 0
22         9         41   TEH+18.8     TEH+19.4       l 18       18         99   TEH+19.0     TEH+19.6       l 18       12         89   TEH+16.4     TEH+19.4 19       18         86   TEH+19.1     TEH+19.4 35       18         93   TEH+15.9     TEH+19.4 8       25         92   TEH+18.7     TEH+18.8 30       30         98   TEH+17.9     TEH+19.2 31       47         93   TEH+17.1     TEH+19.1 23       59         68   TEH+18.0     TEH+18.9       I 21       62         93   TEH+15.8     TEH+18.,8 Total F* applied for Steam Generator "C": 31 l,}}
1 35 82 TEH+1.2 TEH+19.1 3
4 41 TEH+19.0 TEH+19.1 3
93 92 TEH+16.3 TEH+18.9 4
5-40 TEH+17.9 TEH+18.9 22 102 88 TEH+18.6 TEH+19.4 4
27 92 TEH+17.8 TEH+19.1 5
13 40 TEH+18.7 TEH+19.4 6
40 40 TEH+18.5 TEH+19.1 8
20 90 TEH+19.1 TEH+19.6 8
41 59-TEH+18.8 TEH+19.2 12 19 40 TEH+15.9 TEH+19.6 17 13 40 TEH+18.6 TEH+19.3 14 44 55 TEH+17.6 TEH+19.2 23 37 59 TEH+17.0 TEH+19.4 26 26 56 TEH+18.8 TEH+19.3 26 44 86 TEH+15.9 TEH+19.2 27 27 40 TEH+12.9 TEH+19.1 35 31 73 TEH+17.7 TEH+19.1 35 35 81 TEH+18.0 TEH+19.3 45 75 81 TEH+15.8 TEH+19.3 l
9 53 93 TEH+18.4 TEH+19.4
)
22 9
41 TEH+18.8 TEH+19.4 l
18 18 99 TEH+19.0 TEH+19.6 l
18 12 89 TEH+16.4 TEH+19.4 19 18 86 TEH+19.1 TEH+19.4 35 18 93 TEH+15.9 TEH+19.4 8
25 92 TEH+18.7 TEH+18.8 30 30 98 TEH+17.9 TEH+19.2 31 47 93 TEH+17.1 TEH+19.1 23 59 68 TEH+18.0 TEH+18.9 I
21 62 93 TEH+15.8 TEH+18.,8 Total F* applied for Steam Generator "C": 31 l}}

Latest revision as of 05:08, 3 December 2024

Forwards Corrected Results of Steam Generator Tube F* Insps Performed During Mar & Apr 1987.Indication Location in 870515 Submittal Corrected.Exam Conducted Using Digital Multifrequency Techniques
ML20235K341
Person / Time
Site: Summer 
Issue date: 09/30/1987
From: Nauman D
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Murley T
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8710050051
Download: ML20235K341 (8)


Text

p l!

10CFR50.36 gmgns Electric & Gas Company.

L fs n. u n

  • 2 cgo gig 29218 Nuclear Operations a um.c.,m September 30, 1987 l

1 I

Documerit Control Desk l

U. S. Nuclear Regulatory Commission

Washington, DC 20555 Attention: Dr. T. E. Murley l

Subject:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Steam Generator. Tube F* Application

Dear Sir:

In a letter dated May ~15,1987, South Carolina Electric & Gas Company.

subndtted the results of F* tube inspections in accordance with the requirements'of Technical Specifications, Section 4.4.5.5.d.

The inspection-results were from the third inservice eddy current examination of Virgil C.

Summer Raclear Station steam generator tubing performed during the months of March and April 1987.

A recent review of this letter and its attachments identified a typographical error on Attachment I in Row 41, Column 25 of Steam Generator "A."

The indication location in the May 15 submittal should have been TEH+9.6 instead of TEH+19.6. The error has'been corrected in the amended attachment to this letter.

As addressed in the original submittal, the following basic program was used for' each steam generator:

100 percent of rows 45 through 49 (all columns) for full length of tubing; a 4x4 matrix of the remainder of i.he tubes, full length of tubing; a sample of the peripheral tubes, full length of tubes; all row 1 & 2 to the 14th support (14C) outlet side and an inspection of all inlet tube sheet regions within the remaining balance of steam generator tubes. The examination was conducted utilizing digital multifrequency techniques, k

DON 0 O

I l

mI' f'I Document Control Desk L 6

. September.30, 1987-Page 2 1

N

~

The-attachments provide the identification, by row and. column, of each tube left in service for which F* was applied. All' measurements are made from the tube end (TEH) and'are in inches.- For further clarification, the code "DRI"'

indicates distorted-roll with possible indication, and "NDD" indicates no detectable discontinuity; "% TW" indicates'% through wall, and "F* location"

'is.the highest point above the tube end at which the F* criteria can be applied'in accordance with Technical Specifications, Section 4.4.5.4.

If you'should have any questions, please advise.

rytrulyy[rs, 1

D.

.IN um h CJM/ DAN:jez.

Attachments c:

0. W. Dixon,' Jr./T. C. Nichols, Jr.

E. C. Roberts

0. S. Bradham D. R. Moore W..A. Williams, Jr.

J. N. Grace-Group Managers i;

W. R. Baehr I

C. A. Price i

R. B. Clary-W. R. Higgins C. L. Ligon (NSRC)

R. M. Campbell, Jr.

K. E. Nodland J. C. Snelson G. O. Percival R. L. Prevatte J. B. Knotts, Jr.

S. R. Hunt RTS NPCF File

Attachment I to Document Control Desk Letter September 30, 1987 Page 1 of 1 ATTACHMENT I SOUTH CAROLINA ELECTRIC & GAS COMPANY VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 STEAM GENERATOR TUBE F* LIST S/G:

"A" I"

^

N R0W COL

% TW F* LOCATION L

0 1

6 86 TEH+7.6 TEH+19.3 3

7 96 TEH+2.8 TEH+19.3 3

15 76 TEH+17.8 TEH+18.8 6

10 49 TEH+3.5 TEH+19.3 6

18 71 TEH+6.2 TEH+18.4 7

14 44 TEH+13.8 TEH+19.4 7

60 54 TEH+6.5 TEH+19.2 11 82 80 TEH+14.1 TEH+19.2 12 32 41 TEH+18.1 TEH+19.4 15 55 40 TEH+17.9 TEH+19.2 16 99 67 TEH+18.3 TEH+19.3 18 95 76 TEH+5.6 TEH+19.1 24 7

87 TEH+17.1 TEH+18.9 25 46 76 TEH+15.7 TEH+19.6 27 53 40 TEH+15.1 TEH+19.6 29 31 94 TEH+16.5 TEH+19.3 29 38 71 TEH+16.4 TEH+19.2 30 46 65 TEH+5.1 TEH+19.1 30 58 56 TEH+16.1 TEH+19.6 32 52 40 TEH+18.3 TEH+19.6 32 64 88 TEH+18.1 TEH+19.6 35 101 78 TEH+18.1 TEH+19.6 37 57 70 TEH+18.2 TEH+19.6 38 41 79 TEH+16.1 TEH+19.2 39 70 77 TEH+19.5 TEH+19.6 39 77 84 TEH+18.0 TEH+19.4 40 42 40 TEH+14.2 TEH+16.1 41 25 84 TEH+9.6 TEH+19.4 41 71 85 TEH+18.9 TEH+19.6 43 73 87 TEH+13.2 TEH+19.1 43 82 57 TEH+15.2 TEH+19.1 Total number of tubes with F* applied:

31

F Attachment.II to Document Control Desk Letter September 30, 1987

. Pag @'I of 3 ATTACHMENT II SOUTH CAROLINA ELECTRIC & GAS COMPANY VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 STEAM GENERATOR TUBE F* LIST S/G:

"B" F* Application on Unplugged Tubes I

N R0W COL

% TW F* LOCATION 2

58 40 TEH+18.7

,TEH+19.4 2

60 96 TEH+16.4 TEH+18.3 3

14 91 TEH+15.6 TEH+18.9 3

69 52 TEH+3.8 TEH+17.9 3

71 88 TEH+6.5 TEH+19.4 4

63 93 TEH+17.0 TEH+19.4

]

5 7

89 TEH+18.9 TEH+19.1 5-24 59 TEH+6.8 TEH+19.3 5

67 40 TEH+16.3 TEH+19.3 3

6 40 89 TEH+13.6 TEH+19.1 6

72 46 TEH+3.2 TEH+18.8 7

37 40 TEH+16.5 TEH+18.5 8

31 98 TEH+16.5 TEH+19.1

~

8 69 83 TEH+18.2 TEH+19.0 10 24 88 TEH+16.7 TEH+19.0 10 27 90 TEH+16.1 TEH+19.3 11 21 40 TEH+15.0 TEH+19.0 11 30 96 TEH+18.9 TEH+19.2 11 40 40 TEH+18.9 TEH+19.1 12 25 62 TEH+5.9 TEH+19.1 12 56 40 TEH+19.0 TEH+19.2 15 19 40 TEH+17.8 TEH+18.8 15 27 56 TEH+11.9 TEH+19.1 15 39 99 TEH+10.7 TEH+19.0 16 58 65 TEH+1.2 TEH+16.9 17 12 95 TEH+11.8 TEH+19.2

Attachment.II to Document Control Desk Letter September 30, 1987-

_Page 2 of 3 ATTACHMENT II SOUTH CAROLINA ELECTRIC & GAS COMPANY VIRGIL C. SUMMER NUCLEAR STATION ' UNIT 1 STEAM GENERATOR TUBE F* LIST S/G:

"B" F* Application on Unplugged Tubes I

N R0W COL

% TW F* LOCATION 18 9

95 TEH+13.0 TEH+19.1 19 18 40 TEH+16.4 TEH+19.2 19 19 94 TEH+16.2 TEH+19.1 20 41 83 TEH+17.8 TEH+18.1 20 65 74 TEH+17.1 TEH+19.1 23 28 98 TEH+17.5 TEH+19.1 24 20 96 TEH+4.3 TEH+19.0 27 22 40 TEH+15.1 TEH+19.1 27 89 56 TEH+13.0 TEH+17.3 29 28 83 TEH+11.5 TEH+19.1 30 41 91 TEH+6.1 TEH+19.0 31 55 88 TEH+11.7 TEH+19.1 32 25 86 TEH+12.2 TEH+19.1 32 33 64 TEH+11.5 TEH+19.1 33 32 98 TEH+17.5 TEH+19.1 33 40 91 TEH+17.3 TEH+19.1 34 30 83 TEH+18.5 TEH+19.6 34 65 88 TEH+12.9 TEH+19.1 37 71 50 TEH+8.8 TEH+19.6 38 63 71 TEH+0.3 TEH+19.4 l

39 48 88 TEH+16.9 TEH+18.1 40 62 89 TEH+0.4 TEH+16.7 40 67 40 TEH+17.2 TEH+19.1 40 71 93 TEH+16.0 TEH+18.9 i

42 44 47 TEH+17.0 TEH+19.2 1

44 30 77 TEH+14.4 TEH+19.1 i

l L'

i

f I

Attachment II to Document' Control Desk Letter September 30, 1987 Page 3 of 3 1

ATTACHMENT II l

SOUTH CAROLINA ELECTRIC & GAS COMPANY J

VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 i

STEAM GENERATOR TUBE f* LIST S/G: _

"B" l

i F* Application on Unplugged Tubes j

i I

N R0W COL

% TW F* LOCATION 5

33 40 TEH+17.0 TEH+19.4 f

5 60 72 TEH+8.2 TEH+19.4 9

49 94 TEH+18.7 TEH+19.2 l

p Attachment III to Document Control Desk Letter l.

September 30, 1987

~

L Page 1 of 1 ATTACHMENT III SOUTH CAROLINA ELECTRIC.& GAS COMPF.NY VIRGIL ~C. SUMMER NUCLEAR STATION, UNIT 1 STEAM GENERATOR TUBE F* LIST

{

S/G:

"B" F* Application to previously plugged tubes l

IN N

R0W COL

% TW F* LOCATION 1

2 72 91 TEH+18.9 TEH+19.4

.{

3 72 DRI TEH+3.3 TEH+19.4 5

73 DRI TEH+8.1 TEH+19.4 34 68 60 TEH+14.2 TEH+16.0 5

64 DRI TEH+5.4 TEH+19.4 i

4 67 92 TEH+15.4 TEH+19.3 11 73-91 TEH+19.1 TEH+19.2 i

8 76 DRI TEH+17.3 TEH+19.0 34 40 72 TEH+2.0 TEH+19.4 44 42 96 TEH+19.1 TEH+19.2 l

44 35 60 TEH+5.3 TEH+19.4 i

7 9

DRI TEH+16.0 TEH+19.0 24 9

NDD TEH+

TEH+19.0 47 57 NDD TEH+

TEH+19.0 i

t 34 64 95 TEH+13.6 TE3+19.4

)

32 65 86 TEH+18.3 TEH+19.4 31 65 74 TEH+12.8 TEH+19.4 35 44 79 TEH+1.2 TEH+19.3 F* applied to previously plugged tubes:

18 j

F* applied to unplugged tubes:

55 Total F* applied for Steam Generator "B": 73

Attachment IV to Document Control Desk Letter S ptember 30, 1987 Page 1 of 1 t

ATTACHMENT IV SOUTH CAROLINA ELECTRIC & GAS COMPANY VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 STEAM GENERATOR TUBE F* LIST S/G:

"C" R0W COL

' % TW IND A N

F* LOCATION 0

1 35 82 TEH+1.2 TEH+19.1 3

4 41 TEH+19.0 TEH+19.1 3

93 92 TEH+16.3 TEH+18.9 4

5-40 TEH+17.9 TEH+18.9 22 102 88 TEH+18.6 TEH+19.4 4

27 92 TEH+17.8 TEH+19.1 5

13 40 TEH+18.7 TEH+19.4 6

40 40 TEH+18.5 TEH+19.1 8

20 90 TEH+19.1 TEH+19.6 8

41 59-TEH+18.8 TEH+19.2 12 19 40 TEH+15.9 TEH+19.6 17 13 40 TEH+18.6 TEH+19.3 14 44 55 TEH+17.6 TEH+19.2 23 37 59 TEH+17.0 TEH+19.4 26 26 56 TEH+18.8 TEH+19.3 26 44 86 TEH+15.9 TEH+19.2 27 27 40 TEH+12.9 TEH+19.1 35 31 73 TEH+17.7 TEH+19.1 35 35 81 TEH+18.0 TEH+19.3 45 75 81 TEH+15.8 TEH+19.3 l

9 53 93 TEH+18.4 TEH+19.4

)

22 9

41 TEH+18.8 TEH+19.4 l

18 18 99 TEH+19.0 TEH+19.6 l

18 12 89 TEH+16.4 TEH+19.4 19 18 86 TEH+19.1 TEH+19.4 35 18 93 TEH+15.9 TEH+19.4 8

25 92 TEH+18.7 TEH+18.8 30 30 98 TEH+17.9 TEH+19.2 31 47 93 TEH+17.1 TEH+19.1 23 59 68 TEH+18.0 TEH+18.9 I

21 62 93 TEH+15.8 TEH+18.,8 Total F* applied for Steam Generator "C": 31 l