ML20203B941: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:occ;ca Mlt
                                                                            occ;ca Mlt
.
  #
#
*g             e
*g
          .
e
                                          JUL 0 31986
.
      Docket Nos. 50-413, 50-414
JUL 0 31986
      License Nos. NPF-35, NPF-52
Docket Nos. 50-413, 50-414
                                                      .
License Nos. NPF-35, NPF-52
      Duke Power Company
.
    /TTN: Mr. H. B. Tucker, Vice President
Duke Power Company
              Nuclear Production Department
/TTN: Mr. H. B. Tucker, Vice President
      422 South Church Street
Nuclear Production Department
      Charlotte, NC 28242
422 South Church Street
      Gentlemen:
Charlotte, NC 28242
      SUBJECT: NRC INSPECTION REPORT NDS. 50-413/86-19 AND 50-414/86-22
Gentlemen:
      This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
SUBJECT: NRC INSPECTION REPORT NDS. 50-413/86-19 AND 50-414/86-22
      P. K. Van Doorn on April 26 - May 25, 1986. The inspection included a review of
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
      activities authorized for your Catawba facility.       At the conclusion of the
P. K. Van Doorn on April 26 - May 25, 1986. The inspection included a review of
      inspection, the findings were discussed with those members of your staff
activities authorized for your Catawba facility.
      identified.in the enclosed inspection report.
At the conclusion of the
      Areas examined during the inspection are identified in the report. Within these
inspection, the findings were discussed with those members of your staff
      areas, the inspection consisted of selective examinations of procedures and
identified.in the enclosed inspection report.
      representative records, interviews with personnel, and observation of activities
Areas examined during the inspection are identified in the report. Within these
      in progress.
areas, the inspection consisted of selective examinations of procedures and
      Within the scope of the inspection, no violations or deviations were identified.
representative records, interviews with personnel, and observation of activities
      Your attention is invited to unresolved items identified in the inspection
in progress.
      report. These matters will be pursued during future inspections.
Within the scope of the inspection, no violations or deviations were identified.
      In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Your attention is invited to unresolved items identified in the inspection
      Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
report. These matters will be pursued during future inspections.
      will be placed in the NRC Public Document Room.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
      Should you have any questions concerning this letter, please contact us.
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
                                                Sincerely,
will be placed in the NRC Public Document Room.
                                                  cair.mN. StGMD BY
Should you have any questions concerning this letter, please contact us.
                                                  way;M V. 5xWLE f6
Sincerely,
                                                Virgil L. Brownlee, Chief
cair.mN. StGMD BY
                                                Reactor Projects Branch 3
way;M V. 5xWLE f6
                                                Division of Reactor Projects
Virgil L. Brownlee, Chief
      Enclosure:
Reactor Projects Branch 3
      NRC Inspection Report
Division of Reactor Projects
      9c w/ enc 1:                                                                       ,
Enclosure:
    W. L. Dick, Vice President - Construction
NRC Inspection Report
    p.W.Hampton,StationManager
9c w/ enc 1:
      bcc w/ enc 1: (See page 2)       8607180322 860703                             h
,
                                        PDR   ADOCK 05000413
W. L. Dick, Vice President - Construction
                                                            """                       h
p.W.Hampton,StationManager
                                                                                  rE o /
bcc w/ enc 1:
(See page 2)
8607180322 860703
h
PDR
ADOCK 05000413
h
"""
rE o /


                                                _ -   . .     .   .       .       .         .         . _ _- _ _ _-
_
-
. .
.
.
.
.
.
. _ _ _ _
_-
-
4
4
:-
:-
        -
-
                    ,
Jul. 0 31986
,     r
,
              ,                                                                                     Jul. 0 31986
r
  '
,
          Duke Power Company                             2
,
  i
'
          bec w/ encl:
Duke Power Company
          K. N. Jabbour, NRR
2
          5. L. Jordan, IE                                                                                             '
i
;       W RC Resident Inspector
bec w/ encl:
          Document Control Desk
K. N. Jabbour, NRR
  '
5. L. Jordan, IE
'
;
W RC Resident Inspector
'
Document Control Desk
State of South Carolina
'
'
          State of South Carolina
J
J
                                                                                                                        '
'
j
j
i
i
  i
i
.
.
  l
l
1
1
!
!
,
,
  I
I
:
:
)
)
  !
!
i
i
i
i
,
,
Line 104: Line 127:
9
9
e
e
!
!
i
i
:
:
1
1
.)
.)
                                                                                                                        '
'
:
:
:
  :
:
                                                                                                                        ,
:
                                                                                                                        1
,
          RII                     RII
1
RII
RII d
K$
'
j
j
                        '
CW urger:er
                                        d
VLBrownlee
                                        K$
l
          CW urger:er             VLBrownlee
06&o/86
l         06&o/86                 06/ /86
06/ /86
:                       1     o7[c[sp
:
1
o7[c[sp
e
e
!                                                                                                                     ,
!
    ,       __ _       _   _ , - . _       _     ..     ... . . . _ . _ _ _ _ _ _ .
,
,
__ _
_
_ , - . _
_
..
.
.
. .
. .
.
.
}}
}}

Latest revision as of 01:50, 8 December 2024

Forwards Insp Repts 50-413/86-19 & 50-414/86-22 on 860426-0525.No Violation Noted
ML20203B941
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/03/1986
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20203B944 List:
References
NUDOCS 8607180322
Download: ML20203B941 (2)


See also: IR 05000413/1986019

Text

occ;ca Mlt

.

  • g

e

.

JUL 0 31986

Docket Nos. 50-413, 50-414

License Nos. NPF-35, NPF-52

.

Duke Power Company

/TTN: Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NDS. 50-413/86-19 AND 50-414/86-22

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

P. K. Van Doorn on April 26 - May 25, 1986. The inspection included a review of

activities authorized for your Catawba facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified.in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Your attention is invited to unresolved items identified in the inspection

report. These matters will be pursued during future inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

cair.mN. StGMD BY

way;M V. 5xWLE f6

Virgil L. Brownlee, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Enclosure:

NRC Inspection Report

9c w/ enc 1:

,

W. L. Dick, Vice President - Construction

p.W.Hampton,StationManager

bcc w/ enc 1:

(See page 2)

8607180322 860703

h

PDR

ADOCK 05000413

h

"""

rE o /

_

-

. .

.

.

.

.

.

. _ _ _ _

_-

-

4

-

-

Jul. 0 31986

,

r

,

,

'

Duke Power Company

2

i

bec w/ encl:

K. N. Jabbour, NRR

5. L. Jordan, IE

'

W RC Resident Inspector

'

Document Control Desk

State of South Carolina

'

J

'

j

i

i

.

l

1

!

,

I

)

!

i

i

,

9

e

!

i

1

.)

'

,

1

RII

RII d

K$

'

j

CW urger:er

VLBrownlee

l

06&o/86

06/ /86

1

o7[c[sp

e

!

,

,

__ _

_

_ , - . _

_

..

.

.

. .

. .

.

.