ML20206D596: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 14: Line 14:
| page count = 3
| page count = 3
}}
}}
See also: [[followed by::IR 05000424/1986132]]
See also: [[see also::IR 05000424/1986132]]


=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:,eHad
    n.~                                                                                         ,eHad
n.~
                                            MAR 2 71987
.
                                          .
MAR 2 71987
          Georgia Power Company
.
          ATTN: Mr. James P. O'Reilly
Georgia Power Company
                    Senior.Vice President-
ATTN: Mr. James P. O'Reilly
                      Nucl6a'r Operations
Senior.Vice President-
          P. O. Box 4545
Nucl6a'r Operations
          Atlanta, GA 30302
P. O. Box 4545
          Gentlemen:
Atlanta, GA 30302
                                                                                                    -
Gentlemen:
          SUBJECT:   REPORT NO. 50-424/86-132                                                 ;
SUBJECT:
          Thank you for your response of February 27, 1987, to our Notice of Violation
REPORT NO. 50-424/86-132
          issued on January 29, 1987, concerning activities conducted at 'your Vogtle                             ;
;
          facility. We have evaluated your response and found that it meets the require-
-
Thank you for your response of February 27, 1987, to our Notice of Violation
issued on January 29, 1987, concerning activities conducted at 'your Vogtle
;
facility. We have evaluated your response and found that it meets the require-
ments of 10 CFR 2.201.
We will examine the implementation of your corrective
.
.
'
'
          ments of 10 CFR 2.201. We will examine the implementation of your corrective
actions during future inspections.
          actions during future inspections.
We have reviewed your justification with regard to why this violation should be
          We have reviewed your justification with regard to why this violation should be
re-classified as a Severity Level V rather than the stated Severity Level IV,
          re-classified as a Severity Level V rather than the stated Severity Level IV,
and have concluded that Severity Level IV is the appropriate classification.
          and have concluded that Severity Level IV is the appropriate classification.
This violation involved failure to meet regulatory requirements for more than
          This violation involved failure to meet regulatory requirements for more than
one Quality Assurance Criterion.
          one Quality Assurance Criterion. The documentation discrepancies concerning
The documentation discrepancies concerning
          operability of the remote shutdown panel were, alone, considered to be minor by
operability of the remote shutdown panel were, alone, considered to be minor by
          the inspectors during review of the test results in that NRC personnel were
the inspectors during review of the test results in that NRC personnel were
          present when the remote shutdown panel preoperational test was performed. The
present when the remote shutdown panel preoperational test was performed. The
          validity of the test results would have been questioned, based on the
validity of the test results would have been questioned, based on the
          documentation discrepancies, if NRC personnel had not been present during
documentation discrepancies, if NRC personnel had not been present during
          performance of the test. The area which was of greater concern to the
performance of the test. The area which was of greater concern to the
          inspectors was that the documentation discrepancies were very obvious when the
inspectors was that the documentation discrepancies were very obvious when the
          test results were reviewed by the inspectors, but these discrepancies were not
test results were reviewed by the inspectors, but these discrepancies were not
          identified during your review process. We do not consider violations involving
identified during your review process. We do not consider violations involving
          inadequate review of test results to be minor in that the review of completed
inadequate review of test results to be minor in that the review of completed
        ..
test results packages represents the last opportunity for appropriate members
      '.
..
          test results packages represents the last opportunity for appropriate members
'. of your engineering and management staff to ensure that systems and/or
          of your engineering and management staff to ensure that systems and/or
components have been adequately tested to meet design requirements and other
          components have been adequately tested to meet design requirements and other
commitments prior to issuance of the operating license.
          commitments prior to issuance of the operating license.
8704130381 870327
      8704130381 870327
      PDR    ADOCK 05000424
'.
'.
      G                   PDR
PDR
                                                                                                      ) D
ADOCK 05000424
                                              - - - - .               - . _ , . _ _ _ _ _ _ - - -
PDR
                                                                                                          sa c)
G
                                                                                                            _  _ -
) D
sa c)
.-
. _ _
-
-
- - - - .
-
- . .
.
- . _ , . _ _ _ _ _ _ - - -
_
_ -


                                                                                                              ._
._
l
l
            ,. U.
U.
                      Georgia Power Company                                                       2
,.
                                                                                                                                                      NAR 2 71987
Georgia Power Company
                    Therefore, since the violation failed to meet more than one Quality Assurance
2
                    Criterion, and, had more than minor safety significance, it meets the Severity
NAR 2 71987
                    Level IV Category listed in Supplement II to 10 CFR Part 2. Appendix C.
Therefore, since the violation failed to meet more than one Quality Assurance
                    We appreciate your cooperation in this matter.
Criterion, and, had more than minor safety significance, it meets the Severity
                                                                                                Sincerely,         .
Level IV Category listed in Supplement II to 10 CFR Part 2. Appendix C.
                                                                                .,.
We appreciate your cooperation in this matter.
                                                                                                  r-             N ts
Sincerely,
                                                                                                Luis A. Reyes, Director
.
                                                                                                Division of Reactor Projects
.,.
                                                                                                                            "
r-
                    cc:                       . E. Conway, Senior Vice President &
N ts
                                                  Project Director
Luis A. Reyes, Director
                                  /C. Whitney,GeneralManagerProject
Division of Reactor Projects
                                      f Support
cc:
                                JP. D. Rice, Vice President Project
. E. Conway, Senior Vice President &
                                        / Engineering
"
                                  VR. H. Pinson, Vice President, Project
Project Director
                                        / onstruction
/C. Whitney,GeneralManagerProject
                                                C
f Support
                                    vt. W. Hayes Vogtle Quality
JP. D. Rice, Vice President Project
                                          / Assurance Manager
/ Engineering
                                    yC. B. Bockhold, General Manager.
VR. H. Pinson, Vice President, Project
                                    / Nuclear Operations
C
                                / L. Gucwa, Manager, Nuclear Safety
/ onstruction
                                                and Licensino
vt. W. Hayes Vogtle Quality
                                /J. A. Bailey, Project Licensing
/ Assurance Manager
                                                Manager
yC. B. Bockhold, General Manager.
                                /B. W. Churchill, Esq., Shaw,
/ Nuclear Operations
                                  /J. E. Joiner, Troutman, SandersPittman, Potts and Trowbridge
/ L. Gucwa, Manager, Nuclear Safety
                                                                                              ,
and Licensino
/J. A. Bailey, Project Licensing
Manager
/B. W. Churchill, Esq., Shaw,
/J. E. Joiner, Troutman, SandersPittman, Potts and Trowbridge
,
/Lockerinan and Ashmore
;
;
'
'
                                      /Lockerinan and Ashmore
VJ. G,. Ledbetter, Consnissioner.
                                VJ. G,. Ledbetter, Consnissioner.
Department of Human Resources
                                                Department of Human Resources
/C. H. Badger, Office of Planning
                                  /C. H. Badger, Office of Planning
and Budget
                                                and Budget
-(.Kirkland,III, Counsel,
              -                  -(.Kirkland,III, Counsel,
-
                                              Office of the Consumer's Utility
Office of the Consumer's Utility
                                    / Council
/ Council
                                      D
/j.Feig,GeorgiansAgainst
                              /j.Feig,GeorgiansAgainst
D
                                              Nuclear Energy
Nuclear Energy
                                      M. B. Margulies, Esq., Chairman,
M. B. Margulies, Esq., Chairman,
                                              Atomic Safety and Licensing Board
Atomic Safety and Licensing Board
                                                Panel
/Dr
                                /Dr. O. H. Paris, Administrative Judge                                           '
Panel
                                              Atomic Safety and Licensing Board
. O. H. Paris, Administrative Judge
                                              Panel
'
                              /G. A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
                                              Atomic Safety and Licensing Board
/G
                                              Panel
Panel
                bec:                     (See page 3)
. A. Linenberger, Jr., Administrative Judge
  !
Atomic Safety and Licensing Board
    - . - .     . - - _ . _ _ _ - - - - _ - _ - - . _ - - _ - _ - . . _ _ _ _ , _ _ _ _ - - _                           ,_ - . _ - , . - _ _ . - - .
Panel
bec:
(See page 3)
!
- . - .
. - - _ . _ _ _ - - - - _ - _ - - . _ - - _ - _ - . . _ _ _ _ , _ _ _ _ - - _
,_
- . _ - , . - _ _ . - - .


                                                              .
.
          ''   ''
''
    i
i
  e
''
                                                                                                                                            GAR 2 71987
e
                  Georgia Power Company                                             3
GAR 2 71987
                  bec     . Reis. OGC
Georgia Power Company
                        y . M. Hill, IE
3
                          . Miller. NRR
bec
                          . Brach. EDO
. Reis. OGC
                          . Sinkule. RII
y . M. Hill, IE
. Miller. NRR
. Brach. EDO
. Sinkule. RII
/E.Christnot.RII
'
yNRC Resident Inspector
'
'
                      /E.Christnot.RII
Document. Control Desk
                      yNRC Resident Inspector                                                                                            '
State of Georgia
                        Document. Control Desk
:
                        State of Georgia
.
                                                                                                                          :
/
                                                                                                                        .
/
                              /
RI
              /
RII
                RI                                 RII       ,                                RII                   RI                 RII
RII
                MThomas:er                          FJap                      AHerdt          VPagcJefa              MSink'le
RI
                                                                                                                            u            GJ nki
RII
                03/M/87                                                      03py//87        0,3/4/87              03/p/87              .2f/
                                                    03/7 /87
,
,
      r--r -                   st,---s----e----w.-   m%-- +   e-at- . ~e-..       -m - %y - ---.,--,*---.+>-m- -.     w   . - - ,- -
MThomas:er
FJap
AHerdt
VPagcJefa
MSink'le
GJ nki
u
03/M/87
03/7 /87
03py//87
0,3/4/87
03/p/87
.2f/
,
r--r
-
st,---s----e----w.-
m%--
+
e-at-
.
~e-..
-m
-
%y
-
---.,--,*---.+>-m-
-.
w
. - - ,- -
}}
}}

Latest revision as of 02:03, 7 December 2024

Ack Receipt of 870227 Response to 870129 Notice of Violation from Insp Rept 50-424/86-132.Severity Level IV Proper Classification for Violation Since Violation Failed to Meet More than One QA Criterion
ML20206D596
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 03/27/1987
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
References
NUDOCS 8704130381
Download: ML20206D596 (3)


See also: IR 05000424/1986132

Text

,eHad

n.~

.

MAR 2 71987

.

Georgia Power Company

ATTN: Mr. James P. O'Reilly

Senior.Vice President-

Nucl6a'r Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT:

REPORT NO. 50-424/86-132

-

Thank you for your response of February 27, 1987, to our Notice of Violation

issued on January 29, 1987, concerning activities conducted at 'your Vogtle

facility. We have evaluated your response and found that it meets the require-

ments of 10 CFR 2.201.

We will examine the implementation of your corrective

.

'

actions during future inspections.

We have reviewed your justification with regard to why this violation should be

re-classified as a Severity Level V rather than the stated Severity Level IV,

and have concluded that Severity Level IV is the appropriate classification.

This violation involved failure to meet regulatory requirements for more than

one Quality Assurance Criterion.

The documentation discrepancies concerning

operability of the remote shutdown panel were, alone, considered to be minor by

the inspectors during review of the test results in that NRC personnel were

present when the remote shutdown panel preoperational test was performed. The

validity of the test results would have been questioned, based on the

documentation discrepancies, if NRC personnel had not been present during

performance of the test. The area which was of greater concern to the

inspectors was that the documentation discrepancies were very obvious when the

test results were reviewed by the inspectors, but these discrepancies were not

identified during your review process. We do not consider violations involving

inadequate review of test results to be minor in that the review of completed

test results packages represents the last opportunity for appropriate members

..

'. of your engineering and management staff to ensure that systems and/or

components have been adequately tested to meet design requirements and other

commitments prior to issuance of the operating license.

8704130381 870327

'.

PDR

ADOCK 05000424

PDR

G

) D

sa c)

.-

. _ _

-

-

- - - - .

-

- . .

.

- . _ , . _ _ _ _ _ _ - - -

_

_ -

._

l

U.

,.

Georgia Power Company

2

NAR 2 71987

Therefore, since the violation failed to meet more than one Quality Assurance

Criterion, and, had more than minor safety significance, it meets the Severity

Level IV Category listed in Supplement II to 10 CFR Part 2. Appendix C.

We appreciate your cooperation in this matter.

Sincerely,

.

.,.

r-

N ts

Luis A. Reyes, Director

Division of Reactor Projects

cc:

. E. Conway, Senior Vice President &

"

Project Director

/C. Whitney,GeneralManagerProject

f Support

JP. D. Rice, Vice President Project

/ Engineering

VR. H. Pinson, Vice President, Project

C

/ onstruction

vt. W. Hayes Vogtle Quality

/ Assurance Manager

yC. B. Bockhold, General Manager.

/ Nuclear Operations

/ L. Gucwa, Manager, Nuclear Safety

and Licensino

/J. A. Bailey, Project Licensing

Manager

/B. W. Churchill, Esq., Shaw,

/J. E. Joiner, Troutman, SandersPittman, Potts and Trowbridge

,

/Lockerinan and Ashmore

'

VJ. G,. Ledbetter, Consnissioner.

Department of Human Resources

/C. H. Badger, Office of Planning

and Budget

-(.Kirkland,III, Counsel,

-

Office of the Consumer's Utility

/ Council

/j.Feig,GeorgiansAgainst

D

Nuclear Energy

M. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

/Dr

Panel

. O. H. Paris, Administrative Judge

'

Atomic Safety and Licensing Board

/G

Panel

. A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

Panel

bec:

(See page 3)

!

- . - .

. - - _ . _ _ _ - - - - _ - _ - - . _ - - _ - _ - . . _ _ _ _ , _ _ _ _ - - _

,_

- . _ - , . - _ _ . - - .

.

i

e

GAR 2 71987

Georgia Power Company

3

bec

. Reis. OGC

y . M. Hill, IE

. Miller. NRR

. Brach. EDO

. Sinkule. RII

/E.Christnot.RII

'

yNRC Resident Inspector

'

Document. Control Desk

State of Georgia

.

/

/

RI

RII

RII

RI

RII

,

MThomas:er

FJap

AHerdt

VPagcJefa

MSink'le

GJ nki

u

03/M/87

03/7 /87

03py//87

0,3/4/87

03/p/87

.2f/

,

r--r

-

st,---s----e----w.-

m%--

+

e-at-

.

~e-..

-m

-

%y

-

---.,--,*---.+>-m-

-.

w

. - - ,- -