: i. t ia l                                                           FLORIDA POWER AND LIGHT COMPANY TURKEY POINT UNITS 3 AND 4
FLORIDA POWER AND LIGHT COMPANY TURKEY POINT UNITS 3 AND 4 I
                                                      ~ 0FF-NORMAL OPERATING PROCEDURE 9408.2 I                                                                          AUGUST 23, 1985
~ 0FF-NORMAL OPERATING PROCEDURE 9408.2 AUGUST 23, 1985 j.
: j.           1.0
1.0


==Title:==
==Title:==
3                     ENERGIZING 4KV BUSES USING THE CRANKING OIESELS 8US TIE LINES OR STARTUP j                     TRANSFORMER FROM.THE OPPOSITE UNIT 2.0 Approval and List of Effective Pages:
3 ENERGIZING 4KV BUSES USING THE CRANKING OIESELS 8US TIE LINES OR STARTUP j
                                                                                                                                  ~
TRANSFORMER FROM.THE OPPOSITE UNIT 2.0 Approval and List of Effective Pages:
.                    2.1 Approval:
 
}                             Change Dated 8/23/85 Reviewed by Plant Nuclear Safety Committee:                       85-140 1                             and Approved by Plant Manager - Nuclear: 8/23/85 1
===2.1 Approval===
~
}
Change Dated 8/23/85 Reviewed by Plant Nuclear Safety Committee:
85-140 1
and Approved by Plant Manager - Nuclear: 8/23/85 1
2.2 List of Effective Pages:
2.2 List of Effective Pages:
h         Date             Page           Date       Page     Date   h         Date   -
h Date Page Date Page Date h
1    8/23/85             4           8/23/85     7       8/23/85 10       8/23/85 2     8/23/85             5           8/23/85     8       8/23/85   11     8/23/85 3     8/23/85             6           8/23/85     9       8/23/85                           :
Date 1
3.0 Purpose and Discussion:
8/23/85 4
8/23/85 7
8/23/85 10 8/23/85 2
8/23/85 5
8/23/85 8
8/23/85 11 8/23/85 3
8/23/85 6
8/23/85 9
8/23/85 3.0 Purpose and Discussion:


===3.1 Purpose===
===3.1 Purpose===
This procedure provides instructions to be followed when -a loss of nomal                         ;
This procedure provides instructions to be followed when -a loss of nomal power supplies requires an alternate method of feeding the 4KV bus (es) for l
power supplies requires an alternate method of feeding the 4KV bus (es) for                       l the purpose of supplying emergency loads.                 The breakers required to perform the energizing 'of the 4KV buses discuss herein are locked breakers and                           j requires authorization of PS-N to be racked in.                                                   '
the purpose of supplying emergency loads.
3.2 Discussic :                                                                                             -l l                                 3.2.1 This procedure can be utilized to energize .and load the A, B and C l                                       4KV buses and their respective load centers and emergency loads.
The breakers required to perform the energizing 'of the 4KV buses discuss herein are locked breakers and j
l l                                 3.2.2 This procedure can be utilized to l                                       Unit Startup Transformer (for A Bus) or              provide power from the Cranking       the (for Diesels  Opposite C,
requires authorization of PS-N to be racked in.
and "A" or "B").
3.2 Discussic :
1                                 3.2.3 This procedure can .be utilized to energize a dead 4KV bus either j                                       because there isn't the ab_ility to sync. check prior to closing the
-l l
{                                         breaker or because bus clearing must be in to close the breaker.
3.2.1 This procedure can be utilized to energize.and load the A, B and C l
3.2.4 The Cranking Diesel tie line and breakers are rated at no more than SMVA.- ,Qo not allow Cranking Diesel Ammeter indication exceed a total
4KV buses and their respective load centers and emergency loads.
  ;                                      of 630 amps.
l l
8603270226 860106 PDR     FOIA                                                                     .
3.2.2 This procedure can be utilized to l
WEISS 85-729               PDR DM.       !
Unit Startup Transformer (for A Bus) provide power from the Opposite or the Cranking Diesels (for C, and "A" or "B").
i__m    _ _ _ _ -        u._____-___        _m.--               e_._____
1 3.2.3 This procedure can.be utilized to energize a dead 4KV bus either j
because there isn't the ab_ility to sync. check prior to closing the
{
breaker or because bus clearing must be in to close the breaker.
3.2.4 The Cranking Diesel tie line and breakers are rated at no more than SMVA.-,Qo not allow Cranking Diesel Ammeter indication exceed a total of 630 amps.
8603270226 860106 PDR FOIA WEISS 85-729 PDR DM.
i m
u.
m.--
e.
m.
m


                                                                                              ~     l
l
    ?
~
s                                                                                       8/23/85 3                         0FF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 2 ENERGIZING 4KV BUSES USING THE CRANKING DIESELS BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT                   ,
?
l 3l               3.2.5   Interlocks       that affect the closure of the Cranking diesel Incoming   )
s 8/23/85 3
':                      Breaker at the l*C 4KVl Bus 3AC03 (4AC03):                                 '
0FF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 2 ENERGIZING 4KV BUSES USING THE CRANKING DIESELS BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT 3l 3.2.5 Interlocks that affect the closure of the Cranking diesel Incoming
)
Breaker at the l*C 4KVl Bus 3AC03 (4AC03):
4W26466 must be closed.
4W26466 must be closed.
.i                                 AND
.i AND
>f
>f 3AC01 (4AC01) must be open.
;. !                    3AC01 (4AC01) must be open.
AND 3AC16 (4AC16) must be open.
    ,                              AND 3AC16 (4AC16) must be open.                                               ,
j AND il l'
j                             AND il l'
3C(4C) Bus Differential Relay must not be tripped.
    ,                    3C(4C) Bus Differential Relay must not be tripped.
l AND I
lI                              AND Control Switch to CLOSE.                                               t
Control Switch to CLOSE.
;i                                                                                             ,
t
3.2.6   Interlocks that affect the closure of Cranking Diesel tie breaker at the Cranking Diesel Bus 4W26466.
;i 3.2.6 Interlocks that affect the closure of Cranking Diesel tie breaker at the Cranking Diesel Bus 4W26466.
Must not have a Cranking Diesel Bus Lockout.
Must not have a Cranking Diesel Bus Lockout.
AND Cranking Diesel Incoming Breaker at the 3C Bus - 3AC03 must be lRackedInlandOpen.
AND i
i Cranking Diesel Incoming Breaker at the 4C Bus - 4AC03 must be lRackedInlandOpen.
AND
AND
;;                      Cranking Diesel Incoming Breaker at the 3C Bus - 3AC03 must be
.j Control Switch to CLOSE.
:                      lRackedInlandOpen.
l 3.2.7 Interlocks that affect the closure of Load Center 3E(4E) Feeder Breaker 3AC04(4AC11).
AND                                                              I i
:>j 1.
i                    Cranking Diesel Incoming Breaker at the 4C Bus - 4AC03 must be lRackedInlandOpen.
None 3.2.8 Interlocks that affect the closure of load Centers 3F and 3G (4F and
:                              AND
]l 4G) Feeder Breaker 3AC04(4AC04).
.j                       Control Switch to CLOSE.                                                   l
:I 1.
.:                                                                                                  l l              3.2.7   Interlocks that affect the closure of Load Center 3E(4E) Feeder Breaker 3AC04(4AC11).
None I!
j                       1. None
!!              3.2.8   Interlocks that affect the closure of load Centers 3F and 3G (4F and 4G) Feeder Breaker 3AC04(4AC04).
]l
:I                       1. None I!


==4.0 Symptoms==
==4.0 Symptoms==
Line 81: Line 106:


p i
p i
j                                                                                                                       8/23/85 7                                             0FF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 3 J                                               ENERGIZING 4KV. BUSES USING THE CRANKING DIESELS
j 8/23/85 7
: t.                                   BUS TIE LINES GR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT
0FF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 3 J
ENERGIZING 4KV. BUSES USING THE CRANKING DIESELS t.
BUS TIE LINES GR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT


==5.0 Instructions==
==5.0 Instructions==
5.1 Irmoediate Automatic Actions:
5.1 Irmoediate Automatic Actions:
5.1.1 None                                                                                     .
5.1.1 None 5.2 Immediate Operator Actions:
5.2 Immediate Operator Actions:
5.2.1 Stabilize the unit using appropriate Off-Nonnal Operating Procedures.
5.2.1 Stabilize the unit using appropriate Off-Nonnal Operating Procedures.
      ,                              5.2.2   l_I_, an SI signal exists or 1,f, an. SI signal is actuated during this procedure, it ghould be reset to pennit manual loading ' of equipment i                                       on the 4KV bus.i
5.2.2 l_I_, an SI signal exists or 1,f, an. SI signal is actuated during this procedure, it ghould be reset to pennit manual loading ' of equipment i
* 5.2.3 Place following equipment switches in PULL-TO-LOCK or 0FF position:
on the 4KV bus.i 5.2.3 Place following equipment switches in PULL-TO-LOCK or 0FF position:
: 1. . High-head SI_ pumps j                                              2. RHR pumps j
: 1.. High-head SI_ pumps 2.
c
RHR pumps jj 3.
: 3. Containment Spray Pumps                                                 !
Containment Spray Pumps c
1{                                             4. CCW pumps J'
1{
4
4.
:                                        5. Emergency Containment Filter and Cooler Fans
CCW pumps J'
: 6. Intale Cooling Water Pumps 5.3 Subseauent Operstor Actions:
5.
II                                     5.3.1   lPerfonn the following to energize th'e *C 4KV bus utilizing the d-                                             cranking diesel:
Emergency Containment Filter and Cooler Fans 4
  .                                            1. On the *C 4KV Bus, UNLOCK and RACK IN 3AC03 and 4AC03.
6.
NOTE:         Low voltage does not trip the load center feeder breakers l].                                                                  and therefore.have a high, probability of being CLOSED and i'                                                                   will need to-be OPENED.
Intale Cooling Water Pumps 5.3 Subseauent Operstor Actions:
.                                              2. On the *C 4KV Bus to be energized, verify by visual local check that all breakers are OPEN.
II 5.3.1 lPerfonn the following to energize th'e *C 4KV bus utilizing the d-cranking diesel:
CAUTION:             The Cranking Diesel Generator should not be operated S                                                                           unloaded greater than 15 minutes.           Operation at         s a                                                                       periods       longer than 15 minutes could result in
1.
]                                                                         turbochargerfire.l
On the *C 4KV Bus, UNLOCK and RACK IN 3AC03 and 4AC03.
: 3. Notify Unit 1 and 2 Control Room to perform the following:
l].
$                                                    (1)     Install control power fuses (4), remove tag, UNLOCK and RACK u                                                           IN 4W26466.
NOTE:
Low voltage does not trip the load center feeder breakers and therefore.have a high, probability of being CLOSED and i'
will need to-be OPENED.
2.
On the *C 4KV Bus to be energized, verify by visual local check that all breakers are OPEN.
CAUTION:
The Cranking Diesel Generator should not be operated S
unloaded greater than 15 minutes.
Operation at s
a periods longer than 15 minutes could result in
]
turbochargerfire.l 3.
Notify Unit 1 and 2 Control Room to perform the following:
(1)
Install control power fuses (4), remove tag, UNLOCK and RACK u
IN 4W26466.
[
[
(2) Start at least two cranking diesels                          n close their associated output breakers l,gn, dead bus ,1Qr$,l a
(2) close their associated output breakers l,gn, dead bus,1Qr$,l a Start at least two cranking diesels n
=
=
i
i
          <v-me w. , -... e       .. .        ,qy   , , , , _ _              ,,44
<v-me w.
e
,qy
,,44


r
r
                                                                                                                -8/23/85 1                               0FF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 4 ENERGIZING 4KV BUSES USING THE CRANKING DIESELS a
-8/23/85 1
.}                       BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT (3) Close 4W26466 and notify the Plant Supervisor-Nuclear . that 4W26466 is closed.
0FF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 4 ENERGIZING 4KV BUSES USING THE CRANKING DIESELS
: 4. On the *C 4KV bus to be energized (from the Control Room), CLOSE
.}
                                  *AC03.                                                                    .
BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT a
: 5. Verify *C Bus voltage to be approximately 4KV.
(3) Close 4W26466 and notify the Plant Supervisor-Nuclear. that 4W26466 is closed.
: 6. If necessary to energize the remaining *C .4KV bus, perform- the 3                               following for the bus to be energized:
4.
j                               NOTE:   Low voltage does not trip the load center feeder breakers and therefore have a high probability of being CLOSED and                         -
On the *C 4KV bus to be energized (from the Control Room), CLOSE
i will need to be OPENED.
*AC03.
',                              (1) Verify by visual local inspection that all breakers are OPEN.
5.
Verify *C Bus voltage to be approximately 4KV.
6.
If necessary to energize the remaining *C.4KV bus, perform-the 3
following for the bus to be energized:
j NOTE:
Low voltage does not trip the load center feeder breakers and therefore have a high probability of being CLOSED and will need to be OPENED.
i (1) Verify by visual local inspection that all breakers are OPEN.
(2) Close *ACO3 (from the Control Room) 1 (3) Verify *C 4KV bus voltage is approximately 4KY.
(2) Close *ACO3 (from the Control Room) 1 (3) Verify *C 4KV bus voltage is approximately 4KY.
t l*
t l
CAUTION:       If Auxiliary Feedwster is not available, the Standby Steam Generator Feedwater System shall be utilized to supply feedwater in accordance with Operation Procedure 7201.1, Standby Steam Generator Feedwater
CAUTION:
  ;                                            System - Operating Instructions.
If Auxiliary Feedwster is not available, the Standby Steam Generator Feedwater System shall be utilized to supply feedwater in accordance with Operation Procedure 7201.1, Standby Steam Generator Feedwater System - Operating Instructions.
l
l 7.
: 7. If the Auxiliary Feedwater System is unavailable and Standby Steam Generator Feedwater System Operation is required, CLOSE the i                               Standby Steam Generator Feedwater Pump breaker for the.*C 4KV bus
If the Auxiliary Feedwater System is unavailable and Standby Steam Generator Feedwater System Operation is required, CLOSE the i
  !                              being loaded:
Standby Steam Generator Feedwater Pump breaker for the.*C 4KV bus being loaded:
(1) 3AC06 - SSGFP A f                             (2) 4AC10 - SSGFP B l CAUTION:   The Cranking Diesel tie line and breakers are rated
(1) 3AC06 - SSGFP A f
  !                                              at no more than 5 MVA. Do not exceed 630 Amps Total j                                             on the Cranking Diesel ammeters.
(2) 4AC10 - SSGFP B l CAUTION:
I
The Cranking Diesel tie line and breakers are rated at no more than 5 MVA.
: 8. To load either *C 4KV bus perfom step 5.3.2.
Do not exceed 630 Amps Total j
on the Cranking Diesel ammeters.
I 8.
To load either *C 4KV bus perfom step 5.3.2.
E.
E.
l                                 To energize *A or *8 4KV Bus from *C 4KV Bus, perform step 5.3.3. Do not perTorm both steps 5.3.2 and 5.3.3.
l To energize *A or *8 4KV Bus from *C 4KV Bus, perform step 5.3.3.
Do not perTorm both steps 5.3.2 and 5.3.3.
1 l
1 l
j                                                     '
j i
i


f 8/23/85
f 8/23/85 OFF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 5 ENERGIZING 4KV BUSES USING THE CRANKING DIESELS-BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT 5.3.2 To load either *C 4KV Bus:
        ,                                    OFF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 5 ENERGIZING 4KV BUSES USING THE CRANKING DIESELS-BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT 5.3.2 To load either *C 4KV Bus:
1.
: 1. If necessary to energize *E load center, perform-the following:
If necessary to energize *E load center, perform-the following:
[                                           (1) CLOSE 3AC04 for 3C bus E 4AC11 for 4q, bus - supply to *E load center.                                               ,
[
p (2) START n,!gglgl, equipment fed from the *E load center, using h                                                 care to assure _T_oji_al amperage on Cranking Diesel ammeters
(1) CLOSE 3AC04 for 3C bus E 4AC11 for 4q, bus - supply to *E load center.
  !                                              does not exceed 630 amps.       '
p (2) START n,!gglgl, equipment fed from the *E load center, using h
1
care to assure _T_oji_al amperage on Cranking Diesel ammeters does not exceed 630 amps.
  '-                                  2. If necessary to energize *F and *G load centers, perform the j                                        ,
1 2.
following:   ,
If necessary to energize *F and *G load centers, perform the following:
(1) CLOSE 3AC11 for 3C bus E 4AC04 for 4C bus - supply to *F and j                                                 *G load centers.
j (1) CLOSE 3AC11 for 3C bus E 4AC04 for 4C bus - supply to *F and j
*G load centers.
(2) START needed equpment fed from the *F load center, using care to assure "otal ' amperage on Cranking Diesel anneters does not exceed 630 amps.
(2) START needed equpment fed from the *F load center, using care to assure "otal ' amperage on Cranking Diesel anneters does not exceed 630 amps.
  '                                                                                                                                  t j                                         (3) START needed equipment fed from the *G l'o ad center, using care to assure Total am                                                       ammeters i                                              does not exceed 6TfTmps.perage on - Cranking Diesel l                                   3. Repeat steps 5.3.2.1 and 5.3.2.2 to load the other *C 4KV bus if t
t j
(3) START needed equipment fed from the *G l' ad center, using o
care to assure Total am ammeters does not exceed 6TfTmps.perage on - Cranking Diesel i
l 3.
Repeat steps 5.3.2.1 and 5.3.2.2 to load the other *C 4KV bus if t
desired.
desired.
  !                                        CAUTION:         Verify F Load Center (s) tie breaker 41408-is opened i                                                            after closing 3AC04 or 4AC11.
CAUTION:
1                           5.3.3 To energize A E B 4KV Bus from C 4KV bus:
Verify F Load Center (s) tie breaker 41408-is opened after closing 3AC04 or 4AC11.
1l                                   CAUTION:       The *C 4KV bus should be unloaded, 'unless a Standby Steam                                       '
i 1
l                                                  Generator Feedpump(s) is required due to a ' loss of
5.3.3 To energize A E B 4KV Bus from C 4KV bus:
  ;                                                  Auxiliary Feedwater, to ensure amperage requirements are                                           i i                                                   not exceeded on the Cranking Olesel tie line and breakers                                         '
1l CAUTION:
i                                                  when the *A or *B 4KV bus is energized.                                                           i j                                   1. Ensure that the *A or *8 4KV bus to be energized has a CCW pump
The *C 4KV bus should be unloaded, 'unless a Standby Steam l
                                            ,g!d, an. Intake Cooling Water Pump available.
Generator Feedpump(s) is required due to a ' loss of Auxiliary Feedwater, to ensure amperage requirements are i
  ,                                    2. Verify by visual local check that all breakers on the A g 8 4KV bus to be energized, are OPEN.
i not exceeded on the Cranking Olesel tie line and breakers i
CAUTION:         00 NOT energize both A and 8 4KV Buses on a unit with the C 4KV Bus tie.
when the *A or *B 4KV bus is energized.
: 3. On the associated unit, unlock *AC13.
j 1.
: 4. Rack in associated *AC13.                                                                                   l
Ensure that the *A or *8 4KV bus to be energized has a CCW pump
: 5. Close the associated *AC13.                                                                                 l 1
,g!d, an. Intake Cooling Water Pump available.
2.
Verify by visual local check that all breakers on the A g 8 4KV bus to be energized, are OPEN.
CAUTION:
00 NOT energize both A and 8 4KV Buses on a unit with the C 4KV Bus tie.
3.
On the associated unit, unlock *AC13.
4.
Rack in associated *AC13.
5.
Close the associated *AC13.


8/23/85 9         0FF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 6 ENERGIZING 4KV SUSES USING THE CRANKING DIESELS BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT
8/23/85 9
: 6. To energize the associated A 4KV Bus, perform the following:                             ,
0FF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 6 ENERGIZING 4KV SUSES USING THE CRANKING DIESELS BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT 6.
                  . UNLOCK *AA09.
To energize the associated A 4KV Bus, perform the following:
. UNLOCK *AA09.
RACK IN *AA09.
RACK IN *AA09.
CLOSE *AA09.
CLOSE *AA09.
: 4) VERIFY A 4KV Bus Voltage to be,approximately 4160 volts.
: 4) VERIFY A 4KV Bus Voltage to be,approximately 4160 volts.
: 7. To energize the associated B 4KV Bus, perform the filowing:
7.
To energize the associated B 4KV Bus, perform the filowing:
: 1) UNLOCK *AB22.
: 1) UNLOCK *AB22.
: 2) RACK IN *AB22.                                                                                         l
: 2) RACK IN *AB22.
: 3) CLOSE *AB22.                                                                                          .
l
: 4) VERIFY B 4KV Bus Voltage to be approximately 4160 volts.                                         '
: 3) CLOSE *AB22.
: 8. To load A 4KV Bus, perform the following:
: 4) VERIFY B 4KV Bus Voltage to be approximately 4160 volts.
1           (1)     If plant conditions require, energize a CCW pump and Intake Cooling Water Pump on the A 4KV bus energized:
8.
i j                 3A 4KV Bus t
To load A 4KV Bus, perform the following:
3AA12 - 3A CCW Punp                                                               ,
1 (1)
j                  3AA17 - 3C CCW Pump 3AA19 - 3A Intake Cooling Water Pump 4A 4KV Bus                                                                                             ;
If plant conditions require, energize a CCW pump and Intake Cooling Water Pump on the A 4KV bus energized:
4AA12 - 4A CCW Pump                                                                                     l 4AA17 - 4C CCW Pump 4AA19 - 4A Intake Cooling Water Pump (2) CLOSE needed 480 Volt Load Center breakers as follows:
i j
                    *A Bus 4KV Bus
3A 4KV Bus t
                    *AA08   -
3AA12 - 3A CCW Punp j
Feed to A 480 Volt Load Center
3AA17 - 3C CCW Pump 3AA19 - 3A Intake Cooling Water Pump 4A 4KV Bus 4AA12 - 4A CCW Pump 4AA17 - 4C CCW Pump 4AA19 - 4A Intake Cooling Water Pump (2) CLOSE needed 480 Volt Load Center breakers as follows:
                    *AA14   -
*A Bus 4KV Bus
Feed to C 480 Volt Load Center (3) START needed Emergency Equipment from *A or *C 480V load centers, using care to assure Total amperage does not exceed 630 amps.
*AA08 Feed to A 480 Volt Load Center
(4)     If plant conditions require, energize a charging pump on the                                         $
*AA14 Feed to C 480 Volt Load Center (3) START needed Emergency Equipment from *A or *C 480V load centers, using care to assure Total amperage does not exceed 630 amps.
load center energized:
(4)
3A Charging Pump - 30105             3A - 480 V Load Center 3C Charging Pump - 30308             3C - 480 V Load Center or 4A Charging Pump   "T0105           4A - 480 V Load Center 4C Charging Pump - 40308             4C - 480 V Load Center i
If plant conditions require, energize a charging pump on the load center energized:
: 9. To load *B 4KV bus, perfonn the following:
3A Charging Pump - 30105 3A - 480 V Load Center 3C Charging Pump - 30308 3C - 480 V Load Center or 4A Charging Pump "T0105 4A - 480 V Load Center 4C Charging Pump - 40308 4C - 480 V Load Center i
                                                        ._I_*_______._._I.__[__.__$._
9.
* __I._____._                                ____1_.*_. ______._____T_I__'____
To load *B 4KV bus, perfonn the following:
I.
. I *
.. I.
[
1.*.
T I


r
r
.a
.a
                                                                                        .8/23/85
.8/23/85 OFF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 7 ENERGIZING 4KV BUSES USING THE CRANKING DIESELS BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT 1'
      -,                    OFF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 7 ENERGIZING 4KV BUSES USING THE CRANKING DIESELS
.(1) 1f_ ling Water Pump on the B 4KV bus er.ergized: plant conditions Coo t
    ,              BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT 1
3B 4KV Bus 3AB17 - 3B Intake Cooling Water Pump 3AB19 - 3C Intake Cooling Water Pump 7
                          .(1) 1f_
48 4KV Bus J
Coo ling Water Pump on the B 4KV bus er.ergized: plant conditions t                                 3B 4KV Bus 3AB17 - 3B Intake Cooling Water Pump 3AB19 - 3C Intake Cooling Water Pump 7                                 48 4KV Bus J                                 4AB13 - 48 CCW Pump 4AB17 - 4B Intake Cooling Water Pump                           '
4AB13 - 48 CCW Pump 4AB17 - 4B Intake Cooling Water Pump
~
~
4AB19 - 4C Intake Cooling Water Pump i
4AB19 - 4C Intake Cooling Water Pump i
9                           (2) CLOSE needed 480V load center breakers as follows:
9 (2) CLOSE needed 480V load center breakers as follows:
1 J                               *B 4KV Bus
1 J
                                  *AB09  -
*B 4KV Bus Feed to B 480 Volt Load Center
Feed to B 480 Volt Load Center
*AB09
                                  *AB14   -
*AB14 Feed to D 480 Volt Load Center t
Feed to D 480 Volt Load Center t
(3) START needed EMERGENCY EQUIPMENT from
    ,                      (3) START needed EMERGENCY EQUIPMENT from         *B   0R *0   load centers. Usina care to assure TOTAL amperage does not exceed
*B 0R
:                            630 amps.
*0 load centers. Usina care to assure TOTAL amperage does not exceed 630 amps.
(4)   If plant conditions require, energize' a charging pump on the j                             load center energized:
(4)
l,                            3B Charging Pump - 30203             38 - 480 V Load Center or l                           48 Charging Pump - 40308             48 - 480 V Load Center
If plant conditions require, energize' a charging pump on the j
: 10. If total amperage limits allow, START needed Emergency Equipment 3                        Tr~om *A or *B 4KV bus.                                               l ft      5.4 Using the OPPOSITE Startup Transformer to energize the ASSOCIATED Unit A 4KV Bus (B 4KV Bus cannot be enregized from A 4KV Bus):
load center energized:
  )             5.4.1 Verify by visual inspection all breakers on the A 4KV Bus to be energized are OPEN or RACKED OUT.
l 3B Charging Pump - 30203 38 - 480 V Load Center or l
48 Charging Pump - 40308 48 - 480 V Load Center
: 10. If total amperage limits allow, START needed Emergency Equipment Tr~om *A or *B 4KV bus.
3 f
5.4 Using the OPPOSITE Startup Transformer to energize the ASSOCIATED Unit A 4KV t
Bus (B 4KV Bus cannot be enregized from A 4KV Bus):
)
5.4.1 Verify by visual inspection all breakers on the A 4KV Bus to be energized are OPEN or RACKED OUT.
5.4.2 On the A 4KV Bus to be energized, unlock *AA22.
5.4.2 On the A 4KV Bus to be energized, unlock *AA22.
5.4.3 Rack in *AA22.                                                               !
5.4.3 Rack in *AA22.
5.4.4 Verify potential on opposite units startup transformer (white lights         j u                      above frequency recorder).
5.4.4 Verify potential on opposite units startup transformer (white lights above frequency recorder).
i 5.4.5 Close in *AA22.               ,
j u
i 5.4.5 Close in *AA22.
5.4.6 Verify A 4KV Bus Voltage to be approximately 4160 Volts.
5.4.6 Verify A 4KV Bus Voltage to be approximately 4160 Volts.
(
(
-----===-=--==-_-===1=-                         - === = =:_ = = = _ -___ _ ___
-----===-=--==- -===1=-
-=== = =:
= = =


t 8/23/85 i     s 0FF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 8 j                                  ENERGIZING 4KV BUSES USING THE CRANXING DIESELS j                          BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT i                     5.4.7 To load the A 4KV bus perform the following:
t 8/23/85 i
I y                              1. CLOSE the needed Load Center feeder breakers.
0FF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 8 sj ENERGIZING 4KV BUSES USING THE CRANXING DIESELS BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT j
I;                                (1)     Feed to A Load Center *AA08.
i 5.4.7 To load the A 4KV bus perform the following:
I 1.
CLOSE the needed Load Center feeder breakers.
y I
(1)
Feed to A Load Center *AA08.
(2) To feed l> Load Center, use the breaker as follows:
(2) To feed l> Load Center, use the breaker as follows:
I                                           1. OPEN *0210, then i                                          2. CLOSE *0110.
I 1.
: 3. Re-energize required loads.
OPEN *0210, then 2.
j                                 (3)     Feed to C Lead Center *AA14.
CLOSE *0110.
i 3.
Re-energize required loads.
j (3)
Feed to C Lead Center *AA14.
(4) To feed D Load Center, use the tie breaker as follows:
(4) To feed D Load Center, use the tie breaker as follows:
: 1.     OPEN 20410, then
1.
: 2.     CLOSE 1310.                                                                        .
OPEN 20410, then 2.
: 3.     Re-energize required loads.
CLOSE 1310.
3.
Re-energize required loads.
(5) Close in needed Load Center breakers requi red to START EliERGENCY LOADS.
(5) Close in needed Load Center breakers requi red to START EliERGENCY LOADS.
(6) START required 480V EMERGENCY loads.                                                                     l (7) Start 4KV EMERGENCY Pumps as ' required by plant conditions.
(6) START required 480V EMERGENCY loads.
    .                                      CAUTION:       00 NOT exceed 600 Amps total load on the A 4KV Bus.
(7) Start 4KV EMERGENCY Pumps as ' required by plant conditions.
NOTE:       To return the' system to nonnal, the bus (es) energized
CAUTION:
* i                                                  by this procedure MJST be DEAD prior to being
00 NOT exceed 600 Amps total load on the A 4KV Bus.
    !                                                  restored by its nonnal power supply.
NOTE:
l             5.5 To de-energi7e A 4KV bus (powered from opposite unit startup transformer or j                   bustie):
To return the' system to nonnal, the bus (es) energized i
    !                  5.5.1 Energize the B 4KV Bus .by a nonnel feed breaker (*AB05 or Unit 3 1                           3AB20/ Unit 4 4AB21) by using *-0P-005, 4160 Volt Buses A and B.
by this procedure MJST be DEAD prior to being restored by its nonnal power supply.
  &                  5.5.2 Transfer loads by starting needed pumps on B 4KV bus and stopping all
l 5.5 To de-energi7e A 4KV bus (powered from opposite unit startup transformer or j
    !                          pumps on A 4KV Bus.
bustie):
1 5.5.3 Transfa- '.oad Centers by:
5.5.1 Energize the B 4KV Bus.by a nonnel feed breaker (*AB05 or Unit 3 1
l
3AB20/ Unit 4 4AB21) by using *-0P-005, 4160 Volt Buses A and B.
: 1. f tieu to "C" Load Center, transfer D LC by:
5.5.2 Transfer loads by starting needed pumps on B 4KV bus and stopping all pumps on A 4KV Bus.
    ;                                      Verify *0410 OPEN.
1 l
5.5.3 Transfa- '.oad Centers by:
1.
f tieu to "C" Load Center, transfer D LC by:
Verify *0410 OPEN.
CLOSE *AB14.
CLOSE *AB14.
OPEN *0310.
OPEN *0310.
CLOSE *0410.
CLOSE *0410.
Re-energize required loads.
Re-energize required loads.
: 2. If "C" Load Center is needed:
2.
If "C" Load Center is needed:
OPEN *0302.
OPEN *0302.
CLOSE *0310.
CLOSE *0310.
j                                         Re-energize required loads.
j Re-energize required loads.
4
4
(   .. . s, n r .       ..          ....s..w.-       .
(
                                                                , ,_  . . .   .  .m . . . . . . . . . ... , .
s, n r.
____..n. _____y______
....s..w.-
..n.
_____y______
.m


r
r
    .I t
.I t
8/23/85 0FF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 9 ENERGIZING'4KV BUSES USING THE CRANKING DIESELS BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT l
8/23/85 0FF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 9 ENERGIZING'4KV BUSES USING THE CRANKING DIESELS BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT l
: 3. If tied to A Load Center, transfer B Load Center by:
3.
If tied to A Load Center, transfer B Load Center by:
: 1) Verify *0210 OPEN.
: 1) Verify *0210 OPEN.
f;                                                 CLOSE *AB09.
f; CLOSE *AB09.
p                                                       E* 5.
p E*
5.
Re-energize required loads.
Re-energize required loads.
: 4. If "A" Load Center is needed:
4.
If "A" Load Center is needed:
(1) OPEN *0102.
(1) OPEN *0102.
(2) CLOSE *0110.
(2) CLOSE *0110.
(3) Re-energize required loads.
(3) Re-energize required loads.
: 5. After Load Centers are transferred:
5.
After Load Centers are transferred:
(1) OPEN *AA08.
(1) OPEN *AA08.
(2) OPEN *AA14.
(2) OPEN *AA14.
5.5.4 Verify by visual inspection all breakers are OPEN or RACKED OUT except for *AA22 or *AA09, then:                                                                             t j                                     1. OPEN *AA22 or *AA09.
5.5.4 Verify by visual inspection all breakers are OPEN or RACKED OUT except for *AA22 or *AA09, then:
h                                     2. RACK OUT *AA22 or *AA09, i                                                                                                                                             -
t j
i                                   3. LOCK breaker mechanism to prevent RACK IN of breaker on *AA22 or I
1.
                                              *AA09.
OPEN *AA22 or *AA09.
* I                                   4. A 4KV Bus may be energized using *-0P-005, 4160 Volt Buses A and i                                           B.
h 2.
RACK OUT *AA22 or *AA09, i
i 3.
LOCK breaker mechanism to prevent RACK IN of breaker on *AA22 or I
*AA09.
I 4.
A 4KV Bus may be energized using *-0P-005, 4160 Volt Buses A and i
B.
s 5.6 To de-energize B 4KV Bus (powered from bus tie):
s 5.6 To de-energize B 4KV Bus (powered from bus tie):
J                           5.6.1     Energize the A 4KV Bus by a nonnal feed breaker (*AA05 or *AA20) by
J 5.6.1 Energize the A 4KV Bus by a nonnal feed breaker (*AA05 or *AA20) by using *-0P-005, 4160 Volt Buses A and B.
  ;                                    using *-0P-005, 4160 Volt Buses A and B.
A 5.6.2 Transfer loads by starting needed pumps on the A 4KV Bus and stopping 0
A 5.6 .2   Transfer loads by starting needed pumps on the A 4KV Bus and stopping 0                                     all pumps on B 4KV Bus.
all pumps on B 4KV Bus.
5.6.3 Transfer Load Centers to the A 4KV Bus as required.
5.6.3 Transfer Load Centers to the A 4KV Bus as required.
: 1. If tied to       "D" LC, transfer "C" LC by:
1.
~
If tied to "D" LC, transfer "C" LC by:
(1) Verify *0302 is OPEN.
(1) Verify *0302 is OPEN.
(2) OPEN *0310.
(2) OPEN *0310.
~
CLOSE *AA14.
CLOSE *AA14.
CLOSE *0302.
CLOSE *0302.
Re-energize required loads.
Re-energize required loads.
: 2. If "D" LC is needed:
2.
'                                                  OPEN *0410.
If "D" LC is needed:
OPEN *0410.
CLOSE *0310.
CLOSE *0310.
Re-energize required loads.
Re-energize required loads.
    . - . . . , . _ _ . . . . _ . . . _ _ . _ . . ~ . _ . . . . . . . . . . . . . . . , . _ . . . . . , , . . . , . . . . _ _ ..... . . _ . . . . . . _ . . . . .
_... _ _. _.. ~. _...........


t 1
t 1
t 8/23/85
t 8/23/85
      .b                                   0FF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 10 1
.b 0FF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 10 1
ENERGIZING 4KV BUSES USING THE CRANKING DIESELS
ENERGIZING 4KV BUSES USING THE CRANKING DIESELS
      ]                         BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT
]
  .j                               3.     If tied to "B" LC, transfer "A" LC by:
BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT
1
.j 3.
      .                                    (1) Verify OPEN *0102.
If tied to "B" LC, transfer "A" LC by:
1 (1) Verify OPEN *0102.
(2) OPEN *0110.
(2) OPEN *0110.
e                                     '(3) CLOSE *AA08.
e
'(3) CLOSE *AA08.
(4) CLOSE *0102.
(4) CLOSE *0102.
  ).                                     (5) Re-energize required loads.
).
: 4. If "B" LC is needed:
(5) Re-energize required loads.
il 3                                     (1) OPEN *0210.
4.
j                                     (2) CLOSE *0110.
If "B" LC is needed:
d9 (3) Re-energize required loads.                                       -
il 3
i(                     5.6.4 Verify by visual inspection all breakers are OPEN or RACKED OUT j
(1) OPEN *0210.
except for *AB22.
j (2) CLOSE *0110.
3                               1. OPEN *AB22.
d (3) Re-energize required loads.
    'i                             2. RACK OUT *AB22.
9 i(
1                               3. LOCK breaker mechanism to prevent RACK IN of breaker *AB22.
5.6.4 Verify by visual inspection all breakers are OPEN or RACKED OUT
l                                 4. B 4KV Bus may be energized using *-0P-005, 4160 Volt Buses Atand
.j except for *AB22.
  ,j                                       B.
3 1.
j               5.7 To de-energize C 4KV Bus (powered by Cranking Diesels):
OPEN *AB22.
      ;                    5.7.1   If used to power A or B 4KV Bus, perform applicable step 5.5 or 5.6
'i 2.
{                             before connencing thTs step.
RACK OUT *AB22.
      .                    5.7.2   If *AC13 is not opened, racked out and locked, perform the following:
1 3.
: 1. OPEN *AC13.
LOCK breaker mechanism to prevent RACK IN of breaker *AB22.
: 2. RACK OUT *AC13.
l 4.
: 3. LOCK breaker *AC13 to prevent RACK IN.
B 4KV Bus may be energized using *-0P-005, 4160 Volt Buses Atand
i
,j B.
      ;                    5.7.3 Check *AC04 to be open; if not, OPEN *AC04.
j 5.7 To de-energize C 4KV Bus (powered by Cranking Diesels):
g                        5.7.4 Check *AC11 to be open; if not, OPEN *AC11.
5.7.1 If used to power A or B 4KV Bus, perform applicable step 5.5 or 5.6
5.7.5 OPEN *ACO3.
{
1 5.7.6   lAfter,both4AC03and3AC03havebeenopened:
before connencing thTs step.
N'                                   1. RACKOUT3AC03and4AC03l.
5.7.2 If *AC13 is not opened, racked out and locked, perform the following:
1.
OPEN *AC13.
2.
RACK OUT *AC13.
3.
LOCK breaker *AC13 to prevent RACK IN.
i 5.7.3 Check *AC04 to be open; if not, OPEN *AC04.
5.7.4 Check *AC11 to be open; if not, OPEN *AC11.
g 5.7.5 OPEN *ACO3.
1 5.7.6 lAfter,both4AC03and3AC03havebeenopened:
N' 1.
RACKOUT3AC03and4AC03l.
:)
:)
31                                   2. LOCK breaker 3AC03 and 14AC03l to prevent RACK IN.
31 2.
3 jj                                   3.     "C" 4KV Bus may be energized using *-0P-005.1, 4160 Volt Bus "C"
LOCK breaker 3AC03 and 14AC03l to prevent RACK IN.
;i[               6.0  
3 jj 3.
"C" 4KV Bus may be energized using *-0P-005.1, 4160 Volt Bus "C"
;i[
6.0  


==References:==
==References:==
6.1 Emergency Operating Procedure 20007 - Loss of all AC Power.
6.1 Emergency Operating Procedure 20007 - Loss of all AC Power.
y                     6.2 Operating Procedures:
y 6.2 Operating Procedures:
s
s
'l; '                       6.2.1   *-OP-005, 4160 Volt Buses A and B.
'l '
6.2.1
*-OP-005, 4160 Volt Buses A and B.


      ?
?
8/23/85 d                                                0FF-NORMAL OPERATING PROCEDURE 9408.2. PAGE 11 ENERGIZING 4KV BUSES USING THE CRANKING DIESELS BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT 6.2.2     *-0P-005.1, 4160 Volt Bus C.
8/23/85 0FF-NORMAL OPERATING PROCEDURE 9408.2. PAGE 11 d
6.2.3       OP-7201.1. Standby . Steam ' Generator Feedwater System     -
ENERGIZING 4KV BUSES USING THE CRANKING DIESELS BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT 6.2.2
Operating
*-0P-005.1, 4160 Volt Bus C.
-';                                          :,nstructions!
6.2.3 OP-7201.1. Standby. Steam ' Generator Feedwater System Operating
:,nstructions!
1 7.9 Records Required:
1 7.9 Records Required:
7.1     Entry into plant logs of evolutions performed in this procedure.
7.1 Entry into plant logs of evolutions performed in this procedure.
D i
D i
  '.?
'.?
t
t
  'l
'l
-j me
,-j me
.k i
.k i
.I
.I
                                                                                                                      .c
.c
          .--..,7~.       _-....~_.....~s._..,                                                                       *
.--..,7~.
                                                                . . . .            ..    .      .    .      -}}
_-....~_.....~s._..,
*}}

Latest revision as of 07:58, 10 December 2024

Off-Normal Operating Procedure 9408.2, Energizing 4 Kv Buses Using Cranking Diesels Bus Tie Lines or Startup Transformer from Opposite Unit
ML20199E453
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/23/1985
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML20199E404 List:
References
FOIA-85-729 9408.2, NUDOCS 8603270226
Download: ML20199E453 (11)


Text

1 4

i. t ia l

FLORIDA POWER AND LIGHT COMPANY TURKEY POINT UNITS 3 AND 4 I

~ 0FF-NORMAL OPERATING PROCEDURE 9408.2 AUGUST 23, 1985 j.

1.0

Title:

3 ENERGIZING 4KV BUSES USING THE CRANKING OIESELS 8US TIE LINES OR STARTUP j

TRANSFORMER FROM.THE OPPOSITE UNIT 2.0 Approval and List of Effective Pages:

2.1 Approval

~

}

Change Dated 8/23/85 Reviewed by Plant Nuclear Safety Committee:

85-140 1

and Approved by Plant Manager - Nuclear: 8/23/85 1

2.2 List of Effective Pages:

h Date Page Date Page Date h

Date 1

8/23/85 4

8/23/85 7

8/23/85 10 8/23/85 2

8/23/85 5

8/23/85 8

8/23/85 11 8/23/85 3

8/23/85 6

8/23/85 9

8/23/85 3.0 Purpose and Discussion:

3.1 Purpose

This procedure provides instructions to be followed when -a loss of nomal power supplies requires an alternate method of feeding the 4KV bus (es) for l

the purpose of supplying emergency loads.

The breakers required to perform the energizing 'of the 4KV buses discuss herein are locked breakers and j

requires authorization of PS-N to be racked in.

3.2 Discussic :

-l l

3.2.1 This procedure can be utilized to energize.and load the A, B and C l

4KV buses and their respective load centers and emergency loads.

l l

3.2.2 This procedure can be utilized to l

Unit Startup Transformer (for A Bus) provide power from the Opposite or the Cranking Diesels (for C, and "A" or "B").

1 3.2.3 This procedure can.be utilized to energize a dead 4KV bus either j

because there isn't the ab_ility to sync. check prior to closing the

{

breaker or because bus clearing must be in to close the breaker.

3.2.4 The Cranking Diesel tie line and breakers are rated at no more than SMVA.-,Qo not allow Cranking Diesel Ammeter indication exceed a total of 630 amps.

8603270226 860106 PDR FOIA WEISS85-729 PDR DM.

i m

u.

m.--

e.

m.

m

l

~

?

s 8/23/85 3

0FF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 2 ENERGIZING 4KV BUSES USING THE CRANKING DIESELS BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT 3l 3.2.5 Interlocks that affect the closure of the Cranking diesel Incoming

)

Breaker at the l*C 4KVl Bus 3AC03 (4AC03):

4W26466 must be closed.

.i AND

>f 3AC01 (4AC01) must be open.

AND 3AC16 (4AC16) must be open.

j AND il l'

3C(4C) Bus Differential Relay must not be tripped.

l AND I

Control Switch to CLOSE.

t

i 3.2.6 Interlocks that affect the closure of Cranking Diesel tie breaker at the Cranking Diesel Bus 4W26466.

Must not have a Cranking Diesel Bus Lockout.

AND Cranking Diesel Incoming Breaker at the 3C Bus - 3AC03 must be lRackedInlandOpen.

AND i

i Cranking Diesel Incoming Breaker at the 4C Bus - 4AC03 must be lRackedInlandOpen.

AND

.j Control Switch to CLOSE.

l 3.2.7 Interlocks that affect the closure of Load Center 3E(4E) Feeder Breaker 3AC04(4AC11).

>j 1.

None 3.2.8 Interlocks that affect the closure of load Centers 3F and 3G (4F and

]l 4G) Feeder Breaker 3AC04(4AC04).

I 1.

None I!

4.0 Symptoms

4.1 All supply breakers to the affected 4KV Bus are OPEN 4.2 No voltage indication on the affected 4KV bus.

p i

j 8/23/85 7

0FF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 3 J

ENERGIZING 4KV. BUSES USING THE CRANKING DIESELS t.

BUS TIE LINES GR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT

5.0 Instructions

5.1 Irmoediate Automatic Actions:

5.1.1 None 5.2 Immediate Operator Actions:

5.2.1 Stabilize the unit using appropriate Off-Nonnal Operating Procedures.

5.2.2 l_I_, an SI signal exists or 1,f, an. SI signal is actuated during this procedure, it ghould be reset to pennit manual loading ' of equipment i

on the 4KV bus.i 5.2.3 Place following equipment switches in PULL-TO-LOCK or 0FF position:

1.. High-head SI_ pumps 2.

RHR pumps jj 3.

Containment Spray Pumps c

1{

4.

CCW pumps J'

5.

Emergency Containment Filter and Cooler Fans 4

6.

Intale Cooling Water Pumps 5.3 Subseauent Operstor Actions:

II 5.3.1 lPerfonn the following to energize th'e *C 4KV bus utilizing the d-cranking diesel:

1.

On the *C 4KV Bus, UNLOCK and RACK IN 3AC03 and 4AC03.

l].

NOTE:

Low voltage does not trip the load center feeder breakers and therefore.have a high, probability of being CLOSED and i'

will need to-be OPENED.

2.

On the *C 4KV Bus to be energized, verify by visual local check that all breakers are OPEN.

CAUTION:

The Cranking Diesel Generator should not be operated S

unloaded greater than 15 minutes.

Operation at s

a periods longer than 15 minutes could result in

]

turbochargerfire.l 3.

Notify Unit 1 and 2 Control Room to perform the following:

(1)

Install control power fuses (4), remove tag, UNLOCK and RACK u

IN 4W26466.

[

(2) close their associated output breakers l,gn, dead bus,1Qr$,l a Start at least two cranking diesels n

=

i

<v-me w.

e

,qy

,,44

r

-8/23/85 1

0FF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 4 ENERGIZING 4KV BUSES USING THE CRANKING DIESELS

.}

BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT a

(3) Close 4W26466 and notify the Plant Supervisor-Nuclear. that 4W26466 is closed.

4.

On the *C 4KV bus to be energized (from the Control Room), CLOSE

  • AC03.

5.

Verify *C Bus voltage to be approximately 4KV.

6.

If necessary to energize the remaining *C.4KV bus, perform-the 3

following for the bus to be energized:

j NOTE:

Low voltage does not trip the load center feeder breakers and therefore have a high probability of being CLOSED and will need to be OPENED.

i (1) Verify by visual local inspection that all breakers are OPEN.

(2) Close *ACO3 (from the Control Room) 1 (3) Verify *C 4KV bus voltage is approximately 4KY.

t l

CAUTION:

If Auxiliary Feedwster is not available, the Standby Steam Generator Feedwater System shall be utilized to supply feedwater in accordance with Operation Procedure 7201.1, Standby Steam Generator Feedwater System - Operating Instructions.

l 7.

If the Auxiliary Feedwater System is unavailable and Standby Steam Generator Feedwater System Operation is required, CLOSE the i

Standby Steam Generator Feedwater Pump breaker for the.*C 4KV bus being loaded:

(1) 3AC06 - SSGFP A f

(2) 4AC10 - SSGFP B l CAUTION:

The Cranking Diesel tie line and breakers are rated at no more than 5 MVA.

Do not exceed 630 Amps Total j

on the Cranking Diesel ammeters.

I 8.

To load either *C 4KV bus perfom step 5.3.2.

E.

l To energize *A or *8 4KV Bus from *C 4KV Bus, perform step 5.3.3.

Do not perTorm both steps 5.3.2 and 5.3.3.

1 l

j i

f 8/23/85 OFF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 5 ENERGIZING 4KV BUSES USING THE CRANKING DIESELS-BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT 5.3.2 To load either *C 4KV Bus:

1.

If necessary to energize *E load center, perform-the following:

[

(1) CLOSE 3AC04 for 3C bus E 4AC11 for 4q, bus - supply to *E load center.

p (2) START n,!gglgl, equipment fed from the *E load center, using h

care to assure _T_oji_al amperage on Cranking Diesel ammeters does not exceed 630 amps.

1 2.

If necessary to energize *F and *G load centers, perform the following:

j (1) CLOSE 3AC11 for 3C bus E 4AC04 for 4C bus - supply to *F and j

  • G load centers.

(2) START needed equpment fed from the *F load center, using care to assure "otal ' amperage on Cranking Diesel anneters does not exceed 630 amps.

t j

(3) START needed equipment fed from the *G l' ad center, using o

care to assure Total am ammeters does not exceed 6TfTmps.perage on - Cranking Diesel i

l 3.

Repeat steps 5.3.2.1 and 5.3.2.2 to load the other *C 4KV bus if t

desired.

CAUTION:

Verify F Load Center (s) tie breaker 41408-is opened after closing 3AC04 or 4AC11.

i 1

5.3.3 To energize A E B 4KV Bus from C 4KV bus:

1l CAUTION:

The *C 4KV bus should be unloaded, 'unless a Standby Steam l

Generator Feedpump(s) is required due to a ' loss of Auxiliary Feedwater, to ensure amperage requirements are i

i not exceeded on the Cranking Olesel tie line and breakers i

when the *A or *B 4KV bus is energized.

j 1.

Ensure that the *A or *8 4KV bus to be energized has a CCW pump

,g!d, an. Intake Cooling Water Pump available.

2.

Verify by visual local check that all breakers on the A g 8 4KV bus to be energized, are OPEN.

CAUTION:

00 NOT energize both A and 8 4KV Buses on a unit with the C 4KV Bus tie.

3.

On the associated unit, unlock *AC13.

4.

Rack in associated *AC13.

5.

Close the associated *AC13.

8/23/85 9

0FF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 6 ENERGIZING 4KV SUSES USING THE CRANKING DIESELS BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT 6.

To energize the associated A 4KV Bus, perform the following:

. UNLOCK *AA09.

RACK IN *AA09.

CLOSE *AA09.

4) VERIFY A 4KV Bus Voltage to be,approximately 4160 volts.

7.

To energize the associated B 4KV Bus, perform the filowing:

1) UNLOCK *AB22.
2) RACK IN *AB22.

l

3) CLOSE *AB22.
4) VERIFY B 4KV Bus Voltage to be approximately 4160 volts.

8.

To load A 4KV Bus, perform the following:

1 (1)

If plant conditions require, energize a CCW pump and Intake Cooling Water Pump on the A 4KV bus energized:

i j

3A 4KV Bus t

3AA12 - 3A CCW Punp j

3AA17 - 3C CCW Pump 3AA19 - 3A Intake Cooling Water Pump 4A 4KV Bus 4AA12 - 4A CCW Pump 4AA17 - 4C CCW Pump 4AA19 - 4A Intake Cooling Water Pump (2) CLOSE needed 480 Volt Load Center breakers as follows:

  • AA08 Feed to A 480 Volt Load Center
  • AA14 Feed to C 480 Volt Load Center (3) START needed Emergency Equipment from *A or *C 480V load centers, using care to assure Total amperage does not exceed 630 amps.

(4)

If plant conditions require, energize a charging pump on the load center energized:

3A Charging Pump - 30105 3A - 480 V Load Center 3C Charging Pump - 30308 3C - 480 V Load Center or 4A Charging Pump "T0105 4A - 480 V Load Center 4C Charging Pump - 40308 4C - 480 V Load Center i

9.

To load *B 4KV bus, perfonn the following:

I.

. I *

.. I.

[

1.*.

T I

r

.a

.8/23/85 OFF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 7 ENERGIZING 4KV BUSES USING THE CRANKING DIESELS BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT 1'

.(1) 1f_ ling Water Pump on the B 4KV bus er.ergized: plant conditions Coo t

3B 4KV Bus 3AB17 - 3B Intake Cooling Water Pump 3AB19 - 3C Intake Cooling Water Pump 7

48 4KV Bus J

4AB13 - 48 CCW Pump 4AB17 - 4B Intake Cooling Water Pump

~

4AB19 - 4C Intake Cooling Water Pump i

9 (2) CLOSE needed 480V load center breakers as follows:

1 J

  • B 4KV Bus Feed to B 480 Volt Load Center
  • AB09
  • AB14 Feed to D 480 Volt Load Center t

(3) START needed EMERGENCY EQUIPMENT from

  • B 0R
  • 0 load centers. Usina care to assure TOTAL amperage does not exceed 630 amps.

(4)

If plant conditions require, energize' a charging pump on the j

load center energized:

l 3B Charging Pump - 30203 38 - 480 V Load Center or l

48 Charging Pump - 40308 48 - 480 V Load Center

10. If total amperage limits allow, START needed Emergency Equipment Tr~om *A or *B 4KV bus.

3 f

5.4 Using the OPPOSITE Startup Transformer to energize the ASSOCIATED Unit A 4KV t

Bus (B 4KV Bus cannot be enregized from A 4KV Bus):

)

5.4.1 Verify by visual inspection all breakers on the A 4KV Bus to be energized are OPEN or RACKED OUT.

5.4.2 On the A 4KV Bus to be energized, unlock *AA22.

5.4.3 Rack in *AA22.

5.4.4 Verify potential on opposite units startup transformer (white lights above frequency recorder).

j u

i 5.4.5 Close in *AA22.

5.4.6 Verify A 4KV Bus Voltage to be approximately 4160 Volts.

(


===-=--==- -===1=-

-=== = =:

=

t 8/23/85 i

0FF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 8 sj ENERGIZING 4KV BUSES USING THE CRANXING DIESELS BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT j

i 5.4.7 To load the A 4KV bus perform the following:

I 1.

CLOSE the needed Load Center feeder breakers.

y I

(1)

Feed to A Load Center *AA08.

(2) To feed l> Load Center, use the breaker as follows:

I 1.

OPEN *0210, then 2.

CLOSE *0110.

i 3.

Re-energize required loads.

j (3)

Feed to C Lead Center *AA14.

(4) To feed D Load Center, use the tie breaker as follows:

1.

OPEN 20410, then 2.

CLOSE 1310.

3.

Re-energize required loads.

(5) Close in needed Load Center breakers requi red to START EliERGENCY LOADS.

(6) START required 480V EMERGENCY loads.

(7) Start 4KV EMERGENCY Pumps as ' required by plant conditions.

CAUTION:

00 NOT exceed 600 Amps total load on the A 4KV Bus.

NOTE:

To return the' system to nonnal, the bus (es) energized i

by this procedure MJST be DEAD prior to being restored by its nonnal power supply.

l 5.5 To de-energi7e A 4KV bus (powered from opposite unit startup transformer or j

bustie):

5.5.1 Energize the B 4KV Bus.by a nonnel feed breaker (*AB05 or Unit 3 1

3AB20/ Unit 4 4AB21) by using *-0P-005, 4160 Volt Buses A and B.

5.5.2 Transfer loads by starting needed pumps on B 4KV bus and stopping all pumps on A 4KV Bus.

1 l

5.5.3 Transfa- '.oad Centers by:

1.

f tieu to "C" Load Center, transfer D LC by:

Verify *0410 OPEN.

CLOSE *AB14.

OPEN *0310.

CLOSE *0410.

Re-energize required loads.

2.

If "C" Load Center is needed:

OPEN *0302.

CLOSE *0310.

j Re-energize required loads.

4

(

s, n r.

....s..w.-

..n.

_____y______

.m

r

.I t

8/23/85 0FF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 9 ENERGIZING'4KV BUSES USING THE CRANKING DIESELS BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT l

3.

If tied to A Load Center, transfer B Load Center by:

1) Verify *0210 OPEN.

f; CLOSE *AB09.

p E*

5.

Re-energize required loads.

4.

If "A" Load Center is needed:

(1) OPEN *0102.

(2) CLOSE *0110.

(3) Re-energize required loads.

5.

After Load Centers are transferred:

(1) OPEN *AA08.

(2) OPEN *AA14.

5.5.4 Verify by visual inspection all breakers are OPEN or RACKED OUT except for *AA22 or *AA09, then:

t j

1.

OPEN *AA22 or *AA09.

h 2.

RACK OUT *AA22 or *AA09, i

i 3.

LOCK breaker mechanism to prevent RACK IN of breaker on *AA22 or I

  • AA09.

I 4.

A 4KV Bus may be energized using *-0P-005, 4160 Volt Buses A and i

B.

s 5.6 To de-energize B 4KV Bus (powered from bus tie):

J 5.6.1 Energize the A 4KV Bus by a nonnal feed breaker (*AA05 or *AA20) by using *-0P-005, 4160 Volt Buses A and B.

A 5.6.2 Transfer loads by starting needed pumps on the A 4KV Bus and stopping 0

all pumps on B 4KV Bus.

5.6.3 Transfer Load Centers to the A 4KV Bus as required.

1.

If tied to "D" LC, transfer "C" LC by:

(1) Verify *0302 is OPEN.

(2) OPEN *0310.

~

CLOSE *AA14.

CLOSE *0302.

Re-energize required loads.

2.

If "D" LC is needed:

OPEN *0410.

CLOSE *0310.

Re-energize required loads.

_... _ _. _.. ~. _...........

t 1

t 8/23/85

.b 0FF-NORMAL OPERATING PROCEDURE 9408.2, PAGE 10 1

ENERGIZING 4KV BUSES USING THE CRANKING DIESELS

]

BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT

.j 3.

If tied to "B" LC, transfer "A" LC by:

1 (1) Verify OPEN *0102.

(2) OPEN *0110.

e

'(3) CLOSE *AA08.

(4) CLOSE *0102.

).

(5) Re-energize required loads.

4.

If "B" LC is needed:

il 3

(1) OPEN *0210.

j (2) CLOSE *0110.

d (3) Re-energize required loads.

9 i(

5.6.4 Verify by visual inspection all breakers are OPEN or RACKED OUT

.j except for *AB22.

3 1.

OPEN *AB22.

'i 2.

RACK OUT *AB22.

1 3.

LOCK breaker mechanism to prevent RACK IN of breaker *AB22.

l 4.

B 4KV Bus may be energized using *-0P-005, 4160 Volt Buses Atand

,j B.

j 5.7 To de-energize C 4KV Bus (powered by Cranking Diesels):

5.7.1 If used to power A or B 4KV Bus, perform applicable step 5.5 or 5.6

{

before connencing thTs step.

5.7.2 If *AC13 is not opened, racked out and locked, perform the following:

1.

OPEN *AC13.

2.

RACK OUT *AC13.

3.

LOCK breaker *AC13 to prevent RACK IN.

i 5.7.3 Check *AC04 to be open; if not, OPEN *AC04.

5.7.4 Check *AC11 to be open; if not, OPEN *AC11.

g 5.7.5 OPEN *ACO3.

1 5.7.6 lAfter,both4AC03and3AC03havebeenopened:

N' 1.

RACKOUT3AC03and4AC03l.

)

31 2.

LOCK breaker 3AC03 and 14AC03l to prevent RACK IN.

3 jj 3.

"C" 4KV Bus may be energized using *-0P-005.1, 4160 Volt Bus "C"

i[

6.0

References:

6.1 Emergency Operating Procedure 20007 - Loss of all AC Power.

y 6.2 Operating Procedures:

s

'l '

6.2.1

  • -OP-005, 4160 Volt Buses A and B.

?

8/23/85 0FF-NORMAL OPERATING PROCEDURE 9408.2. PAGE 11 d

ENERGIZING 4KV BUSES USING THE CRANKING DIESELS BUS TIE LINES OR STARTUP TRANSFORMER FROM THE OPPOSITE UNIT 6.2.2

  • -0P-005.1, 4160 Volt Bus C.

6.2.3 OP-7201.1. Standby. Steam ' Generator Feedwater System Operating

,nstructions!

1 7.9 Records Required:

7.1 Entry into plant logs of evolutions performed in this procedure.

D i

'.?

t

'l

,-j me

.k i

.I

.c

.--..,7~.

_-....~_.....~s._..,