                                          APPENDIX C_
APPENDIX C_
                                CONSTRUCTION INSPECTION REPORT           ,
CONSTRUCTION INSPECTION REPORT
                              U.S. NUCLEAR REGULATORY COMMISSION
,
                                            REGION IV
U.S. NUCLEAR REGULATORY COMMISSION
    NRC Inspection Report:     50-445/85-16                 Permits: CPPR-126
REGION IV
                                50-446/85-13                         .CPFR-127
NRC Inspection Report:
    Dockets: 50-445                                         Category; A2
50-445/85-16
              50-446                                                                 t
Permits: CPPR-126
    Applicant: Texas Utilities Electric Company (TVEC)
50-446/85-13
                Skyway Tower
.CPFR-127
                400 North Olive Street
Dockets: 50-445
                Lock Box 81
Category; A2
                Dallas, Texas       75201
50-446
    Facility Name: Comanche Peak Steam Electric Station (CPSES), Units 1 & 2
t
    Inspection At: Glen Pose, Texas
Applicant: Texas Utilities Electric Company (TVEC)
    Inspection Conducted: November 1-30, 1985
Skyway Tower
    Inspectorst              /          (2 h/
400 North Olive Street
                    N. 5. Ptiillips, Senicfr Resident Redctor
Lock Box 81
                                                                          f/Z/ff6
Dallas, Texas
                                                                          Date
75201
                        Inspector (SRRI), Construction,RegionIV
Facility Name: Comanche Peak Steam Electric Station (CPSES), Units 1 & 2
                        CPSES Group
Inspection At: Glen Pose, Texas
                    (paragraphs 1, 2, 3, 4, 5, 6, and 8)
Inspection Conducted: November 1-30, 1985
                                        D
(2 h/
                      L     4G%           illa -                         Jh/hd
f/Z/ff6
                                                                          Date'/
Inspectorst
                                                                                  '
/
                                                                                    "
N. 5. Ptiillips, Senicfr Resident Redctor
                                                                                      )
Date
                    D. T. Kelley, 5RRI, pperat/ons, Region IV
Inspector (SRRI), Construction,RegionIV
                        CPSES Group
CPSES Group
                    (paragraph 7)                                                     <
(paragraphs 1, 2, 3, 4, 5, 6, and 8)
    Consultants:   EG&G-J. H. McCleskey
D
                    Parameter-T. H. Young                                             s
L
    Reviewed By:           8mM                   .
4G%
                    I. Barnes, Grot'p Leader, Region IV CP5ES
illa -
                                                                            4M_
Jh/hd
                                                                          .Date
"
                                                                                      #
D. T. Kelley, 5RRI, pperat/ons, Region IV
                        Group
Date'/
                                                                                      (
'
        8604100269 860404
)
          DR ADOCK0500g5
CPSES Group
                                                                                      $
(paragraph 7)
<
Consultants:
EG&G-J. H. McCleskey
Parameter-T. H. Young
s
Reviewed By:
8mM
.
.Date
#
4M_
I. Barnes, Grot'p Leader, Region IV CP5ES
Group
(
8604100269 860404
DR
ADOCK0500g5
$


                                                        m     .                         .
m
  I
.
.
I
e
e
                                                2
2
                                                                                          ,
,
                                                      *
*
    Approved:                                             ~
Approved:
                      T. F. W a terman, Chief, Region IV CPSES Grcup     Date           :
~
    Inspection Strncary
T. F. W a terman, Chief, Region IV CPSES Grcup
    inspection Conc' acted: November 1-30,1965(Report 50-445L85-161                       ,
Date
    Areas Inspected:       Routine, uncanounced in3pection of Unit I which ine'uoed
:
    applicant actions on construction deficiencies, applicart oc'tions en previcus
Inspection Strncary
    Ni<C " inspection findings, IE Bulletins, QA records, and electrical cGr.etrations.
inspection Conc' acted: November 1-30,1965(Report 50-445L85-161
    The inspection involved 143 inspector-hours onsite t'y one NRC inspector ard twa
,
    censultants.
Areas Inspected:
    Results: Within the seven areas inspecteed, no violations or deviations were
Routine, uncanounced in3pection of Unit I which ine'uoed
      ~
applicant actions on construction deficiencies, applicart oc'tions en previcus
                                                                                          .
Ni<C " inspection findings, IE Bulletins, QA records, and electrical cGr.etrations.
    Ide?itl fied.                                                                         ,
The inspection involved 143 inspector-hours onsite t'y one NRC inspector ard twa
    A cettion Conaucteo: Sovemoer 1-30.1985 (Repyt_5f-446/05-13)
censultants.
    AreaLIn_ spec
Results: Within the seven areas inspecteed, no violations or deviations were
              s  _ted:   Routine, anacuaced and unannounced inspection of (Jnit 2
.
    wnich included plent tours, applicant actioni, en corntractiori deficiencies,
~
    applicant actions or previous NRC inspaction findings, IE Sulletins, OA
Ide?itl fied.
    record 3, electr ical penetrations, and review of electrictsl inspection and         ,
,
    installation test procedures.     The inspection itivolved 226 inspector-boors
A cettion Conaucteo: Sovemoer 1-30.1985 (Repyt_5f-446/05-13)
    onsite by two NRC inspectors and two consultants.
AreaLIn_ spec _ted:
    Results- Wjthin the six areas inspected, no violatfor.s or deviations were
Routine, anacuaced and unannounced inspection of (Jnit 2
    identified.
s
                                                                                          f
wnich included plent tours, applicant actioni, en corntractiori deficiencies,
                                                                                          t
applicant actions or previous NRC inspaction findings, IE Sulletins, OA
record 3, electr ical penetrations, and review of electrictsl inspection and
,
installation test procedures.
The inspection itivolved 226 inspector-boors
onsite by two NRC inspectors and two consultants.
Results- Wjthin the six areas inspected, no violatfor.s or deviations were
identified.
f
t


          - -.       ._
- -.
                          -
._
                                          -       -  .   ._
-
    ,
-
      '
.
                                                                                            1
._
                                                  3
-
                                              OfTAILJ
'
                                                                                            :
,
        1. Pwsog ontacted
1
j         Texas _ Utilities, Generating Company (TUCCo)
3
  ,
OfTAILJ
          K. Arcp> Site Design Engineer                                                     ,
:
1.
Pwsog ontacted
j
Texas _ Utilities, Generating Company (TUCCo)
,
K. Arcp> Site Design Engineer
,
R. Babb, Engineer and Site Fire Protection Leader, TUGCo Nuclect
*
*
          R. Babb, Engineer and Site Fire Protection Leader, TUGCo Nuclect
i
i            Engiraering (TNE)
Engiraering (TNE)
          H. Cheatheam, Tecnnical Support Engineer
H. Cheatheam, Tecnnical Support Engineer
R. Cisneros, Special Project Group Coordinator
,
,
          R. Cisneros, Special Project Group Coordinator                                    ,
          9. Halstead, M'anager, Quality Control
i          J. Hicks, Licent ing
          J. Marshali, ticensing
:          J. liarri'tt, Assistant Project General Manager, Unit 2
!          0. Palmer, Industrial Operating Experiente Coordinator
,
,
          C. Welch, QC Services Supervisor
9. Halstead, M'anager, Quality Control
                                                                                            i
i
  j       Contractor Personnel
J. Hicks, Licent ing
          W. Baker, Engineer, Brown & Root (8&R)
J. Marshali, ticensing
          D. 6alenthez, Site QC Supervisor, Brand Industrial Services Inc.
:
              (81500)
J. liarri'tt, Assistant Project General Manager, Unit 2
          G. Fedor, Development Engineer, BISCC, Park Ridge, Illinois
!
          B. Kennedy, Site Project Manager, BISCO
0. Palmer, Industrial Operating Experiente Coordinator
          t. Smith, Engineer, B&R
C. Welch, QC Services Supervisor
          8. Wright, Engineer, B&R
,
          The NRC inspectors also interviewed other applicant employees during this
i
          inspectibn period.
j
Contractor Personnel
W. Baker, Engineer, Brown & Root (8&R)
D. 6alenthez, Site QC Supervisor, Brand Industrial Services Inc.
(81500)
G. Fedor, Development Engineer, BISCC, Park Ridge, Illinois
B. Kennedy, Site Project Manager, BISCO
t. Smith, Engineer, B&R
8. Wright, Engineer, B&R
The NRC inspectors also interviewed other applicant employees during this
inspectibn period.
!
!
        2. Applicant Action on Previous NRC Insoection Findings
2.
          a.     (Cbsed) Unresolved Item (445/8119 'J-02): Control of QA records for
Applicant Action on Previous NRC Insoection Findings
                pipe supports. Procedures, had not addressed or given instructions         ,
a.
                  for retrieval of records for items that had been completed and then
(Cbsed) Unresolved Item (445/8119 'J-02):
                needed to be modified. Cn October 29 and November 4, 19&S, the NRC
Control of QA records for
'                                                                                           '
pipe supports.
                  inspector reviewed the applicable procedures that were implemented
Procedures, had not addressed or given instructions
,                from 1982 until the present. These procedures adequately addressed
,
                  the retrieval of completed packages from the vault when modifications
for retrieval of records for items that had been completed and then
                are required.
needed to be modified.
Cn October 29 and November 4, 19&S, the NRC
'
'
inspector reviewed the applicable procedures that were implemented
from 1982 until the present.
These procedures adequately addressed
,
the retrieval of completed packages from the vault when modifications
are required.
b.
(Closed) Deviatica (445/8408-D-03):
Deviation from desig,, information
>
>
          b.    (Closed) Deviatica (445/8408-D-03):    Deviation from desig,, information
for the installation of Seismic Category I/ Seismic Category II
                  for the installation of Seismic Category I/ Seismic Category II
structural steel for the bolted connections between the part designated
                  structural steel for the bolted connections between the part designated
W16x40 and the wall on platform OP-11 in the pressurizer compartment.
                W16x40 and the wall on platform OP-11 in the pressurizer compartment.
This deviation concerned a platform that was upgraded to Category I
                This deviation concerned a platform that was upgraded to Category I         q
q
                without a corresponding chance in details for bolted connections.
'
'
                On October 24-28, 1985, the NRC inspector followed up on this item to
without a corresponding chance in details for bolted connections.
On October 24-28, 1985, the NRC inspector followed up on this item to
determine if corrective action was complete.
TUGCo's response dated
'
'
                determine if corrective action was complete. TUGCo's response dated
August 23, 1984, Indicated that design change authorization
-
-
                August 23, 1984, Indicated that design change authorization
!
!
l
l


  *
*
.
4
(DCA) 19469, Revision 1, was issued to require a locking mechanism on
platform OP-11 bolts and that the DCA addressed locking devices.
The
response also indicated that a complete review of the " hand-tight"
instruction would be complete by October 1,1984. .The last DCA was
issued in July 1985 to cover this issue.
The NRC inspector took a
sample of 17 DCAs and one drawing that had been generated or revised
to address the " hand-tight" issue.
These all showed that locking
devices were required where potential movement and backing off of nuts
must be addressed.
i
c.
(Closed) Violation (445/8422-V-03):
Unit I unauthorized removal of
'
BISCO fire seal.
The applicant initiated corrective action which
included:
(1) providing training to construction to reindoctrinate
,
(2) performing a walkdown
them on CPSES rules and policies s
inspection of Unit 1, and (3) initiating programmatic controls for
construction.
The NRC inspector reviewed the following documentation
of the corrective actions:
T-141, TUGC0 CAR-038, IM No. 27535 dated
August 3, 1984, and also the practice of using discrete constructioa
packages containing the necessary instruction and forms to complete
the specified work.
d.
(Closed) Unresolved Item (445/8426-U-03):
As-built notation on field
sketch instrument number (FSI) drawings.
There was a question on one
"as-built" notation on FSI drawings.
During November 6 and 7, 1985,
the NRC inspector followed up on this item to determine if the
applicant had completed the actions they agreed to complete.
Sample
copies of six of the drawings in question were requested at the
central document control center (OCC).
All had been stamped "for
reference purposes only." Also, the drawings at the central DCC and
four other distribution points are stamped "for office and
engineering use only" when issued.
None of the drawings had
"as-built" on them.
This action satisfies the NRC concerns.
'
e.
(Closed) Unresolved Item (445/8432-U-01, 446/8432-U-01): TUGCo
organization.
On November 1, 1985, the NRC inspector reviewed this
unresolved item.
The essistant project general manager of TUGCo
still reports to two different vice presidents; however, a third vice
president is responsible for licensing, nuclear fuel, and quality'
assurance (QA),
The Of rector of QA reports directly to the TUGCo
Vice President, Licensing, Nuclear Fuel and QA.
This separation is
acceptable from a cost and scheduling standpoint and the reporting
level is sufficiently high to provide organizational freedom for
organizations performing QA functions.
This concern is reflected in
the CPSES QA Plan, Section 1.1, Quality Assurance Division, which was
revised October 18, 1985.
f.
(0 pen) Unresolved Item (445/8514-U-02, 446/8511-U-01):
Procedures do
not address 10 CFR Part 50,55(e) file content or provide a method for
completion /signoff for corrected construction deficiencies.
The NRC
inspector reviewed TUGCo Procedure NEO CS-1 entitled, " Evaluation of
and Reporting).of Iteru/ Events Under 10 CFR Part 21 and 10 CFR
Part50.55(e
The review revealed that the following procedures
"
'
,
..
.. .
......
-
.
.
.
.
...
. ..
.
.
.
. .
.
.
.
m
.
.
.
                                      4
      (DCA) 19469, Revision 1, was issued to require a locking mechanism on
      platform OP-11 bolts and that the DCA addressed locking devices. The
      response also indicated that a complete review of the " hand-tight"
        instruction would be complete by October 1,1984. .The last DCA was
        issued in July 1985 to cover this issue.    The NRC inspector took a
      sample of 17 DCAs and one drawing that had been generated or revised
      to address the " hand-tight" issue. These all showed that locking
      devices were required where potential movement and backing off of nuts
      must be addressed.
                                                                                  i
                                                                                  '
    c. (Closed) Violation (445/8422-V-03): Unit I unauthorized removal of
      BISCO fire seal. The applicant initiated corrective action which
      included: (1) providing training to construction to reindoctrinate        ,
      them on CPSES rules and policies s (2) performing a walkdown
      inspection of Unit 1, and (3) initiating programmatic controls for
      construction.    The NRC inspector reviewed the following documentation
      of the corrective actions: T-141, TUGC0 CAR-038, IM No. 27535 dated
      August 3, 1984, and also the practice of using discrete constructioa
      packages containing the necessary instruction and forms to complete
      the specified work.
    d. (Closed) Unresolved Item (445/8426-U-03): As-built notation on field
      sketch instrument number (FSI) drawings. There was a question on one
      "as-built" notation on FSI drawings. During November 6 and 7, 1985,
      the NRC inspector followed up on this item to determine if the
      applicant had completed the actions they agreed to complete. Sample
      copies of six of the drawings in question were requested at the
      central document control center (OCC). All had been stamped "for
      reference purposes only." Also, the drawings at the central DCC and
      four other distribution points are stamped "for office and
      engineering use only" when issued. None of the drawings had
      "as-built" on them. This action satisfies the NRC concerns.
                                                                                '
    e. (Closed) Unresolved Item (445/8432-U-01, 446/8432-U-01): TUGCo
      organization. On November 1, 1985, the NRC inspector reviewed this
      unresolved item. The essistant project general manager of TUGCo
      still reports to two different vice presidents; however, a third vice
      president is responsible for licensing, nuclear fuel, and quality'
      assurance (QA), The Of rector of QA reports directly to the TUGCo
      Vice President, Licensing, Nuclear Fuel and QA. This separation is
      acceptable from a cost and scheduling standpoint and the reporting
      level is sufficiently high to provide organizational freedom for
      organizations performing QA functions. This concern is reflected in
      the CPSES QA Plan, Section 1.1, Quality Assurance Division, which was
      revised October 18, 1985.
    f. (0 pen) Unresolved Item (445/8514-U-02, 446/8511-U-01):    Procedures do
      not address 10 CFR Part 50,55(e) file content or provide a method for
      completion /signoff for corrected construction deficiencies. The NRC
      inspector reviewed TUGCo Procedure NEO CS-1 entitled, " Evaluation of
      and  Reporting).of
      Part50.55(e    "    Iteru/
                          The      Events
                              review    Underthat
                                      revealed  10the
                                                    CFR  Part 21procedures
                                                      following  and 10 CFR    '
                                                                                  ,


                                            '
'
            .
.
                                                                                              5
5
                                                              were inconsistent with Procedure NE0 CS-1: CP-QP-16.1, Revision 6,
were inconsistent with Procedure NE0 CS-1:
                                                              dated January 16, 1985; TNE-AD-5, Revision 3, dated June 21, 1984;
CP-QP-16.1, Revision 6,
                                                              DQP-QA-12, Revision 2, dated September 9, 1985; and CP-QP-15.6,
dated January 16, 1985; TNE-AD-5, Revision 3, dated June 21, 1984;
                                                              Revision 3, dated January 16, 1985. The inconsistencies included
DQP-QA-12, Revision 2, dated September 9, 1985; and CP-QP-15.6,
                                                              conflicting responsibilities, method of evaluation, repo*tability
Revision 3, dated January 16, 1985.
                                                              criteria, notification policy, and reporting instructions.
The inconsistencies included
                                                              TUGCo has committed to the resolution of file tracking problems and
conflicting responsibilities, method of evaluation, repo*tability
                                                              procedural inconsistencies by March 1, 1986.
criteria, notification policy, and reporting instructions.
                                                        g.   (0 pen) Unresolved Item (445/8514-U-03, 446/8511-U-02): Incomplete
TUGCo has committed to the resolution of file tracking problems and
                                                              significant deficiency analysis report files. TUGCo has indicated
procedural inconsistencies by March 1, 1986.
                                                              that actions are being taken to identify all records necessary to
g.
                                                              close out open files. This action is scheduled to be completed by
(0 pen) Unresolved Item (445/8514-U-03, 446/8511-U-02):
                                                              March 1, 1986.
Incomplete
2
significant deficiency analysis report files.
                                                        h.   (0 pen) Unresolved Item (445/8422-U-04):   Material certification for
TUGCo has indicated
                                                              electrical penetration seals. The NRC inspector quet,tioned the
that actions are being taken to identify all records necessary to
                                                              certification of the chemical and physical testing. In response,
close out open files.
                                                              TUGCo provided BISCO certificate of compliance (C0C) Nos. 3057, 3081,
This action is scheduled to be completed by
                                                              2893, and the BISCO site receiving inspection checklist for Purchase
March 1, 1986.
                                                              Order (PO) Nos. 2730 and 2773. There was a statement that the
2
                                                              articles complied with all P0 specification requirements (2323-MS-38F);
h.
                                                              however, no reference was made to the DOW Corning, Inc., chemical and
(0 pen) Unresolved Item (445/8422-U-04):
                                                              physical testing of the subject material. This item remains open
Material certification for
                                                              pending the receipt of a C0C which certifies that this material meets
electrical penetration seals.
'
The NRC inspector quet,tioned the
                                                              such test requirements or DOW test results.
certification of the chemical and physical testing.
                                                              During this inspection, the NRC inspector found other documentation
In response,
                                                              and hardware issues which are discussed in paragraph 6 of this report. ,
TUGCo provided BISCO certificate of compliance (C0C) Nos. 3057, 3081,
2893, and the BISCO site receiving inspection checklist for Purchase
Order (PO) Nos. 2730 and 2773. There was a statement that the
articles complied with all P0 specification requirements (2323-MS-38F);
however, no reference was made to the DOW Corning, Inc., chemical and
physical testing of the subject material.
This item remains open
pending the receipt of a C0C which certifies that this material meets
such test requirements or DOW test results.
'
During this inspection, the NRC inspector found other documentation
and hardware issues which are discussed in paragraph 6 of this report.
,
3.
Applicant Action on 10 CFR Part 50.55(e) Deficiencies:
.
.
                                                      3. Applicant Action on 10 CFR Part 50.55(e) Deficiencies:
The NRC inspectors evaluated corrective action taken on reportable
1                                                      The NRC inspectors evaluated corrective action taken on reportable
1
I
I
                                                        deficiencies by reviewing TUGCo deficiency reports. The inspector found no
deficiencies by reviewing TUGCo deficiency reports. The inspector found no
corrective action completion date for CP-84-29, "HVAC Fire Scenarlo."
It
'
'
                                                        corrective action completion date for CP-84-29, "HVAC Fire Scenarlo." It
was noted that corrective action for deficiency CP-84-27. " Ventilation
                                                        was noted that corrective action for deficiency CP-84-27. " Ventilation
Exhaust Dampers," was to be completed for Unit I by September 1985 and for
:                                                      Exhaust Dampers," was to be completed for Unit I by September 1985 and for
:
                                                        Unit 2 before startup testing. However, as of November 30, 1985, Unit 1
Unit 2 before startup testing. However, as of November 30, 1985, Unit 1
                                                        deficiencies were not corrected and it was not clear how corrective action
deficiencies were not corrected and it was not clear how corrective action
                                                        for Unit 2 will be tracked. Deficiencies CP-85-13 and CP-85-05, which are     i
for Unit 2 will be tracked. Deficiencies CP-85-13 and CP-85-05, which are
                                                        described in deficiency reports and the open items list, also give no         '
i
                                                        corrective action dates.
described in deficiency reports and the open items list, also give no
                                                        Several final 10 CFR Part 50.55(e) reports contained corrective action
'
                                                        completion dates; however, work was neither completed by the reported date
corrective action dates.
                                                        nor was a supplemental report made to the NRC to report on significant
Several final 10 CFR Part 50.55(e) reports contained corrective action
                                                        corrective action date changes. Deficiency report for CP-84-31 " Control
completion dates; however, work was neither completed by the reported date
                                                        Room Separation Wall," stated that corrective action was scheduled for
nor was a supplemental report made to the NRC to report on significant
                                                        completion by December 15, 1984; however, it was not completed as of
corrective action date changes.
                                                        November 30, 1985. Similarly, deficiency reports for CP-85-11. " Instrument
Deficiency report for CP-84-31 " Control
!
Room Separation Wall," stated that corrective action was scheduled for
completion by December 15, 1984; however, it was not completed as of
November 30, 1985.
Similarly, deficiency reports for CP-85-11. " Instrument
!
!
  ______-._-._ __-_ _ _ _ _-.__ - _. - - -_-____--- - _          .
!
-. -.
-
-.
-
. - - - -
--- -
.
-
- -
. - -
- -
. .
- .
- - -
- -
- -
.


      '
'
    .
.
;
;
                                                6
6
:
:
          Fitting Locations," and CP-85-12 " Auxiliary Feedwater Pressure Control "
Fitting Locations," and CP-85-12 " Auxiliary Feedwater Pressure Control "
          stated that corrective action was scheduled to be completed for Unit 1 by
stated that corrective action was scheduled to be completed for Unit 1 by
          May 1985. The open items list indicated that they were not completed on
May 1985. The open items list indicated that they were not completed on
          November 30, 1985.
November 30, 1985.
          TUGCo management has assembled a task force consisting of four to five
TUGCo management has assembled a task force consisting of four to five
          engineers or specialists to evaluate and take action on the matters
engineers or specialists to evaluate and take action on the matters
i
i
          described above. This item is unresolved (445/8516-U-01, 446/8513-U-01).
described above. This item is unresolved (445/8516-U-01, 446/8513-U-01).
          No violations or deviations were identified.
No violations or deviations were identified.
        4. Applicant Action on IE Bulletins (IEBs)
4.
          a.     In response to discussions regarding the TUGCo program concerning IEBs,
Applicant Action on IE Bulletins (IEBs)
  '
a.
                  Circulars, and Infomation Notices, Region IV was informed that TUGCo
In response to discussions regarding the TUGCo program concerning IEBs,
Circulars, and Infomation Notices, Region IV was informed that TUGCo
'
'
                  will perform a review of related procedures and records to determine
will perform a review of related procedures and records to determine
                  the adequacy of procedures and the completeness of associated records.
the adequacy of procedures and the completeness of associated records.
                  The initiation of this effort will follow the task review of the
'
!
The initiation of this effort will follow the task review of the
                  10 CFR Part 50.55(e) program which is presently in progress.
10 CFR Part 50.55(e) program which is presently in progress.
                  This item is unresolved (445/8516-U-02, 446/8513-U-02).
!
  ,
This item is unresolved (445/8516-U-02, 446/8513-U-02).
          b.     The TUGCo actions on two IEBs (i.e., Nos. 79-14 and 79-28) were
b.
t                selected to revicw hardware evaluations or repair / replacements. TUGCo
The TUGCo actions on two IEBs (i.e., Nos. 79-14 and 79-28) were
                  10ER Log Sheet, page 10, dated April 9, 1984, was reviewed to
,
,
selected to revicw hardware evaluations or repair / replacements. TUGCo
                  determine the status of the IEBs.
t
I
10ER Log Sheet, page 10, dated April 9, 1984, was reviewed to
                  (1)   IEB 79-14 was evaluated by TUGCo in 1983 and was statused as   ,
determine the status of the IEBs.
                        closed. The NRC inspector indicated that the closure of IEB 79-14
,
                        was premature since Stone & Webster is currently analyzing Unit 1
I
  i                    seismic analysis versus as-built drewings, which directly relates
(1)
IEB 79-14 was evaluated by TUGCo in 1983 and was statused as
,
closed. The NRC inspector indicated that the closure of IEB 79-14
was premature since Stone & Webster is currently analyzing Unit 1
seismic analysis versus as-built drewings, which directly relates
i
to this IEB. Unit 2 as-built work has also not been completed.
4
4
                        to this IEB. Unit 2 as-built work has also not been completed.
TUGCo stated that the IEB 79-14 file will be reopened and a
.
.
                        TUGCo stated that the IEB 79-14 file will be reopened and a
supplemental report will be submitted upon completion of the
                        supplemental report will be submitted upon completion of the
j
  j                     ongoing project engireering work.
ongoing project engireering work.
  ,
Theaboveitem(IEBNo.79-14)statusisconsideredanopenitem
                        Theaboveitem(IEBNo.79-14)statusisconsideredanopenitem
,
  !
(445/8516-0-03,446/8513-0-03).
                        (445/8516-0-03,446/8513-0-03).
                  (2)  IEB 79-28 identified deficiencies with certain manufactured lots
,                      of NAMCO EA 180 limit switches. The gasket material of the
  ,
                        faulty lots, when exposed to temperatures above 175"F, vaporized
i                      and emitted a yellow-brown crystal like resin that can cause these
i                      switches to fail. The NRC inspector found the TUGCo documentation
                        to be complete with respect to the specified corrective action of
                                                                                          '
!
!
                        replacing these switches with switches manufacturt.d in acceptable   .
(2)
                        lots.
IEB 79-28 identified deficiencies with certain manufactured lots
.
of NAMCO EA 180 limit switches. The gasket material of the
,
faulty lots, when exposed to temperatures above 175"F, vaporized
,
i
and emitted a yellow-brown crystal like resin that can cause these
i
switches to fail. The NRC inspector found the TUGCo documentation
'
!
to be complete with respect to the specified corrective action of
.
replacing these switches with switches manufacturt.d in acceptable
.
I
I
                                                                                            l
lots.
                                                                                            I
l
l                      Field verification of replacement of 14 switches identified,
Field verification of replacement of 14 switches identified,
l                     however, that the identity of 2 switches could not be traced to
l
  '
however, that the identity of 2 switches could not be traced to
                        existing travelers. Specifically, the replacement NAMCO limit
existing travelers. Specifically, the replacement NAMCO limit
          -,,r--
'
-,,r--


          .
.
      *
*
    .
.
                                                  7
7
                                                                                        l
l
                        switches on residual heat removal valves 1-HCV-606 and 1-FCV-618
switches on residual heat removal valves 1-HCV-606 and 1-FCV-618
                        were identified on travelers EE 82-1415-5801 and EE 83-0373-5801
were identified on travelers EE 82-1415-5801 and EE 83-0373-5801
,
as EA 180-32302 and EA 170-31302, respectively.
                        as EA 180-32302 and EA 170-31302, respectively. The switches
The switches
                        actually installed in the field were identified as EA 180-31302
,
                        and EA 180-31302, respectively.     TUGCo is evaluating this
actually installed in the field were identified as EA 180-31302
                        inconsistency to determine if there is other documentation to
and EA 180-31302, respectively.
                        account for this.
TUGCo is evaluating this
                        This item is unresolved (445/8516-U-04, 446/8513-U-04).         l
inconsistency to determine if there is other documentation to
                                                                                        I
account for this.
        5. QA Records Retention                                                         !
This item is unresolved (445/8516-U-04, 446/8513-U-04).
  i        The NRC inspectors found that construction deficiency and IEB files were
l
:           not stored in the QA records vaults. Because such records have not been     i
I
  i        deposited in a central location, difficulties have been encountered in
5.
            retrieval. TUGCo is assessing this record file issue.
QA Records Retention
<
!
            This item is open pending the completion of their review (445/8516-0-05,
The NRC inspectors found that construction deficiency and IEB files were
            446/8513-0-05).
i
l
:
!       6. Electrical Penetrations
not stored in the QA records vaults.
!
Because such records have not been
            In NRC Inspection Report 50-445/84-22 dated October 11, 1984, the
i
            certification of BISCO electrical penetration seals (fire barriers) was
deposited in a central location, difficulties have been encountered in
            questioned with respect to the testing of the seals. During the followup
i
            of this item, which is discussed in paragraph 2.h above, the NRC inspector
retrieval.
            identified related but different findings.
TUGCo is assessing this record file issue.
            The NRC inspector reviewed the records to determine if the documentation
This item is open pending the completion of their review (445/8516-0-05,
            for eight 815C0 seals support the certification statement. The eight
<
i         penetrations inspected were; AB-790-174-1022A, EC-854-150A-1018A and-1018B,
446/8513-0-05).
            EC-854-151A-2003A and-2004A, EC-854-1518-2025A and-2026A, and
l
'
!
            TB-803-010A-1008A.
6.
            The following documents contained apparent conflicting information that the
Electrical Penetrations
            NRC inspector has identified for further followup:
!
            .    BISCO letter to TUGCo dated November 13, 1984, answered the NRC
In NRC Inspection Report 50-445/84-22 dated October 11, 1984, the
                  certification inquiry and stated that the subject fire barrier seal
certification of BISCO electrical penetration seals (fire barriers) was
                  (Test No. PCA-76, ANI No. S-26, 24"x42", floor / wall, material 6548,
questioned with respect to the testing of the seals.
                  9 inches depth, LAD or SLD tray, all cables, 40% loaded) met all test
During the followup
                  requirements of TUGCo Contract No. CP-0707, Gibbs & Hill
of this item, which is discussed in paragraph 2.h above, the NRC inspector
                  Specification 2323-MS-38F, ASTM E-119, and IEEE 634.                   '
identified related but different findings.
The NRC inspector reviewed the records to determine if the documentation
for eight 815C0 seals support the certification statement. The eight
i
penetrations inspected were; AB-790-174-1022A, EC-854-150A-1018A and-1018B,
EC-854-151A-2003A and-2004A, EC-854-1518-2025A and-2026A, and
TB-803-010A-1008A.
'
The following documents contained apparent conflicting information that the
NRC inspector has identified for further followup:
BISCO letter to TUGCo dated November 13, 1984, answered the NRC
.
certification inquiry and stated that the subject fire barrier seal
(Test No. PCA-76, ANI No. S-26, 24"x42", floor / wall, material 6548,
9 inches depth, LAD or SLD tray, all cables, 40% loaded) met all test
requirements of TUGCo Contract No. CP-0707, Gibbs & Hill
Specification 2323-MS-38F, ASTM E-119, and IEEE 634.
'
'
            .    American Nuclear Insurers (ANI) letter to BISCO dated August 20, 1985,
American Nuclear Insurers (ANI) letter to BISCO dated August 20, 1985,
t                 withdrew its acceptance of BISCO SF-20 (1977) Silicone or Dow Corning
'
.
t
withdrew its acceptance of BISCO SF-20 (1977) Silicone or Dow Corning
i
i
3-6548 RTV Silicone foam for 2- and 3-hour rating without a damming
'
'
                  3-6548 RTV Silicone foam for 2- and 3-hour rating without a damming
board left in place.
                  board left in place. The NRC inspectors ascertained that this
The NRC inspectors ascertained that this
                  withdrawal was based on BISCO not having complete documentation of
withdrawal was based on BISCO not having complete documentation of
                  the test results and the recent failure of a BISCO sample tested at
the test results and the recent failure of a BISCO sample tested at
                  an independent laboratory employed by the ANI.
an independent laboratory employed by the ANI.
;
;
4
4
.
.
.
-
.
.
.
.
.
. -
.
.
. .
.


                                                ~
~
i
i
    '
!
! .
'
                                          8
.
      . ANI letter dated August 20, 1985, to TUGCo informed them of the
8
        rescinded acceptance and the test failure that occurred 2 hours and
ANI letter dated August 20, 1985, to TUGCo informed them of the
        35 minutes into the independent test performed in accordance with
.
        ASTM E-119.   Further, it stated that this fire barrier may not be
rescinded acceptance and the test failure that occurred 2 hours and
        adequate where there is a strict requirement for a barrier with a
35 minutes into the independent test performed in accordance with
        3-hour rating.
ASTM E-119.
      . Comanche Peak Final Safety Analysis Report (FSAR), page 9.5-223,
Further, it stated that this fire barrier may not be
        requires that penetration seals be tested in accordance with
adequate where there is a strict requirement for a barrier with a
        ASTM E-119 and IEEE 634.     FSAR Section 9.5, paragraph D.1.c. requires:
3-hour rating.
        (1) each cable spreading room should be separated from other areas of
Comanche Peak Final Safety Analysis Report (FSAR), page 9.5-223,
        the plant by barriers with a minimum fire resistance of 3 hours, and
.
        (2) cabling for redundant safety divisions should be separated by
requires that penetration seals be tested in accordance with
        walls having a 3-hour rating as a fire barrier. Section 9.5,
ASTM E-119 and IEEE 634.
        paragraph D.3.c. requires a 3-hour rating for barriers for cable trays
FSAR Section 9.5, paragraph D.1.c. requires:
        that contain cold shutdown cabling.
(1) each cable spreading room should be separated from other areas of
      . TUGCo Design Deficiency Report (T00R) No. FP-85-063 dated August 29,
the plant by barriers with a minimum fire resistance of 3 hours, and
        1985, documented the deficiency. On the same report, the deficiency
(2) cabling for redundant safety divisions should be separated by
        was marked not reportable in the 10 CFR Part 21 and Part 50.55(e)
walls having a 3-hour rating as a fire barrier.
        reportable block. The corrective action was for BISCO to prove
Section 9.5,
        satisfactory testing of the failed seal and all other ANI accepted
paragraph D.3.c. requires a 3-hour rating for barriers for cable trays
        seals.
that contain cold shutdown cabling.
        Note:   The evaluation of reportability is being reevaluated by TUGCo.
TUGCo Design Deficiency Report (T00R) No. FP-85-063 dated August 29,
.    . BISCO letter dated September 16, 1985, stated that approval had been
.
l       rescinded because the hose stream test data was destroyed or lost
1985, documented the deficiency.
l       during either a 1976 fire or a subsequent move to another facility.
On the same report, the deficiency
        It also stated that the ANI testing standards are much more stringent
was marked not reportable in the 10 CFR Part 21 and Part 50.55(e)
        and stated that BISCO seals meet and surpass the test standards of
reportable block.
l       ASTM E-119.   The letter turther stated that the ANI representative
The corrective action was for BISCO to prove
        witnessed a test on 9-inch silicone foam using the same design
satisfactory testing of the failed seal and all other ANI accepted
        configuration that failed in the ANI test.       However, the letter also
seals.
i       stated that the success of this BISCO test was based on applying a
Note:
        3/8-inch proprietary coating on the face of the silicone foam. The
The evaluation of reportability is being reevaluated by TUGCo.
        letter stated that this retrofit corrective measure can be employed
BISCO letter dated September 16, 1985, stated that approval had been
        by those who wish to upgrade this particular seal design.
.
        Note: It   appears that the original seals that were tested had no
.
;       . coating.
l
!     .  TUGCo interoffice memorandum (Creamer to Kennedy) dated October 16,
rescinded because the hose stream test data was destroyed or lost
,       1985, discussed the rework of all seals affected by ANI disapproval
l
l       of S-26.
during either a 1976 fire or a subsequent move to another facility.
It also stated that the ANI testing standards are much more stringent
and stated that BISCO seals meet and surpass the test standards of
l
ASTM E-119.
The letter turther stated that the ANI representative
witnessed a test on 9-inch silicone foam using the same design
configuration that failed in the ANI test.
However, the letter also
i
stated that the success of this BISCO test was based on applying a
3/8-inch proprietary coating on the face of the silicone foam.
The
letter stated that this retrofit corrective measure can be employed
by those who wish to upgrade this particular seal design.
Note:
It appears that the original seals that were tested had no
;
. coating.
!
TUGCo interoffice memorandum (Creamer to Kennedy) dated October 16,
.
,
1985, discussed the rework of all seals affected by ANI disapproval
l
of S-26.
1
1
      .  BISCO memorandum to TUGCo (Trent to Anger) dated October 24, 1985,
BISCO memorandum to TUGCo (Trent to Anger) dated October 24, 1985,
(       identified eight penetrations to be reworked.
.
                                                  '
(
identified eight penetrations to be reworked.
'
.
.
                                                    \
\\
                                                                                  l
l
                                                    <
<
i
i
-
-
- -
-
-
-
-
-
.
.
-


  '
'
.
B
9
The letters discussed above appeared to contain conflicting statements.
The BISCO letters dated November 13, 1984, and September 16, 1985, differed
in that the first one certified to meeting ASTM E-119 and IEEE 634 test
requirements, while the latter only mentioned ASTM E-119. The September 16,
1985, letter also stated that BISCO recently retested the original design
configuration and it passed; however, in the same paragraph on page 2 they
stated that they added a 3/8-inch proprietary coating, which according to
TUGCo is not on their barriers that are installed.
In the same paragraph,
,
BISCO discussed this coating as if it were a retrofit and/or a design
change. Thus, BISCO's claim that their retest was successful appears to be
based on testing an upgraded test sample. The ANI letter to TUGCo, dated
August 20, 1985, stated that their test was in accordance with ASTM E-119;
however, BISCO claimed that the ANI test exceeded ASTM E-119 requirements
and thus is an inconsistency.
It is also unclear as to how many test
failures have occurred.
Indications are that there were two recent
failures, an ANI test and a BISCO test failure.
The following items are unresolved pending clarification or resolution:
a.
Reevaluation of available 1976 test documentation and recent test
failures for 10 CFR Part 21 and 10 CFR Part 50.55(e) reportability
(445/8516-U-06,446/8513-U-06).
b.
Inconsistent test methods and/or test results documented by BISCO and
the ANI test laboratories for the specific design configuration
PCA-76 (ANI No. S-26) for which the ANI rescinded acceptance and also
the completion of TDDR No. FP-85-063 required corrective actions
(445/8516-U-07,446/8513-U-07).
7.
Review of Electrical Inspection and Installation / Test Procedures
The NRC inspector completed the review of the applicant's QA/QC program
and procedures relating to the installation of electrical components'and
cables.
In addition, a review of the electrical installation / test proce-
dures was conducted. The areas covered in the review were: organizational
structure and personnel, audits, quality requirements, work and quality-
inspection procedures, control of material, control of processes, correc-
tive action, document control, test control, control of test equipment,
quality records, and onsite design control.
In order to identify specific criteria-in the above areas, a review was
conducted of Sections 7, 8, and 17 of the applicant's FSAR to identify the
commitments pertaining to the installation of electrical components and
cables. The tabulation consisted of the pertinent regulatory' guides
IEEE
standards, and specific alternative programs. The specific commitments,
coupled with the requirements of of Appendix B to 10 CFR Part 50, form _ the
criteria by which the QA/QC program is judged.
.
.
                                                                                  B
                                            9
      The letters discussed above appeared to contain conflicting statements.
      The BISCO letters dated November 13, 1984, and September 16, 1985, differed
      in that the first one certified to meeting ASTM E-119 and IEEE 634 test
      requirements, while the latter only mentioned ASTM E-119. The September 16,
      1985, letter also stated that BISCO recently retested the original design
      configuration and it passed; however, in the same paragraph on page 2 they
      stated that they added a 3/8-inch proprietary coating, which according to
  ,    TUGCo is not on their barriers that are installed. In the same paragraph,
      BISCO discussed this coating as if it were a retrofit and/or a design
      change. Thus, BISCO's claim that their retest was successful appears to be
      based on testing an upgraded test sample. The ANI letter to TUGCo, dated
      August 20, 1985, stated that their test was in accordance with ASTM E-119;
      however, BISCO claimed that the ANI test exceeded ASTM E-119 requirements
      and thus is an inconsistency. It is also unclear as to how many test
      failures have occurred. Indications are that there were two recent
      failures, an ANI test and a BISCO test failure.
      The following items are unresolved pending clarification or resolution:
      a.    Reevaluation of available 1976 test documentation and recent test
            failures for 10 CFR Part 21 and 10 CFR Part 50.55(e) reportability
              (445/8516-U-06,446/8513-U-06).
      b.    Inconsistent test methods and/or test results documented by BISCO and
            the ANI test laboratories for the specific design configuration
            PCA-76 (ANI No. S-26) for which the ANI rescinded acceptance and also
            the completion of TDDR No. FP-85-063 required corrective actions
              (445/8516-U-07,446/8513-U-07).
    7. Review of Electrical Inspection and Installation / Test Procedures
      The NRC inspector completed the review of the applicant's QA/QC program
      and procedures relating to the installation of electrical components'and
      cables. In addition, a review of the electrical installation / test proce-
      dures was conducted. The areas covered in the review were: organizational
      structure and personnel, audits, quality requirements, work and quality-
      inspection procedures, control of material, control of processes, correc-
      tive action, document control, test control, control of test equipment,
      quality records, and onsite design control.
      In order to identify specific criteria-in the above areas, a review was
      conducted of Sections 7, 8, and 17 of the applicant's FSAR to identify the
      commitments pertaining to the installation of electrical components and
      cables. The tabulation consisted of the pertinent regulatory' guides IEEE
      standards, and specific alternative programs. The specific commitments,
      coupled with the requirements of of Appendix B to 10 CFR Part 50, form _ the
      criteria by which the QA/QC program is judged.
          .


    '
'
  .
.
                                            10
10
        A second examination was conducted to identify the QA/QC program specifics
A second examination was conducted to identify the QA/QC program specifics
        and procedures which pertained to the installation of electrical components
and procedures which pertained to the installation of electrical components
        and cables. The program and procedures were then compared to the FSAR
and cables. The program and procedures were then compared to the FSAR
        commitments and 10 CFR Part 50, Appendix B criteria to determine if the
commitments and 10 CFR Part 50, Appendix B criteria to determine if the
        program and procedures adequately addressed the required criteria.
program and procedures adequately addressed the required criteria.
        The following procedures were reviewed: (a) Inspection Procedures QP-11.3-27,
The following procedures were reviewed: (a) Inspection Procedures QP-11.3-27,
        Revision 11; QP-ll.3-28, Revision 28; QP-11.3-29, Revision 17; QP-11.2-29.1,
Revision 11; QP-ll.3-28, Revision 28; QP-11.3-29, Revision 17; QP-11.2-29.1,
        Revision 18; QP-11.3-31, Revision 8; QP-11.3-38, Revision 7; QP-11.3-40,
Revision 18; QP-11.3-31, Revision 8; QP-11.3-38, Revision 7; QP-11.3-40,
        Revision 2; QP-11.3-41 Revision 5; QP-11.3-43, Revision 19; OP-11.3-44,
Revision 2; QP-11.3-41 Revision 5; QP-11.3-43, Revision 19; OP-11.3-44,
        Revision 16; (b) Installation / Test Procedures EEI-5, Revision 3; EEI-6,
Revision 16; (b) Installation / Test Procedures EEI-5, Revision 3; EEI-6,
        Revision 6; eel-7, Revision 5; EEI-8, Revision 5; EEI-13, Revision 4;
Revision 6; eel-7, Revision 5; EEI-8, Revision 5; EEI-13, Revision 4;
EEI-16, Revision 0; EEI-18, Revision 3; EEI-21, Revision 0; EEI-23
,
,
        EEI-16, Revision 0; EEI-18, Revision 3; EEI-21, Revision 0; EEI-23
Rev.ision 1; EEI-26, Revision 0; ECP-20, Revision 0; and (c) Administrative
        Rev.ision 1; EEI-26, Revision 0; ECP-20, Revision 0; and (c) Administrative
Procedure CPM-6.3, Revision 11.
        Procedure CPM-6.3, Revision 11.
No violations or deviations were identified.
        No violations or deviations were identified.
8.
      8. Exit Interview
Exit Interview
        An exit interview was conducted December 4,1985, with the applicant
An exit interview was conducted December 4,1985, with the applicant
        representatives identified in paragraph 1 of Appendix D of this report.
representatives identified in paragraph 1 of Appendix D of this report.
        During this interview, the NRC inspectors summarized the scope and findings
During this interview, the NRC inspectors summarized the scope and findings
        of the inspection. The applicant acknowledged the findings. Subsequent to
of the inspection. The applicant acknowledged the findings. Subsequent to
        this interview, the NRC inspector notified the applicant with respect to
this interview, the NRC inspector notified the applicant with respect to
        the failure to report the 10 CFR Part 50.55(e) deficiency described in
the failure to report the 10 CFR Part 50.55(e) deficiency described in
        paragraph 6 above.
paragraph 6 above.
.
.
.
                .
I
I
                                                                                      l
j
                                                                                      l
                                                                                      l
                                                                                      I
                                                                                      j
}}
}}

Latest revision as of 04:07, 8 December 2024

Const Insp Repts 50-445/85-16 & 50-446/85-13 on 851101-30.No Violation or Deviation Noted.Major Areas Inspected:Const Deficiencies,Ie Bulletins,Qa Records,Electrical Penetrations & Electrical Insp & Installation Test Procedures
ML20199K977
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/04/1986
From: Barnes I, Kelley D, Phillips H, Westerman T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20199K948 List:
References
50-445-85-16, 50-446-85-13, IEB-79-14, IEB-79-28, NUDOCS 8604100269
Download: ML20199K977 (10)


See also: IR 05000445/1985016

Text

,

APPENDIX C_

CONSTRUCTION INSPECTION REPORT

,

U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

NRC Inspection Report:

50-445/85-16

Permits: CPPR-126

50-446/85-13

.CPFR-127

Dockets: 50-445

Category; A2

50-446

t

Applicant: Texas Utilities Electric Company (TVEC)

Skyway Tower

400 North Olive Street

Lock Box 81

Dallas, Texas

75201

Facility Name: Comanche Peak Steam Electric Station (CPSES), Units 1 & 2

Inspection At: Glen Pose, Texas

Inspection Conducted: November 1-30, 1985

(2 h/

f/Z/ff6

Inspectorst

/

N. 5. Ptiillips, Senicfr Resident Redctor

Date

Inspector (SRRI), Construction,RegionIV

CPSES Group

(paragraphs 1, 2, 3, 4, 5, 6, and 8)

D

L

4G%

illa -

Jh/hd

"

D. T. Kelley, 5RRI, pperat/ons, Region IV

Date'/

'

)

CPSES Group

(paragraph 7)

<

Consultants:

EG&G-J. H. McCleskey

Parameter-T. H. Young

s

Reviewed By:

8mM

.

.Date

4M_

I. Barnes, Grot'p Leader, Region IV CP5ES

Group

(

8604100269 860404

DR

ADOCK0500g5

$

m

.

.

I

e

2

,

Approved:

~

T. F. W a terman, Chief, Region IV CPSES Grcup

Date

Inspection Strncary

inspection Conc' acted: November 1-30,1965(Report 50-445L85-161

,

Areas Inspected:

Routine, uncanounced in3pection of Unit I which ine'uoed

applicant actions on construction deficiencies, applicart oc'tions en previcus

Ni<C " inspection findings, IE Bulletins, QA records, and electrical cGr.etrations.

The inspection involved 143 inspector-hours onsite t'y one NRC inspector ard twa

censultants.

Results: Within the seven areas inspecteed, no violations or deviations were

.

~

Ide?itl fied.

,

A cettion Conaucteo: Sovemoer 1-30.1985 (Repyt_5f-446/05-13)

AreaLIn_ spec _ted:

Routine, anacuaced and unannounced inspection of (Jnit 2

s

wnich included plent tours, applicant actioni, en corntractiori deficiencies,

applicant actions or previous NRC inspaction findings, IE Sulletins, OA

record 3, electr ical penetrations, and review of electrictsl inspection and

,

installation test procedures.

The inspection itivolved 226 inspector-boors

onsite by two NRC inspectors and two consultants.

Results- Wjthin the six areas inspected, no violatfor.s or deviations were

identified.

f

t

- -.

._

-

-

.

._

-

'

,

1

3

OfTAILJ

1.

Pwsog ontacted

j

Texas _ Utilities, Generating Company (TUCCo)

,

K. Arcp> Site Design Engineer

,

R. Babb, Engineer and Site Fire Protection Leader, TUGCo Nuclect

i

Engiraering (TNE)

H. Cheatheam, Tecnnical Support Engineer

R. Cisneros, Special Project Group Coordinator

,

,

9. Halstead, M'anager, Quality Control

i

J. Hicks, Licent ing

J. Marshali, ticensing

J. liarri'tt, Assistant Project General Manager, Unit 2

!

0. Palmer, Industrial Operating Experiente Coordinator

C. Welch, QC Services Supervisor

,

i

j

Contractor Personnel

W. Baker, Engineer, Brown & Root (8&R)

D. 6alenthez, Site QC Supervisor, Brand Industrial Services Inc.

(81500)

G. Fedor, Development Engineer, BISCC, Park Ridge, Illinois

B. Kennedy, Site Project Manager, BISCO

t. Smith, Engineer, B&R

8. Wright, Engineer, B&R

The NRC inspectors also interviewed other applicant employees during this

inspectibn period.

!

2.

Applicant Action on Previous NRC Insoection Findings

a.

(Cbsed) Unresolved Item (445/8119 'J-02):

Control of QA records for

pipe supports.

Procedures, had not addressed or given instructions

,

for retrieval of records for items that had been completed and then

needed to be modified.

Cn October 29 and November 4, 19&S, the NRC

'

'

inspector reviewed the applicable procedures that were implemented

from 1982 until the present.

These procedures adequately addressed

,

the retrieval of completed packages from the vault when modifications

are required.

b.

(Closed) Deviatica (445/8408-D-03):

Deviation from desig,, information

>

for the installation of Seismic Category I/ Seismic Category II

structural steel for the bolted connections between the part designated

W16x40 and the wall on platform OP-11 in the pressurizer compartment.

This deviation concerned a platform that was upgraded to Category I

q

'

without a corresponding chance in details for bolted connections.

On October 24-28, 1985, the NRC inspector followed up on this item to

determine if corrective action was complete.

TUGCo's response dated

'

August 23, 1984, Indicated that design change authorization

-

!

l

.

4

(DCA) 19469, Revision 1, was issued to require a locking mechanism on

platform OP-11 bolts and that the DCA addressed locking devices.

The

response also indicated that a complete review of the " hand-tight"

instruction would be complete by October 1,1984. .The last DCA was

issued in July 1985 to cover this issue.

The NRC inspector took a

sample of 17 DCAs and one drawing that had been generated or revised

to address the " hand-tight" issue.

These all showed that locking

devices were required where potential movement and backing off of nuts

must be addressed.

i

c.

(Closed) Violation (445/8422-V-03):

Unit I unauthorized removal of

'

BISCO fire seal.

The applicant initiated corrective action which

included:

(1) providing training to construction to reindoctrinate

,

(2) performing a walkdown

them on CPSES rules and policies s

inspection of Unit 1, and (3) initiating programmatic controls for

construction.

The NRC inspector reviewed the following documentation

of the corrective actions:

T-141, TUGC0 CAR-038, IM No. 27535 dated

August 3, 1984, and also the practice of using discrete constructioa

packages containing the necessary instruction and forms to complete

the specified work.

d.

(Closed) Unresolved Item (445/8426-U-03):

As-built notation on field

sketch instrument number (FSI) drawings.

There was a question on one

"as-built" notation on FSI drawings.

During November 6 and 7, 1985,

the NRC inspector followed up on this item to determine if the

applicant had completed the actions they agreed to complete.

Sample

copies of six of the drawings in question were requested at the

central document control center (OCC).

All had been stamped "for

reference purposes only." Also, the drawings at the central DCC and

four other distribution points are stamped "for office and

engineering use only" when issued.

None of the drawings had

"as-built" on them.

This action satisfies the NRC concerns.

'

e.

(Closed) Unresolved Item (445/8432-U-01, 446/8432-U-01): TUGCo

organization.

On November 1, 1985, the NRC inspector reviewed this

unresolved item.

The essistant project general manager of TUGCo

still reports to two different vice presidents; however, a third vice

president is responsible for licensing, nuclear fuel, and quality'

assurance (QA),

The Of rector of QA reports directly to the TUGCo

Vice President, Licensing, Nuclear Fuel and QA.

This separation is

acceptable from a cost and scheduling standpoint and the reporting

level is sufficiently high to provide organizational freedom for

organizations performing QA functions.

This concern is reflected in

the CPSES QA Plan, Section 1.1, Quality Assurance Division, which was

revised October 18, 1985.

f.

(0 pen) Unresolved Item (445/8514-U-02, 446/8511-U-01):

Procedures do

not address 10 CFR Part 50,55(e) file content or provide a method for

completion /signoff for corrected construction deficiencies.

The NRC

inspector reviewed TUGCo Procedure NEO CS-1 entitled, " Evaluation of

and Reporting).of Iteru/ Events Under 10 CFR Part 21 and 10 CFR

Part50.55(e

The review revealed that the following procedures

"

'

,

..

.. .

......

-

.

.

.

.

...

. ..

.

.

.

. .

.

.

.

m

.

.

'

.

5

were inconsistent with Procedure NE0 CS-1:

CP-QP-16.1, Revision 6,

dated January 16, 1985; TNE-AD-5, Revision 3, dated June 21, 1984;

DQP-QA-12, Revision 2, dated September 9, 1985; and CP-QP-15.6,

Revision 3, dated January 16, 1985.

The inconsistencies included

conflicting responsibilities, method of evaluation, repo*tability

criteria, notification policy, and reporting instructions.

TUGCo has committed to the resolution of file tracking problems and

procedural inconsistencies by March 1, 1986.

g.

(0 pen) Unresolved Item (445/8514-U-03, 446/8511-U-02):

Incomplete

significant deficiency analysis report files.

TUGCo has indicated

that actions are being taken to identify all records necessary to

close out open files.

This action is scheduled to be completed by

March 1, 1986.

2

h.

(0 pen) Unresolved Item (445/8422-U-04):

Material certification for

electrical penetration seals.

The NRC inspector quet,tioned the

certification of the chemical and physical testing.

In response,

TUGCo provided BISCO certificate of compliance (C0C) Nos. 3057, 3081,

2893, and the BISCO site receiving inspection checklist for Purchase

Order (PO) Nos. 2730 and 2773. There was a statement that the

articles complied with all P0 specification requirements (2323-MS-38F);

however, no reference was made to the DOW Corning, Inc., chemical and

physical testing of the subject material.

This item remains open

pending the receipt of a C0C which certifies that this material meets

such test requirements or DOW test results.

'

During this inspection, the NRC inspector found other documentation

and hardware issues which are discussed in paragraph 6 of this report.

,

3.

Applicant Action on 10 CFR Part 50.55(e) Deficiencies:

.

The NRC inspectors evaluated corrective action taken on reportable

1

I

deficiencies by reviewing TUGCo deficiency reports. The inspector found no

corrective action completion date for CP-84-29, "HVAC Fire Scenarlo."

It

'

was noted that corrective action for deficiency CP-84-27. " Ventilation

Exhaust Dampers," was to be completed for Unit I by September 1985 and for

Unit 2 before startup testing. However, as of November 30, 1985, Unit 1

deficiencies were not corrected and it was not clear how corrective action

for Unit 2 will be tracked. Deficiencies CP-85-13 and CP-85-05, which are

i

described in deficiency reports and the open items list, also give no

'

corrective action dates.

Several final 10 CFR Part 50.55(e) reports contained corrective action

completion dates; however, work was neither completed by the reported date

nor was a supplemental report made to the NRC to report on significant

corrective action date changes.

Deficiency report for CP-84-31 " Control

Room Separation Wall," stated that corrective action was scheduled for

completion by December 15, 1984; however, it was not completed as of

November 30, 1985.

Similarly, deficiency reports for CP-85-11. " Instrument

!

!

-. -.

-

-.

-

. - - - -

--- -

.

-

- -

. - -

- -

. .

- .

- - -

- -

- -

.

'

.

6

Fitting Locations," and CP-85-12 " Auxiliary Feedwater Pressure Control "

stated that corrective action was scheduled to be completed for Unit 1 by

May 1985. The open items list indicated that they were not completed on

November 30, 1985.

TUGCo management has assembled a task force consisting of four to five

engineers or specialists to evaluate and take action on the matters

i

described above. This item is unresolved (445/8516-U-01, 446/8513-U-01).

No violations or deviations were identified.

4.

Applicant Action on IE Bulletins (IEBs)

a.

In response to discussions regarding the TUGCo program concerning IEBs,

Circulars, and Infomation Notices, Region IV was informed that TUGCo

'

will perform a review of related procedures and records to determine

the adequacy of procedures and the completeness of associated records.

'

The initiation of this effort will follow the task review of the

10 CFR Part 50.55(e) program which is presently in progress.

!

This item is unresolved (445/8516-U-02, 446/8513-U-02).

b.

The TUGCo actions on two IEBs (i.e., Nos. 79-14 and 79-28) were

,

selected to revicw hardware evaluations or repair / replacements. TUGCo

t

10ER Log Sheet, page 10, dated April 9, 1984, was reviewed to

determine the status of the IEBs.

,

I

(1)

IEB 79-14 was evaluated by TUGCo in 1983 and was statused as

,

closed. The NRC inspector indicated that the closure of IEB 79-14

was premature since Stone & Webster is currently analyzing Unit 1

seismic analysis versus as-built drewings, which directly relates

i

to this IEB. Unit 2 as-built work has also not been completed.

4

TUGCo stated that the IEB 79-14 file will be reopened and a

.

supplemental report will be submitted upon completion of the

j

ongoing project engireering work.

Theaboveitem(IEBNo.79-14)statusisconsideredanopenitem

,

(445/8516-0-03,446/8513-0-03).

!

(2)

IEB 79-28 identified deficiencies with certain manufactured lots

of NAMCO EA 180 limit switches. The gasket material of the

,

faulty lots, when exposed to temperatures above 175"F, vaporized

,

i

and emitted a yellow-brown crystal like resin that can cause these

i

switches to fail. The NRC inspector found the TUGCo documentation

'

!

to be complete with respect to the specified corrective action of

.

replacing these switches with switches manufacturt.d in acceptable

.

I

lots.

l

Field verification of replacement of 14 switches identified,

l

however, that the identity of 2 switches could not be traced to

existing travelers. Specifically, the replacement NAMCO limit

'

-,,r--

.

.

7

l

switches on residual heat removal valves 1-HCV-606 and 1-FCV-618

were identified on travelers EE 82-1415-5801 and EE 83-0373-5801

as EA 180-32302 and EA 170-31302, respectively.

The switches

,

actually installed in the field were identified as EA 180-31302

and EA 180-31302, respectively.

TUGCo is evaluating this

inconsistency to determine if there is other documentation to

account for this.

This item is unresolved (445/8516-U-04, 446/8513-U-04).

l

I

5.

QA Records Retention

!

The NRC inspectors found that construction deficiency and IEB files were

i

not stored in the QA records vaults.

Because such records have not been

i

deposited in a central location, difficulties have been encountered in

i

retrieval.

TUGCo is assessing this record file issue.

This item is open pending the completion of their review (445/8516-0-05,

<

446/8513-0-05).

l

!

6.

Electrical Penetrations

!

In NRC Inspection Report 50-445/84-22 dated October 11, 1984, the

certification of BISCO electrical penetration seals (fire barriers) was

questioned with respect to the testing of the seals.

During the followup

of this item, which is discussed in paragraph 2.h above, the NRC inspector

identified related but different findings.

The NRC inspector reviewed the records to determine if the documentation

for eight 815C0 seals support the certification statement. The eight

i

penetrations inspected were; AB-790-174-1022A, EC-854-150A-1018A and-1018B,

EC-854-151A-2003A and-2004A, EC-854-1518-2025A and-2026A, and

TB-803-010A-1008A.

'

The following documents contained apparent conflicting information that the

NRC inspector has identified for further followup:

BISCO letter to TUGCo dated November 13, 1984, answered the NRC

.

certification inquiry and stated that the subject fire barrier seal

(Test No. PCA-76, ANI No. S-26, 24"x42", floor / wall, material 6548,

9 inches depth, LAD or SLD tray, all cables, 40% loaded) met all test

requirements of TUGCo Contract No. CP-0707, Gibbs & Hill

Specification 2323-MS-38F, ASTM E-119, and IEEE 634.

'

American Nuclear Insurers (ANI) letter to BISCO dated August 20, 1985,

'

.

t

withdrew its acceptance of BISCO SF-20 (1977) Silicone or Dow Corning

i

3-6548 RTV Silicone foam for 2- and 3-hour rating without a damming

'

board left in place.

The NRC inspectors ascertained that this

withdrawal was based on BISCO not having complete documentation of

the test results and the recent failure of a BISCO sample tested at

an independent laboratory employed by the ANI.

4

.

.

.

-

.

.

.

.

.

. -

.

.

. .

.

~

i

!

'

.

8

ANI letter dated August 20, 1985, to TUGCo informed them of the

.

rescinded acceptance and the test failure that occurred 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and

35 minutes into the independent test performed in accordance with

ASTM E-119.

Further, it stated that this fire barrier may not be

adequate where there is a strict requirement for a barrier with a

3-hour rating.

Comanche Peak Final Safety Analysis Report (FSAR), page 9.5-223,

.

requires that penetration seals be tested in accordance with

ASTM E-119 and IEEE 634.

FSAR Section 9.5, paragraph D.1.c. requires:

(1) each cable spreading room should be separated from other areas of

the plant by barriers with a minimum fire resistance of 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />, and

(2) cabling for redundant safety divisions should be separated by

walls having a 3-hour rating as a fire barrier.

Section 9.5,

paragraph D.3.c. requires a 3-hour rating for barriers for cable trays

that contain cold shutdown cabling.

TUGCo Design Deficiency Report (T00R) No. FP-85-063 dated August 29,

.

1985, documented the deficiency.

On the same report, the deficiency

was marked not reportable in the 10 CFR Part 21 and Part 50.55(e)

reportable block.

The corrective action was for BISCO to prove

satisfactory testing of the failed seal and all other ANI accepted

seals.

Note:

The evaluation of reportability is being reevaluated by TUGCo.

BISCO letter dated September 16, 1985, stated that approval had been

.

.

l

rescinded because the hose stream test data was destroyed or lost

l

during either a 1976 fire or a subsequent move to another facility.

It also stated that the ANI testing standards are much more stringent

and stated that BISCO seals meet and surpass the test standards of

l

ASTM E-119.

The letter turther stated that the ANI representative

witnessed a test on 9-inch silicone foam using the same design

configuration that failed in the ANI test.

However, the letter also

i

stated that the success of this BISCO test was based on applying a

3/8-inch proprietary coating on the face of the silicone foam.

The

letter stated that this retrofit corrective measure can be employed

by those who wish to upgrade this particular seal design.

Note:

It appears that the original seals that were tested had no

. coating.

!

TUGCo interoffice memorandum (Creamer to Kennedy) dated October 16,

.

,

1985, discussed the rework of all seals affected by ANI disapproval

l

of S-26.

1

BISCO memorandum to TUGCo (Trent to Anger) dated October 24, 1985,

.

(

identified eight penetrations to be reworked.

'

.

\\

l

<

i

-

-

- -

-

-

-

-

-

.

.

-

'

.

B

9

The letters discussed above appeared to contain conflicting statements.

The BISCO letters dated November 13, 1984, and September 16, 1985, differed

in that the first one certified to meeting ASTM E-119 and IEEE 634 test

requirements, while the latter only mentioned ASTM E-119. The September 16,

1985, letter also stated that BISCO recently retested the original design

configuration and it passed; however, in the same paragraph on page 2 they

stated that they added a 3/8-inch proprietary coating, which according to

TUGCo is not on their barriers that are installed.

In the same paragraph,

,

BISCO discussed this coating as if it were a retrofit and/or a design

change. Thus, BISCO's claim that their retest was successful appears to be

based on testing an upgraded test sample. The ANI letter to TUGCo, dated

August 20, 1985, stated that their test was in accordance with ASTM E-119;

however, BISCO claimed that the ANI test exceeded ASTM E-119 requirements

and thus is an inconsistency.

It is also unclear as to how many test

failures have occurred.

Indications are that there were two recent

failures, an ANI test and a BISCO test failure.

The following items are unresolved pending clarification or resolution:

a.

Reevaluation of available 1976 test documentation and recent test

failures for 10 CFR Part 21 and 10 CFR Part 50.55(e) reportability

(445/8516-U-06,446/8513-U-06).

b.

Inconsistent test methods and/or test results documented by BISCO and

the ANI test laboratories for the specific design configuration

PCA-76 (ANI No. S-26) for which the ANI rescinded acceptance and also

the completion of TDDR No. FP-85-063 required corrective actions

(445/8516-U-07,446/8513-U-07).

7.

Review of Electrical Inspection and Installation / Test Procedures

The NRC inspector completed the review of the applicant's QA/QC program

and procedures relating to the installation of electrical components'and

cables.

In addition, a review of the electrical installation / test proce-

dures was conducted. The areas covered in the review were: organizational

structure and personnel, audits, quality requirements, work and quality-

inspection procedures, control of material, control of processes, correc-

tive action, document control, test control, control of test equipment,

quality records, and onsite design control.

In order to identify specific criteria-in the above areas, a review was

conducted of Sections 7, 8, and 17 of the applicant's FSAR to identify the

commitments pertaining to the installation of electrical components and

cables. The tabulation consisted of the pertinent regulatory' guides

IEEE

standards, and specific alternative programs. The specific commitments,

coupled with the requirements of of Appendix B to 10 CFR Part 50, form _ the

criteria by which the QA/QC program is judged.

.

'

.

10

A second examination was conducted to identify the QA/QC program specifics

and procedures which pertained to the installation of electrical components

and cables. The program and procedures were then compared to the FSAR

commitments and 10 CFR Part 50, Appendix B criteria to determine if the

program and procedures adequately addressed the required criteria.

The following procedures were reviewed: (a) Inspection Procedures QP-11.3-27,

Revision 11; QP-ll.3-28, Revision 28; QP-11.3-29, Revision 17; QP-11.2-29.1,

Revision 18; QP-11.3-31, Revision 8; QP-11.3-38, Revision 7; QP-11.3-40,

Revision 2; QP-11.3-41 Revision 5; QP-11.3-43, Revision 19; OP-11.3-44,

Revision 16; (b) Installation / Test Procedures EEI-5, Revision 3; EEI-6,

Revision 6; eel-7, Revision 5; EEI-8, Revision 5; EEI-13, Revision 4;

EEI-16, Revision 0; EEI-18, Revision 3; EEI-21, Revision 0; EEI-23

,

Rev.ision 1; EEI-26, Revision 0; ECP-20, Revision 0; and (c) Administrative

Procedure CPM-6.3, Revision 11.

No violations or deviations were identified.

8.

Exit Interview

An exit interview was conducted December 4,1985, with the applicant

representatives identified in paragraph 1 of Appendix D of this report.

During this interview, the NRC inspectors summarized the scope and findings

of the inspection. The applicant acknowledged the findings. Subsequent to

this interview, the NRC inspector notified the applicant with respect to

the failure to report the 10 CFR Part 50.55(e) deficiency described in

paragraph 6 above.

.

.

I

j