Technical Spacifications.
Technical Spacifications.
Amendment No.
Amendment No.
Page 7,1-7.               l Authorized deviations to the working hour guidelines shall   be documented and available for         Nuclear Regulatory Commission review.                                     l
Page 7,1-7.
: 3. Training
l Authorized deviations to the working hour guidelines shall be documented and available for Nuclear Regulatory Commission review.
: a. A retraining ard replacement training program for the facility staff shall be maintained under the
l 3.
            !              direction of the Nuclear Training Manager and shall meet or exceed the requirements and _ recommendations-of Section 5.5 of ANSI N18.1-1971 and Appendix "A"                 ;
Training a.
of 10CFR Part 55. Compliance with Section 5.5 of ANSI 18.1-1971   shall   be achieved no later than six months   following     commencement of     commercial           !
A retraining ard replacement training program for the facility staff shall be maintained under the direction of the Nuclear Training Manager and shall meet or exceed the requirements and _ recommendations-of Section 5.5 of ANSI N18.1-1971 and Appendix "A" of 10CFR Part 55. Compliance with Section 5.5 of ANSI 18.1-1971 shall be achieved no later than six months following commencement of commercial operation.
operation.
r b.
r
A training program for the Fire Brigade shall be l
: b. A training program for the Fire Brigade shall be l               maintained under the direction of the           Nuclear           ,
maintained under the direction of the Nuclear f
l               Training Manager and shall meet - or exceed the                   f requirements of Section 27 of the NFPA Code-1975, I
l Training Manager and shall meet - or exceed the requirements of Section 27 of the NFPA Code-1975, I
except for Fire Brigade training / drill       sessions           ;
except for Fire Brigade training / drill sessions which shall be held at least once per calendar
which shall be held at least once per calendar quarter,
: quarter, c.
: c. The Technical Advisors shall have a bachelor degree or equivalent in a scientific         or   engineering discipline with specific training in plant design i
The Technical Advisors shall have a bachelor degree or equivalent in a scientific or engineering discipline with specific training in plant design i
I
'9003010022 800205 PDR ADOCK 05000267
    '9003010022 800205 PDR   ADOCK 05000267
.P DCD
    .P                 DCD


Fort St. Vrain 01 Technical S;acifications Amendment No.
Fort St. Vrain 01 Technical S;acifications Amendment No.
Page 7.1- 8 and   response   and   analysis of the plant for transients and accidents. An initial training and retraining program for the Technical Advisors shall l           be maintained under the direction of the Nuclear
Page 7.1-8 and response and analysis of the plant for transients and accidents.
        ]           Training Manager. The Technical Advisors shall also i
An initial training and retraining program for the Technical Advisors shall l
receive training in plant design         and   layout, l                   including the capabilities of instrumentation and controls in the Control Room.
be maintained under the direction of the Nuclear
!          Specification AC 7.1.2 - Plant Operations Review Committee 1
]
Training Manager.
The Technical Advisors shall also i
receive training in plant design and
: layout, l
including the capabilities of instrumentation and controls in the Control Room.
Specification AC 7.1.2 - Plant Operations Review Committee 1
(PORC), Administrative Controls l
(PORC), Administrative Controls l
l           The organization,     responsibilities,   and authority of the PORC shall be as follows:
l The organization, responsibilities, and authority of the PORC shall be as follows:
!          1. Membership l
1.
Membership l
The Plant Operation > Review Committee shall be composed of the following:
The Plant Operation > Review Committee shall be composed of the following:
Chairman: Station Manager Technical / Administrative Services Manager Support Services Manager (Radiation Protection Manager)
Chairman: Station Manager Technical / Administrative Services Manager Support Services Manager (Radiation Protection Manager)
Superintendent of Operations Superintendent of Maintenance l               Superintendent of Nuclear Betterment Engineering l
Superintendent of Operations Superintendent of Maintenance l
Superintendent of Nuclear Betterment Engineering l
l
l


Fort St. Vrain #1 Technical Specifications Amendment No.
Fort St. Vrain #1 Technical Specifications Amendment No.
Page 7.1- 9 Results Engineering Supervisor l     Administrative Shift Supervisor I
Page 7.1-9 Results Engineering Supervisor l
Superintendent of Technical Services Engineering l     Nuclear Training Manager
Administrative Shift Supervisor I
: 2. Alternates An   alternate   chairman   and alternate members,     if required, shall be appointed in writing by the PORC Chairman to serve in the absence of a chairman or a member; however, no more than two alternate members
Superintendent of Technical Services Engineering l
      ]     shall participate as voting members in PORC activities at any one time.
Nuclear Training Manager 2.
: 3. Meeting Frequency The PORC shall meet at least once per calendar month and I     as convened by the Chairman or his designated alterr. ate.
Alternates An alternate chairman and alternate members, if required, shall be appointed in writing by the PORC Chairman to serve in the absence of a chairman or a member; however, no more than two alternate members
: 4. Quorum A quorum shall     consist of the Chairman or alternate Chairman, and four members including alternates.
]
shall participate as voting members in PORC activities at any one time.
3.
Meeting Frequency The PORC shall meet at least once per calendar month and I
as convened by the Chairman or his designated alterr. ate.
4.
Quorum A quorum shall consist of the Chairman or alternate Chairman, and four members including alternates.
i i
i i
: 5. Responsibilities                                                     l l
5.
The PORC shall be responsible for:
Responsibilities The PORC shall be responsible for:
I 1
I
I


Fort St. Vrain #1 Technical Specifications Amendment No.
Fort St. Vrain #1 Technical Specifications Amendment No.
Page 7.1-10
Page 7.1-10 a.
: a. Review of all     procedures required by Technical l   Specification 7.4(a), (b), (c) and (d) and changes thereto, and any other proposed procedure or changes to approved procedures as determined by the Station Manager to affect nuclear safety.
Review of all procedures required by Technical l
I
Specification 7.4(a), (b), (c) and (d) and changes thereto, and any other proposed procedure or changes to approved procedures as determined by the Station Manager to affect nuclear safety.
: b. Review of all     *cposed tests and experiments that affect nuclear . uty,
b.
: c. Review of all     proposed changes to the Technical Specification.e.
Review of all
: d. Review of all proposed changes or modifications to plar,t systems or equipment that affect nuclear safety.
*cposed tests and experiments that affect nuclear.
: e. Investigation of all     violations of the Technical Specifications   including   the   preparation   and forwarding of rsports covering the evaluatio7 and                 l re:ammendations to prevent       recurrence   to   the Manager, Nuclear Production and to the Chairman of the Nuclear Facility Safety Committee.
: uty, c.
l l
Review of all proposed changes to the Technical Specification.e.
: f. Review of all Reportable Event 5.                                 !
d.
: g. Review of facility operations to detect potential nuclear safety hazards.
Review of all proposed changes or modifications to plar,t systems or equipment that affect nuclear safety.
e.
Investigation of all violations of the Technical Specifications including the preparation and forwarding of rsports covering the evaluatio7 and re:ammendations to prevent recurrence to the Manager, Nuclear Production and to the Chairman of the Nuclear Facility Safety Committee.
f.
Review of all Reportable Event 5.
g.
Review of facility operations to detect potential nuclear safety hazards.


Fort St. Vrain 01 Technical Specifications Amendment No.
Fort St. Vrain 01 Technical Specifications Amendment No.
Page 7.1-13 e)   Instrumentation and Control f)   Radiological Safety g)   Mechanical and Electrical Engineering h)   Quality Assurance Practices
Page 7.1-13 e)
: 1)   Other   appropriate   fields   associated with the unique characteristics of the nuclear power plant.
Instrumentation and Control f)
: 2. Membership                                                                     ,
Radiological Safety g)
The NFSC shall be composed of the following:
Mechanical and Electrical Engineering h)
Quality Assurance Practices 1)
Other appropriate fields associated with the unique characteristics of the nuclear power plant.
: 2. Membership The NFSC shall be composed of the following:
Chairman (As appointed - See Step 4)
Chairman (As appointed - See Step 4)
Manager, Nuclear Licensing and Fuels Divi ion Manager, ?.uclear Production Division Manager, Nuclear Engineering Division Manager, Quality Assurance Division I
Manager, Nuclear Licensing and Fuels Divi ion Manager, ?.uclear Production Division Manager, Nuclear Engineering Division Manager, Quality Assurance Division i
i hfety and Security Director                                               j l         Consultants, as required, shall be appointed in writing by l         the Vice President, Nucle r Operations.
hfety and Security Director j
: 3. Alternates Alternate members, if required, shill be appointed in writing by the Vice President, Nuclear Ortri''---   however, no more tha" two alternate members sha'l participate as voting members in NFSC activitics at any one time.
l Consultants, as required, shall be appointed in writing by l
I l
the Vice President, Nucle r Operations.
: 3. Alternates Alternate members, if required, shill be appointed in writing by the Vice President, Nuclear Ortri''---
however, no more tha" two alternate members sha'l participate as voting members in NFSC activitics at any one time.


FORT ST. VRAIN NUCLEAR GENERATINS STATION                                           .
FORT ST. VRAIN NUCLEAR GENERATINS STATION ADMINISTRATIVE AND DEPARTMENTAL MANAGEMENT ORGANIZATION CHART Chairman and Chief Executive Officer Vice President Nucicar NFSC Operations NFSC - Nuclear Facility Safety Committee PORC - Plant Operations Review Committee
ADMINISTRATIVE AND DEPARTMENTAL MANAGEMENT ORGANIZATION CHART Chairman and Chief Executive Officer Vice President Nucicar                         NFSC Operations NFSC - Nuclear Facility Safety Committee PORC - Plant Operations Review Committee
" Serves as the Radiation Protection Manager Manager Manager Manager Manager Oo..ity Nuclear Licensing Nuclear Nuclear Ass irance and Engineering Production Division Fuels Division Division Division Nuclear Technical /
                                                      " Serves as the Radiation Protection Manager Manager                                 Manager                   Manager             Manager Oo. .ity                           Nuclear Licensing             Nuclear             Nuclear Ass irance                                 and                   Engineering         Production Division                             Fuels Division               Division             Division Nuclear                                                                                               Technical /     2 $" # d' Supp rt                   Station                                         a.n, Training Services                  Manager                      Ad*. .'"'strative egg-Manager                                   Manager . .                                             Services Manager   yg l                                   732-FNk
2 $" # d' Supp rt Station Training Services Manager egg-a.n, Ad*..'"'strative Manager Manager..
Services Manager yg l
732-FNk
: 2. "
: 2. "
B PORC                           0 t
B PORC 0
FIGURE 7.1 - 1
t FIGURE 7.1 - 1


FORT ST. VRAIN NUCLEAR GENERATING STATION CONDUCT OF OPERATIONS CHART Manager Nuclear Productu>n Division Support                                                     Station                                   Technical /
FORT ST. VRAIN NUCLEAR GENERATING STATION CONDUCT OF OPERATIONS CHART Manager Nuclear Productu>n Division Support Station Technical /
Services                                                 Manager                                   Administrative Manages"                                                                                               Services Manager l SLO.
Services Manager Administrative Manages" Services l SLO.
PORC Superintendent                       Superintendent         Superintendent                 Superintendent Nuclear                           Maintenance             Operations                     Technical Betterrnent                                                                                 Services Engineering l Engineenng                                                         lsto.                                 i m > -a vi B
Manager PORC Superintendent Superintendent Superintendent Superintendent Nuclear Maintenance Operations Technical Betterrnent Services l Engineenng lsto.
Health                 Results                                                 Adnunistratrve        Shift                                     om Physics             Engineering                                                   Shdt           Supervisors                                   *R?"
Engineering i
ya_m Supervisor             Supervisor                                                   Supervisor
m > -a vi B
                                                                                                                                                            - agr lSto                                  e e*
Adnunistratrve om Health Results Shift Physics Engineering Shdt Supervisors
fiths the Station Manages or the Supennierwient of Operations U -m Y shall possessa Senior Lxense                                                                                                                               O]*na
*R?"
" Serves as the Radution Protection Marajer                                                                                                                       23 Equipment           Reactor                 Auxiliary Technical PORC Plant Operations Review Conettee                                                   Operators         Operators               Tenders   Advisors       Q Senior Literned Operatm o
Supervisor Supervisor Supervisor ya_m lSto agr e
SLO LO     - Licensed Operats                                                                                           h
e*
* g 5
U -m Y fiths the Station Manages or the Supennierwient of Operations O]*
shall possessa Senior Lxense na
" Serves as the Radution Protection Marajer Equipment Reactor Auxiliary Technical 23 PORC Plant Operations Review Conettee Operators Operators Tenders Advisors Qo SLO Senior Literned Operatm h
g LO
- Licensed Operats 5
Figure 7.12
Figure 7.12


Line 108: Line 137:
Page 7.4-1 7.4 PROCEDURES - ADMINISTRATIVE CONTROLS Applicability Applies to admin'strttive procedures which will govern plant operations.
Page 7.4-1 7.4 PROCEDURES - ADMINISTRATIVE CONTROLS Applicability Applies to admin'strttive procedures which will govern plant operations.
Objective To ensure that written procedures will be maintained to define requirements for plant operation.
Objective To ensure that written procedures will be maintained to define requirements for plant operation.
Specification AC 7.4 - Procedures, Administrative Controls
Specification AC 7.4 - Procedures, Administrative Controls a.
: a. Written     procedures     shall   be   established, implemented and maintained covering the activities referenced below:
Written procedures shall be established, implemented and maintained covering the activities referenced below:
: 1. The   applicable   procedures recommended in l                     Appendix A of Safety Guide 33, November, 1972.
1.
: 2. Refueling operations.
The applicable procedures recommended in l
: 3. Surveillance and test activities of safety-related equipment.
Appendix A of Safety Guide 33, November, 1972.
: 4. Security Plan implementation.
2.
: 5. Emergency Plan implementation.
Refueling operations.
: 6. Frocess Control Program (PCP) implementation.
3.
Surveillance and test activities of safety-related equipment.
4.
Security Plan implementation.
5.
Emergency Plan implementation.
6.
Frocess Control Program (PCP) implementation.


Fort St. Vrain #1
^
^
Fort St. Vrain #1 Technical Specifica2ic.is Amendment No.
Technical Specifica2ic.is Amendment No.
Page 7.4- 2
Page 7.4-2 7.
: 7. Offsite   Dose   Calculation Manual     (00CM) implementation.
Offsite Dose Calculation Manual (00CM) implementation.
: 8. Quality Assurance Program for effluent and environmental monitoring using the guidance in Regulatory Guide 1.21, Revision 1, June, 1974 and Regulatory Guide 4.1, Revision   1,   April, 1975.
8.
: b. Procedures and administrative policies of a) above, and changes thereto, shall be reviewed by the PORC, I     or a subcommittee thereof, and approved by the l     appropriate management prior to implementation.
Quality Assurance Program for effluent and environmental monitoring using the guidance in Regulatory Guide 1.21, Revision 1, June, 1974 and Regulatory Guide 4.1, Revision 1,
l     Procedures shall     be reviewed periodically as set forth in Administrative Procedures.
: April, 1975.
Security Plan procedures,     and changes thereto, shall be reviewed by the Plant Operations Review l     Committee, or a subcommittee thereof, and approved b/ the designated Plant Security Officer prior to implementation.
b.
l
Procedures and administrative policies of a) above, and changes thereto, shall be reviewed by the PORC, I
: c. Temporary changes to procedures of a) above may be made prc'ided:                                                 l i
or a subcommittee thereof, and approved by the l
1 i
appropriate management prior to implementation.
: 1. The intent of the original procedure is not altered.
l Procedures shall be reviewed periodically as set forth in Administrative Procedures.
Security Plan procedures, and changes thereto, shall be reviewed by the Plant Operations Review l
Committee, or a subcommittee thereof, and approved b/ the designated Plant Security Officer prior to implementation.
c.
Temporary changes to procedures of a) above may be made prc'ided:
i i
1.
The intent of the original procedure is not altered.


Fort St. Vrain #1 1
1 Fort St. Vrain #1 Technical Specifications Amendment No.
Technical Specifications                   :
[
Amendment No.                             [
i Page 7.4-3 l
i Page 7.4-3                                 l I
I 2.
: 2. The change is approved by two members of the plant management staff, at least one of whom                                         j holds a Senior Reactor Operators License,                                            ,
The change is approved by two members of the j
                                                                                                                            .)
plant management staff, at least one of whom holds a Senior Reactor Operators License,
: 3. The- change .i s documented,           reviewed by the l                       PORC, or a subcommittee thereof, and approved 4
.)
;              1                       by the appropriate management within 14 days                                         ;
3.
j                                        of implementation.                                                                   !
The-change.i s documented, reviewed by the l
: d. Procedures for personnel radiation protection shall be prepared consiste.it with the requirements of f                                   10 CFR Part 20, and shall be' approved, maintained, i
PORC, or a subcommittee thereof, and approved 4
i                                   and adhered to for all           operations             involving i
1 by the appropriate management within 14 days j
j                                   personnel radiation exposure.
of implementation.
Respiratory protective equipment shall be provided                                       ;
d.
in accordance with 10 CFR 20.103.                                           . _ -        I e
Procedures for personnel radiation protection shall be prepared consiste.it with the requirements of f
t r
10 CFR Part 20, and shall be' approved, maintained, i
j                                                                                                                             l l
i and adhered to for all operations involving i
j                                                                                                                             '
j personnel radiation exposure.
i I
Respiratory protective equipment shall be provided in accordance with 10 CFR 20.103.
i 5
I e
t r'
j l
l j
i i
I 5
r I
r I
;                                                                                                                              I a                                                                                                                             i t
I a
4                                                                                                                             !
i t
        .              . _ -            . . ~ . , . .         . - . - . _ .            _
4
.. ~.,..


Fort St. Vrain #1 Technical Specifications Amendment No.
Fort St. Vrain #1 Technical Specifications Amendment No.
Page 7.5-3 and     survei tior :e,   in-service     inspectics.,
Page 7.5-3 and survei tior :e, in-service inspectics.,
routine     maintenance,     special   maintenance (describe maintenance), waste processing, and refueling. The dose assignment to various duty functions may be estimates based on pocket     dosimeter,     TLD,   or   film   badge measurements.       Small   exposures totaling 'ess than 20% of the individual total dose need not be accounted for.       In the aggregate, at least 80% of the whole body dose received from external sources shall be assigned to specific major work functions,
routine maintenance, special maintenance (describe maintenance), waste processing, and refueling. The dose assignment to various duty functions may be estimates based on pocket dosimeter,
: c. Monthly Operating Report A     routine   operating report covering the operation of the unit during the previous month     shall   be   submitted prior to the fif teenth calendar day of the following month.
: TLD, or film badge measurements.
Submittal     shall   be to the     U. S. Nuclear l     Regulatory Commission, ATTN: Document Control i     Desk, Washington, D. C. 20555, with a copy to the appropriate NRC Regional Administrator.
Small exposures totaling 'ess than 20% of the individual total dose need not be accounted for.
* e S
In the aggregate, at least 80% of the whole body dose received from external sources shall be assigned to specific major work functions, c.
Monthly Operating Report A
routine operating report covering the operation of the unit during the previous month shall be submitted prior to the fif teenth calendar day of the following month.
Submittal shall be to the U.
S.
Nuclear l
Regulatory Commission, ATTN: Document Control i
Desk, Washington, D. C. 20555, with a copy to the appropriate NRC Regional Administrator.
 
e S
e ATTACHMENT 3 SIGNIFICANT HAZARDS CONSIDERATION
e ATTACHMENT 3 SIGNIFICANT HAZARDS CONSIDERATION


SIGNIFICANT HAZARDS CONSIDERATION i
SIGNIFICANT HAZARDS CONSIDERATION i
: f. Evaluation c
f.
The proposed chi les to Section 7 and Figures 7.1-1 and 7.1-2                             :
Evaluation c
are evaluated in ti.) following paragraphs.                                               !
The proposed chi les to Section 7 and Figures 7.1-1 and 7.1-2 are evaluated in ti.) following paragraphs.
The pos'; tion of Suparintendent of ' Training has been                             l eliminated. The Nuclear Training Organization will                   now eport to the new position of Nuclear Training Manager who will report directly.to the Vice President of . Nuclear                             ,
The pos'; tion of Suparintendent of ' Training has been l
Operations.           This change is administrative only and the Training Program will continue to meet or exceed the                                 l requirements of Section 5.5 of ANSI '18.1 - 1971 and                                 i Appendix "A" of 10CFR55.                                                             !
eliminated. The Nuclear Training Organization will now eport to the new position of Nuclear Training Manager who will report directly.to the Vice President of. Nuclear Operations.
  ;                        Specification AC 7.1.2.1 (PORC Membership).               The prnposed changes to this section will eliminate four persons from
This change is administrative only and the Training Program will continue to meet or exceed the l
:                        membership of the PORC.           This action is in response to the                 .
requirements of Section 5.5 of ANSI '18.1 - 1971 and i
:                        NRC's request for *dditional               information,   NRC letter Heitner to Williams, ac*ed Decembe- 5, 1986 (G-86636).                 In addition to lowering cnmmittee membership                   from     the existing 14 members to the proposed 10 members, the following steps have been tak:n to ensure that continuity.                           ,
Appendix "A" of 10CFR55.
of members is retained from one meeting to the next                                 ;
Specification AC 7.1.2.1 (PORC Membership).
meeting:                                                                             ,
The prnposed changes to this section will eliminate four persons from membership of the PORC.
i
This action is in response to the NRC's request for *dditional information, NRC letter Heitner to Williams, ac*ed Decembe-5, 1986 (G-86636).
!                            1.       Fewer PORC meetings - one per week versus one per                           ;
In addition to lowering cnmmittee membership from the existing 14 members to the proposed 10 members, the following steps have been tak:n to ensure that continuity.
3 day or three per week-P
of members is retained from one meeting to the next meeting:
: 2.       A training program for all PORC members (incloding alter.iates) has been instituted.
i 1.
: 3.       All         PORC     members (including alternates) h0ve                   l successfully completed the training program.
Fewer PORC meetings - one per week versus one per 3
: 4.       Only         those personnel designated by name (PSC Interofft.4 Memo) are eligible to serve on the                             >
day or three per week-P 2.
PORC.                                                                       :
A training program for all PORC members (incloding alter.iates) has been instituted.
: 5.       90% of all             PORC meetings are chaired by the                       :
3.
Chairman.
All PORC members (including alternates) h0ve successfully completed the training program.
4.
Only those personnel designated by name (PSC Interofft.4 Memo) are eligible to serve on the PORC.
5.
90% of all PORC meetings are chaired by the Chairman.
4 i
4 i
Specification AC 7.1.2.1 (PORC Membership).               The title of                 l
Specification AC 7.1.2.1 (PORC Membership).
  ,                          Shift Supervisor Administration has been changed                     .to           )
The title of Shift Supervisor Administration has been changed
Administrative Shift Superd or. There is no significant                               !
.to
;                            change to the responsibilitiesi' unctions associated with this position.                                                                       I I
)
Specification AC 7.1.2.2 (Alternates) has been revised to                             1 clarify that no more than two alternate members shall participate "as voting memoers" in PORC activities at any one time.       The proposed change is consistent with the'
Administrative Shift Superd or.
;                            guidance provided in the Standard Technical Specifications i                           (STS).
There is no significant change to the responsibilitiesi' unctions associated with this position.
I I
Specification AC 7.1.2.2 (Alternates) has been revised to 1
clarify that no more than two alternate members shall participate "as voting memoers" in PORC activities at any one time.
The proposed change is consistent with the' guidance provided in the Standard Technical Specifications i
(STS).
1 5
1 5


Specification -AC 7.1.2.3 (Meeting -Frequency) has been revised to allow the "designated alternate" PORC Chairman to   convene   PORC meetings.         The proposed change is consistent with the guidance provided in the STS.
Specification -AC 7.1.2.3 (Meeting -Frequency) has been revised to allow the "designated alternate" PORC Chairman to convene PORC meetings.
Specification AC     7.1.2.5.a _(Responsibilities) has been revised to     add     Specification       "7.4(d)" which was             ,
The proposed change is consistent with the guidance provided in the STS.
inadvertently     omitted       in     a   previous   Technical Specification submittal.           The   proposed   change   is consistent with procedure reviews presently performed by PORC.
Specification AC 7.1.2.5.a _(Responsibilities) has been revised to add Specification "7.4(d)"
4 Specification AC 7.1.3.2 (NFSC Membership) has been revised to indicate that consultants will be appointed "in writing by the Vice President, Nuclear Operations". This clarification is consistent with Specification AC 7.1.3.3 and   7.1.3.4   for     appointing Alternate Members and Chairman / Alternate Chairman, respectively.
which was inadvertently omitted in a
Figures 7.1-1     and 7.1-2 have been updated to reflect the above described organization and the words "Fort St.
previous Technical Specification submittal.
The proposed change is consistent with procedure reviews presently performed by PORC.
Specification AC 7.1.3.2 (NFSC Membership) has been 4
revised to indicate that consultants will be appointed "in writing by the Vice President, Nuclear Operations". This clarification is consistent with Specification AC 7.1.3.3 and 7.1.3.4 for appointing Alternate Members and Chairman / Alternate Chairman, respectively.
Figures 7.1-1 and 7.1-2 have been updated to reflect the above described organization and the words "Fort St.
Vrain" eliminated for consistency.
Vrain" eliminated for consistency.
Specification AC 7.4.a.1 is revised to delete an incorrect reference to Regulatory Guide 1.33 and add Safety Guide 33, November, 1972.       Regulatory Guide 1.33 did not exist in November, 1972.
Specification AC 7.4.a.1 is revised to delete an incorrect reference to Regulatory Guide 1.33 and add Safety Guide 33, November, 1972.
Specifications AC 7.4.b         and 7.4.c have been revised to allow for certain procedure reviews to be performed by the PORC, "or a subcommittee thereof", prior to the PORC review required in Specification AC 7.1.2.3.a.               .This       !
Regulatory Guide 1.33 did not exist in November, 1972.
);             proposed change will relieve the PORC of some of the l             in-depth procedure reviews and allow more time to be spent           _. .
Specifications AC 7.4.b and 7.4.c have been revised to allow for certain procedure reviews to be performed by the PORC, "or a subcommittee thereof",
{             on other issues, thereby enhancing overall PORC continuity
prior to the PORC review required in Specification AC 7.1.2.3.a.
;              while maintaining the quality of procedure reviews.           The procedure will     then be approved by the "appropriate management" personnel (previously, "appropriate Manager").
.This
The PSC management structure is such that the appropriate approver may     be   a     vice president,       manager,   or         j superintendent. This change is for clarification only and                 I will have no affect on the level of review the procedure receives.                                                                   l The proposed change to Specification AC 7.5.1.c (Monthly Operations Report) updates the address in accordarice with NUREG ONS, dated February 6, 1987. Reference to the Director, uffice of Inspection and Enforcement has been j             eliminated to .-aflect recent USNRC organizational changes.
);
1 l
proposed change will relieve the PORC of some of the l
1
in-depth procedure reviews and allow more time to be spent
{
on other issues, thereby enhancing overall PORC continuity while maintaining the quality of procedure reviews.
The procedure will then be approved by the "appropriate management" personnel (previously, "appropriate Manager").
The PSC management structure is such that the appropriate approver may be a
vice president,
: manager, or j
superintendent.
This change is for clarification only and I
will have no affect on the level of review the procedure receives.
The proposed change to Specification AC 7.5.1.c (Monthly Operations Report) updates the address in accordarice with NUREG ONS, dated February 6,
1987.
Reference to the Director, uffice of Inspection and Enforcement has been j
eliminated to.-aflect recent USNRC organizational changes.
1 1
.I
.I


II. Conclusion-Based on the above, operation of Fort St. Vrain in accordance with the proposed changes will not (1) involve a significant increase in the probability or consequences of an accident previously evaluated, (2) create the possibility of a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety. Therefore, this change will not create an undue. risk to o                      the health and safety of the public nor does it . involve any 4
II. Conclusion-Based on the above, operation of Fort St. Vrain in accordance with the proposed changes will not (1) involve a significant increase in the probability or consequences of an accident previously evaluated, (2) create the possibility of a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety.
significant hazards consideration.                                                                                             '
Therefore, this change will not create an undue. risk to the health and safety of the public nor does it. involve any o
4 significant hazards consideration.
l 6
l 6
i                                                                                                                                                      .
i i
i i
l l
i i
i 4
4 l
l 4
4 i
i
-}}
_ . _ , . . - - . . _ _ , .}}

Latest revision as of 08:22, 11 December 2024

Proposed Tech Specs Re Changes to Administrative Controls to Reflect Organizational Changes in Util & NRC
ML20149N039
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 02/05/1988
From:
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML20149N034 List:
References
NUDOCS 8803010022
Download: ML20149N039 (15)


Text

'

Fort St. Vrain 00.

Technical Spacifications.

Amendment No.

Page 7,1-7.

l Authorized deviations to the working hour guidelines shall be documented and available for Nuclear Regulatory Commission review.

l 3.

Training a.

A retraining ard replacement training program for the facility staff shall be maintained under the direction of the Nuclear Training Manager and shall meet or exceed the requirements and _ recommendations-of Section 5.5 of ANSI N18.1-1971 and Appendix "A" of 10CFR Part 55. Compliance with Section 5.5 of ANSI 18.1-1971 shall be achieved no later than six months following commencement of commercial operation.

r b.

A training program for the Fire Brigade shall be l

maintained under the direction of the Nuclear f

l Training Manager and shall meet - or exceed the requirements of Section 27 of the NFPA Code-1975, I

except for Fire Brigade training / drill sessions which shall be held at least once per calendar

quarter, c.

The Technical Advisors shall have a bachelor degree or equivalent in a scientific or engineering discipline with specific training in plant design i

'9003010022 800205 PDR ADOCK 05000267

.P DCD

Fort St. Vrain 01 Technical S;acifications Amendment No.

Page 7.1-8 and response and analysis of the plant for transients and accidents.

An initial training and retraining program for the Technical Advisors shall l

be maintained under the direction of the Nuclear

]

Training Manager.

The Technical Advisors shall also i

receive training in plant design and

layout, l

including the capabilities of instrumentation and controls in the Control Room.

Specification AC 7.1.2 - Plant Operations Review Committee 1

(PORC), Administrative Controls l

l The organization, responsibilities, and authority of the PORC shall be as follows:

1.

Membership l

The Plant Operation > Review Committee shall be composed of the following:

Chairman: Station Manager Technical / Administrative Services Manager Support Services Manager (Radiation Protection Manager)

Superintendent of Operations Superintendent of Maintenance l

Superintendent of Nuclear Betterment Engineering l

l

Fort St. Vrain #1 Technical Specifications Amendment No.

Page 7.1-9 Results Engineering Supervisor l

Administrative Shift Supervisor I

Superintendent of Technical Services Engineering l

Nuclear Training Manager 2.

Alternates An alternate chairman and alternate members, if required, shall be appointed in writing by the PORC Chairman to serve in the absence of a chairman or a member; however, no more than two alternate members

]

shall participate as voting members in PORC activities at any one time.

3.

Meeting Frequency The PORC shall meet at least once per calendar month and I

as convened by the Chairman or his designated alterr. ate.

4.

Quorum A quorum shall consist of the Chairman or alternate Chairman, and four members including alternates.

i i

5.

Responsibilities The PORC shall be responsible for:

I

Fort St. Vrain #1 Technical Specifications Amendment No.

Page 7.1-10 a.

Review of all procedures required by Technical l

Specification 7.4(a), (b), (c) and (d) and changes thereto, and any other proposed procedure or changes to approved procedures as determined by the Station Manager to affect nuclear safety.

b.

Review of all

  • cposed tests and experiments that affect nuclear.
uty, c.

Review of all proposed changes to the Technical Specification.e.

d.

Review of all proposed changes or modifications to plar,t systems or equipment that affect nuclear safety.

e.

Investigation of all violations of the Technical Specifications including the preparation and forwarding of rsports covering the evaluatio7 and re:ammendations to prevent recurrence to the Manager, Nuclear Production and to the Chairman of the Nuclear Facility Safety Committee.

f.

Review of all Reportable Event 5.

g.

Review of facility operations to detect potential nuclear safety hazards.

Fort St. Vrain 01 Technical Specifications Amendment No.

Page 7.1-13 e)

Instrumentation and Control f)

Radiological Safety g)

Mechanical and Electrical Engineering h)

Quality Assurance Practices 1)

Other appropriate fields associated with the unique characteristics of the nuclear power plant.

2. Membership The NFSC shall be composed of the following:

Chairman (As appointed - See Step 4)

Manager, Nuclear Licensing and Fuels Divi ion Manager, ?.uclear Production Division Manager, Nuclear Engineering Division Manager, Quality Assurance Division i

hfety and Security Director j

l Consultants, as required, shall be appointed in writing by l

the Vice President, Nucle r Operations.

3. Alternates Alternate members, if required, shill be appointed in writing by the Vice President, Nuclear Ortri---

however, no more tha" two alternate members sha'l participate as voting members in NFSC activitics at any one time.

FORT ST. VRAIN NUCLEAR GENERATINS STATION ADMINISTRATIVE AND DEPARTMENTAL MANAGEMENT ORGANIZATION CHART Chairman and Chief Executive Officer Vice President Nucicar NFSC Operations NFSC - Nuclear Facility Safety Committee PORC - Plant Operations Review Committee

" Serves as the Radiation Protection Manager Manager Manager Manager Manager Oo..ity Nuclear Licensing Nuclear Nuclear Ass irance and Engineering Production Division Fuels Division Division Division Nuclear Technical /

2 $" # d' Supp rt Station Training Services Manager egg-a.n, Ad*..'"'strative Manager Manager..

Services Manager yg l

732-FNk

2. "

B PORC 0

t FIGURE 7.1 - 1

FORT ST. VRAIN NUCLEAR GENERATING STATION CONDUCT OF OPERATIONS CHART Manager Nuclear Productu>n Division Support Station Technical /

Services Manager Administrative Manages" Services l SLO.

Manager PORC Superintendent Superintendent Superintendent Superintendent Nuclear Maintenance Operations Technical Betterrnent Services l Engineenng lsto.

Engineering i

m > -a vi B

Adnunistratrve om Health Results Shift Physics Engineering Shdt Supervisors

  • R?"

Supervisor Supervisor Supervisor ya_m lSto agr e

e*

U -m Y fiths the Station Manages or the Supennierwient of Operations O]*

shall possessa Senior Lxense na

" Serves as the Radution Protection Marajer Equipment Reactor Auxiliary Technical 23 PORC Plant Operations Review Conettee Operators Operators Tenders Advisors Qo SLO Senior Literned Operatm h

g LO

- Licensed Operats 5

Figure 7.12

Fort St. Vrain 01 Techn' cal Specifications Amendment No.

Page 7.4-1 7.4 PROCEDURES - ADMINISTRATIVE CONTROLS Applicability Applies to admin'strttive procedures which will govern plant operations.

Objective To ensure that written procedures will be maintained to define requirements for plant operation.

Specification AC 7.4 - Procedures, Administrative Controls a.

Written procedures shall be established, implemented and maintained covering the activities referenced below:

1.

The applicable procedures recommended in l

Appendix A of Safety Guide 33, November, 1972.

2.

Refueling operations.

3.

Surveillance and test activities of safety-related equipment.

4.

Security Plan implementation.

5.

Emergency Plan implementation.

6.

Frocess Control Program (PCP) implementation.

Fort St. Vrain #1

^

Technical Specifica2ic.is Amendment No.

Page 7.4-2 7.

Offsite Dose Calculation Manual (00CM) implementation.

8.

Quality Assurance Program for effluent and environmental monitoring using the guidance in Regulatory Guide 1.21, Revision 1, June, 1974 and Regulatory Guide 4.1, Revision 1,

April, 1975.

b.

Procedures and administrative policies of a) above, and changes thereto, shall be reviewed by the PORC, I

or a subcommittee thereof, and approved by the l

appropriate management prior to implementation.

l Procedures shall be reviewed periodically as set forth in Administrative Procedures.

Security Plan procedures, and changes thereto, shall be reviewed by the Plant Operations Review l

Committee, or a subcommittee thereof, and approved b/ the designated Plant Security Officer prior to implementation.

c.

Temporary changes to procedures of a) above may be made prc'ided:

i i

1.

The intent of the original procedure is not altered.

1 Fort St. Vrain #1 Technical Specifications Amendment No.

[

i Page 7.4-3 l

I 2.

The change is approved by two members of the j

plant management staff, at least one of whom holds a Senior Reactor Operators License,

.)

3.

The-change.i s documented, reviewed by the l

PORC, or a subcommittee thereof, and approved 4

1 by the appropriate management within 14 days j

of implementation.

d.

Procedures for personnel radiation protection shall be prepared consiste.it with the requirements of f

10 CFR Part 20, and shall be' approved, maintained, i

i and adhered to for all operations involving i

j personnel radiation exposure.

Respiratory protective equipment shall be provided in accordance with 10 CFR 20.103.

I e

t r'

j l

l j

i i

I 5

r I

I a

i t

4

.. ~.,..

Fort St. Vrain #1 Technical Specifications Amendment No.

Page 7.5-3 and survei tior :e, in-service inspectics.,

routine maintenance, special maintenance (describe maintenance), waste processing, and refueling. The dose assignment to various duty functions may be estimates based on pocket dosimeter,

TLD, or film badge measurements.

Small exposures totaling 'ess than 20% of the individual total dose need not be accounted for.

In the aggregate, at least 80% of the whole body dose received from external sources shall be assigned to specific major work functions, c.

Monthly Operating Report A

routine operating report covering the operation of the unit during the previous month shall be submitted prior to the fif teenth calendar day of the following month.

Submittal shall be to the U.

S.

Nuclear l

Regulatory Commission, ATTN: Document Control i

Desk, Washington, D. C. 20555, with a copy to the appropriate NRC Regional Administrator.

e S

e ATTACHMENT 3 SIGNIFICANT HAZARDS CONSIDERATION

SIGNIFICANT HAZARDS CONSIDERATION i

f.

Evaluation c

The proposed chi les to Section 7 and Figures 7.1-1 and 7.1-2 are evaluated in ti.) following paragraphs.

The pos'; tion of Suparintendent of ' Training has been l

eliminated. The Nuclear Training Organization will now eport to the new position of Nuclear Training Manager who will report directly.to the Vice President of. Nuclear Operations.

This change is administrative only and the Training Program will continue to meet or exceed the l

requirements of Section 5.5 of ANSI '18.1 - 1971 and i

Appendix "A" of 10CFR55.

Specification AC 7.1.2.1 (PORC Membership).

The prnposed changes to this section will eliminate four persons from membership of the PORC.

This action is in response to the NRC's request for *dditional information, NRC letter Heitner to Williams, ac*ed Decembe-5, 1986 (G-86636).

In addition to lowering cnmmittee membership from the existing 14 members to the proposed 10 members, the following steps have been tak:n to ensure that continuity.

of members is retained from one meeting to the next meeting:

i 1.

Fewer PORC meetings - one per week versus one per 3

day or three per week-P 2.

A training program for all PORC members (incloding alter.iates) has been instituted.

3.

All PORC members (including alternates) h0ve successfully completed the training program.

4.

Only those personnel designated by name (PSC Interofft.4 Memo) are eligible to serve on the PORC.

5.

90% of all PORC meetings are chaired by the Chairman.

4 i

Specification AC 7.1.2.1 (PORC Membership).

The title of Shift Supervisor Administration has been changed

.to

)

Administrative Shift Superd or.

There is no significant change to the responsibilitiesi' unctions associated with this position.

I I

Specification AC 7.1.2.2 (Alternates) has been revised to 1

clarify that no more than two alternate members shall participate "as voting memoers" in PORC activities at any one time.

The proposed change is consistent with the' guidance provided in the Standard Technical Specifications i

(STS).

1 5

Specification -AC 7.1.2.3 (Meeting -Frequency) has been revised to allow the "designated alternate" PORC Chairman to convene PORC meetings.

The proposed change is consistent with the guidance provided in the STS.

Specification AC 7.1.2.5.a _(Responsibilities) has been revised to add Specification "7.4(d)"

which was inadvertently omitted in a

previous Technical Specification submittal.

The proposed change is consistent with procedure reviews presently performed by PORC.

Specification AC 7.1.3.2 (NFSC Membership) has been 4

revised to indicate that consultants will be appointed "in writing by the Vice President, Nuclear Operations". This clarification is consistent with Specification AC 7.1.3.3 and 7.1.3.4 for appointing Alternate Members and Chairman / Alternate Chairman, respectively.

Figures 7.1-1 and 7.1-2 have been updated to reflect the above described organization and the words "Fort St.

Vrain" eliminated for consistency.

Specification AC 7.4.a.1 is revised to delete an incorrect reference to Regulatory Guide 1.33 and add Safety Guide 33, November, 1972.

Regulatory Guide 1.33 did not exist in November, 1972.

Specifications AC 7.4.b and 7.4.c have been revised to allow for certain procedure reviews to be performed by the PORC, "or a subcommittee thereof",

prior to the PORC review required in Specification AC 7.1.2.3.a.

.This

);

proposed change will relieve the PORC of some of the l

in-depth procedure reviews and allow more time to be spent

{

on other issues, thereby enhancing overall PORC continuity while maintaining the quality of procedure reviews.

The procedure will then be approved by the "appropriate management" personnel (previously, "appropriate Manager").

The PSC management structure is such that the appropriate approver may be a

vice president,

manager, or j

superintendent.

This change is for clarification only and I

will have no affect on the level of review the procedure receives.

The proposed change to Specification AC 7.5.1.c (Monthly Operations Report) updates the address in accordarice with NUREG ONS, dated February 6,

1987.

Reference to the Director, uffice of Inspection and Enforcement has been j

eliminated to.-aflect recent USNRC organizational changes.

1 1

.I

II. Conclusion-Based on the above, operation of Fort St. Vrain in accordance with the proposed changes will not (1) involve a significant increase in the probability or consequences of an accident previously evaluated, (2) create the possibility of a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety.

Therefore, this change will not create an undue. risk to the health and safety of the public nor does it. involve any o

4 significant hazards consideration.