ML20125E122: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:OPERATING DATA REPORT DOCKET NO. | ||
OPERATING DATA REPORT DOCKET NO. | 050-0298 UNIT CNS DATE March 10. 1992 | ||
_ 402) 825-5766 | |||
( | |||
OPERATING STATUS TELEPHONE 1. | |||
Unit Name: | |||
COooet Nuclear Station Notes 2. | |||
Reporting Period; February 1992 3 | |||
Ucensed Thermal Power (MWt): | |||
This Month | 2381 4. | ||
Nameplate Rating (Gross MWe): | |||
836 5. | |||
Design Electrical Rating (Net MWe): 778 6 | |||
Maximum Dependable Capacity (Gross MWe): 787 7. | |||
Maximum Dependable Capacity (Net MWe): | |||
764 8 | |||
If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons: | |||
9. | |||
Power Level To Which Restricted, if Any (Net MWe): | |||
10. | |||
Reasons For Restrict:on,if Any: | |||
BaMery replacement shutdown - April 17. Duration 7 days 25 | This Month Yr.-to-Date Cumulative 11. | ||
26 | Hours in Reporting Period 696 0 1.440.0 154.873 0 12. | ||
Number of Hours Reactor Was Critical 576 7 1,320.7 117.821.0 13. | |||
Reactor Reserve Shutdown Hours 0.0 0.0 0.0 14. | |||
Hours Generator On-Une 565_0_ | |||
1.309 0 116.081.5 0 | |||
15. | |||
Unit Reserve Shutdown Hours 00 00 0.0 16. | |||
Gross Thermal Energy Generated (MWH) | |||
_1.280.256 0 3.041.544.0 236.597.596 0 17. | |||
Gross Electric Energy Generated (MWH) 426.823 0 1.018.966.0 76.589.118.0 18 Not Electric Energy Generated (MWH) 414.200.0 987.589 0 73.917.976 0 19. | |||
Unit Service Factor 81.2 90.9 75 0 20 Unit Availability Factor 81.2 90.9 75.0 21. | |||
Unit Capacity Factor (Using MDC Net) 77.9 89 8 62_5._ | |||
22. | |||
Unit Capacity Factor (U9q DER Net) 76 5 88.2 61.3 23. | |||
Unit Forced Outage Rate 18 8 9.1 4.6 24 Shutdown Scheduled Over Next 6 Months (Type. Date, and Duration of Each): | |||
BaMery replacement shutdown - April 17. Duration 7 days 25 If Shut Down At End of Report Period, Estimated Date of Startup: | |||
26 Units in Test Status (Prior to Commercial Operation): | |||
Forecast Achieved INITlAL CRITICAUTY INITIAL ELECTRICITY COMMERCLAL OPERATION 9212160196 921204 PDR ADOCK 05000298 R | |||
PDR | |||
-___}} | |||
Latest revision as of 20:32, 12 December 2024
| ML20125E122 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 02/29/1992 |
| From: | NEBRASKA PUBLIC POWER DISTRICT |
| To: | |
| Shared Package | |
| ML20125E109 | List: |
| References | |
| NUDOCS 9212160196 | |
| Download: ML20125E122 (1) | |
Text
OPERATING DATA REPORT DOCKET NO.
050-0298 UNIT CNS DATE March 10. 1992
_ 402) 825-5766
(
OPERATING STATUS TELEPHONE 1.
Unit Name:
COooet Nuclear Station Notes 2.
Reporting Period; February 1992 3
Ucensed Thermal Power (MWt):
2381 4.
Nameplate Rating (Gross MWe):
836 5.
Design Electrical Rating (Net MWe): 778 6
Maximum Dependable Capacity (Gross MWe): 787 7.
Maximum Dependable Capacity (Net MWe):
764 8
If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level To Which Restricted, if Any (Net MWe):
10.
Reasons For Restrict:on,if Any:
This Month Yr.-to-Date Cumulative 11.
Hours in Reporting Period 696 0 1.440.0 154.873 0 12.
Number of Hours Reactor Was Critical 576 7 1,320.7 117.821.0 13.
Reactor Reserve Shutdown Hours 0.0 0.0 0.0 14.
Hours Generator On-Une 565_0_
1.309 0 116.081.5 0
15.
Unit Reserve Shutdown Hours 00 00 0.0 16.
Gross Thermal Energy Generated (MWH)
_1.280.256 0 3.041.544.0 236.597.596 0 17.
Gross Electric Energy Generated (MWH) 426.823 0 1.018.966.0 76.589.118.0 18 Not Electric Energy Generated (MWH) 414.200.0 987.589 0 73.917.976 0 19.
Unit Service Factor 81.2 90.9 75 0 20 Unit Availability Factor 81.2 90.9 75.0 21.
Unit Capacity Factor (Using MDC Net) 77.9 89 8 62_5._
22.
Unit Capacity Factor (U9q DER Net) 76 5 88.2 61.3 23.
Unit Forced Outage Rate 18 8 9.1 4.6 24 Shutdown Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
BaMery replacement shutdown - April 17. Duration 7 days 25 If Shut Down At End of Report Period, Estimated Date of Startup:
26 Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITlAL CRITICAUTY INITIAL ELECTRICITY COMMERCLAL OPERATION 9212160196 921204 PDR ADOCK 05000298 R
-___