ML19209A796: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 2: | Line 2: | ||
| number = ML19209A796 | | number = ML19209A796 | ||
| issue date = 09/25/1979 | | issue date = 09/25/1979 | ||
| title = Startup Test 2:Control Rod Operability & Subcritical Check | | title = Startup Test 2:Control Rod Operability & Subcritical Check | ||
| author name = | | author name = | ||
| author affiliation = COMMONWEALTH EDISON CO. | | author affiliation = COMMONWEALTH EDISON CO. | ||
| Line 22: | Line 22: | ||
: 1) Each control rod will be withdrawn after the fcur fuel bundles surrounding the given control rod are loaded. This will in-sure that the mobility of the control rod is not impaired. | : 1) Each control rod will be withdrawn after the fcur fuel bundles surrounding the given control rod are loaded. This will in-sure that the mobility of the control rod is not impaired. | ||
: 2) After the core is fully loaded, each control will be withdrawn and inserted one at a time to assure that criticality will not occur due to the withdrawal of a single rod. Nuclear instru-mentation will be monitored during the movement of each control rod to verify subcriticality. | : 2) After the core is fully loaded, each control will be withdrawn and inserted one at a time to assure that criticality will not occur due to the withdrawal of a single rod. Nuclear instru-mentation will be monitored during the movement of each control rod to verify subcriticality. | ||
RESULTS AND DISCUSSION Each control rod was withdrawn after the four fuel bundles surround-ing the given control rod were loadad. Control rod mobility was assured. | RESULTS AND DISCUSSION Each control rod was withdrawn after the four fuel bundles surround-ing the given control rod were loadad. | ||
After the core was loaded, each control rod was withdrawn and in-serted one at a time. The Source Range Monitors were monitored during the movement of each rod and subcriticality was verified. | Control rod mobility was assured. | ||
After the core was loaded, each control rod was withdrawn and in-serted one at a time. | |||
The Source Range Monitors were monitored during the movement of each rod and subcriticality was verified. | |||
1126 314 otoo3o M}} | 1126 314 otoo3o M}} | ||
Latest revision as of 23:01, 4 January 2025
| ML19209A796 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 09/25/1979 |
| From: | COMMONWEALTH EDISON CO. |
| To: | |
| Shared Package | |
| ML17174A048 | List: |
| References | |
| NUDOCS 7910050405 | |
| Download: ML19209A796 (1) | |
Text
.
DRESDEN UNIT 2 STARTUP TEST No. 2 CONTROL ROD OPERABILITY AND SUBCRITICAL CHECK PURPOSE The purpose of this test is to assure that no gross large local reacti-vity irregularities exist and that all control rods are functioning properly.
CFITinfA
- 1) Each control rod will be withdrawn after the fcur fuel bundles surrounding the given control rod are loaded. This will in-sure that the mobility of the control rod is not impaired.
- 2) After the core is fully loaded, each control will be withdrawn and inserted one at a time to assure that criticality will not occur due to the withdrawal of a single rod. Nuclear instru-mentation will be monitored during the movement of each control rod to verify subcriticality.
RESULTS AND DISCUSSION Each control rod was withdrawn after the four fuel bundles surround-ing the given control rod were loadad.
Control rod mobility was assured.
After the core was loaded, each control rod was withdrawn and in-serted one at a time.
The Source Range Monitors were monitored during the movement of each rod and subcriticality was verified.