{{#Wiki_filter:-          -
{{#Wiki_filter:UNIT,Octn;o Unit 2 1/9/76
                                        -                                        UNIT ,Octn;o Unit 2
'N DATE ~ 50-270 DOCKET NO.
      - 'N                                                                                1/9/76 DOCKETDATE  NO.  ~ 50-270
PREPARED BY L. J. Bare OPERATING STATUS 1.
* PREPARED BY         L. J. Bare OPERATING STATUS
REPORTING PERIOD: September 1 THROUGH September' 30. 1976 GROSS HOURS IN REPORTING PERIOD:
: 1. REPORTING PERIOD: September 1             THROUGH           September' 30. 1976 GROSS HOURS IN REPORTING PERIOD:           720.00
720.00 2.
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):       871                                       _
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):
: 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)
871 3.
: 4. REASONS FOR RESTRICTION (IF ANY)
POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) 4.
This Month           Year to Date         Cumulative
REASONS FOR RESTRICTION (IF ANY)
: 5. NUMBER OF HOURS THE REACTOR WAS CRITICAL                                     714.1                 3952.4               12511.5
This Month Year to Date Cumulative 5.
: 6. REACTOR RESERVE SHUTDOWN HOURS
NUMBER OF HOURS THE REACTOR WAS CRITICAL 714.1 3952.4 12511.5 6.
: 7. HOURS GENERATOR ON-LINE                     704.9                 3793.0               12072.5
REACTOR RESERVE SHUTDOWN HOURS 7.
: 8. UNIT RESERVE SHUTDOWN HOURS                           -
HOURS GENERATOR ON-LINE 704.9 3793.0 12072.5 8.
: 9. GROSS THERMAL ENERGY GENERATED (MWH) 1728522                       8985952     ,
UNIT RESERVE SHUTDOWN HOURS 9.
28658380
GROSS THERMAL ENERGY GENERATED (MWH) 1728522 8985952 28658380 10.
: 10. GROSS ELECTRICAL ENERGY GENERATED 3038540             9759096 (ygg)                                       594910
GROSS ELECTRICAL ENERGY GENERATED 594910 3038540 9759096 (ygg) 11.
: 11. NET ELECTRICAL ENERGY GENERATED                     -
NET ELECTRICAL ENERGY GENERATED 2900005 9255156 567209 (3gg) 12.
2900005             9255156 567209 (3gg)
REACTOR SERVICE FACIOR 99.2 60.1 69.2 13.
: 12. REACTOR SERVICE FACIOR                       99.2                 60.1                 69.2 58.2                67.4
REACTOR AVAIIABILITY FACTOR
: 13. REACTOR AVAIIABILITY FACTOR               _100.0
_100.0 58.2 67.4 14.
: 14. UNIT SERVICE FACTOR                         97.9                 57.7                 66.8
UNIT SERVICE FACTOR 97.9 57.7 66.8 66.8 15.
: 15. UNIT AVAILABILITY FACTOR                   97.9                 _57.7               ,
UNIT AVAILABILITY FACTOR 97.9
66.8
_57.7 16.
: 16. UNIT CAPACITY FACTOR (Using Net             90.5                 50.6                 58.8 Capability)
UNIT CAPACITY FACTOR (Using Net 90.5 50.6 58.8 Capability) 17.
: 17. UNIT CAPACITY FACTOR (Using Design Mwe)                          88.8       ,        49.7                 58.8*
UNIT CAPACITY FACTOR 88.8 49.7 58.8*
i
i (Using Design Mwe) 18.
                                                                                                                          -l
UNIT FORCED OUTAGE RATE 2.1 27.0 25.7
: 18. UNIT FORCED OUTAGE RATE                     2.1                   27.0                 25.7
- l 19.
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
: 20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:                                             h
h 20.
IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
[
[
REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAT. X 100
REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAT. X 100
                                                    !!OURS IN REPORTING PERIOD REACTOR AVAILtSILI1Y FACTOR = IIOWdS REACTOR L'AS* AVAIL \RLE TO OPERATE X 100 110URS IN REPORTING PERIOD UNIT SERVICE PACTC;;   = Il0PPS CENERATOR ON LTNE
!!OURS IN REPORTING PERIOD REACTOR AVAILtSILI1Y FACTOR = IIOWdS REACTOR L'AS* AVAIL \\RLE TO OPERATE X 100 110URS IN REPORTING PERIOD UNIT SERVICE PACTC;;
                                                    !!OURS IN REPORTING PERIOD '
= Il0PPS CENERATOR ON LTNE
UNIT AVAILABILITY FACTOR = !! CURS UNIT WAS A'/\11 AOLE TO GE!!ERATE X 100                         '
!!OURS IN REPORTING PERIOD '
HOURS IN REPoliriNG PERIOD UNIT CAPACITY FACTcR   = NET ELECTRICAL P0hER Gr.NTRATF1)                             -- Y 100 (N L C.spatillity or Design (P.we-Net.).1 X ll0URS LN Rt:Poh rM;C PERTOD UNIT FORCED OUTACE RATE = FonCrn OtiTAGE IIOURS                                     X 100 HOURS GENERATOR ON 1.13E + FORCED CUfM;           IOURS 7912180 w
UNIT AVAILABILITY FACTOR = !! CURS UNIT WAS A'/\\11 AOLE TO GE!!ERATE X 100 HOURS IN REPoliriNG PERIOD UNIT CAPACITY FACTcR
= NET ELECTRICAL P0hER Gr.NTRATF1)
-- Y 100 (N L C.spatillity or Design (P.we-Net.).1 X ll0URS LN Rt:Poh rM;C PERTOD UNIT FORCED OUTACE RATE = FonCrn OtiTAGE IIOURS X 100 HOURS GENERATOR ON 1.13E + FORCED CUfM; IOURS 7912180 w


  .                .                                                                                              I 50-270             j DOCKET NO.                       ~
I 50-270 j
UNIT      Oconee Unit 2     -
DOCKET NO.
DATE      10/9/76             i AVERAGE DAILY UNIT POWER LEVEL MONTil       september, 1916 AVERAGE DAILY POWER LEVEL                           AVERAGE DAILY POWER LEVEL DAY               (MWe-net)           .
~
DAY                     (MWe-net) f:
Oconee Unit 2 UNIT 10/9/76 i
gi7 1
DATE AVERAGE DAILY UNIT POWER LEVEL MONTil september, 1916 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
814                           17                                                     I 809                           18                 679 2
DAY (MWe-net) f 814 17 gi7 I
816                                               776                                  h gg 3                                                                                                             l I
1 679 809 18 2
815                           20                817                                     1 4
h 776 816 gg 3
827                                    l 811                           21-5 806                           22                 826 6
I 815 817 4
758                           23                 832 7
20 811 21-827 5
830 8                                                 24 g
806 22 826 6
738                               -
758 23 832 7
831                                f 10
830 24 8
                          - 807                           26                 824                                  f 11 812                           27               827                                  f k
f 831 738 f
816                           28                 826 12                                                                                                           Y 818                           29                 825                                  l 13 819                           30                 825                                 l 14 15 819                          31                                                     f 819                                                                                 ]
g 824
- 807 26 10 f
827 812 27 11 k
816 28 826 Y
12 825 818 29 13 l
819 30 825 14 f
819 15 31 819
]
16 i
16 i
l i
l i
DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.       l l
DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.
l l
Compute to the nearest whole megawatt.
Compute to the nearest whole megawatt.
                                                                                                                  .i These figures will be used to plot a graph for each reporting month. Note that by using maximum i
These figures will be used to plot a graph for each reporting month. Note that by using maximum
dependable capacity for the net electrical ratmg of the unit there may be occasions when the daily           !
.i dependable capacity for the net electrical ratmg of the unit there may be occasions when the daily i
average power level exceeds the 100'~o line (or the restricted power level linet In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
average power level exceeds the 100'~o line (or the restricted power level linet In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
l u
l u
                                                                                                            *m
*m


DdCKET NO. 50-270               .    .
DdCKET NO.
* UNIT SHUTDOWNS       ,
50-270 UNIT SHUTDOWNS UNIT NAM 1i Oconce Unit 2 10/9/76 DATli REPORT MONTil September, 1976 TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO.
UNIT NAM 1i Oconce Unit 2                 '
DATE S SCHEDULED (HOURS)
DATli 10/9/76 REPORT MONTil September,     1976 TYPE                                 METHOD OF F FORCED   DURATION                 SHUTTING DOWN NO. DATE   S SCHEDULED   (HOURS) REASON (1)       THE REACTOR (2)           CORRECTIVE ACTIONS / COMMENTS 12   76-09       F         15.14     B                 3           Speed amplifier circuit failure during                     '
REASON (1)
a scheduled turbine trip test.
THE REACTOR (2)
(1) REASON                         (2) MET 110D A EQUIPMENT FAILURE (EXPLAIN)       1-MANUAL B- M AINT. OR TEST.                 2-MANUAL C- REI'UELING                           SCRAM D-REGULATORY RESTRICTION             3- AUTP*1ATIC E-OPERATOR TRAINING AND               SCRAA LICENSE EX AMIN AT10N F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)
CORRECTIVE ACTIONS / COMMENTS 12 76-09 F 15.14 B
3 Speed amplifier circuit failure during a scheduled turbine trip test.
(1) REASON (2) MET 110D A EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL B-M AINT. OR TEST.
2-MANUAL C-REI'UELING SCRAM D-REGULATORY RESTRICTION 3-AUTP*1ATIC E-OPERATOR TRAINING AND SCRAA LICENSE EX AMIN AT10N F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)
I!-OTilLR (EXPLAIN)
I!-OTilLR (EXPLAIN)


==SUMMARY==
==SUMMARY==
No major outages this month.                                                                                         -
No major outages this month.
  '. ]                                                                       .      ..
'. ]
1       - - - - _                -.          -          .
1
                                                                                                                                            .      -}}
-}}

Latest revision as of 21:55, 1 January 2025

Monthly Operating Rept for Sept 1976
ML19317E608
Person / Time
Site: Oconee  
Issue date: 10/09/1976
From: Bare L
DUKE POWER CO.
To:
Shared Package
ML19317E604 List:
References
NUDOCS 7912180808
Download: ML19317E608 (3)


Text

UNIT,Octn;o Unit 2 1/9/76

'N DATE ~ 50-270 DOCKET NO.

PREPARED BY L. J. Bare OPERATING STATUS 1.

REPORTING PERIOD: September 1 THROUGH September' 30. 1976 GROSS HOURS IN REPORTING PERIOD:

720.00 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):

871 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) 4.

REASONS FOR RESTRICTION (IF ANY)

This Month Year to Date Cumulative 5.

NUMBER OF HOURS THE REACTOR WAS CRITICAL 714.1 3952.4 12511.5 6.

REACTOR RESERVE SHUTDOWN HOURS 7.

HOURS GENERATOR ON-LINE 704.9 3793.0 12072.5 8.

UNIT RESERVE SHUTDOWN HOURS 9.

GROSS THERMAL ENERGY GENERATED (MWH) 1728522 8985952 28658380 10.

GROSS ELECTRICAL ENERGY GENERATED 594910 3038540 9759096 (ygg) 11.

NET ELECTRICAL ENERGY GENERATED 2900005 9255156 567209 (3gg) 12.

REACTOR SERVICE FACIOR 99.2 60.1 69.2 13.

REACTOR AVAIIABILITY FACTOR

_100.0 58.2 67.4 14.

UNIT SERVICE FACTOR 97.9 57.7 66.8 66.8 15.

UNIT AVAILABILITY FACTOR 97.9

_57.7 16.

UNIT CAPACITY FACTOR (Using Net 90.5 50.6 58.8 Capability) 17.

UNIT CAPACITY FACTOR 88.8 49.7 58.8*

i (Using Design Mwe) 18.

UNIT FORCED OUTAGE RATE 2.1 27.0 25.7

- l 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

h 20.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

[

REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAT. X 100

!!OURS IN REPORTING PERIOD REACTOR AVAILtSILI1Y FACTOR = IIOWdS REACTOR L'AS* AVAIL \\RLE TO OPERATE X 100 110URS IN REPORTING PERIOD UNIT SERVICE PACTC;;

= Il0PPS CENERATOR ON LTNE

!!OURS IN REPORTING PERIOD '

UNIT AVAILABILITY FACTOR = !! CURS UNIT WAS A'/\\11 AOLE TO GE!!ERATE X 100 HOURS IN REPoliriNG PERIOD UNIT CAPACITY FACTcR

= NET ELECTRICAL P0hER Gr.NTRATF1)

-- Y 100 (N L C.spatillity or Design (P.we-Net.).1 X ll0URS LN Rt:Poh rM;C PERTOD UNIT FORCED OUTACE RATE = FonCrn OtiTAGE IIOURS X 100 HOURS GENERATOR ON 1.13E + FORCED CUfM; IOURS 7912180 w

I 50-270 j

DOCKET NO.

~

Oconee Unit 2 UNIT 10/9/76 i

DATE AVERAGE DAILY UNIT POWER LEVEL MONTil september, 1916 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe-net) f 814 17 gi7 I

1 679 809 18 2

h 776 816 gg 3

I 815 817 4

20 811 21-827 5

806 22 826 6

758 23 832 7

830 24 8

f 831 738 f

g 824

- 807 26 10 f

827 812 27 11 k

816 28 826 Y

12 825 818 29 13 l

819 30 825 14 f

819 15 31 819

]

16 i

l i

DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

l l

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum

.i dependable capacity for the net electrical ratmg of the unit there may be occasions when the daily i

average power level exceeds the 100'~o line (or the restricted power level linet In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

l u

  • m

DdCKET NO.

50-270 UNIT SHUTDOWNS UNIT NAM 1i Oconce Unit 2 10/9/76 DATli REPORT MONTil September, 1976 TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO.

DATE S SCHEDULED (HOURS)

REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS / COMMENTS 12 76-09 F 15.14 B

3 Speed amplifier circuit failure during a scheduled turbine trip test.

(1) REASON (2) MET 110D A EQUIPMENT FAILURE (EXPLAIN) 1-MANUAL B-M AINT. OR TEST.

2-MANUAL C-REI'UELING SCRAM D-REGULATORY RESTRICTION 3-AUTP*1ATIC E-OPERATOR TRAINING AND SCRAA LICENSE EX AMIN AT10N F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)

I!-OTilLR (EXPLAIN)

SUMMARY

No major outages this month.

'. ]