ML19332A634: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML19332A634 | | number = ML19332A634 | ||
| issue date = 08/06/1980 | | issue date = 08/06/1980 | ||
| title = Responds to NRC | | title = Responds to NRC Requesting Supplemental Response to IE Insp Rept 50-270/80-10.Corrective Actions:Block 40303 Will Be Modified to Meet ASME Requirements | ||
| author name = Parker W | | author name = Parker W | ||
| author affiliation = DUKE POWER CO. | | author affiliation = DUKE POWER CO. | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 8009160540 | | document report number = NUDOCS 8009160540 | ||
| title reference date = 07-10-1980 | |||
| package number = ML19332A630 | | package number = ML19332A630 | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| Line 17: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:' | ||
_a;__w._2. | |||
y | |||
-m | |||
.i | |||
\\ > | |||
s, DUKE POWER COMP 4NY Powan Buxtazwo '; | .; v s, | ||
422 Scurn Gnuncu Srazer, CHAR 14TTz, N. . hadda' | DUKE POWER COMP 4NY Powan Buxtazwo '; | ||
w a u m w o. Pa n nc a,s a. | bQ ~ y, | ||
WCr Pt..UDENT | 422 Scurn Gnuncu Srazer, CHAR 14TTz, N. | ||
Region II 101 Marietta Street, Suite 3100 Atlanta,' Georgia 30303 Re: RII:NE | . hadda' August 6,1980 ; > / "f' lg,q[g. | ||
3 w a u m w o. Pa n nc a,s a. | |||
WCr Pt..UDENT ICL(PMONE ARCA 704 Secaos PnoDuCT*0m 373.4083 Mr. James P.-O'Reilly,. Director U.'S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta,' Georgia 30303 Re: RII:NE 50-270/80-10 i | |||
==Dear Sir:== | ==Dear Sir:== | ||
With regard to Mr. C. E. Murphy's letter of July 10, 1980 which requested a supplemental response to the subject inspection report, please find-attached the requested response. | With regard to Mr. C. E. Murphy's letter of July 10, 1980 which requested a supplemental response to the subject inspection report, please find-attached the requested response. | ||
~V ry truly yours b. | |||
i | Y-wa William O. Parker, Jr N I | ||
FTF:ses | i FTF:ses Attachment 1 | ||
Attachment 1 | .) | ||
.s l | |||
80'0.91-606.h.. | |||
..ow1CIAL COPY: | |||
/ | |||
m | m | ||
a n _...:. - - | |||
2: | |||
OCONEE NUCLEAR STATION Supplemental Response to . | ?3 o ;- y A | ||
OCONEE NUCLEAR STATION Supplemental Response to. | |||
i IE Inspection Report 50-270/80-10 The two calibration blocks, 40303 and 40304, identified by item 50-270/80-10-01, were being used to monitor the size of certain identifications in the pressurizer head to shell' weld. | |||
The indications were originally discovered during baseline inspection and have been monitored since dis-covery using these blocks. Duke Power Company intends to continue to use blocks 40303 and 40304'for the purpose of monitoring the size of the indications in the pressurizer shell to head weld. | |||
Block 40303 will be modified to meet the requirements of Figure 1-3131 of ASME Section XI (74S75). A new block, meeting all requirements of ASME Section XI will be fabricated to replace 40304 for all-future inspections. | |||
This work will be completed by December 1, 1980. | |||
4 4 | 4 4 | ||
1 1 | 1 1 | ||
I | I a | ||
b 4 | |||
4 | -}} | ||
Latest revision as of 03:18, 31 December 2024
| ML19332A634 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 08/06/1980 |
| From: | Parker W DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19332A630 | List: |
| References | |
| NUDOCS 8009160540 | |
| Download: ML19332A634 (2) | |
Text
'
_a;__w._2.
y
-m
.i
\\ >
.; v s,
DUKE POWER COMP 4NY Powan Buxtazwo ';
bQ ~ y,
422 Scurn Gnuncu Srazer, CHAR 14TTz, N.
. hadda' August 6,1980 ; > / "f' lg,q[g.
3 w a u m w o. Pa n nc a,s a.
WCr Pt..UDENT ICL(PMONE ARCA 704 Secaos PnoDuCT*0m 373.4083 Mr. James P.-O'Reilly,. Director U.'S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta,' Georgia 30303 Re: RII:NE 50-270/80-10 i
Dear Sir:
With regard to Mr. C. E. Murphy's letter of July 10, 1980 which requested a supplemental response to the subject inspection report, please find-attached the requested response.
~V ry truly yours b.
Y-wa William O. Parker, Jr N I
i FTF:ses Attachment 1
.)
.s l
80'0.91-606.h..
..ow1CIAL COPY:
/
m
a n _...:. - -
2:
?3 o ;- y A
OCONEE NUCLEAR STATION Supplemental Response to.
i IE Inspection Report 50-270/80-10 The two calibration blocks, 40303 and 40304, identified by item 50-270/80-10-01, were being used to monitor the size of certain identifications in the pressurizer head to shell' weld.
The indications were originally discovered during baseline inspection and have been monitored since dis-covery using these blocks. Duke Power Company intends to continue to use blocks 40303 and 40304'for the purpose of monitoring the size of the indications in the pressurizer shell to head weld.
Block 40303 will be modified to meet the requirements of Figure 1-3131 of ASME Section XI (74S75). A new block, meeting all requirements of ASME Section XI will be fabricated to replace 40304 for all-future inspections.
This work will be completed by December 1, 1980.
4 4
1 1
I a
b 4
-