ML12018A403: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML12018A403
| number = ML12018A403
| issue date = 01/03/2012
| issue date = 01/03/2012
| title = 2012/01/03 Watts Bar 2 OL - NRC PM Open Items List 01-04-12.docx
| title = OL - NRC PM Open Items List 01-04-12.docx
| author name =  
| author name =  
| author affiliation = - No Known Affiliation
| author affiliation = - No Known Affiliation
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:WBN2Public Resource From:                 Boyd, Desiree L [dlboyd@tva.gov]
{{#Wiki_filter:1 WBN2Public Resource From:
Sent:                 Tuesday, January 03, 2012 9:56 AM To:                   Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc:                   Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Boyd, Desiree L; Crouch, William D
Boyd, Desiree L [dlboyd@tva.gov]
Sent:
Tuesday, January 03, 2012 9:56 AM To:
Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc:
Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Boyd, Desiree L; Crouch, William D


==Subject:==
==Subject:==
NRC PM Open Items List 01-04-12.docx Attachments:         NRC PM Open Items List 01-04-12.docx For next phone call.
NRC PM Open Items List 01-04-12.docx Attachments:
Thank You,
NRC PM Open Items List 01-04-12.docx For next phone call.
Thank You,  
~*~*~*~*~*~*~*~*~*~*~
~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN Unit 2 Licensing dlboyd@tva.gov 423-365-8764 1
Désireé L. Boyd WBN Unit 2 Licensing dlboyd@tva.gov 423-365-8764  


Hearing Identifier:     Watts_Bar_2_Operating_LA_Public Email Number:           618 Mail Envelope Properties       (7AB41F650F76BD44B5BCAB7C0CCABFAF26FACDB9)
Hearing Identifier:
Watts_Bar_2_Operating_LA_Public Email Number:
618 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF26FACDB9)  


==Subject:==
==Subject:==
NRC PM Open Items List 01-04-12.docx Sent Date:               1/3/2012 9:55:38 AM Received Date:           1/3/2012 9:55:49 AM From:                   Boyd, Desiree L Created By:             dlboyd@tva.gov Recipients:
NRC PM Open Items List 01-04-12.docx Sent Date:
1/3/2012 9:55:38 AM Received Date:
1/3/2012 9:55:49 AM From:
Boyd, Desiree L Created By:
dlboyd@tva.gov Recipients:  
"Arent, Gordon" <garent@tva.gov>
"Arent, Gordon" <garent@tva.gov>
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
Tracking Status: None "Smith, James D" <jdsmith@tva.gov>
Line 38: Line 49:
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>
Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>
Tracking Status: None Post Office:             TVANUCXVS2.main.tva.gov Files                           Size                   Date & Time MESSAGE                         227                   1/3/2012 9:55:49 AM NRC PM Open Items List 01-04-12.docx                         35566 Options Priority:                       Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Tracking Status: None Post Office:
Recipients Received:
TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 227 1/3/2012 9:55:49 AM NRC PM Open Items List 01-04-12.docx 35566 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:  


NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#
NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#
No.             Description                 Status                   Additional Comments                         Resp Org/Person
1 l P a g e No.
: 1. Cyber Security Plan/Controls and   NRC Table                                                           Heinrich/Snyder Implementation                      Top/Pilot                                                           (Bryan)
Description Status Additional Comments Resp Org/Person
Feb/Mar 2012 Inspection 4th Qtr 2012
: 1.
: 2. Instrumentation RAI List (Knuettel) 1. 1/19/12     1. Next I&C submittal update                          Eng/Hilmes
Cyber Security Plan/Controls and Implementation NRC Table Top/Pilot Feb/Mar 2012 Inspection 4th Qtr 2012 Heinrich/Snyder (Bryan)
: 1. Submit I&C update letter          a. 1/19/12       a. 04038903-1SP                                  (Bryan)
: 2.
: b. 1/19/12       b. 04038903-2SP
Instrumentation RAI List (Knuettel)
: c. 1/19/12       c. 04038903-4SP Requires Civil Calculation
: 1. Submit I&C update letter
: d. Cmplt          d. Responses to 11/18/11 RAI for OI 80, 81
: 1. 1/19/12
: e. TBD            e. Revise Common Q Compliance Matrix
: a. 1/19/12
: 2. 1/19/12      2) Jan. I&C submittal update
: b. 1/19/12
: a. 1/15/12        a. Revise IEEE-603 analysis
: c. 1/19/12
: b. 1/13/12        b. TR-1136 NP & withholding affidavit
: d. Cmplt
: c. 1/13/12        c. U2 BISI Calculation
: e. TBD
: d. 1/15/12        d. Responses to 11/18/11 RAI for OI 94, 105, 108
: 2. 1/19/12
: 3. TBD          3) WINCISE qualification testing write-up
: a. 1/15/12
: a. TBD            a. Composite summary
: b. 1/13/12
: b. TBD            b. Sketch of all cable segments
: c. 1/13/12
: 4. Cmplt        4) Revise TVA response to SSER OI 127 1lPage
: d. 1/15/12
: 3. TBD
: a. TBD
: b. TBD
: 4. Cmplt
: 1. Next I&C submittal update
: a. 04038903-1SP
: b. 04038903-2SP
: c. 04038903-4SP Requires Civil Calculation
: d. Responses to 11/18/11 RAI for OI 80, 81
: e. Revise Common Q Compliance Matrix
: 2) Jan. I&C submittal update
: a. Revise IEEE-603 analysis
: b. TR-1136 NP & withholding affidavit
: c. U2 BISI Calculation
: d. Responses to 11/18/11 RAI for OI 94, 105, 108
: 3) WINCISE qualification testing write-up
: a. Composite summary
: b. Sketch of all cable segments
: 4) Revise TVA response to SSER OI 127 Eng/Hilmes (Bryan)


NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#
NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#
No.               Description               Status                       Additional Comments                         Resp Org/Person
2 l P a g e No.
: 3. Complete Implementation (Hemmer)     Pump           Substantial building - preliminary planning in process, Hemmer Relocation      (Fukushima NTTF item 4.2) 5/30/12 Provide document of mitigating equipment and Bldg Plan Mar  location for unit 2.
Description Status Additional Comments Resp Org/Person
2012 Inspection -
: 3.
Oct 2012
Complete Implementation (Hemmer)
: 4. Fire Protection Report             1. mid-Feb     1. Submit Revised FPR per 12-21 Meeting, include       ENG/Hilmes
Pump Relocation 5/30/12 Bldg Plan Mar 2012 Inspection -
: 2. TBD            commitment update                                   (Arent)
Oct 2012 Substantial building - preliminary planning in process, (Fukushima NTTF item 4.2)
: 2. Meet with Staff following submittal
Provide document of mitigating equipment and location for unit 2.
: 5. Tech Spec Revisions from latest T/S 1. TBD          1. CSST A & B                                          Licensing/Elton markup and NRC Review comments     2. TBD         2. I-131 DEI                                            (Bryan)
Hemmer
: 3. 1/27/12     3. Diesel Generator Frequency
: 4.
: 4. TBD          4. AST FHA
Fire Protection Report
: 6. ACRS                               04/10/12
: 1. mid-Feb
* Cyber Security - Implementation                   Arent/Hilmes/
: 2. TBD
* Attachment HH items (#59 - Sump, #61 -PAD,       Koontz
: 1. Submit Revised FPR per 12-21 Meeting, include commitment update
                                                            #63/93 - Eagle 21, #91 - GDC 5, #132 - Boron Dil)
: 2. Meet with Staff following submittal ENG/Hilmes (Arent)
: 7. ACRS                               June 2012
: 5.
* Fire Protection                                       Arent
Tech Spec Revisions from latest T/S markup and NRC Review comments
* Attachment HH item - #133/134 - Hydrology
: 1. TBD
: 8. SSER 22/23/24/25 Open Items         As needed       The expanded HH list and status is covered             Licensing Response                                            periodically.
: 2. TBD
: 9. Transient Analysis issues           1/13/12         Question on RG revision and modes 3, 4, & 5. TVA to ENG/Koontz provide write-up explaining NRC acceptance (CLB) of WEC/Morgan Boron dilution RAI response                        unit 1 for modes 3, 4, & 5. See SSER OI 132.
: 3. 1/27/12
: 10. FSAR A108                           Feb. 2012                                                               Lic/Stockton
: 4. TBD
: 11. Develop list of planned License     1. 1/20/12     1.     Review Unit 1 SER for exemptions. Sand         NRR/TVA Conditions, Exemptions and Relief    2. TBD        baskets, cyber security, physical security, PAD 4.0     (Bryan)
: 1. CSST A & B
Requests (Arent)                    3. TBD          2.     NRR to review current exemptions
: 2. I-131 DEI
: 3.     Verify required notifications made 2lPage
: 3. Diesel Generator Frequency
: 4. AST FHA Licensing/Elton (Bryan)
: 6.
ACRS 04/10/12 Cyber Security - Implementation Attachment HH items (#59 - Sump, #61 -PAD,  
#63/93 - Eagle 21, #91 - GDC 5, #132 - Boron Dil)
Arent/Hilmes/
Koontz
: 7.
ACRS June 2012 Fire Protection Attachment HH item - #133/134 - Hydrology Arent
: 8.
SSER 22/23/24/25 Open Items  
 
===Response===
As needed The expanded HH list and status is covered periodically.
Licensing
: 9.
Transient Analysis issues Boron dilution RAI response 1/13/12 Question on RG revision and modes 3, 4, & 5. TVA to provide write-up explaining NRC acceptance (CLB) of unit 1 for modes 3, 4, & 5. See SSER OI 132.
ENG/Koontz WEC/Morgan
: 10.
FSAR A108 Feb. 2012 Lic/Stockton
: 11.
Develop list of planned License Conditions, Exemptions and Relief Requests (Arent)
: 1. 1/20/12
: 2. TBD
: 3. TBD
: 1.
Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0
: 2.
NRR to review current exemptions
: 3.
Verify required notifications made NRR/TVA (Bryan)


NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#
NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#
No.               Description                 Status                     Additional Comments                   Resp Org/Person
3 l P a g e No.
: 12. Submit TS version G (includes bases   1/27/12       Include remaining changes resulting from U1 and Lic/Bryan and TRM)                                              Setpoint Reviews.
Description Status Additional Comments Resp Org/Person
: 13. Issue two Unit Offsite Dose Calculation 3/16/12                                                         Chemistry/
: 12.
Manual -                                                                                                Woods (Bryan)
Submit TS version G (includes bases and TRM) 1/27/12 Include remaining changes resulting from U1 and Setpoint Reviews.
: 14. TMI action items                       7/1/12         TVA to provide letter when TMI actions are field Licensing complete.                                       (Gordon)
Lic/Bryan
: 15. EP Drill Open Items                     TBD           Determine NPG Schedule for Changes - Update AS- EP -
: 13.
: a. Duty Specialist                                  Built E-Plan.                                   Detchemendy
Issue two Unit Offsite Dose Calculation Manual -
: b. Commercial Dose Assessment
3/16/12 Chemistry/
: 16. Extend Construction Permit             4/27/12                                                         Lic (Arent)
Woods (Bryan)
NRC Follow-up Items ASME N-801 & N-802 code cases           TBD           NRC response to relief request submitted 9/1/11. NRR Exemption to 10CFR50.49 for some       1/20/12       Determine if exemption required. NRC may need to Hilmes Category II cables?                                    establish a license condition.                   (Stockton)
: 14.
Post ETC Updates Issue Unit 2 Completion Letter         TBD                                                             Licensing/Arent Submit final as-constructed FSAR       TBD                                                             Licensing/
TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.
figures                                                                                                Stockton Special Nuclear Materials License                                                                       Licensing (Arent)
Licensing (Gordon)
Letter to terminate Part 30/40 License TBD                                                            Licensing after receipt of Part 50 License                                                                       (Arent)
: 15.
Combined U1/U2 FSAR (Stockton)         TBD                                                             Licensing ASME Section III N-3 report             TBD                                                             Eng/Crouch Letter to notify NRC when Vital Area   TBD           Security Plan Update - Boundary to be restored. Lic/Arent Boundary returned to original location 3lPage}}
EP Drill Open Items
: a. Duty Specialist
: b. Commercial Dose Assessment TBD Determine NPG Schedule for Changes - Update AS-Built E-Plan.
EP -
Detchemendy
: 16.
Extend Construction Permit 4/27/12 Lic (Arent)
NRC Follow-up Items ASME N-801 & N-802 code cases TBD NRC response to relief request submitted 9/1/11.
NRR Exemption to 10CFR50.49 for some Category II cables?
1/20/12 Determine if exemption required. NRC may need to establish a license condition.
Hilmes (Stockton)
Post ETC Updates Issue Unit 2 Completion Letter TBD Licensing/Arent Submit final as-constructed FSAR figures TBD Licensing/
Stockton Special Nuclear Materials License Licensing (Arent)
Letter to terminate Part 30/40 License after receipt of Part 50 License TBD Licensing (Arent)
Combined U1/U2 FSAR (Stockton)
TBD Licensing ASME Section III N-3 report TBD Eng/Crouch Letter to notify NRC when Vital Area Boundary returned to original location TBD Security Plan Update - Boundary to be restored.
Lic/Arent}}

Latest revision as of 21:00, 12 January 2025

OL - NRC PM Open Items List 01-04-12.docx
ML12018A403
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 01/03/2012
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML12018A403 (5)


Text

1 WBN2Public Resource From:

Boyd, Desiree L [dlboyd@tva.gov]

Sent:

Tuesday, January 03, 2012 9:56 AM To:

Poole, Justin; Milano, Patrick; Campbell, Stephen; Epperson, Dan Cc:

Arent, Gordon; Smith, James D; Bryan, Robert H Jr; Smith, James D; Boyd, Desiree L; Crouch, William D

Subject:

NRC PM Open Items List 01-04-12.docx Attachments:

NRC PM Open Items List 01-04-12.docx For next phone call.

Thank You,

~*~*~*~*~*~*~*~*~*~*~

Désireé L. Boyd WBN Unit 2 Licensing dlboyd@tva.gov 423-365-8764

Hearing Identifier:

Watts_Bar_2_Operating_LA_Public Email Number:

618 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF26FACDB9)

Subject:

NRC PM Open Items List 01-04-12.docx Sent Date:

1/3/2012 9:55:38 AM Received Date:

1/3/2012 9:55:49 AM From:

Boyd, Desiree L Created By:

dlboyd@tva.gov Recipients:

"Arent, Gordon" <garent@tva.gov>

Tracking Status: None "Smith, James D" <jdsmith@tva.gov>

Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>

Tracking Status: None "Smith, James D" <smith1jd@westinghouse.com>

Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>

Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>

Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov>

Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov>

Tracking Status: None "Epperson, Dan" <Dan.Epperson@nrc.gov>

Tracking Status: None Post Office:

TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 227 1/3/2012 9:55:49 AM NRC PM Open Items List 01-04-12.docx 35566 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#

1 l P a g e No.

Description Status Additional Comments Resp Org/Person

1.

Cyber Security Plan/Controls and Implementation NRC Table Top/Pilot Feb/Mar 2012 Inspection 4th Qtr 2012 Heinrich/Snyder (Bryan)

2.

Instrumentation RAI List (Knuettel)

1. Submit I&C update letter
1. 1/19/12
a. 1/19/12
b. 1/19/12
c. 1/19/12
d. Cmplt
e. TBD
2. 1/19/12
a. 1/15/12
b. 1/13/12
c. 1/13/12
d. 1/15/12
3. TBD
a. TBD
b. TBD
4. Cmplt
1. Next I&C submittal update
a. 04038903-1SP
b. 04038903-2SP
c. 04038903-4SP Requires Civil Calculation
d. Responses to 11/18/11 RAI for OI 80, 81
e. Revise Common Q Compliance Matrix
2) Jan. I&C submittal update
a. Revise IEEE-603 analysis
b. TR-1136 NP & withholding affidavit
c. U2 BISI Calculation
d. Responses to 11/18/11 RAI for OI 94, 105, 108
3) WINCISE qualification testing write-up
a. Composite summary
b. Sketch of all cable segments
4) Revise TVA response to SSER OI 127 Eng/Hilmes (Bryan)

NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#

2 l P a g e No.

Description Status Additional Comments Resp Org/Person

3.

Complete Implementation (Hemmer)

Pump Relocation 5/30/12 Bldg Plan Mar 2012 Inspection -

Oct 2012 Substantial building - preliminary planning in process, (Fukushima NTTF item 4.2)

Provide document of mitigating equipment and location for unit 2.

Hemmer

4.

Fire Protection Report

1. mid-Feb
2. TBD
1. Submit Revised FPR per 12-21 Meeting, include commitment update
2. Meet with Staff following submittal ENG/Hilmes (Arent)
5.

Tech Spec Revisions from latest T/S markup and NRC Review comments

1. TBD
2. TBD
3. 1/27/12
4. TBD
1. CSST A & B
2. I-131 DEI
3. Diesel Generator Frequency
4. AST FHA Licensing/Elton (Bryan)
6.

ACRS 04/10/12 Cyber Security - Implementation Attachment HH items (#59 - Sump, #61 -PAD,

  1. 63/93 - Eagle 21, #91 - GDC 5, #132 - Boron Dil)

Arent/Hilmes/

Koontz

7.

ACRS June 2012 Fire Protection Attachment HH item - #133/134 - Hydrology Arent

8.

SSER 22/23/24/25 Open Items

Response

As needed The expanded HH list and status is covered periodically.

Licensing

9.

Transient Analysis issues Boron dilution RAI response 1/13/12 Question on RG revision and modes 3, 4, & 5. TVA to provide write-up explaining NRC acceptance (CLB) of unit 1 for modes 3, 4, & 5. See SSER OI 132.

ENG/Koontz WEC/Morgan

10.

FSAR A108 Feb. 2012 Lic/Stockton

11.

Develop list of planned License Conditions, Exemptions and Relief Requests (Arent)

1. 1/20/12
2. TBD
3. TBD
1.

Review Unit 1 SER for exemptions. Sand baskets, cyber security, physical security, PAD 4.0

2.

NRR to review current exemptions

3.

Verify required notifications made NRR/TVA (Bryan)

NRC PM Open Items List 01/04/2012 (423) 751-7777 ID 4233658764#

3 l P a g e No.

Description Status Additional Comments Resp Org/Person

12.

Submit TS version G (includes bases and TRM) 1/27/12 Include remaining changes resulting from U1 and Setpoint Reviews.

Lic/Bryan

13.

Issue two Unit Offsite Dose Calculation Manual -

3/16/12 Chemistry/

Woods (Bryan)

14.

TMI action items 7/1/12 TVA to provide letter when TMI actions are field complete.

Licensing (Gordon)

15.

EP Drill Open Items

a. Duty Specialist
b. Commercial Dose Assessment TBD Determine NPG Schedule for Changes - Update AS-Built E-Plan.

EP -

Detchemendy

16.

Extend Construction Permit 4/27/12 Lic (Arent)

NRC Follow-up Items ASME N-801 & N-802 code cases TBD NRC response to relief request submitted 9/1/11.

NRR Exemption to 10CFR50.49 for some Category II cables?

1/20/12 Determine if exemption required. NRC may need to establish a license condition.

Hilmes (Stockton)

Post ETC Updates Issue Unit 2 Completion Letter TBD Licensing/Arent Submit final as-constructed FSAR figures TBD Licensing/

Stockton Special Nuclear Materials License Licensing (Arent)

Letter to terminate Part 30/40 License after receipt of Part 50 License TBD Licensing (Arent)

Combined U1/U2 FSAR (Stockton)

TBD Licensing ASME Section III N-3 report TBD Eng/Crouch Letter to notify NRC when Vital Area Boundary returned to original location TBD Security Plan Update - Boundary to be restored.

Lic/Arent