IR 05000016/2017013: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:December 1, 2017 | ||
==SUBJECT:== | |||
NRC INSPECTION REPORT NO. 05000016/2017013 (DNMS) - ENRICO FERMI ATOMIC POWER PLANT, UNIT 1 | |||
==Dear Mr. Polson:== | ==Dear Mr. Polson:== | ||
On November 2, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed on-site inspection activities at the permanently shut down Enrico Fermi Atomic Power Plant, Unit 1 (Fermi 1). The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. The enclosed report presents the results of this inspection, which were discussed with members of your staff on November 2, 2017. | On November 2, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed on-site inspection activities at the permanently shut down Enrico Fermi Atomic Power Plant, Unit 1 (Fermi 1). The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. The enclosed report presents the results of this inspection, which were discussed with members of your staff on November 2, 2017. | ||
The inspection consisted of an examination of activities at the facility as they relate to safety and compliance with the | The inspection consisted of an examination of activities at the facility as they relate to safety and compliance with the Commissions rules and regulations. Areas examined during the inspection included facility management and control and radiological safety. Within these areas, the inspection consisted of a selective examination of procedures and representative records, field observations of activities in progress, and interviews with personnel. | ||
Based on the results of this inspection, no violations of NRC requirements were identified. | Based on the results of this inspection, no violations of NRC requirements were identified. | ||
This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, | This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. We will gladly discuss any questions you have concerning this inspection. | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Michael A. Kunowski, Chief | |||
Michael A. Kunowski, Chief | |||
Division of Nuclear Materials Safety | Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety | ||
Docket No. 50-016 License No. DPR-9 | Docket No. 50-016 License No. DPR-9 | ||
Latest revision as of 13:24, 7 January 2025
| ML17335A047 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 12/01/2017 |
| From: | Michael Kunowski NRC/RGN-III/DNMS/MCID |
| To: | Polson K DTE Energy |
| Lee P | |
| References | |
| IR 2017013 | |
| Download: ML17335A047 (9) | |
Text
December 1, 2017
SUBJECT:
NRC INSPECTION REPORT NO. 05000016/2017013 (DNMS) - ENRICO FERMI ATOMIC POWER PLANT, UNIT 1
Dear Mr. Polson:
On November 2, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed on-site inspection activities at the permanently shut down Enrico Fermi Atomic Power Plant, Unit 1 (Fermi 1). The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. The enclosed report presents the results of this inspection, which were discussed with members of your staff on November 2, 2017.
The inspection consisted of an examination of activities at the facility as they relate to safety and compliance with the Commissions rules and regulations. Areas examined during the inspection included facility management and control and radiological safety. Within these areas, the inspection consisted of a selective examination of procedures and representative records, field observations of activities in progress, and interviews with personnel.
Based on the results of this inspection, no violations of NRC requirements were identified.
This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. We will gladly discuss any questions you have concerning this inspection.
Sincerely,
/RA/
Michael A. Kunowski, Chief
Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety